Questions and Answers 2.pdf
PDF 29 KB Posted
- Attached to
- Pallet and Cantilever Racks
- Solicitation number
- H92254-10-P-0006
- Issued by
-
United States Special Operations Command
About this file
Questions 5 - 13.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 3 21 Jun 10.pdf | ||
| Final SOO for ARSOSSA and TAPO Racks 6-14-10.docx | DOCX document | |
| Rack drawings A1 B1 C1.pdf | ||
| Questions and Answers.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 2
Question 5. Rack installation. Do you require union labor? Or is shop labor ok?
Answer: Labor is to be provided in accordance with Department of Labor Wage Rates and established catalog or market prices. See Wage Determinations OnLine (WDOL) http://www.wdol.gov
Question 6. With the installation, will this be a prevailing wage project?
Answer: Labor is to be provided in accordance with Department of Labor Wage Rates and established catalog or market prices. See Wage Determinations OnLine (WDOL) http://www.wdol.gov
Question 7. What type of racking do you currently have? My installer said that it appears the new racks will tie into the old ones.
Answer: The rack type is "tear-drop pallet rack" and they are interchangeable with existing racks.
Question 8. Do the pallet racking uprights have to be closed posts?
Answer: Yes, closed tubular (closed posts).
Question 9. Speed Rack provides an upright with enclosed legs. Our uprights utilize a three sided leg, meeting the same spec's, will this be acceptable.
Answer: Uprights with enclosed legs are acceptable. No, non-enclosed legs.
Question 10. The 25 ft towers are usually mounted on a base plate, is this required also.
Answer: Yes. The upright must have some type of plate with holes for mounting purposes.
Question 11. Is Solicitation # H92254-10-P-0006 designed as a small disadvantaged business set aside?
Answer: This solicitation is a 100% set-a-side for Small Businesses.
Question 12. Is there an advantage supplying a Contract No?
Answer: The contract number will be assigned at date of award.
Question 13. We have obtained competitive pricing from several different manufacturers, but in every case the lead time is after approval drawings…not After Receipt of Order. Will there be a need for approval drawings or are the items to be manufactured based only on the specifications provided?
http://www.wdol.gov/ http://www.wdol.gov/
Is the 21 day delivery time negotiable at all? Is 28 days possible?
Answer: There will not be a need to approve drawings. Installation Drawings A-1, B-1, and C-1 have been approved and included in the amendment. Delivery time is also noted in the amendment by phases and the number of delivery days will be evaluated in accordance with FAR 13.106-2, Evaluation of quotations or offers.