08-20004_LAUNCH DECK Assembly Package.pdf

PDF 219 KB Posted

Attached to
Mobile Launch Vehicle (MLV) Fabrication
Solicitation number
Not on record
Issued by

About this file

This document is a series of engineering drawings for the NASA Balloon Program that specify the design and manufacturing requirements for a Launch Deck cage assembly and related components used in balloon payload operations.

The drawings detail multiple integrated components including an upper cage bar launch deck (part 08-20004), a modified scissor lift launch deck (part 08-20004-200), and a mounting rail launch deck (part 08-20004-201). The upper cage bar assembly measures approximately 68 inches in length with usable length clevis pins and retaining ring grooves, and is specified to be finished in yellow per federal standards. The scissor lift table variant includes a double scissor lift mechanism with 16-inch low height and 95-inch raised height capacity of 6,000 pounds on a 48-by-72-inch table. The mounting rail component is fabricated from 3-by-1.5-by-0.31-inch wall C-channel material. All components require dimensional tolerancing per ASME standards, fastener clearance per ASME B18.2, burr and sharp edge removal to 0.005 to 0.010 inches maximum, and welding performed per AWS D1.1/D1.1M:2020 specifications with filler metals ER70S-6, ER70S-2, and E7018-1. Post-weld surface preparation includes rust and grease removal per NASA-STD-5008B with application of carboline primer, carboacrylic midcoat, and carboacrylic topcoat in black or yellow per NASA standards. All components must include high-character stamping with lot and serial numbers, visual and magnetic particle or liquid penetrant testing inspection, and assembly per manufacturer installation instructions ensuring flush alignment with the cage mid-rail.

View the file

Other files

File Type Posted
08-20002_BOOM Assembly Package.pdf PDF
08-20012 Service Brake System Package.pdf PDF
08-20016_WHEEL CART NBOC MLV.pdf PDF
08-20019_STAIRCASE CAT966M OVERHEAD WALKWAY package.pdf PDF
08-20021_SPRING LOCKING PIN ASSEMBLY_package.pdf PDF
_max_820-REQ-NBOC2-40-1 Fabrication of MLV_Signed_Redacted.pdf PDF
08-20000_MLV ASSEMBLY NBOC MLV.pdf PDF
08-20001_CHASSIS ASSEMBLY NBOC MLV.pdf PDF
08-20007-200_CRADLE AXLE CART NBOC MLV.pdf PDF
08-20010 NBOC MLV Documentation and Reports.pdf PDF
08-20013_BOOM FAILSAFE package.pdf PDF
08-20017_CHASSIS JACK ASSEMBLY package.pdf PDF
08-20018 NBOC-II MLV Electrical Schematic package.pdf PDF
_min_820-REQ-13 MLV Chassis Req_20260203_printed.pdf PDF
08-20003_FRAME ASSEMBLY_package.pdf PDF
08-20008-01_DOCUMENT TREE NBOC MLV.pdf PDF
08-20009_SEMI-CHASSIS INTERFACE Package.pdf PDF
08-20011 Model Hydraulic Cylinder package.pdf PDF
08-20014_BUCKET INTERFACE NBOC MLV.pdf PDF
08-20015 Folding Safety Railing package.pdf PDF
08-20005 Generator Set Pallet Assembly Package.pdf PDF
08-20020_CAT966M BOOM TENSION ROD_package.pdf PDF
OM-300-200-00-SW_A - Launch Head Assembly_dwg.PDF PDF
_min_820-REQ-13 MLV Chassis Req_20260203_printed.pdf PDF
_max_820-REQ-NBOC2-40-1 Fabrication of MLV_Signed_Redacted.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

A

08-20004 Launch Deck
08-20004-01 Upper Cage Bar
08-20004-100 Cage
08-20004-200 Modified Scissor Lift
08-20004-201 Mounting Rail

File details come from the government source that posted it. Updated .