Office Ren SOL.rtf
RTF text file 412 KB Posted
- Attached to
- Renovate Office Spaces
- Solicitation number
- H92254-10-T-0007
- Issued by
-
United States Special Operations Command
About this file
Solicitation
Text of this file
file_0.wmf file_1.wmf
H92254-10-T-0007
Section A - Solicitation/Contract Form
The Contractor’s quote shall include all labor, material, supplies, transportation, supervision and all other necessary items for a complete and usable facility. Performing all work in a workman like manner in complete compliance with all plans, drawings, and specifications approved for use by Special Operations Forces Activity.
DESIGN/MEASUREMENTS: The contractor shall be responsible for all design, measurements, take offs, and technical requirements associated with this project. A concept drawing is provded in Section J. The contractor receiving contract award is expected to provide a design/drawing to scale for the project.
SITE VISIT: The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site investigations and conditions affecting the work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. Due to mission requirements, there will be one (1) formal site visit scheduled. All interested offerors are encouraged to attend the site visit at the scheduled date and time.
The site visit is scheduled for;
DATE: 23 June 2010
TIME: 12:30 P.M.
All interested contractors must contact Mr. Mark Degroat at (859) 566-5011 for instructions and installation entry procedures to attend the site visit.
Magnitude of Construction: The magnitude of Construction for this project is between $25,000.00 and $100,000.00.
Section B - Supplies or Services and Prices
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
Job
Interior Office Renovation 221 B Bay
FFP
Renovate office spaces at building 221 B Bay. The offeror shall use the scope of work located in (Attachment J) and provide; a cost breakdown, statement of work, construction schedule, material submittal schedule, specifications, desing and drawings.
FOB: Destination
NET AMT
Section C - Descriptions and Specifications
1. SOFSA Scope of Work
Objective: Provide a quote for inside construction/demolition services to support SSA consolidation project. Work will be in warehouse and office areas.
Location of Work: Bluegrass Station, Building 221 - A, B, and C Bays.
Customer: Jim Doyle 566-5251.
SOFSA Contracting Officer Representative (COR); Mark DeGroat 566- 5011.
Formal quote is to be provided within the time stated in block 10 of the SF18 (10 days) and given to Mr. Taft Bradley, Contract specialist. Email; taft.bradley@CTR@ SOFSA.mil.
| General Requirements of Contractor. |
| Construction/modification/installation to conform to all applicable State, Local, and Federal, Electrical Code and Fire Code Regulations. If conflicts exist between this Statement of Objectives and any Code requirement, the Code requirements supersede the Statement of Objectives. |
Sub-contractor must be licensed and certified to perform all related work.
All personnel working on-site must be US Citizens.
All work to be performed during normal business hours (7:00am – 3:30pm EST)
| Office space work to be performed is in B bay building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished: |
| Remove interior walls |
Construct new walls Remove carpet in entire office area and replace with L3 standard carpet:
| 24” x 24” carpet squares |
| Manufacturer: Mohawk |
Style: Junxtion Color: Network Install 6” black cove base in all areas Paint all walls Dover White – eggshell finish Paint all doorframes and trim Dover White – semi-gloss finish Rework sprinkler system as needed Remove ceiling grid in affected areas and install new Install new acoustical in affected areas Rework HVAC system to accommodate new configuration Rework electrical outlets as needed for office areas per code Install power poles as indicated for furniture in main office area
Work to be accomplished in Warehouse A bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
| Install 30A, 208V foam machine |
| Install 20A, 208V shrink wrap machine |
Install 1, 20A circuit to Fed Ex workstation Install 1, 20A circuit to inspection workstation Install 2, 20A dedicated quads to each of the 3 incoming freight workstations Install 6, 20A quads on 3 circuits @ the shipping workstations along the firewall Remove 2 TSP forklift battery chargers and install 1 Hyster forklift battery charger
Work to be accomplished in Warehouse B bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
Install 1 TSP forklift battery chargers
Install 1 exhaust fan – vent to outside Install eyewash station between chargers
Work to be accomplished in Warehouse C bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
Remove all chain link fencing and gates
Palletize all fencing material (Pallets provided by L3)
| Remove 1 Hyster forklift charger from tunnel - - Install 2 forklift chargers in A Bay |
| Move 1 BAF to roadside aisle way |
Remove one BAF and palletize
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this/these address: https://www.acquisition.gov/far/index.html
| CLAUSE NO. | TITLE: |
| FAR 52.246-12 | Inspection of Construction (AUG 1996) |
E.2 CONTRACTOR DAILY REPORTING REQUIREMENT
The Contractor is required to prepare and file a Contractor’s Daily Report, for each day of contract performance. This report shall be delivered to, or mailed to the Contracting Officer’s Representative on Fridays, and include all work, equipment, tests, and activities completed in the previous work week. Report shall be numbered, dated and signed by the Contractor. Failure to submit the daily reports at weeks end could result in payments being delayed until such time as all daily reports are current.
E.3 CONTRACTING OFFICER’S REPRESENTATIVE
A Contracting Officer’s Representative (COR), for the purpose of representing the Contracting Officer and assuring contractor compliance with the contract requirements, will be designated. The COR has no authority to issue orders/directions which effect cost, money or time.The Contracting Officer’s Representative (COR), is authorized to issue notices regarding noncompliance with contract requirements, and to stop work on any portion of the job if the contractor’s methods cause unsafe conditions or will result in noncompliance work which would be impracticable to correct or to replace while permitting other (conforming) portions of the work to continue. Issuing of a Notice of Noncompliance as described herein does not constitute a suspension of work as described in FAR Clause 52.242-14, Suspension of Work.
E.4 FINAL INSPECTION
Final inspection, punch list, acceptance and cleanup of the project site are to be completed before the contract completion date. Final inspection and acceptance of the work will be by the Contracting Officer or his authorized representative.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination N/A Destination Government
Section F - Deliveries or Performance
F.1 FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within FIVE (5) CALENDAR DAYS after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than NINTY (90) CALENDAR DAYS after the contractor receives the Notice to Proceed (NTP). The time specified for completion shall include final cleanup of the premises.
(End of clause)
DELIVERY INFORMATION
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
28-SEP-2010
SOFSA
BLUEGRASS STATION
L3 COMM BUILDING 5
5749 BRIAR HILL ROAD
LEXINGTON KY 40516
859-566-5051 FOB: Destination H92254
Section G - Contract Administration Data
G.1 Contracting Officer means a person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, review and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to a contract. The individual appointed as Contracting Officer for this procurement is Karene Spurlin.
G.2 ADDRESS OF CORRESPONDENCE
All correspondence, unless otherwise specified, shall be directed to the following address:
U.S. Mail Address:
Special Forces Support Activity (SOFSA) Bluegrass Station (BGS) 5751 Briar Hill Road Lexington, KY 40516 Telephone Numbers: Commercial: (859) 566-5137
FAX: (859) 293-4166
Office hours: 8:00 A.M. to 4:30 P.M. Eastern Standard Time Monday thru Friday (Except Federal Holidays)
NOTE: Include Contract Number on all correspondence.
G.3 WAWF INSTRUCTIONS
Memorandum for Wide Area Work Flow (WAWF) – Electronic Receiving Report and Invoicing Instructions, Contract:
1. In accordance with DFARS 232.7002, and SOFARS 5652.232-9002, use of electronic payment requests is mandatory. WAWF will speed up payment processing time and allow you to monitor payment status online. There are no charges or fees associated with the use of WAWF. For more information contact Steve Miller 859 566-5053 or Steve.miller@sofsa.mil for information on WAWF, go to https://wawf.eb.mil.
2. The accounts payable address can be found on the DD1155, of your order. You can easily access payment information using the DFAS web site at http://www.dod.mil/dfas/. Your contract number and order number (if applicable), or invoice will be required to inquire status of your payment. Go to DFAS on the web at http://www.dod.mil/dfas/contractorpay.html.
3. The following codes will be required to route your receiving reports, invoices, and additional e-mail to correctly process through the WAWF system.
TYPE OF DOCUMENT: Combo
Vendor/Contractor CAGE CODE:
| ISSUING OFFICE DODAAC: | H92254 | |
| CONTRACT ADMIN DODAAC: | H92254 | |
| INSPECTION DODAAC/BPN: | H92254 PLUS SIX EXT: |
ACCEPTOR / SHIP TO
| DODAAC/BPN: | H92254 PLUS SIX EXT: |
| LOCAL PROCESSING OFFICE: | H92254 PLUS SIX EXT: |
PAY/DISBURSING OFFICE
DODAAC: HQ0339
E-MAIL POINT OF CONTACT LISTING (maximize use of group e-mail accounts):
INSPECTOR: steve.miller@sofsa.mil ACCEPTOR: steve.miller@sofsa.mil CONTRACTING OFFICER: karene.spurlin@sofsa.mil
G.4 METHOD OF PAYMENT
In accordance with FAR Clause 52.232-33, PAYMENT BY ELECTRONIC FUNDS TRANSFER – CENTRAL CONTRACTOR REGISTRATION (OCT 2003), as contained in Section I, Contract Clauses, the Government shall make payment to the Contractor using the EFT information contained in the Central Contractor Registration (CCR) database. In the event that the EFT information changes, the Contractor shall be responsible for providing the updated information to the CCR database. The Government may make payment by EFT through either the Automated Clearing House (ACH) network, subject to the rules of the National Automated Clearing House Association, or the Fedwire Transfer System. The rules governing Federal payments through the ACH are contained in 31 CFR part 210.
For Registration Assistance: CCR Customer Service Contact Information Toll-Free Phone Number 888-227-2423 Outside U.S. : 269-961-4725 Website: http://www.ccr.gov
G.5 CERTIFICATION OF PAYMENTS-RELEASE OF CLAIM
The Contractor, prior to receiving a progress payment or final payment under this contract, shall submit to the Contracting Officer a certification that the contractor has made payment from proceeds of prior payments, or that he will make timely payment form the proceeds of the progress of final payment then due him, to their subcontractors and suppliers in accordance with his contractual arrangements. The Contractor shall submit to the Contracting Officer, together with his request for final payment, a properly executed Contractor’s Release statement.
G.6 PRE-CONSTRUCTION CONFERENCE
The Contractor, at no additional expense to the Government, shall attend a pre-construction conference at Special Operations Forces Activity, Lexington KY on a date and time to be designated by the Contracting Officer. See also FAR Clause 52.236-26 incorporated by reference in Section I.
Section H - Special Contract Requirements
H.1 PRICING OF REQUEST FOR EQUITABLE ADJUSTMENT
The cost principles and procedures of FAR Subpart 31.2, prescribed by Federal Acquisition Regulations (FAR) Subpart 31.105, are incorporated in this contract.
| (a) | The Contractor shall submit detailed price quotes for all Contract Modification Requests, and/or changes in the work to the Contracting Officer when requested, within 20 calendar days after receipt of request or such other time as prescribed by the Contracting Officer. The proposal must consist of an itemized price breakdown in sufficient detail to permit an analysis of all materials, labor, equipment and overhead at both the prime and subcontractor levels and must cover all work involved whether such work was deleted, added or changed. An itemized breakdown will not be required for quotes amounting to less than $2,500.00. In addition, if your proposal includes a request for a time extension clearly show the effect of the modification/change on your construction schedule including which activities will be impacted, the extent of the impact, and an explanation of why the remainder of the schedule can’t be adjusted to reduce this impact. |
| (b) | When the necessity to proceed with a change does not allow sufficient time to negotiate a modification or because of failure to reach an agreement the Contracting Officer may, under the authority of the Changes and Changed Conditions Clause of this contract (FAR 52.243-5), issue a Change Order instructing you to proceed on the basis of a tentative price based on the best estimate available at the time, with the firm price to be determined later. Furthermore, when a Change Order is issued, you must submit a price proposal following the procedure in (a), above, for the equitable adjustment within 20 calendar days, or such other time as prescribed by the Contracting Officer. |
| (c) | The Contracting Officer may consider issuing a unilateral modification to the contract, if your proposal, prepared as required by paragraphs (a) and (b) of this clause, is not received within the required time, or if agreement is not reached. |
| (d) | The proper measure of the amount of downward adjustment to the contract price when the change involves credit to the Government is your reasonable costs had you performed the deleted work. Also, a reasonable allowance for overhead and profit included as part of the downward adjustment for deductive changes. This allowance is subject to negotiations. |
| (e) | Bond premium adjustment, consequent upon changes ordered, will be made based upon the bond percentages as reflected on your Payment and Performance Bonds. |
| (f) | Equipment rental charges shall be based upon the following: |
| (1) | Rental equipment will be priced at the actual rate paid at the equipment rental supplier’s quoted rate for the time the equipment was actually used on the changed work. |
| (2) | Owned equipment shall be priced at the lower of either the actual costs as reflected in |
the equipment owner’s accounting records or the Dataquest “Rental Rate Blue Book”
H.2 CONTRACTOR INITIATED CHANGES
Contractor initiated requests for changes to the contract will be considered by the Government only if they meet all of the following conditions:
| (a) | The request shall be submitted to the Contracting Officer by separate correspondence signed by your authorized representative. |
| (b) | The request shall state how the proposed change would be incorporated into the construction schedule, whether or not a time extension will be necessary, and the calendar date by which you must receive approval or disapproval so as not to affect the existing schedule. |
| (c) | The request shall include a complete listing of labor, materials and equipment costs, and proposed changes to the original contract requirements as well as all indirect costs, and delays. It shall include a listing, with telephone numbers of all sources necessary for Government verification of proposed costs and your offer. |
| (d) | Cost and pricing information shall be submitted according to the provisions of H.1 above. |
THE GOVERNMENT MAY REJECT ANY REQUEST THAT DOES NOT PROVIDE ALL OF THE ABOVE INFORMATION IN A SINGLE SUBMISSION.
H.3 SUBCONTRACT DATA
The Contractor shall submit an executed Statement and Acknowledgment Standard Form 1413 to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgment by the subcontractor that mandatory ’’flow-down’’ contract clauses have been included in his contract in accordance with FAR Clause 52.222-11 (FEB 1988). You will be given a copy of Form SF 1413 after award of a contract. Completing this form creates no contractual relationship between the subcontractor and the Government.
H.4 SUPERINTENDENCE BY CONTRACTOR
The contractor shall directly oversee all work or have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and who has authority to act for the contractor. The superintendent cannot be designated for more than one contract while on site work is being performed. (The superintendent and alternate shall be an employee of the prime contractor).
H.5 Schedules for Construction
The contractor shall provide a construction schedule (3 copies) showing the order in which proposes to perform the work, dates contemplates starting the work and completing the work. Including acquiring materials, plant and equipment. The schedule shall be in the form of a progress chart suitable scale to indicate appropriately the percentage of work scheduled for completion by an given date during the period. Reference FAR Clause 52.236-15 “Schedules for Construction” as further reference.
Section I - Contract Clauses
CLAUSES
CLAUSES INCORPORATED BY REFERENCE
52.204-7 Central Contractor Registration
APR 2008
52.204-9 Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.215-8 Order of Precedence--Uniform Contract Format
OCT 1997
52.222-3 52.222-4 Convict Labor Contract Work Hours and Safety Standards Act Overtime Compensation
JUN 2003
JUL 2005
52.222-6 Davis Bacon Act
JUL 2005
52.222-7 Withholding of Funds
FEB 1988
52.222-8 Payrolls and Basic Records
FEB 1988
52.222-9 Apprentices and Trainees
JUL 2005
52.222-10 Compliance with Copeland Act Requirements
FEB 1988
52.222-11 Subcontracts (Labor Standards)
JUL 2005
52.222-12 Contract Termination-Debarment
FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14 Disputes Concerning Labor Standards
FEB 1988
52.222-15 Certification of Eligibility
FEB 1988
52.222-21 Prohibition Of Segregated Facilities
FEB 1999
52.222-26 Equal Opportunity
MAR 2007
52.222-27 Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-50 Combating Trafficking in Persons
FEB 2009
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
DEC 2007
52.223-3 Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5 Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-12 Refrigeration Equipment and Air Conditioners
MAY 1995
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.225-11 Alt I Buy American Act--Construction Materials Under Trade Agreements (Aug 2009) Alternate I
JUN 2009
52.225-13 Restrictions on Certain Foreign Purchases
JUN 2008
52.227-1 Authorization and Consent
DEC 2007
52.232-5 Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-23 Assignment Of Claims
JAN 1986
52.232-27 Prompt Payment for Construction Contracts
OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1 Disputes
JUL 2002
52.233-3 Protest After Award
AUG 1996
52.236-2 Differing Site Conditions
APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work
APR 1984
52.236-5 Material and Workmanship
APR 1984
52.236-6 Superintendence by the Contractor
APR 1984
52.236-7 Permits and Responsibilities
NOV 1991
52.236-8 Other Contracts
APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas
APR 1984
52.236-11 Use and Possession Prior to Completion
APR 1984
52.236-12 Cleaning Up
APR 1984
52.236-13 Accident Prevention
NOV 1991
52.236-14 52.236-15 Availability and Use of Utility Services Schedules for Construction Contracts
APR 1984
APR 1984
52.236-17 Layout of Work
APR 1984
52.236-21 Specifications and Drawings for Construction
FEB 1997
52.236-26 Preconstruction Conference
FEB 1995
52.243-5 Changes and Changed Conditions
APR 1984
52.245-1 Government Property
JUN 2007
52.245-9 Use And Charges
JUN 2007
52.249-1 Termination For Convenience Of The Government (Fixed Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction)
APR 1984
52.253-1 Computer Generated Forms
JAN 1991
Section J - List of Documents, Exhibits and Other Attachments
J.1 LIST OF ATTACHMENTS
The following listed attachments are a part of this solicitation and any resulting contract:
ATTACHMENTS:
Scope of Work; Office renovations (inside construction services)
General Decision Number; KY20080006 Concept of Office Layout Statement of Acknowldegement SF1413
Attachment 1 Scope of Work
Objective: Provide a quote for inside construction/demolition services to support SSA consolidation project. Work will be in warehouse and office areas.
Location of Work: Bluegrass Station, Building 221 - A, B, and C Bays.
Customer: Jim Doyle 566-5251.
SOFSA Contracting Officer Representative (COR); Mark DeGroat 566- 5011.
Formal quote is to be provided within the time stated in block 10 of the SF18 (10 days) and given to Mr. Taft Bradley, Contract specialist. Email; taft.bradley@CTR@ SOFSA.mil.
| General Requirements of Contractor. |
| Construction/modification/installation to conform to all applicable State, Local, and Federal, Electrical Code and Fire Code Regulations. If conflicts exist between this Statement of Objectives and any Code requirement, the Code requirements supersede the Statement of Objectives. |
Sub-contractor must be licensed and certified to perform all related work.
All personnel working on-site must be US Citizens.
All work to be performed during normal business hours (7:00am – 3:30pm EST)
| Office space work to be performed is in B bay building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished: |
| Remove interior walls |
Construct new walls Remove carpet in entire office area and replace with L3 standard carpet:
| 24” x 24” carpet squares |
| Manufacturer: Mohawk |
Style: Junxtion Color: Network Install 6” black cove base in all areas Paint all walls Dover White – eggshell finish Paint all doorframes and trim Dover White – semi-gloss finish Rework sprinkler system as needed Remove ceiling grid in affected areas and install new Install new acoustical in affected areas Rework HVAC system to accommodate new configuration Rework electrical outlets as needed for office areas per code Install power poles as indicated for furniture in main office area
Work to be accomplished in Warehouse A bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
| Install 30A, 208V foam machine |
| Install 20A, 208V shrink wrap machine |
Install 1, 20A circuit to Fed Ex workstation Install 1, 20A circuit to inspection workstation Install 2, 20A dedicated quads to each of the 3 incoming freight workstations Install 6, 20A quads on 3 circuits @ the shipping workstations along the firewall Remove 2 TSP forklift battery chargers and install 1 Hyster forklift battery charger
Work to be accomplished in Warehouse B bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
Install 1 TSP forklift battery chargers
Install 1 exhaust fan – vent to outside Install eyewash station between chargers
Work to be accomplished in Warehouse C bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:
Remove all chain link fencing and gates
Palletize all fencing material (Pallets provided by L3)
Remove 1 Hyster forklift charger from tunnel – install 2 forklift chargers at A Bay
Move 1 BAF to roadside aisle way Remove one BAF and palletize
Attachment 2 General Decision Number: KY100006 06/04/2010 KY6
Superseded General Decision Number: KY20080006 State: Kentucky Construction Type: Building
County: Fayette County in Kentucky.
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 04/16/2010 3 06/04/2010
CARP1650-003 06/01/2009
Rates Fringes
Carpenters: (Excluding Batt Insulation): Installating Acoustical Ceiling and Cabinet).........................$ 19.88 10.35
ELEV0020-003 01/01/2010
Rates Fringes
ELEVATOR MECHANIC................$ 36.94 20.035+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
* ENGI0181-011 06/01/2010
Rates Fringes
Operating Engineer:
GROUP 1.....................$ 24.35 13.00
GROUP 2.....................$ 21.61 13.00
GROUP 3.....................$ 20.84 13.00
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Crane; Hoe Type Machine; Motor Scrapper; Motor Grader; Roller (Bituminous); Truck Crane; Tower Crane (French, German & Other Types); Hydrocrane; & Forklift (Reqardless of Lift Height)
GROUP 2 - Form Grader; Roller (Rock); & Whirley Oiler
GROUP 3 - Roller (Earth); Oiler; & Truck Crane Oiler
CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE
$.50 ABOVE GROUP 1
ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE GROUP 1
REGARDLESS OF BOOM LENGTH
SFKY0669-001 01/01/2010
Rates Fringes
SPRINKLER FITTER.................$ 29.50 15.85
SHEE0110-008 12/01/2009
Rates Fringes
Sheet Metal Worker HVAC Duct Work & Setting Units.......................$ 28.00 14.82
SUKY1990-003 05/01/1990
Rates Fringes
BRICKLAYER.......................$ 12.00
Carpenters: (Excluding Batt Insulation) Form Work...................$ 11.39 1.47
Carpenters:
All Work (Including Drywall Hanging, but Excluding Form work, Installing Acoustical Ceilings & Cabinets)........$ 11.32 1.99
CAULKER..........................$ 10.97
CEMENT MASON/CONCRETE FINISHER...$ 12.01 2.25
DRYWALL FINISHER/TAPER...........$ 10.00
ELECTRICIAN (Including Fire & Burglar Alarms, but Excluding HVAC Control Wiring).............$ 9.55 .77
FLOOR LAYER: Carpet (Soft) Floor............................$ 10.32
GLAZIER..........................$ 9.93 1.15
Heating, Ventilation & Air Condition Mechanic (Startups, Air Flow & Control Wiring).......$ 11.38 1.43
INSTALLER - OVERHEAD DOOR........$ 7.50 .89
IRONWORKER, STRUCTURAL...........$ 11.26 1.24
Laborers: (Excluding Blown Insulation) Asphalt Raker...............$ 9.09 2.30 Brick Mason Tender/Hod Carrier.....................$ 7.62
Laborers:
Unskilled...................$ 7.52
Painters: (Excluding Drywall Finishing).......................$ 8.91 1.30
PIPEFITTER
HVAC Work...................$ 13.11 1.66 All Other Work..............$ 14.86 2.60
PLUMBER (Excluding HVAC Work)....$ 13.78 1.86
Power Equipment Operator Bulldozer...................$ 10.96 1.25
ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 9.26
Sheet Metal Worker All Other Work..............$ 12.42
Truck drivers:...................$ 7.29
WATERPROOFER.....................$ 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section K - Representations, Certifications and Other Statements of Offerors
CLAUSES INCORPORATED BY REFERENCE
52.209-2
52.219-19 Prohibition on Contracting with Inverted Domestic Corporations--Representation Small Business Concern Representation for Small Business Competitiveness Demonstration Program
JUL 2009
JUL 2009
252.204-7007 Alt
Annual Representations and Certifications Alternate
MAY 2010
Section L - Instructions, Conditions and Notices to Bidders
INSTRUCTIONS
All offerors shall provide the following documentation on or before the closing date and time of this solicitation. Failure to submit the information may result in the proposal/quote being rejected without further consideration;
1) Cost Breakdown of prices
2) Construction Schedule (90 day performance period)
3) Statement of Work
4) Completed Schedule B Lump Sum price quote,
5) Past Experience/Past Performance - List of references of work performed with same or similar work with same or similar complexity and magnitude. List references for work performed within the past 3 years.
Your reference list shall include the following information; Name of Activity, Phone Number, Contract Number, Project Title/Description of work, Point of Contact (POC) and Address
This solicitation contain a scope of work (SOW) which will describe the objectives of the project. The offeror shall use the SOW (Attachment J) to develop a cost effective solution and propose innovative alternatives that meet those objectives. The SOW shall be used by the offeror to develop a cost breakdown, statement of work, specifications, construction schedule and design with drawings.
Schedules for Construction: The contractor shall provide a construction schedule (3 copies) showing the order in which proposes to perform the work, dates contemplates starting the work and completing the work (90 day performance period). The schedule shall be in the form of a progress chart suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. Reference FAR Clause 52.236-15 “Schedule for Construction” for further reference.
Cost Breakdown; The contractor shall provide a cost breakdown of the total price proposed for the work. The cost shall be broken out to show separately the direct cost; Labor, Material, equipment, overhead, and profit. Sub contractor cost shall also be broken out in the same format. No contingency costs shall be used, as this will be a firm fixed priced contract, so be sure to include all costs associated for the completion of the project.
Statement of Work; The contractor shall provide a statement of work detailing the work to be accomplished. The Statement of work shall represent how the work will be accomplished and what work will be completed to provide a usable facility at project completion. Separate specifications shall be provided where applicable.
Design/Measurements; The contractor shall be responsible for all designs, measurements, takeoffs associated with this project. A concept drawing for this project is attached. The contractor receiving contract award is expected to provide a design/drawing to scale for the project.
FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price Construction Contract resulting from this solicitation.
(End of provision)
Section M - Evaluation Factors for Award
In accordance with FAR 13.106-1(a) (2) the award of this contract will be made based on Price and Other Factors. Award may not be made to the lowest priced offeror. This award will be based on best value considering price and other factors; The other factors to be used to award this contract are as follows;
Past experience/Past performance – within the past 3 years
Construction Schedule – identify the process of work proposed to be completed within the performance period.
Statement of Work – Describe the work effort and approach proposed to meet the objectives in the Scope of Work.
Other files
| File | Type | Posted |
|---|---|---|
| SSA Consolidation - Rev 06- Amendment 2.pdf | ||
| Office Q A Amendment 2.doc | DOC document | |
| Amendment 002 OfficeRenov.doc | DOC document | |
| List of Attendees.pdf | ||
| Q A.doc | DOC document | |
| Conformed Copy RFQ.doc | DOC document | |
| SSA Renovation - Drawing 1.pdf | ||
| SSA Renovation - Drawing 2.pdf | ||
| amendment 1.doc | DOC document | |
| SOL T-0007 Attach 3.pdf | ||
| SOL T-0007 Atch 4.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .