DD254 FSR Continuation Pages_Rev001_15JUNE11.pdf
PDF 22 KB Posted
- Attached to
- Distributed Tactical Communications System (DTCS) Global Logistical Services Management contract
- Solicitation number
- HC1047-11-R-4021
- Issued by
-
Defense Information Systems Agency
About this file
Attach 2- DD254 Continuation page
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev. 001_26 October 2010
Continuation Page 1 of 2
SCI Continuation Sheet –DD Form 254
Block 13:
General Information:
All visit access requests (VARs) by contractors shall be sent via the Joint Personnel
Adjudication System (JPAS) to the DISA VAR Center (JPAS SMO:DKABAA10) or appropriate SMO for the effort. The COR/TM must approve the VAR prior to sending the request to the facility being visited. Contractors must also provide a copy of the VAR to the security manager.
The COR/TM must be notified and approve the receipt and/or generation of classified information under this contract.
All classified information received and/or generated under this contract is the property of the U.S. Government regardless of proprietary claims. Upon completion or termination of this contract, the U.S. Government will be contacted for destruction or disposition instructions.
Foreign Nationals will not perform on any area of the contract (classified or unclassified).
Reference Item 10e(1): This contract requires access to SCI.
a. The number of personnel required to have access to SCI is determined by the
COR/TM and the DISA SSO.
b. The Director, Defense Intelligence Agency (DIA) and Director, Defense
Information Systems Agency (DISA), as the executive agent for DIA, have exclusive security responsibility for SCI released to the contractor or developed under this contract.
c. Contractor generated or Government furnished material may not be provided to the
Defense Technical Information Center. Contract generated technical reports will bear the statement ‘Not Releasable to the Defense Technical Information Center per
DoD Instruction 5230.24.’
d. All contractor personnel requiring access to SCI information must: be U.S.
citizens, have been granted a final DCID 6/4 security clearance by the U.S.
Government, and have been indoctrinated for the applicable compartments of SCI access prior to being given any access to such information released or generated under this contract.
Rev. 001_26 October 2010
Continuation Page 2 of 2
SCI Continuation Sheet –DD Form 254
e. Classified material released or generated under this contract is not releasable to foreign nationals without the expressed written permission of the Director (through the DISA SSO) and Director, DIA.
f. SCI received under this contract may not be released to subcontractors without permission of the DISA SSO.
g. The contractor and COR/TM will revalidate all SCI billets under this contract with the DISA SSO annually or when a revised DD Form 254 issued, whichever is sooner.
h. All SCI visit requests by contractors shall be forwarded to the COR/TM for approval and need-to-know certification before being sent through the DISA SSO to the facility to be visited.
Reference Item 10g: Access up to and including SECRET material will be required for reference at United States Central Command (USCENTCOM) Areas of
Responsibility (AOR) to include Afghanistan, Iraq, Qatar and Kuwait.
Block 14
The contractor will be provided and will abide by DCID 6/3, “Protecting Sensitive
Compartmented Information within Information Systems”, 5 June 1999 and by DCID
6/9, "Physical Security Standards for Sensitive Compartmented Information Facilities
(SCIF),” 18 November 2002. Provided under separate cover.
The contractor will abide by DCID 6/6 (formerly 1/7), Security Controls on the
Dissemination of Intelligence Information, 11 July 2001. Provided under separate cover.
File details come from the government source that posted it. Updated .