AMD0002_-Questions_-_Government_Response_(003).xlsx

XLSX spreadsheet 85 KB Posted

Attached to
DITCO SCOTT Facility Maintenance Federal contract opportunity
Solicitation number
HC102819R0072
Issued by
Defense Information Systems Agency

About this file

List of Contractor questions with Government Response in bold text starting in Column G.

View the file

Other files for this federal contract opportunity

Other files attached to DITCO SCOTT Facility Maintenance, newest first.
File Type Posted
2019_01_MGE_UPS.pdf PDF
HC102819R0072_-_Amendment_00002.pdf PDF
2019_01_Telcom_UPS.pdf PDF
2019_05_Battery_Cabinet.pdf PDF
3.jpg JPG image
Visio-DITCO_WiringDiagrams.pdf PDF
1.jpg JPG image
5.jpg JPG image
NEW_TRANE_HVAC_REPLACEMENTS_20_TON_AND_42_TONSl.pdf PDF
2.jpg JPG image
6.jpg JPG image
4.jpg JPG image
HC102819R0072_-_AMD0001.pdf PDF
HC102819R0072.pdf PDF
NDA.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

Question #Section/DocumentPage/Spec. ItemReferenceQuestionsGovernment Response
1RFP/Section SF 1449 - CONTINUATION SHEETPage 3, Para 1Proposal due date
September 4, 2019 at 1:00pm CSTBecause the due date is only eight days after the site visit and seven days after we submit our questions we haven't much time to develop an accurate proposal response. Would the Government consider extending the proposal due date?Solicitation shall be extended with AMD0002
2RFP/Section SF 1449 - CONTINUATION SHEETPage 3, Para 2Offerors are requested to submit a written technical and price proposal in response to the Performance Work Statement (PWS) embedded in HC102819R0072 and Quality Assurance Surveillance Plan (QASP).At the preproposal conference we were told that past performance or corporate experience submittals are not required. And that the government will use CPARS to evaluate offerors past performance. Will the government reconsider allowing the submittal of past performance other that federal contracts that are equivalent in magnitude and complexity?Requirement is identified as Lowest Price, Technically Accptable. Past Performance is not a requirement within an LPTA solicitation. Sources may supply past performance; however it is not being used to consider the award.
3RFP/Section SF 1449 - CONTINUATION SHEETPage 3, Para 2.aIAW with DISA Acquisition Regulation Supplement (DARS) 52.209-9000, each offeror shall specifically identify in its proposal, whether or not any potential or actual Organizational and Consultant Conflicts of Interest (OCCI) as described in Federal Acquisition Regulation (FAR) Subpart 9.5 exists for this procurement.Is this to be provided in addition to the Technical and Price volumes? Which volume should this be included? Is this included in the page count?Responses by sources should include as a separate tab within proposal package, not to be included in page count.
4RFP/Section SF 1449 - CONTINUATION SHEETPage 4, Para 2.cThe technical portion of the proposal is to be submitted as a Microsoft (MS) Word 2007 or PDF document.Since Microsoft (MS) Word 2016 is compatible with Microsoft (MS) Word 2007, can the technical portion of the proposal be submitted as a MS Word 2016 document?YES
5RFP/Section SF 1449 - CONTINUATION SHEETPage 4, Para 2.cThe price proposal spreadsheet shall be a separate document from the technical proposal and shall be submitted in MS Excel 2007 formatSince Excel 2007 is 12 years old, succeeded by two versions, and not typically used, will the government reconsider this requirement and permit pricing spreadsheets to be submitted in Excel 2016 format?YES
6RFP/Section SF 1449 - CONTINUATION SHEETPage 4, Para 3.c.(1).(a), Subfactor 1Preventative Maintenance, PWS line 6.1—Contractor demonstrates the technical knowledge and ability to maintain commercial grade HVAC equipment, and the facility Uninterrupted Power Supply (UPS).At the site visit we were told the electrical equipment was not included in this requirement. Can the government clarify the requirement for the facility Uninterrupted Power Supply (UPS)?Yes the UPS is included in the proposal for the HVAC
7RFP/PERFORMANCE WORK STATEMENTPage 7, Para 6 Performance RequirementsThe contractor shall supply all parts, labor, materials, equipment, tools, consumables, supervision, and other resources necessary to accomplish all tasks in accordance with the recommended manufacturer’s PM requirementsCan the government provide an office and storage area.NO office space or storage area is available; during performance of any required work, the COR shall designate a space to provide contractor personnel to stage materials/supplies for the type of work required under contract.
8RFP/PERFORMANCE WORK STATEMENTPage 7, Para 6 Performance RequirementsThe contractor shall supply all parts, labor, materials, equipment, tools, consumables, supervision, and other resources necessary to accomplish all tasks in accordance with the recommended manufacturer’s PM requirementsCan the government provide an equipment list to include description, model, and serial numbers?See spead sheet
9RFP/PERFORMANCE WORK STATEMENTPage 10, Para 6.1.11 Subtask 11UPS & Batteries (Facility UPS and UPS batteries, also Switch batteries)At the site visit we were told the electrical equipment was not included in this requirement. Can the government clarify the requirement for the facility Uninterrupted Power Supply (UPS)? If UPS is included can the government provide specifications, and quantities of batteries?Yes the UPS is included in the proposal for the HVAC
10RFP/PERFORMANCE WORK STATEMENTPage 11, Para 6.1.18 Subtask 18 Plumbing ServicesDrain maintenance - Inspect all drains to include sinks, commodes, urinals, drinking fountains, and floor drains to ensure proper drainage.At the site visit we were told that drinking fountains were not included in this requirement. It is our understaning that the contractor is to maintain the drain lines on the HVAC. Can the government clarify the requirement for the Drain Maintenance?PWS now reflects what requird under 6.1.18
11RFP/PERFORMANCE WORK STATEMENTPage 11, Para 6.1.18 Subtask 18 Plumbing ServicesLeak checks - Inspect all plumbing connections in restrooms, kitchenettes, and drinking fountains to insure there are not leaks. Test operation of all plumbing fixtures to insure proper operation.Can the gvernment clarify the pumbing service requirement? If plumbing is included, can the government provide an inventory of plumbing fixtures.Removed from PWS
12RFP/PERFORMANCE WORK STATEMENTPage 11, Para 6.1.19 Subtask 19 Electrical ServicesInspect interior/exterior lighting fixtures, light ballasts, emergency/exit lights, switches, or similar electrical/lighting equipment.At the site visit we were told the electrical equipment was not included in this requirement. Can the government clarify the requirement for Lighting Equipment? If lighting equipment is included can the government provide an inventory of lighting the equipment?REMOVED FROM PWS Para 6.1.19 Subtask 19 Electrical Services
13RFP/PERFORMANCE WORK STATEMENTPage 11, Para 6.1.20 Subtask 20 Structural Services1. Inspect automatic door openers for proper operation.

2. Inspect windows for leaks.

3. Inspect Floorings, landings, steps, and thresholds for looseness and trip hazards.Can the government clairfy the preventive maintenance requirements for doors, windows, and flooring? Does this include adjustments, services and repair of structural components?REMOVED FROM PWS Para 6.1.20 Subtask 20 Stuctural Services
14RFP/PERFORMANCE WORK STATEMENTPage 14, Para 6.13 Other Pertinent Information or Special ConsiderationsRemove all trash, old equipment, excess materials, and debris from the worksite and do not utilize the facility dumpster.Where is trash, old equipment, excess materials, and debris to be disposed of?Contractor is responsible to dispose of their trash, old equipment, excess materials and debris in an authorized dumping facility, NOT on the Scott Air Force Base location.
15
16
17