Questions and Answers 3 21 Jun 10.pdf

PDF 20 KB Posted

Attached to
Pallet and Cantilever Racks
Solicitation number
H92254-10-P-0006
Issued by

About this file

Questions 14 - 15

View the file

Other files

File Type Posted
Questions and Answers 2.pdf PDF
Final SOO for ARSOSSA and TAPO Racks 6-14-10.docx DOCX document
Rack drawings A1 B1 C1.pdf PDF
Questions and Answers.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers 3

Question 14. The description on the SOO and related drawings totals to a different quantity of material list than the list requested on the solicitation. Which material list should be included in the lump sum totals?

Answer: Use the material list noted for CLIN 1 and 2. Numbers/Quantities are correct. Only one error was noted in the SOO, Phase 2, Bldg 195, Cantilever Racks, Para. c.

The following is changed from:

c. Install uprights with two (2) 60” braces between uprights (marked by an “X” on the drawing);

install four (4) straight arms on each upright;

to:

c. Install uprights with two (2) 60” braces between uprights (marked by an “X” on the drawing);

install five (5) straight arms on each upright;

Question 15. The change posted on 15 Jun 10 leaves only 96 each 10' beams for line item 2.

Please confirm that the requirements changed.

Answer: 96 ea - 10'-0" beams is correct as noted in CLIN 2. See Answer 14 above.