amendment 1.doc

DOC document 149 KB Posted

Attached to
Renovate Office Spaces
Solicitation number
H92254-10-T-0007
Issued by

View the file

Other files

File Type Posted
SSA Consolidation - Rev 06- Amendment 2.pdf PDF
Office Q A Amendment 2.doc DOC document
Amendment 002 OfficeRenov.doc DOC document
List of Attendees.pdf PDF
Q A.doc DOC document
Conformed Copy RFQ.doc DOC document
SSA Renovation - Drawing 1.pdf PDF
SSA Renovation - Drawing 2.pdf PDF
SOL T-0007 Attach 3.pdf PDF
SOL T-0007 Atch 4.pdf PDF
Office Ren SOL.rtf RTF text file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 01-Jul-2010 05:00 PM to 13-Jul-2010 05:00 PM.

The following have been modified:

SCHEDULE

The Contractor’s quote shall include all labor, material, supplies, transportation, supervision and all other necessary items for a complete and usable facility. Performing all work in a workman like manner in complete compliance with all plans, drawings, and specifications approved for use by Special Operations Forces Activity.

· DESIGN/MEASUREMENTS: The contractor shall be responsible for all design, measurements, take offs, and technical requirements associated with this project. A concept drawing is provded in Section J. The contractor receiving contract award is expected to provide a design/drawing to scale for the project.

· SITE VISIT: The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site investigations and conditions affecting the work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. Due to mission requirements, there will be one (1) formal site visit scheduled. All interested offerors are encouraged to attend the site visit at the scheduled date and time.

(a) The site visit is scheduled for;

DATE: 23 June 2010

TIME: 12:30 P.M. Eastern Standard Time

(b) All interested contractors must contact Mr. Mark Degroat at (859) 566-5011 for instructions and installation entry procedures to attend the site visit.

Magnitude of Construction: The magnitude of Construction for this project is between $25,000.00 and $100,000.00.

NOTICE: If awarded this contract, FAR 52.228-13 -- Alternative Payment Protections apply:

(a) The Contractor shall submit one of the following payment protections:

A Payment Bond

An Irrevocable Letter of Credit (ILC)

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 5 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement. (End of Clause)

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Renovate office spaces at building 221 B Bay. The offeror shall use the scope of work located in (Attachment J) and provide; a cost breakdown, statement of work, construction schedule, material submittal schedule, specifications, desing and drawings. to Renovate office spaces at building 221 A,B,C Bays. The offeror shall use the scope of work located in (Attachment J) and provide; a cost breakdown, statement of work, construction schedule, material submittal schedule, specifications, design and drawings..

The unit of issue has changed from Job to Lump Sum.

CLIN 0002 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

Option 1 Certified HVAC Balancer

FFP

Priced Separately - Provide a certified air balancer to balance the HVAC system within the office areas and renovated office spaces. The Government at its discretion may decide to use this option should funding become available.

FOB: Destination

NET AMT

CLIN 0003 is added as follows:

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

Option 2 Remove Air handler

FFP

Priced Separately - An option price is requested to remove the air handling system located on the roof top of the offices. The contractor must use company resources and equipment. The price must be priced separately and may be added to the contract should funding become available.

NET AMT

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

SCOPE OF WPRK

1. SOFSA Scope of Work

Objective: Provide a quote for inside construction/demolition services to support SSA consolidation project. Work will be in warehouse and office areas.

Location of Work: Bluegrass Station, Building 221 - A, B, and C Bays.

Customer: Jim Doyle 566-5251.

SOFSA Contracting Officer Representative (COR); Mark DeGroat 566- 5011.

Formal quote is to be provided within the time stated in block 10 of the SF18 (10 days) and given to Mr. Taft Bradley, Contract specialist. Email; taft.bradley@CTR@ SOFSA.mil.

1. General Requirements of Contractor.

a. Construction/modification/installation to conform to all applicable State, Local, and Federal, Electrical Code and Fire Code Regulations. If conflicts exist between this Statement of Objectives and any Code requirement, the Code requirements supersede the Statement of Objectives.

b. Sub-contractor must be licensed and certified to perform all related work.

c. All personnel working on-site must be US Citizens.

d. All work to be performed during normal business hours (7:00am – 3:30pm EST)

2. Office space work to be performed is in B bay building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Remove interior walls

b. Construct new walls (with sound proofing)

c. Remove carpet in entire office area and replace with L3 standard carpet:

1. 24” x 24” carpet squares

2. Manufacturer: Mohawk

3. Style: Junxtion

4. Color: Network

d. Install 6” black cove base in all areas

e. Paint all walls Dover White – eggshell finish

f. Paint all doorframes and trim Dover White – semi-gloss finish

g. Rework sprinkler system as needed

h. Remove ceiling grid in affected areas and install new

1. The contractor shall be responsible for demolishing and removing the layers of ceiling above. The contractor shall be responsible for installing one layer of accoustical ceiling. Also, in the ceiling area; the contractor will remove all electrical wiring not used and are expected to terminate wiring in accordance with electrical code. The contractor will NOT be responsible for removing any IT cables.

i. Install new acoustical in affected areas (with sound proofing)

j. Rework HVAC system to accommodate new configuration

1. The Contractor is required to configure the HVAC and Heating system and associated duct work suitable for the office environment defined in this solicitation. Contractor is responsible for calculating the environment and determining the size of HVAC and heating system to fit specifications for a general office environment.

2. The contractor is expected to remove and dispose of the old duct work where needed and replace with new duct work.

3. The 4 Ton A/C and Heating unit on the west side must be removed and replaced with comparable 4 Ton system.

4. The contractor must include in their quote; to install Condensors for the A/C and Heating systems to be located on the back dock and figure cost to run associated connections in accordance with required code and regulations back to the office area.

k. Rework electrical outlets as needed for office areas per code

l. Install power poles as indicated for furniture in main office area

3. Work to be accomplished in Warehouse A bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Install 30A, 208V foam machine

b. Install 20A, 208V shrink wrap machine

c. Install 1, 20A circuit to Fed Ex workstation

d. Install 1, 20A circuit to inspection workstation

e. Install 2, 20A dedicated quads to each of the 3 incoming freight workstations

f. Install 6, 20A quads on 3 circuits @ the shipping workstations along the firewall

g. Remove 2 TSP forklift battery chargers and install 1 Hyster forklift battery charger

4. Work to be accomplished in Warehouse B bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Install 1 TSP forklift battery chargers

b. Install 1 exhaust fan – vent to outside

c. Install eyewash station between chargers

5. Work to be accomplished in Warehouse C bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Remove all chain link fencing and gates

· Palletize all fencing material (Pallets provided by L3)

b. Remove 1 Hyster forklift charger from tunnel - - Install 2 forklift chargers in A Bay

c. Move 1 BAF to roadside aisle way

d. Remove one BAF and palletize

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0002:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination
Government
Destination
Government

I/S E.1

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this/these address: https://www.acquisition.gov/far/index.html

CLAUSE NO.

TITLE:

FAR 52.246-12

Inspection of Construction (AUG 1996)

E.2

CONTRACTOR DAILY REPORTING REQUIREMENT

The Contractor is required to prepare and file a Contractor’s Daily Report, for each day of contract performance. This report shall be delivered to, or mailed to the Contracting Officer’s Representative on Fridays, and include all work, equipment, tests, and activities completed in the previous work week. Report shall be numbered, dated and signed by the Contractor. Failure to submit the daily reports at weeks end could result in payments being delayed until such time as all daily reports are current.

E.3

CONTRACTING OFFICER’S REPRESENTATIVE

A Contracting Officer’s Representative (COR), for the purpose of representing the Contracting Officer and assuring contractor compliance with the contract requirements, will be designated. The COR has no authority to issue orders/directions which effect cost, money or time.The Contracting Officer’s Representative (COR), is authorized to issue notices regarding noncompliance with contract requirements, and to stop work on any portion of the job if the contractor’s methods cause unsafe conditions or will result in noncompliance work which would be impracticable to correct or to replace while permitting other (conforming) portions of the work to continue. Issuing of a Notice of Noncompliance as described herein does not constitute a suspension of work as described in FAR Clause 52.242-14, Suspension of Work.

E.4

FINAL INSPECTION

Final inspection, punch list, acceptance and cleanup of the project site are to be completed before the contract completion date. Final inspection and acceptance of the work will be by the Contracting Officer or his authorized representative.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
28-SEP-2010
1
SOFSA

BLUEGRASS STATION

L3 COMM BUILDING 5

5749 BRIAR HILL ROAD

LEXINGTON KY 40516

859-566-5051

H92254

To:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
12-NOV-2010
1
SOFSA

BLUEGRASS STATION

L3 COMM BUILDING 5

5749 BRIAR HILL ROAD

LEXINGTON KY 40516

859-566-5051

H92254

The following Delivery Schedule item has been added to CLIN 0002:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
12-NOV-2010
1
SOFSA

BLUEGRASS STATION

L3 COMM BUILDING 5

5749 BRIAR HILL ROAD

LEXINGTON KY 40516

859-566-5051

H92254

The following Delivery Schedule item has been added to CLIN 0003:

DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
12-NOV-2010
1
SOFSA

BLUEGRASS STATION

L3 COMM BUILDING 5

5749 BRIAR HILL ROAD

LEXINGTON KY 40516

859-566-5051

H92254

DELIVERIES OR PERFORMANCE

F.1

FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF

WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within FIVE (5) CALENDAR DAYS after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than One Hundred Twenty (120) CALENDAR DAYS after the contractor receives the Notice to Proceed (NTP). The time specified for completion shall include final cleanup of the premises.

(End of clause)

SECTION I - CONTRACT CLAUSES

The following have been modified:

CLAUSES

CLAUSES INCORPORATED BY REFERENCE

52.204-7
Central Contractor Registration
APR 2008
52.204-9
Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997

52.222-3

52.222-4 Convict Labor

Contract Work Hours and Safety Standards Act

Overtime Compensation

JUN 2003

JUL 2005

52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
FEB 1988
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-50
Combating Trafficking in Persons
FEB 2009
52.223-2
Affirmative Procurement of Biobased Products Under Service and Construction Contracts
DEC 2007
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5
Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-12
Refrigeration Equipment and Air Conditioners
MAY 1995
52.223-17
Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
MAY 2008
52.225-11 Alt I
Buy American Act--Construction Materials Under Trade Agreements (Aug 2009) Alternate I
JUN 2009
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008

52.227-1

52.228-13

52.228-14 Authorization and Consent

Alternative Payment Protections

Irrevocable Letter of Credit

DEC 2007

JUL 2000

DEC 1999

52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-23
Assignment Of Claims
JAN 1986
52.232-27
Prompt Payment for Construction Contracts
OCT 2008
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991

52.236-14

52.236-15 Availability and Use of Utility Services

Schedules for Construction Contracts

APR 1984

APR 1984

52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-26
Preconstruction Conference
FEB 1995
52.243-5
Changes and Changed Conditions
APR 1984
52.245-1
Government Property
JUN 2007
52.245-9
Use And Charges
JUN 2007
52.249-1
Termination For Convenience Of The Government (Fixed Price) (Short Form)
APR 1984
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST

1. SOFSA Scope of Work

Objective: Provide a quote for inside construction/demolition services to support SSA consolidation project. Work will be in warehouse and office areas.

Location of Work: Bluegrass Station, Building 221 - A, B, and C Bays.

Customer: Jim Doyle 566-5251.

SOFSA Contracting Officer Representative (COR); Mark DeGroat 566- 5011.

Formal quote is to be provided within the time stated in block 10 of the SF18 (10 days) and given to Mr. Taft Bradley, Contract specialist. Email; taft.bradley@CTR@ SOFSA.mil.

6. General Requirements of Contractor.

a. Construction/modification/installation to conform to all applicable State, Local, and Federal, Electrical Code and Fire Code Regulations. If conflicts exist between this Statement of Objectives and any Code requirement, the Code requirements supersede the Statement of Objectives.

b. Sub-contractor must be licensed and certified to perform all related work.

c. All personnel working on-site must be US Citizens.

d. All work to be performed during normal business hours (7:00am – 3:30pm EST)

7. Office space work to be performed is in B bay building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Remove interior walls

b. Construct new walls (with sound proofing)

c. Remove carpet in entire office area and replace with L3 standard carpet:

1. 24” x 24” carpet squares

2. Manufacturer: Mohawk

3. Style: Junxtion

4. Color: Network

d. Install 6” black cove base in all areas

e. Paint all walls Dover White – eggshell finish

f. Paint all doorframes and trim Dover White – semi-gloss finish

g. Rework sprinkler system as needed

h. Remove ceiling grid in affected areas and install new

1. The contractor shall be responsible for demolishing and removing the layers of ceiling above. The contractor shall be responsible for installing one layer of accoustical ceiling. Also, in the ceiling area; the contractor will remove all electrical wiring not used and are expected to terminate wiring in accordance with electrical code. The contractor will NOT be responsible for removing any IT cables.

i. Install new acoustical in affected areas (with sound proofing)

j. Rework HVAC system to accommodate new configuration

1. The Contractor is required to configure the HVAC and Heating system and associated duct work suitable for the office environment defined in this solicitation. Contractor is responsible for calculating the environment and determining the size of HVAC and heating system to fit specifications for a general office environment.

2. The contractor is expected to remove and dispose of the old duct work where needed and replace with new duct work.

3. The 4 Ton A/C and Heating unit on the west side must be removed and replaced with comparable 4 Ton system.

4. The contractor must include in their quote; to install Condensors for the A/C and Heating systems to be located on the back dock and figure cost to run associated connections in accordance with required code and regulations back to the office area.

k. Rework electrical outlets as needed for office areas per code

l. Install power poles as indicated for furniture in main office area

8. Work to be accomplished in Warehouse A bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Install 30A, 208V foam machine

b. Install 20A, 208V shrink wrap machine

c. Install 1, 20A circuit to Fed Ex workstation

d. Install 1, 20A circuit to inspection workstation

e. Install 2, 20A dedicated quads to each of the 3 incoming freight workstations

f. Install 6, 20A quads on 3 circuits @ the shipping workstations along the firewall

g. Remove 2 TSP forklift battery chargers and install 1 Hyster forklift battery charger

9. Work to be accomplished in Warehouse B bay, building 221. Walk thru of work will be performed so contractor understands entire scope of the job. During the walk-thru a drawing detailing specifics will be accomplished:

a. Install 1 TSP forklift battery chargers

b. Install 1 exhaust fan – vent to outside

c. Install eyewash station between chargers

Attachment 2 General Decision Number: KY100006 06/04/2010 KY6

Superseded General Decision Number: KY20080006

State: Kentucky

Construction Type: Building

County: Fayette County in Kentucky.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 04/16/2010

3 06/04/2010

CARP1650-003 06/01/2009

Rates Fringes

Carpenters: (Excluding Batt

Insulation): Installating

Acoustical Ceiling and

Cabinet).........................$ 19.88 10.35

ELEV0020-003 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 36.94 20.035+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after

Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

* ENGI0181-011 06/01/2010

Rates Fringes

Operating Engineer:

GROUP 1.....................$ 24.35 13.00

GROUP 2.....................$ 21.61 13.00

GROUP 3.....................$ 20.84 13.00

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Crane; Hoe Type Machine; Motor Scrapper; Motor

Grader; Roller (Bituminous); Truck Crane; Tower Crane

(French, German & Other Types); Hydrocrane; & Forklift

(Reqardless of Lift Height)

GROUP 2 - Form Grader; Roller (Rock); & Whirley Oiler

GROUP 3 - Roller (Earth); Oiler; & Truck Crane Oiler

CRANE WITH BOOM 150 FEET & OVER, INCLUDING JIB SHALL RECEIVE

$.50 ABOVE GROUP 1

ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE GROUP 1

REGARDLESS OF BOOM LENGTH

SFKY0669-001 01/01/2010

Rates Fringes

SPRINKLER FITTER.................$ 29.50 15.85

SHEE0110-008 12/01/2009

Rates Fringes

Sheet Metal Worker

HVAC Duct Work & Setting

Units.......................$ 28.00 14.82

SUKY1990-003 05/01/1990

Rates Fringes

BRICKLAYER.......................$ 12.00

Carpenters: (Excluding Batt

Insulation)

Form Work...................$ 11.39 1.47

Carpenters:

All Work (Including

Drywall Hanging, but

Excluding Form work, Installing Acoustical

Ceilings & Cabinets)........$ 11.32 1.99

CAULKER..........................$ 10.97

CEMENT MASON/CONCRETE FINISHER...$ 12.01 2.25

DRYWALL FINISHER/TAPER...........$ 10.00

ELECTRICIAN (Including Fire &

Burglar Alarms, but Excluding

HVAC Control Wiring).............$ 9.55 .77

FLOOR LAYER: Carpet (Soft)

Floor............................$ 10.32

GLAZIER..........................$ 9.93 1.15

Heating, Ventilation & Air

Condition Mechanic (Startups, Air Flow & Control Wiring).......$ 11.38 1.43

INSTALLER - OVERHEAD DOOR........$ 7.50 .89

IRONWORKER, STRUCTURAL...........$ 11.26 1.24

Laborers: (Excluding Blown

Insulation)

Asphalt Raker...............$ 9.09 2.30

Brick Mason Tender/Hod

Carrier.....................$ 7.62

Laborers:

Unskilled...................$ 7.52

Painters: (Excluding Drywall

Finishing).......................$ 8.91 1.30

PIPEFITTER

HVAC Work...................$ 13.11 1.66

All Other Work..............$ 14.86 2.60

PLUMBER (Excluding HVAC Work)....$ 13.78 1.86

Power Equipment Operator

Bulldozer...................$ 10.96 1.25

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 9.26

Sheet Metal Worker

All Other Work..............$ 12.42

Truck drivers:...................$ 7.29

WATERPROOFER.....................$ 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTIONS

A. All offerors shall provide the following documentation on or before the closing date and time of this solicitation. Quotes shall be sent electronically to Mr. Taft Bradley at; taft.bradley.ctr@sofsa.mil. Failure to submit the following information may result in the proposal/quote being rejected without further consideration;

1) Cost Breakdown of prices

2) Construction Schedule (120 day performance period)

3) Statement of Work

4) Completed Schedule B Lump Sum price quote and Option 1, and 2 cost.

5) Past Experience/Past Performance - List of references of work performed with same or similar work with same or similar complexity and magnitude. List references for work performed within the past 3 years.

a. Your reference list shall include the following information; Name of Activity, Phone Number, Contract Number, Project Title/Description of work, Point of Contact (POC) and Address

B. This solicitation containes a scope of work (SOW) which will describe the objectives of the project. The offeror shall use the SOW (Attachment J) to develop a cost effective solution and propose innovative alternatives that meet those objectives. The SOW shall be used by the offeror to develop a cost breakdown, statement of work, specifications, construction schedule and design with drawings.

1. Schedules for Construction: The contractor shall provide a construction schedule (3 copies) showing the order in which proposes to perform the work, dates contemplates starting the work and completing the work (120 day performance period). The schedule shall be in the form of a progress chart suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. Reference FAR Clause 52.236-15 “Schedule for Construction” for further reference.

2. Cost Breakdown; The contractor shall provide a cost breakdown of the total price proposed for the work. The cost shall be broken out to show separately the direct cost; Labor, Material, equipment, overhead, and profit. Sub contractor cost shall also be broken out in the same format. No contingency costs shall be used, as this will be a firm fixed priced contract, so be sure to include all costs associated for the completion of the project.

3. Statement of Work; The contractor shall provide a statement of work detailing the work to be accomplished. The Statement of work shall represent how the work will be accomplished and what work will be completed to provide a usable facility at project completion. Separate specifications shall be provided where applicable.

4. Design/Measurements; The contractor shall be responsible for all designs, measurements, takeoffs associated with this project. A concept drawing for this project is attached. The contractor receiving contract award is expected to provide a design/drawing to scale for the project.

FAR 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price Construction Contract resulting from this solicitation.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .