18 RFQ HC101924R0003 QandA 8.14.24.pdf
PDF 487 KB Posted
- Attached to
- DISA-PAC VIDEO WALL
- Solicitation number
- HC101924R0003
- Issued by
-
Defense Information Systems Agency
About this file
This document is a set of Questions and Answers (Q&A) related to Solicitation No. HC1019-24-R-0003 issued by the Defense Information Systems Agency (DISA) / Defense Information Technology Contracting Organization-Pacific (DITCO-PAC) for the removal, procurement, installation, programming, and testing of two new video walls, two video processors, and miscellaneous audio/visual equipment/materials located at DISA-PAC in Pearl Harbor, Hawaii.
The Q&A provides details on the video wall specifications, including preferred dimensions, screen type (LED), pixel pitch, and minimum brightness. It confirms that no photos or drawings of the existing video walls or the mounting walls are available. The Q&A also addresses billing, stating that the government will authorize payment for materials and equipment once accepted, and for labor upon government acceptance of the work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC101924R0003 Ques ons
Q1: Regarding Sec on 6.1.2 Subtask 2 Install two new video walls, two video processors, and all associated equipment and cabling. Label all new cabling
a. Are there specifica ons that define:
I. The preferred overall dimensions of each Video Wall? Each wall should be 6' 9.04'' H X 24' 0.15'' W X 0' 2.1” D (Approximate dimensions), 2160x7680 pixels
II. Is the preferred solu on to be constructed of TV Screens or LED Screen Panels? LED
III. If TV Screens – is there a preferred bezel size? N/A
IV. If LED Panels is there a preferred pixel pitch? 0.9
V. Are there specifica ons for required brightness? 600 nits minimum
b. Are there photos available of the current Video Walls that are being replaced? No, the video walls are in a space where no cameras are allowed. The current video walls are on slightly concaved walls.
c. Are there drawings/eleva ons available that detail the strength of the walls where the Video Walls will be mounted? No, but the new video walls will be mounted on the same wall the exis ng video walls are currently mounted on.
d. Are there drawings available that detail the current wiring? No
e. If my Technical Team has addi onal ques ons – is there a deadline for submi ng these ques ons? Ques ons are due no later than 12:00pm HST on Friday, August 16.
Q2: Billing:
a. On PG 3 for CLIN’s please confirm that UOM listed on Materials/Labor/Shipping will allow us to perform periodic billing as equipment arrives and installa on progress is made on-site. As a small business in order to serve you best we request that periodic billing is permi ed based upon a pre-agreed schedule should this be awarded. Government will authorize payment for materials and equipment once accepted by the Government that have been delivered to the delivery des na on set forth in this solicita on. Items over $5,000 will be assigned a separate CLIN IAW the IUID Clause 252.211-7003, Item Unique Iden fica on and Valua on. Government will pay for Labor upon government acceptance of the work set forth in the resultant contract.