Attachment 6 QASP.docx
DOCX document 65 KB Posted
- Solicitation number
- HC101324R0001
- Issued by
-
Defense Information Systems Agency
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a multiple award indefinite delivery, indefinite quantity contract for proliferated low Earth orbit satellite-based services. The Defense Information Systems Agency is seeking these services to provide low-latency connectivity to all military domains and use cases. The QASP outlines performance standards such as weekly order updates, shipment timelines, monitoring tools, reporting requirements, customer service support, and operational service levels. It defines roles for program managers, contracting officers, contracting officer representatives, and quality assurance coordinators to oversee contractor performance. Methods for evaluating contractor quality include random sampling, 100% inspections, and customer input. The QASP also addresses documenting acceptable and unacceptable performance, notifying the government of issues, and implementing corrective actions and remedies if necessary.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR INTERNAL USE ONLY
Proliferated Low Earth Orbit (PLEO) Satellite-Based Services
Quality Assurance Surveillance Plan (QASP)
November 21, 2023
Department of Defense United States Space Force Commercial Satellite Communications Office
Table of Contents
| 1. | Contract or Task Order Title: | 3 |
| 2. | Purpose: | 3 |
| 3. | Roles and Responsibilities: | 4 |
| 4. | Primary Method of Surveillance: | 6 |
| 5. | Performance Standards: | 7 |
| 6. | Documenting Performance: | 9 |
| 7. | Mandatory or regulatory compliance items: | 11 |
| 8. | Acceptable Quality Level (AQL): | 11 |
| 9. | Evaluation Method: | 12 |
| 10. | Performance Rating: | 12 |
| Appendix 1 – Performance Assessment Report | 13 | |
| Appendix 2 – Customer Complaint Record | 14 | |
| Appendix 3 – Corrective Action Report | 15 | |
| Appendix 4 – Corrective Action Log | 16 |
1. Contract or Task Order Title:
Multiple Award Indefinite Delivery, Indefinite Quantity (IDIQ) Contract for Proliferated Low Earth Orbit (PLEO) Satellite-Based Services (SBS)
2. Purpose:
This Quality Assurance Surveillance Plan (QASP) has been developed to provide the Contracting Officer Representative (COR)and effective and systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
The role of Government quality assurance is to ensure contract standards are achieved. This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. In conducting surveillance, the COR is to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and shall be revised or modified by members of the multi-functional team as circumstances warrant, throughout the life of the contract, to ensure adequate oversight of Contractor performance is maintained. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
3. Roles and Responsibilities:
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.
Contracting Officer – The Contracting Officer shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The Contracting Officer shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Additional responsibilities of the Contracting Officer are as follows:
a. Advise the multi-functional team on Quality Assurance Surveillance Plan (QASP) development.
b. Manages the listing of Contracting Officer Representative (COR) assigned to the contract, indicating their areas of responsibilities and limitation of authority, and ensures that the Contractor is notified of such.
c. Serve as multi-functional team advisor for developing incentives/remedies, as appropriate, tied to performance objectives and performance thresholds.
d. Maintain in the contract file documentation of training provided by contracting personnel and/or QAPC identified herein.
Contracting Officer’s Representative (COR) – The COR is responsible for managing, planning, provisioning, optimizing, providing and supporting timely COMSATCOM services to and across all Mission Partners. In addition, the COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the Contracting Officer. The COR is required to provide an annual performance assessment to the Contracting Officer which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Additional responsibilities of the COR are as follows:
a. Serves as a member of the multi-functional team.
b. Develops technical requirements and independent cost/Government estimates for contract services.
c. Conducts Government contract quality assurance by or under the direction of Government personnel.
d. Evaluates and documents the Contractor’s performance in accordance with the procedures set forth in this plan.
e. Notifies the Contracting Officer of any performance deficiencies.
f. Maintains surveillance documentation.
g. Recommends improvements to the Performance Work Statement (PWS) and Quality Assurance Surveillance Plan (QASP), throughout the life of the contract.
h. Maintains technical competency in the functional area surveyed.
i. Obtains proficiency in surveillance procedures.
j. Certifies acceptance of services.
k. Promotes business decisions to meet customer requirements by researching the marketplace to remain current with the most efficient and effective performance assessment methods and techniques. Performs market research throughout the life of the requirement to ensure the team is knowledgeable of the commercial marketplace.
l. Identifies opportunities to improve performance throughout the life of the contract, including benchmarking against industry, identifying initiatives, assessing the risk associated with these initiatives, using the QASP for implementing initiatives brought forward, and monitoring the success of implementation.
m. Recommends any changes necessary to the contract, specifications, instructions, or other requirements that will provide more effective operations or eliminate unnecessary costs
Quality Assurance Program Coordinator (QAPC) - Roles and Responsibilities of the QAPC are as follows:
a. Supports the multi-functional team in the development of contract requirements specifically ensuring that requirements are clearly stated and enforceable.
b. Trains CORs on the contracting requirements associated with the quality assurance program.
c. Trains Functional Commanders/Directors (FC/FD).
d. Provides training, documents CORs acknowledgement of their requirement to:
(1) Evaluate and document Contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP).
(2) Notify the contracting officer of any significant performance deficiencies and provide any recommendations to improve the QASP or PWS.
(3) Maintain surveillance documentation.
e. Assists in development of quality assurance related training as requested.
f. Processes/maintains/updates quality assurance appointments and delegations memos.
g. Maintains documentation of training provided by contracting personnel identified herein.
h. Assists the market research efforts of the multi-functional team in determining commercial quality assurance practices.
i. Assists as required with the evaluation of the Contractor’s Quality Control Plans.
j. Provides refresher training annually if, necessary, to ensure the CORs are up to date with all required changes.
Contractor – Roles and Responsibilities of the Contractor as related to quality assurance are as follows:
a. Complies fully with the terms and conditions of the contract.
b. Participates as a member of the multi-functional team after contract award.
c. Maintains and implements a quality control plan that is acceptable to the Government.
d. Ensures that non-conformance of contract requirements are identified, corrected, and prevents recurrence.
e. Tenders to the Government for acceptance only those services that conform to contract requirements.
f. Recommends any changes to the contract that will provide more effective operations or eliminate unnecessary costs.
4. Primary Method of Surveillance:
A combination of random sampling, 100% inspection and customer input will be used to evaluate contractor performance for this BPA. The performance standards, acceptable quality level (AQL) and surveillance methods are outlined in Section 5. In addition to the Performance Standards defined in Section 5 below, the Government shall perform annual surveillance for contractor compliance as required by FAR 52.222-50, Combating Trafficking in Persons (see Section 7 below).
· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.
· Random Sampling. This is usually the most appropriate method for recurring tasks. With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Computer programs may be available to assist in establishing sampling procedures.
· Customer Input. Although usually not a primary method, this is a valuable supplement to more systematic methods. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations where customers can be relied upon to complain consistently when the quality of performance is poor, e.g., dining facilities, building services, customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints should be documented using the Customer Complaint Record (Appendix 2).
5. Performance Standards:
In addition to the Contractor's standard commercial terms as agreed under a TO for any commercial items as defined in FAR 2.101, the following performance standards apply to this contract:
Table 8-1. Performance Standards
| Performance Standard |
| Acceptable Quality Level |
| Method of Surveillance |
6.4.1 Weekly Order Update
| The contractor shall provide a weekly update to the CSCO COR or delegatee on the current status of all in-process task orders (task orders that have not been completed) to include status, issues, variances in schedule and other contractual/programmatic items of importance to the contractor or government. The contractor shall provide the Weekly Order Update 100% of the time. |
| 100% inspection of Weekly Order Updates. |
6.4.2 Equipment Shipment
Standard Shipment - within 5 calendar days ARO Priority Shipment - within 2 calendar days ARO Overnight Shipment – within 24 hours ARO on 100% of task orders Periodic inspection of task order date vs ship date.
6.5.2 NetOps Monitoring
| The contractor shall provide an online account management tool for near real-time data. |
| Random sampling and customer surveys to ensure tool is providing requested data within 10 seconds. |
6.5.2 NetOps Monitoring
| The contractor shall provide an initial training session on the online account management tool complete with copies of the training materials as stated in each TO. |
| COR Review |
6.5.3 Service Availability Reporting
| The contractor shall perform service availability measurements and reporting as mutually agreed between the contractor and the Government specified in each TO. |
| 100% inspection of Service Availability Reports. |
6.5.4 Service Activation Reporting
| The contractor shall report the status of all service activations by the 5th business day of each month 100% of the time |
| 100% Inspection of Service Activation Reports |
6.5.5 Monthly Status Reporting
| Report provided by the 5th of every month |
| 100% Inspection of Monthly Status Reports |
6.5.6 Quarterly Usage Report
| Report must be timely and accurate 100% of the time |
| 100% Inspection of Quarterly Usage Reports |
6.5.7 Fault Reporting
| Fault Reporting shall be in accordance with timelines, formats, protocols, and escalation procedures to be agreed by the parties 100% of the time. |
| 100% Inspection of Fault Reports |
6.5.7 Service Outage Reporting
| Service Outage Reporting shall be in accordance with timelines, formats, protocols, and escalation procedures to be agreed by the parties 100% of the time |
| 100% Inspection of Service Outage Reports |
6.5.8 Information Assurance Reporting
| The contractor shall continually monitor and verify IA is maintained in accordance with the CIAQ or IA-PRE certification; IA incident notification is made within 24 hours; detailed incident report is provided within 5 business days. |
| Periodic inspection, as required |
6.6.1 Customer Service Support Requirements
| The contractor shall have English speaking technicians available 24 hours a day, 7 days a week as the focal point for any problems encountered with the leased services. |
| Customer Support Satisfaction survey of sampling of support recipients conducted by CSCO. |
6.6.1 Field Service
| The contractor shall satisfy the requirements of the service order 100% of the time. |
| Periodic inspection of service order hours delivered vs hours ordered |
6.6.2 Field Service
| The contractor shall submit a Field Service trip report within 5 business days after completion of travel 100% of the time. |
| 100% Inspection of Field Service Report |
6.6.4 Service Activation Plan
| Within 30 calendar days after base contract award |
| 100% Inspection |
6.6.5 Communications and Escalation Plan
| Plan Shall contain the mutually agreed-to content 100% of the time |
| 100% Inspection of the C & E Plan |
6.6.7 EMI/RFI Identification, Characterization, and Geo-Location
| RSSC-West notified within 10 minutes of detection; best effort geo-location of the interfering signal source, spectrum analyzer screenshots, and characterization provided to the RSSC-West within 30 minutes |
| 100% Inspection of RSSC trouble ticket records |
6.6.8 Frequency Clearances and Approvals
| The contractor shall secure all national and international approvals to operate and provide service. |
| 100% Inspection |
7.1 PLEO Operational Services
| Requirements per Table 7-1 |
| Random Sampling of service provided |
7.1.1 PLEO Services
| The contractor shall provide low-latency PLEO services to all domains and use cases in accordance with performance parameters as specified above and in SLAs corresponding to service offerings. |
| Random Sampling of service provided |
7.1.2 Priority Service
| The contractor shall provide a service priority for the Government priority services. |
| Random Sampling of service provided |
7.1.3 Priority Activation
| The contractor shall support expedited/emergency activation service and associated terminal units in the Government inventory. |
| Random sampling of Priority Activation requests |
7.1.4 Terminal Provisioning
| The contractor shall provide provisioning services for PLEO satellite-based services on a contractor type approved user terminal if one is required for the service to function. |
| Random Sampling of service provided |
7.1.5 Terrestrial Interconnect Services
| The contractor shall provide terrestrial interconnect to the Internet for access to their business systems, through which users may request products or effects, receive products or effect confirmations, or route traffic to/from any Internet-accessible address including Government network entry points. |
| Random Sampling of service provided |
7.2 Initial, Limited Use PLEO Services
| Requirements per Table 7-2 |
| Random Sampling of service provided |
6. Documenting Performance:
Acceptable Performance.
The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 1). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.
Unacceptable performance.
Unacceptable contractor performance can be identified by customer complaints (Appendix 2) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor and attempt to determine the cause of the unacceptable performance. If any Government action, or lack of action, caused the unacceptable performance, the unacceptable performance shall not be counted against the Contractor. The COR shall take action to ensure Government action, or lack of action, does not interfere with the Contractor’s performance in the future. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the Contracting Officer.
When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the Contracting Officer for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 3).
The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the Contracting Officer and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.
Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the Contracting Officer.
The Contractor shall be required to re-perform the service, if possible, without additional cost to the Government. Unacceptable performance re-performed by the Contractor shall still count as unacceptable performance. If the Contractor challenges the validity of the CORs unacceptable surveillance findings, and the COR and Contractor cannot come to an agreement, the matter shall be referred to the Contracting Officer for resolution. The Contractor shall be required to return all completed CARS to the COR, no later than the suspense date indicated on the CAR. The COR shall maintain a CAR Log (Appendix 5) of all CARS issued to the Contractor. The CAR log shall contain the CAR number, date issued, Contractor, description of unacceptable performance, suspense date, and closeout date. All CARs and CAR logs shall be maintained by the COR for the life of the contact. A CAR Log will be maintained and is included as Appendix 4 to this document.
Contracting Officer Notification.
Findings are broken down into two categories, Major and Minor. Definitions for Major and Minor Findings as well as notification requirements are as follows:
0. Major Finding. If at any time COR identifies a condition as having a significant adverse effect on the quality of the activity, such as those stated below, COR shall document their findings and notify the Contracting Officer immediately in writing.
0. Contractor failure to meet a Performance Threshold.
0. A significant morbidity or mortality involving Contractor personnel,
0. Failure to provide adequate corrective action to preclude reoccurrence of Government identified findings.
0. Failure to provide corrective action to deficiencies identified by the Contractor within a prescribed suspense period.
0. Any failure to adhere to security regulations that results in a security incident.
0. Revocation of clinical privileges.
0. Minor Finding. A departure from established standards having little bearing on the service provided. When COR identify a minor finding, the COR shall document the findings, but is not required to notify the Contracting Officer. However, if the same minor finding is repeatedly identified, it may be an indication that a major finding is occurring or has occurred because the Contractor has not taken proper steps to prevent recurrence. In this case, the COR shall notify the Contracting Officer in writing.
Remedies for Unacceptable Performance.
a. In accordance with the contract Inspection of Services Clause 52.246-4, if any of the services do not conform with the contract requirements; the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. This includes but is not limited to (if applicable) the termination of health care workers and recruitment of substitute health care workers that are equally qualified within established timeframes. When the defects in services cannot be corrected by re-performance, the Government may:
1. Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
1. Reduce the contract price (e.g. CLINs) to reflect the reduced value of the services performed. This may include a reduction in the number of paid hours to reflect the total non-performance period.
b. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may:
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract or task order for default.
7. Mandatory or regulatory compliance items:
The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the Contracting Officer.
8. Acceptable Quality Level (AQL):
AQL for tasks on this IDIQ are detailed in Section 5 above.
9. Evaluation Method:
The COR will document the time of verbal notification to the contractor. The COR will document the official time and date of notification on the Maintenance Call Record. The COR will review self-diagnostic systems logs, conduct a comparison with actual maintenance performance and otherwise verify and validate contractor performance. The contractor shall enter in the record the official time the system is restored to full operational status. The COR will confirm the date and time of problem resolution in the record.
10. Performance Rating:
In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).
Performance Rating Criteria
| Exceptional |
| Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Appendix 1 – Performance Assessment Report
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
| 5. COR PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
Appendix 2 – Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
Appendix 3 – Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
| CAR No. |
| Date Opened |
| Source |
| Description |
| Assigned to |
| Target Close Date |
| Actual Close Date |
Appendix 4 – Corrective Action Log
Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2 image1.emf
File details come from the government source that posted it. Updated .