HDTRA1-07-R-0004RFPAmendment0128Aug07.pdf

PDF 55 KB Posted

Attached to
Biological Threat Reduction Integration Contracts (BTRIC) Federal contract opportunity
Solicitation number
HDTRA1-07-R-0004
Issued by
Defense Threat Reduction Agency

About this file

HDTRA1-07-R-0004 RFP Amendment 01

View the file

Other files for this federal contract opportunity

Other files attached to Biological Threat Reduction Integration Contracts (BTRIC), newest first.
File Type Posted
HDTRA1-07-R-0004Questions-Answers08Feb08.pdf PDF
HDTRA1-07-R-0004Questions-Answers06Feb08.pdf PDF
HDTRA1-07-R-0004Amendment0005withAttachments.pdf PDF
HDTRA1-07-R-0004AMENDMENT0004withAttachments11Jan08.pdf PDF
HDTRA1-07-R-0004Questions-Answers14Sep07.pdf PDF
HDTRA1-07-R-0004MatrixforWorkPlannedforBTRICTO1UkraineRevised14S —
HDTRA1-07-R-0004Amendment0003.pdf PDF
DIDOT-07-60000.pdf PDF
Amendment2.pdf PDF
MatrixofWorkPlanned.pdf PDF
Q A1-9posted07SEP2007.pdf PDF
HDTRA1-07-R-0004SF33onlyandSectionK-Unprotected.doc DOC document
HDTRA1-07-R-0004Question-AnswerBTRICLibrary17Aug07-2.pdf PDF
HDTRA01-07-R-0004Amendment01BTRICUkrainePhase2SOORev122Aug07.doc DOC document
HDTRA1-07-R-0004Amendment01CoverLtr28Aug07.pdf PDF
BTRICUpdate08-24-07.pdf PDF
questions-answers-1.pdf PDF
questions-answers-2.pdf PDF
1_HDTRA1-07-R-0004Question-Answer17Aug07.pdf PDF
HDTRA1-07-R-0004Question-Answer17Aug07.pdf PDF
HDTRA1-07-R-0004SmallBusinessQuestion-Answer15Aug07.pdf PDF
HDTRA1-07-R-0004CoverLetter.pdf PDF
HDTRA1-07-R-0004EXHIBITACDRLs.pdf PDF
HDTRA1-07-R-0004DD2548Jun07.pdf PDF
HDTRA1-07-R-0004ATTACHMENT1BTRPIDIQSOO.doc DOC document
HDTRA1-07-R-0004ExhibitBDID-1.pdf PDF
HDTRA1-07-R-0004PackagingandMarkingAttachment5.doc DOC document
HDTRA1-07-R-0004ATTACHMENT3DD254.pdf PDF
HDTRA1-07-R-0004ATTACHMENT6BTRICL-1L-2Questionnaires.doc DOC document
HDTRA1-07-R-0004BTRICATTACHMENT4AwardFeePlan.pdf PDF
HDTRA1-07-R-0004EXHIBITBDID.pdf PDF
HDTRA1-07-R-0004RFP10-Aug-07.doc DOC document
HDTRA1-07-R-0004ATTACHMENT2BTRP-UkrainePhase2SOO.doc DOC document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CTB070006240

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

see page 2 for changes. Per Block 11, Offer must acknowledge receipt of this amendment. The proposal submission date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Aug-2007

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HDTRA1-07-R-0004

X 9B. DATED (SEE ITEM 11)

10-Aug-2007

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

2. AMENDMENT/MODIFICATION NO.

10A. MOD. OF CONTRACT/ORDER NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Aug-2007

CODE

4. REQUISITION/PURCHASE REQ. NO.

CODE

DEFENSE THREAT REDUCTION AGENCY/BE-BC

8725 JOHN J. KINGMAN ROAD, MSC 6201

FORT BELVOIR VA 22060-6201

HDTRA1 7. ADMINISTERED BY (If other than item 6)

See Item 6

CODE FACILITY CODE

EMAIL:TEL:

HDTRA1-07-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.229-8 Taxes--Foreign Cost-Reimbursement Contracts MAR 1990 52.232-25 Alt I Prompt Payment (Oct 2003) Alternate I FEB 2002

The following have been deleted:

52.245-1 Alt I Government Property (Jun 2007) Alternate I JUN 2007

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

ATTACHMENT 2 REV.1

Paragraph 2.1 is deleted in its entirety and replaced with the following:

2.1 Bring Ukraine’s existing disease surveillance, reporting, and response systems up to international diagnostic and reporting standards for robust, integrated tracking and epidemiological evaluation capability. Integrate BTRP efforts in the area of CBR projects, as many as five per year. Accommodate the efforts of designated (and separately contracted) training entities.

ATTACHMENT 5 REV.1

Section 1. Paragraph 5.a. is deleted in its entirety and replaced with the following:

5. Hand Carry Requests

a. Two weeks prior to export, the Contractor shall provide transaction information for items being hand-carried in support of CTR program activities to DTRA CTR’s Export Compliance Administrator (ECA).

DTRA-CTR’s ECA will review the request and provide written response/authorization as applicable.

The following have been modified:

LIST OF DOCUMENTS, EXHIBITS AN

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 2 Statement of Objectives (SOO) entitled “Biological Threat Reduction Integrating Contract – Specific Requirement for Ukraine” rev.1

2 22-AUG-2007

Attachment 5 Packaging and Marking rev.1 15 22-AUG-2007

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS, CONDITIONS AND N

SECTION L

INFORMATION TO OFFERORS (ITO) and INSTRUCTIONS FOR PROPOSAL

PREPARATION

The section L.6.4.1 is deleted in its entirety and replaced with the following:

L.6.4.1. ASSUMPTIONS

For the purpose of the cost proposal, assume the following. Costs for both base work and optional work should be included in the proposal:

1. Base work:

a. Assume one human EMS per oblast. Exceptions of Kyivska Oblast, Odesa Oblast, and Lvivska Oblast, which will have EMSs stood up in an earlier phase of work. Six other oblasts (Chernihivska, Cherkaska, Kirovohradska, Poltavska, Kharkivska, and Luhanska) will receive only EIDSS via a separate sole-source contract in addition to equipment.

b. A total of 25 Human EMSs will be designed, built/renovated, equipped, stood up, certified, and commissioned as listed below. There is no designated order for EMS construction

i) EMSs H-1 through H-5 require the full suite of diagnostic equipment, and minor security upgrades.

ii) EMSs H-6 through H-16 require full renovation plus a full suite of diagnostic equipment. (Note: EMS H-10 will receive only a small package of diagnostic equipment. Assume 50% of the full suite of diagnostic equipment.)

iii) EMSs H-17 through H-23 require only a small package of diagnostic equipment and the full package of reporting equipment. No renovation required.

iv) EMSs H-24 through H-25 require partial renovations plus a full suite of diagnostic equipment.

c. Electronic Integrated Disease Surveillance System (EIDSS) will be procured separately through BTRP’s provider.

d. The one interim CRL (previously renovated) will only require sustainment.

e. A total of 18 TRV vehicles will be required for EMS H1 to H16, H24 to H25.

f. Training required for all facilities.

g. One MORU will be based at the interim CRL. The minimum technical requirements for team members are the knowledge, skills and abilities they have as epidemiologists, veterinary inspectors and laboratory technicians in their present roles in the TADR system.

h. EMS, TRV, MORU, and CRL sustainment will be provided for three years after commissioning and may taper down from 100 percent. Sustainment cost includes equipment maintenance and consumables but excludes salaries. The U.S. Government will pay for sustainment in diminishing levels for three years: year 1 at 100%; year 2 at 66%; year 3 at 33%.

Commensurably, the Government of Ukraine will pay for 0% of sustainment in year 1; 34 percent in year 2; and 67% in year 3. By year 4, the Government of Ukraine will be responsible for 100% of the sustainment costs of the MORU.

i. There will be on average 5 Collaborative Biological Research projects per year.

i) New projects will start in the last year of the existing projects so there will be consistent engagement with Ukrainian research institutes.

ii) There will be on average 1.5 US Collaborators per project (i.e., non- DoD academic collaborators) and 2 institutes per project.

2. Optional work

a. 1 Human only CRL

i) The permanent human CRL will be greenfield construction and will be provided by the Government of Ukraine.

ii) BTRP designs will require adaptation to human only operations, local site conditions and building codes.

iii) The permanent human CRL will require a full suite of diagnostic, computational, and reporting equipment.

iv) The permanent human CRL will require BSL-2 and BSL-3 laboratory capability.

v) The design of the permanent human CRL will require full biosecurity measures and large-capacity pathogen repository space.

vi) Training and sustainment are required.

b. A total of 7 Vet EMSs will require the full suite of diagnostic equipment, minor security upgrades, seven TRV, training, and sustainment

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION FACTORS FOR AWARD

SECTION M

EVALUATION FOR AWARD

The section M.2.4.2 Sub-factor B.2.1 –Technical Capability is deleted in its entirety and replaced with the following:

M.2.4.2 Sub-factor B.2.1 –Technical Capability Evaluation of this sub-factor will focus on the Offeror’s technical capabilities and standard practices for satisfying the overall program and contract objectives of the BTRIC SOO using systems engineering discipline, risk management processes, integrated logistics support, and sustainment plans. The information in Volume IV (Sample Task) that demonstrates application of these technical processes or plans will be used during the assessment.

This sub-factor is met when the Offeror demonstrates the ability to accomplish the following technical elements with an acceptable level of proposal risk (as identified by the Contractor and/or Government). Each of these elements will be considered in arriving at a rating but will not be separately rated.

• Systems Engineering: The ability to apply a systems engineering process for designing, developing, testing, constructing, installing, and sustaining products, services, and capabilities for the BTRP system, including facilities and laboratories. This includes how all stakeholders and subcontractors participate in its Systems Engineering process and how the process involves the government/government representative witness and verification requirements.

• Risk Management: The ability to accurately identify, assess, mitigate, monitor, and report BTRP and specific project risk.

• Quality Control: The ability to ensure the quality (timeliness, adequacy, accuracy, etc.)

of products and services.

• Integrated Logistics: The ability to provide integrated logistics support for all applicable elements, to include: maintenance planning; maintainability; manpower, personnel, and training; supply support; export compliance, and sustainment. The ability to establish a global supplier base with an agile supply chain that provides multiple material solutions and vendors for any BTRP commodity. This includes not only cost, but also speed of delivery, license and warranty support, and analysis of vendor’s ability to work directly with the recipient state government following transition of sustainment responsibilities.

• Biological Expertise: The ability to apply the required level of biological expertise toward all aspects of BTRP. Specifically: to implement, facilitate and manage cooperative biological research projects and ensure compliance with all biological safety and biological security requirements and restrictions program-wide.

(End of Summary of Changes)

M.2.4.2 Sub-factor B.2.1 –Technical Capability

File details come from the government source that posted it. Updated .