Attachment #5 Quality Assurance Surveillance Plan (QASP) Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_10_-_Question_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_1_SOO_v3.docx | DOCX document | |
| Attachement_16_-_SF328.pdf | ||
| HC1047-18-R-4007_Draft_RFP_Ver2.docx | DOCX document | |
| Attachment_6_-_CLIN_v2.xlsx | XLSX spreadsheet | |
| Attachment_2_-_FRD_v2.pdf | ||
| Attachment_10_-_Question_Matrix.xlsx | XLSX spreadsheet | |
| Attachment_8__-_Sample_Consent_Letter.docx | DOCX document | |
| Attachment__6_CLIN.xlsx | XLSX spreadsheet | |
| DEOS_DRAFT_RFP_4-16.docx | DOCX document | |
| Attachment_10_-_Question_Matrix.xlsx | XLSX spreadsheet | |
| Attachment__4_PWS_Temp.DOC | DOC document | |
| Attachment_15_-_NonDisclosure_Agreement_Contractor.pdf | ||
| Attachment_9_-_Past_Performance_Volume_Submission_Template.docx | DOCX document | |
| Attachment___2_FRD.pdf | ||
| Attachment_14_-_EULA_Addendum.docx | DOCX document | |
| Attachment_12_-_Small_Business_Parti.docx | DOCX document | |
| Attachment_7_-_QUESTIONNAIRE_COVER_LETTER.docx | DOCX document | |
| Attachment___1_SOO.DOCX | DOCX document | |
| Attachment__13.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title Defense Enterprise Office Solutions (DEOS)
2. Purpose:
The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP will correspond to the DEOS Request for Proposal (RFP), Statement of Objective (SOO), and Design Capability Document (CDD). The objective of this QASP is to evaluate the Vendor’s performance requirements of the SOO as well as other performance standards contained in the CDD. The Vendor will develop a QASP to meet the detailed standards in the CDD as well as less critical requirements of the SOO.
The Government is responsible for a Quality Assurance (QA) plan to measure compliance with overall final standards.
The primary purpose of the QASP is the acceptability of the services and/or final product provided by the Vendor, rather than the detailed operational procedures utilized to provide the service.
This QASP does not detail how the Vendor accomplishes the work. Rather, the QASP is created with the premise that the Vendor is responsible for management and quality control actions to meet the terms of the contract. The QASP focuses on the quality of the products and/or services received from the Vendor rather than on the procedures used to provide them. The QASP details the following:
· The methods for surveillance of each award requirement
· The evaluation procedures to be used for each surveillance method
· The approaches for implementation of the QASP
Note: All information in italics is provided for the purpose of definition and may be deleted by the vendor in the submitted response to the RFP.
3. Key Terms:
The following terms and acronyms are provided to facilitate understanding of the QASP.
| Term |
| Definition |
| Acceptable Performance Level (APL) |
| The minimum percentage of products or services that may be defective (do not meet performance standards) in a lot of Vendor deliverables for that lot to be considered satisfactory. Contract specification of an APL does not allow the contractor to knowingly provide defective service; instead, it is recognition of the fact that defective performance may sometimes occur unintentionally. As long as the percentage of defective performance is below the APL, the Government will not deduct for poor performance. However, the Vendor shall be required to re-perform or correct the defective service or product at no additional cost to the Government. |
Contractor Discrepancy Report (CDR) This report is the official form for documenting unsatisfactory performance requiring resolution by the contractor (see sample CDR).
| Quality Assurance (QA) |
| The functions and associated actions performed by the Government to ensure that award requirements are performed in accordance with contractor specified standards, and that an appropriate level of contractor quality control activities are in place. |
Quality Assurance Surveillance Plan (QASP) A written Vendor document that identifies to the contractor the techniques and procedures the Government will utilize to perform quality assurance and acceptance of Vendor’s products and/or services.
| Quality Control (QC) |
| Internal contractor management functions that include, but are not limited to, training, documented procedures, and tests (taken at the point of performance) necessary to ensure that Vendor products and/or services conform to SOO and CDD requirements, specifications, and standards. |
| Surveillance Positions |
| The Government will utilize the following positions to perform management and surveillance of resultant contract award: |
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the Vendor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the Vendor’s performance.
Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the Vendor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the Vendor’s actual performance. The purpose is to ensure that the Vendor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting Vendor performance.
| Vendor |
| The successful bidding vendor on the testing DRFP. Also includes the employees of the contractor who are performing services under the award and any and all subcontractors. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf. |
4. Primary Method of Surveillance:
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection: These services are monitored weekly, monthly, quarterly, semiannually, annually, etc. Periodic types of activities are perfect for periodic inspection because not only are they infrequent, but there is normally a predetermined, specified time frame within which the tasks must be accomplished. Therefore, you know exactly when to conduct the evaluations. Periodic inspections automatically become 100 percent evaluations or "100 percent checks." Inspections should be divided and scheduled by frequency: annual, semiannual, quarterly, monthly, weekly and as required. Sometimes services are required for which the time or frequency cannot be predicted, such as accident investigations, one-time special tasking by higher headquarters, etc. These would be labeled "as required inspections." Others are known and predictable such as the quarterly status report or the monthly travel report currently included in some DISA service contracts.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented, preferably on a standard form.
Surveillance Matrix
The Surveillance Matrix (Table - 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.
5. Performance Standards:
Performance Standards define the level of service required under the contract and subsequent task orders to successfully meet the performance objectives. The performance standards specified in the table below represent the baseline for the Acceptable Quality Levels (AQLs) for task orders issued under the DEOS contract.
The offeror may propose AQLs in their proposed PWS/QASP that the Government has not indicated in the table below. However, at a minimum, all of the AQLs listed in the Table 1 shall be included and addressed within the PWS/QASP. Based upon their proposed technical and management solution, the offeror shall provide any additional performance standards, measures and values, comparable to or better than industry best practices, that enable the Government to verify satisfactory performance of each proposed task as applicable.
Table - 1
| Performance Standard |
| Reference |
| AQL or Tolerance |
| Method of |
Surveillance
| Availability |
| FRD – |
System Wide Provide 99.9% availability of services.
NOTE: The 99.9% availability is limited to the service provided by the CSP, not the underlying transport, or delivery to the end user.
· Random Sampling
· Trend Analysis
| Capacity |
| N/A |
| For solutions hosted in DoD datacenters, ensure that the ratio of the workload to the capacity of the available infrastructure does not exceed 95%. The ratio is calculated by tracking average utilization over time of workloads with varying demand, and working from the mean to find the capacity to handle 95% of all workloads. The Government shall perform capacity planning at least once a month. The capacity planning shall verify that the local load balancing/sharing is adequate or if additional servers or other associated equipment are needed. |
| · Trend Analysis |
| Elasticity |
| N/A |
| For solutions hosted in DoD datacenters, support elasticity for up to 80% of the computing and traffic load generated by the simultaneous use of DEOS services without failure due to resource exhaustion for each system (e.g., NIPR/SIPR). |
| · Random Sampling |
· Trend Analysis
| Information Security |
| FRD – Incident Management |
| Notify the DEOS PMO and other Government designated personnel within 60 minutes of detecting a data breach or data loss in the NIPR environment, and within 30 minutes of detecting a data breach or data loss in the SIPR environment. |
| · Trend Analysis |
· Third-party Audits
Access Management
| FRD – Access Management |
| Provision accounts within 30 minutes of the CSP receiving a single subscriber account request. |
| · Trend Analysis |
· Customer Feedback
Business Continuity
FRD –
System Wide
| Provide a Recovery Point Objective (RPO) of < 45 minutes per event. |
| · Trend Analysis |
· Third-party Audits
Disaster Recovery
FRD –
System Wide
| Provide a Recovery Time Objective (RTO) of <2 hours per event. |
| · Trend Analysis |
· Third-party Audits
| Encryption |
| FRD – |
System-Wide
| Encrypt data in transit and at rest to comply with DoD specifications, except for points where Break & Inspect (B&I) is necessary. |
| · Random Sampling |
Service Desk Response
FRD –
Service Desk
| Respond within 15 minutes for catastrophic incidents; within 1 hour for critical incidents; within 4 hours for major incidents; and within 2 business days for normal incidents |
| · Trend Analysis |
· Customer Feedback
D-DIL
Reconnection
FRD -
D-DIL
| Support quick authentication and reconnect (< 30 seconds). |
| · Trend Analysis |
· Customer Feedback
Event Management
| FRD – Event Management |
| Collect system performance data every N seconds on a continuous basis. The value N must be configurable, and have a default value of 300. |
| · Trend Analysis |
Incident Management
| FRD – Incident Management |
| Notify the DEOS PMO and other Government designated personnel within 60 minutes of detecting an outage |
| · Trend Analysis |
· Third-party Audits
| Intellectual Property / Data Loss |
| FRD – System-Wide |
| Report an intellectual property or Data Loss violation within 4 hours of detection to the Government. |
| · Trend Analysis |
· Third-party Audits
Incident Management
| FRD – Incident Management |
| Provide root-cause reports and fixes for major outage occurrence resulting in greater than 1-hour of unscheduled downtime. |
| · Periodic Sampling |
| Service Desk |
| FRD – Service Desk |
| Provide Live Agent Tier 3 support during normal business hours, allowing customer service desk interactions for submitting incidents using telephone and email, at a minimum. |
| · Random Sampling |
· Customer Feedback
| Service Desk |
| FRD – Service Desk |
| Provide the ability to submit service requests 24 hours per day, 7 days per week, with Tier 3 on call support after hours as situations arise that require advanced engineering. |
| · Random Sampling |
· Customer Feedback
Email Retention
| FRD - Email |
| Retain deleted items for a configurable duration, with a default of 30 days. |
| · Random Sampling |
| Performance Standard |
| Reference |
| AQL or Tolerance |
| Method of |
Surveillance
| Availability |
| FRD – |
System Wide Provide 99.9% availability of services.
NOTE: The 99.9% availability is limited to the service provided by the CSP, not the underlying transport, or delivery to the end user.
· Random Sampling
· Trend Analysis
| Capacity |
| N/A |
| For solutions hosted in DoD datacenters, ensure that the ratio of the workload to the capacity of the available infrastructure does not exceed 95%. The ratio is calculated by tracking average utilization over time of workloads with varying demand, and working from the mean to find the capacity to handle 95% of all workloads. The Government shall perform capacity planning at least once a month. The capacity planning shall verify that the local load balancing/sharing is adequate or if additional servers or other associated equipment are needed. |
| · Trend Analysis |
| Elasticity |
| N/A |
| For solutions hosted in DoD datacenters, support elasticity for up to 80% of the computing and traffic load generated by the simultaneous use of DEOS services without failure due to resource exhaustion for each system (e.g., NIPR/SIPR). |
| · Random Sampling |
· Trend Analysis
| Information Security |
| FRD – Incident Management |
| Notify the DEOS PMO and other Government designated personnel within 60 minutes of detecting a data breach or data loss in the NIPR environment, and within 30 minutes of detecting a data breach or data loss in the SIPR environment. |
| · Trend Analysis |
· Third-party Audits
Access Management
| FRD – Access Management |
| Provision accounts within 30 minutes of the CSP receiving a single subscriber account request. |
| · Trend Analysis |
· Customer Feedback
Business Continuity
FRD –
System Wide
| Provide a Recovery Point Objective (RPO) of < 45 minutes per event. |
| · Trend Analysis |
· Third-party Audits
Disaster Recovery
FRD –
System Wide
| Provide a Recovery Time Objective (RTO) of <2 hours per event. |
| · Trend Analysis |
· Third-party Audits
| Encryption |
| FRD – |
System-Wide
| Encrypt data in transit and at rest to comply with DoD specifications, except for points where Break & Inspect (B&I) is necessary. |
| · Random Sampling |
Service Desk Response
FRD –
Service Desk
| Respond within 15 minutes for catastrophic incidents; within 1 hour for critical incidents; within 4 hours for major incidents; and within 2 business days for normal incidents |
| · Trend Analysis |
· Customer Feedback
D-DIL
Reconnection
FRD -
D-DIL
| Support quick authentication and reconnect (< 30 seconds). |
| · Trend Analysis |
· Customer Feedback
Event Management
| FRD – Event Management |
| Collect system performance data every N seconds on a continuous basis. The value N must be configurable, and have a default value of 300. |
| · Trend Analysis |
Incident Management
| FRD – Incident Management |
| Notify the DEOS PMO and other Government designated personnel within 60 minutes of detecting an outage |
| · Trend Analysis |
· Third-party Audits
| Intellectual Property / Data Loss |
| FRD – System-Wide |
| Report an intellectual property or Data Loss violation within 4 hours of detection to the Government. |
| · Trend Analysis |
· Third-party Audits
Incident Management
| FRD – Incident Management |
| Provide root-cause reports and fixes for major outage occurrence resulting in greater than 1-hour of unscheduled downtime. |
| · Periodic Sampling |
| Service Desk |
| FRD – Service Desk |
| Provide Live Agent Tier 3 support during normal business hours, allowing customer service desk interactions for submitting incidents using telephone and email, at a minimum. |
| · Random Sampling |
· Customer Feedback
| Service Desk |
| FRD – Service Desk |
| Provide the ability to submit service requests 24 hours per day, 7 days per week, with Tier 3 on call support after hours as situations arise that require advanced engineering. |
| · Random Sampling |
· Customer Feedback
Email Retention
| FRD - Email |
| Retain deleted items for a configurable duration, with a default of 30 days. |
| · Random Sampling |
Incentives Comment by Gray, Christopher A CIV DISA PLD (US): Missing numbering
The Government will positively and/or negatively assess the offeror’s performance in the Offeror’s Performance Assessment Rating System (CPARS) based on the success or failure in meeting the established performance standards and timely delivery of required services and deliverables. The offeror is incentivized to earn favorable Government reviews to support continuation of DISA requirements and support contract awards with other Government agencies seeking DISA’s input on the offeror’s past performance. Failure to meet the acceptable quality levels specified or to submit deliverables in a relevant and timely manner may result in an unsatisfactory past performance report by the Government. Additionally, the Government will determine the level of performance as a factor in the determination to exercise additional options for continuity of services or addition of capacity or capabilities.
Where a functional interruption occurs for any users as a consequence of failure to meet applicable Operational Availability Performance Standards credits for outage (interruption) of service will be provided to the Government by the offeror in accordance with the following schedule. The schedule shall be used to determine the credit (one day equals 1/30th of the Monthly Recurring Charge (MRC)) due the Government during each monthly billing period:
SERVICE INTERRUPTIONS OF 24 HOURS OR LESS
| Less than 5 Minutes |
| None |
| 5 Minutes but less than 3 Hours |
| 1/8 Day |
| 3 Hours but less than 6 Hours |
| 1/4 Day |
| 6 Hours but less than 9 Hours |
| 1/3 Day |
| 9 Hours but less than 12 Hours |
| 1/2 Day |
| 12 Hours but less than 24 Hours |
| (1) One Day |
SERVICE INTERRUPTIONS OVER 24 HOURS
Credit of 1/30th of the MRC (or the US dollar equivalent) for each day of outage until service is restored.
Outage credits do not apply for the following:
a) Interruptions caused by the negligence of the Government or others authorized by the Government to use the Government's service.
b) Interruptions due to the failure of power, equipment, systems or connections not provided by Offeror or subofferors.
c) Interruptions during any period when the Government has released the service environment for maintenance or rearrangement purposes or for the implementation of a Government order.
d) Interruptions that continue because of the Government's failure to authorize replacement of any element of special construction. The period for which credit is not allowed begins on the seventh day after the Government receives the offeror’s written notification of the need for such replacement. It ends on the day after receipt of the Government's written authorization for such replacement.
e) Interruptions during periods when the Government elects not to release the private service environment for testing and/or repair.
f) An interruption or group of interruptions, resulting from a common cause, for amounts less than $1.00.
Outage credits will be due no later than the next Billing Cycle/Month following the outage. Each credit will identify the associated trouble ticket, time, date and duration of the outage/outages.
Minimum Service Level accepted will be 99.9% Operational Availability Rate calculated monthly. All proposals will provide the Offeror service level agreement to include incentives and exclusions for evaluation.
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 1). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 2) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 3).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.
7. Mandatory or regulatory compliance items:
The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.
8. Acceptable Quality Level (AQL):
The AQL’s for this effort are outlines in the table in section 5.
9. Evaluation Method:
The COR will document the time of verbal notification to the contractor. The COR will document the official time and date of notification on the Maintenance Call Record. The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the system is restored to full operational status. The COR will confirm the date and time of problem resolution in the record.
10. Performance Rating
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
Performance Rating Criteria
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Appendix 1 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 2 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 3 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2
File details come from the government source that posted it.