SSA_EVault_RFI_Round_3.xls

XLS spreadsheet 83 KB Posted

Attached to
Electronic Vault (E-Vault) Federal contract opportunity
Solicitation number
GS-08-P-17-JA-C-0005
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Round three RFI Responses

View the file

Other files for this federal contract opportunity

Other files attached to Electronic Vault (E-Vault), newest first.
File Type Posted
SSA_GSA_E-Vault_Ammendment_Listing_090817.pdf PDF
SF30_Amendment_0006_GS-08-P-17-JA-C-0005.pdf PDF
September_6_Third_Site_Visit_Sign_In.pdf PDF
SF30_Amendment_0003.pdf PDF
UNIT_PRICES_Supplemental_Pricing_Sheet.xlsx XLSX spreadsheet
SF30_Amendment_0005_GS-08-P-17-JA-C-0005.pdf PDF
SF30_Amendment_0004_GS-08-P-17-JA-C-0005.pdf PDF
SSA_EVault_RFI_Round_2_-_082517.xls XLS spreadsheet
AMENDMENT_0004_Third_Site_Visit.pdf PDF
DFC_map_508_2014-0619.pdf PDF
RFIs_GSA-SSA_E-Vault_Rd_1_8-17-17.xlsx XLSX spreadsheet
C_201_REVISED_080317_SSA_E-Vault_Solicitation.pdf PDF
SF30_Amendment_0002.pdf PDF
SSA_-_GSA_GeoTech_Report_110316.pdf PDF
Sign_In_Sheets_Site_Visit_073117.pdf PDF
AMENDMENT_0001_Second_Site_Visit.pdf PDF
DFC_map_508_2014-0619.pdf PDF
Sign_In_Sheets_from_Site_Visit_7-19-17.pdf PDF
SF30_Amendment_0001.pdf PDF
RFP_Letter.pdf PDF
Attachment_0006_WD_Building_CO33_060917.pdf PDF
Attachment_0007_SSA_EVault_Construction_SOW_05_2017.pdf PDF
Attachment_0004_-_Offeror_Past_Performance_Survey.pdf PDF
Attachment_0001_SBU_Form_GS08P17JAC0005.pdf PDF
Attachment_0008_Price_Proposal_Worksheet.xlsx XLSX spreadsheet
Justification_for_Brand_Name_of_Equal_signed.pdf PDF
Attachment_0002_Request_for_Solicitation_Documents_Form.pdf PDF
Attachment_0003_Offeror_Experience_Information.pdf PDF
Attachment_0005_Model_Subcontracting_Plan_Effective_Jan_2017.pdf PDF
C_201_SSA_E-Vault_Solicitation.pdf PDF
C301_Offeror_Representations_and_Certifications.pdf PDF
C101_SSA_E-Vault_Agreement.pdf PDF
SF_1442_GS-08-P-17-JA-C-0005__Form.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1st Round

SSA E-Vault Questions GS-08-P-17-JA-C-0005
QUESTIONRECOMMENDED ADDENDUM TERMINOLOGY
1Factor 2, Past Experience, requires two or more similar contracts/task orders, substantially completed within the past seven years, to include whether initial construction or retrofit of an existing building, and further states that a more favorable evaluation may be provided for data center retrofit experience versus data center initial construction and for Tier III Data Center experience. Each of these prerequisites has the effect of limiting competition. This factor goes on to require similar Data Center building construction with both 10,000 GSF or more and a total project construction cost exceeding $10,000,000. Such limitations may further unduly restrict competition by excluding relevant past performance that does not meet these two thresholds. 1) When taken as a whole, the requirements appear to favor large businesses; please consider relaxing the 10,000 GSF and $10,000,000 minimums. 2) Please clarify how past performance for major subcontractors which are meaningfully involved in the planned project will be considered. 3) Please confirm that commercial projects may be used as Past Performance references.Factor 2 - ADD: Summary) Data Center facilities are very complex; The goal is to ascertain the Data Center & construction knowledge of the bidders and select the most qualified for the most reasonable price. A project of this size and magnatude requires a Prime contractor that has experience managing all aspects of a multi-million dollar project. The main subcontractors (Electrical & Mechanical) shall be designated in the bid submittal.
2The pricing excel sheet provided as part of the bid documents does not have a location for the Optional Extended Warranty line items identified in spec section 001200-4 3.5 Extended Warranty. Is the provision for pricing the extended warranty required and how should it be presented?ADD: to the SF 1442 the 5 year warranty for all major electrical equipment: generators, ATS' + UPS', and switchboards
3Spec section 001200 section 3.6.C requires a Factory Witness Test (FWT) of the complete power system. This is very costly and will have a significant impact on the overall construction duration.Specification section 001200 section 3.6.C. ADD: Contractors will provide provisions for "Factory Witness Testing" (FWT) as stated in the specifications.
4Specification section 013200 Section 1.1.C references Division 1 Section “Network Analysis Schedules”. This division 1 specification is not included in the current specification set. Please provide this specification section."Network Analysis Schedules" is as stated in section 013200, Part 1.2 and is entitled "CONSTRUCTION PROGRESS SCHEDULING".
5Specification Section 001200 Part 3.4 Unit prices requires the submission of two unit prices, in accordance with 3.4.B and 3.4.C. Please add both of these unit prices to the SF1442 Pricing sheet.These items (General Conditions Costs & Excavation of "unsuitable soil excavation" as stated in section 001200 / 3.11 - Geo-Tech Requirements) will be ADDED to the "Supplemental Pricing Sheet". Additionally, bidders may provide "DEDUCT" if "Office / Storage" trailer function is IN south end of building 94 in lieu of exterior / rented trailers. Subdivision of the space (approximately 5,600 SF) is at the GCs expense.
6There is no requirement for unit prices for the cast in place drilled pile in the contract. This work is typically performed on a unit price basis so over runs and under runs are easily accounted for. Will a unit price for piling be added to the pricing sheet? If not will over runs in piling operations be addressed through the Differing Site Conditions Clause?ADD Section 001200 part 3.4 / D: LUMP Sum price based on drawings and specifications - considering the "Geo-Technical" Report- AND - Provide a "Unit Price" per lineal foot of cast-in-place "DRILLED PIERS" over the dimensions indicated on the drawings. As stated in section 316326 / 1.3 AND this will be added to the GSA "Supplemental Pricing Sheet".
7Specification Section 001200 Part 3.2 Identifies the basis of award as lowest price for the base bid under “Contract award – Sealed Bidding”. This contradicts section VI. Method of Award which identifies the use of best value to determine award. Please verify that the evaluation for award will be based on best value in accordance with section VI. Method of Award.Specification section 001200 part 3.2.A ADD: "Contract Award shall be based on "Overall Best Value"".
8Please clarify the extent of the High Voltage electrical work to be completed under this contract?The DFC distribution voltage operator (Sturgeon) is the onsite Dever Federal Center coordinator of the high voltage portion of the project.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

2nd Round

SSA E-VAULT QUESTIONS GS-08-P-17-JA-C-0005
QUESTIONANSWER
9What is the process of requiring permits and inspections?Any permits required (i.e. excavation, weld or burn) will be obtained through GSA and coordination of the Project and Building Managers. All inspections will need to be scheduled and coordinated through GSA Project Manager.
10Who is the authority having jurisdiction? Jacobs Engineering or Core of Engineers?The authority having jurisdiction is GSA, Region 8, Fire Marshall, Alan Antonio.
11Specification 262300-1 references “Digital Realty” building standards. Please clarify why this is in the specifications.Disregard this reference it does not apply to this project.
12Specification 262300-1 mentions “Low Voltage Switchgear-Pre-purchase”. Please clarify if GSA is providing this material or is the General Contractor providing?General contractor is to provide the Switchgear.
13Specification 001200-4 3.6 A -Factory Witness Testing. Please clarify that Factory Witness testing will be done onsite (Building 94) after all equipment has been installed and started up.Factory Witness Testing cannot be performed on-site in the event that some revisions are required at the factory. Factory Witness Testing will be performed at the factory.
14DSI could not find a finish schedule for flooring, painting, ceiling and door hardware. Please provide.Apparently the Finish Schedule (Dwg #A-6.3) was inadvertantly left off the Bid Set. The finishes are indicated on that drawing vwhich is attached here. Basic door hardware is noted on Dwg #A-6.2 and in spec section #087100 part #1.8.B.1 - Your "Architectural Hardware Consultant" (AHC) will prepare the final Hardware Schedule. Please email Sarah Callies your SBU to obtain the additional drawings.
15Sheet A-0.1 Architectural Demo Plan- Please confirm if GSA is removing the fencing or the general contractor.Yes, GSA will be removing the existing fencing
16During the second onsite meeting E2 Optics mentioned that they will provide an addendum for the data hall structural ceiling support grid. Tate? Please provide information or specifications.Refer to the forthcoming modification specs section #095100. The structural capabilites have been modified as follows1.2 / a: Ceiling grid system shall be capable of supporting a uniform load up to 25 lbs/SF.

b. Ceiling system shall be capable of a maximum static point load of 200 lbs. with standard duty connector.

As competitors - several systems are only capable of a 90 lb point load - which is too low for our anticipated loads. The revised drawing #A-3.2 is attached here.

17Please confirm GSA is providing all server cabinets, rack PDU’s and anchor brackets. How many racks will be installed day one?SSA will be providing all server cabinets, rack PDU's and ganging kits to anchor cabinets to each other. 8 cabinets Demarc #1; 8 cabinets Demarc #2; 23 cabinets Data Hall #1 and 21 cabinets Data Hall #2; Total Cabinets = 60, See DAT-1 for details.
18Will GSA provide server cabinet anchorage details?Ganging kits will be provided to bolt cabinets together, there will be one standalone cabinet not bolted to another in Data Hall #1.
19Hot Aisle Containment System (HACS) clarification. Drawing A-3.2 shows containment curtain. Specification 13 2110 section 2.3 calls for steel vertical and horizontal framing. Is this a combination of hard panels and curtains where no cabinets are being installed day one?Yes the HACS is with hard Panels and soft curtains. -- Drawing #A-6.2 gives a very good rendition of the HACS. Coordinate drawings #A-3.2 & A-6.2 with the full specifications. The HACS system will contain an upper permanent structure that will be approximately 3-4 feet from the ceiling and will allow an attachable/detachable curtains to block the approximate 8-9 feet from the upper permanent structure to the floor. Example is on drawing A-6.2. Final dimensions will depend on Vendor chosen for proposal.
20How many server cabinet blanking panels are required in bid proposal? 1U blanking panels or 42U blanking panels that can be cut?Blanking panels will be part of the server cabinet order and will be supplied by SSA.
Drawing SC 1.10 Please confirm the base proposal includes the following quantity of bus plugs.Quantity of 'b.' is 16, changed from 15 - all other quantities remain the same reference Drawing SC 1.10
a. (54) 60-amp bus plug RS460C9W
b. (15) 50 amp bus plug 9C54U2
c. (80) 30 amp bus plug A-B phase L6-30R
d. (80) 30 amp bus plug B-C phase L6-30R
e. (80) 30 amp bus plug C-A phase L6-30R
21f. (10) 20-amp bus plug 5-20R (was this supposed to be Locking L5-20R)
22Section 260573 Overcurrent Protective Device Coordination Study. Who is responsible for developing the short circuit coordination study and the Arc Flash 260574? Where is Specification 260573 and 260574 located?Further clarification will be forthcoming.
23The Supplementary Instructions to Bidders contains (in Section 001200) requests for more detailed pricing and/or Labor Rates. These pricing requests are not found in either June 29, 2017 Instruction to Offerors letter, nor in the C201 Solicitation document. Should those Supplementary Instructions be followed? If so, how should that pricing be included with/added to the Attachment 0008 Price Proposal Worksheet?Please reference Construction Wage Rate Requirements that are part of the solicitation package.
24Is the General Contractor responsible for providing diesel fuel for commissioning/testing as well as topping off at the completion of the project?Yes, the General Contractor is required to provide the fuel for Commissioning/Testing as well as topping off at the completion of the project.
25On the single line diagram E-4.00 “MDSA” & “MDSB” shows normally open 800 amp circuit breakers labeled “MDSA-04” & “MDSB-06”. Please clarify what these circuit breakers are for or are they spares?Circuit breakers MDSA-04 and MDSB-06 are spares.
26I have received two emails that the potential contractors cannot locate the actual Electrical Narrative in the document. The expectation was to find it around page 198, (before Section 5 – Physical Security), however they are unable to locate it, please advise.Electrical narrative section is forthcoming.

3rd Round

SSA E-Vault Questions GS-08-P-17-JA-C-0005
QUESTIONANSWER
27Can the contractor utilize 11X17 pages for submission of the project schedule?Yes
28Will 11X17 schedule pages be counted as a single page in the total proposal page count?Schedule pages will not count against total proposal page count
29The specifications or drawings do not provide a room finish schedule. Will a complete room finish schedule be provided to clarify finish types and colors in each individual space?(JFD) - Room Finish Schedule (dwg A-6.3) can be requested from Sarah Callies via email sarah.callies@gsa.gov. - Colors will be selected by GSA & the tenant
30There is no detail sheet or information contained in the specifications as it relates to partition types identified on drawing A1.3. Please provide information on partition types as they are referenced in drawing A1.3.(JFD) - Partition types are on the Room Finish Schedule (dwg A-6.3) can be requested from Sarah Callies via email sarah.callies@gsa.gov
31Specification section 09 91 00 High Performance Special Coatings section 3.10 provides a Schedule of Coating Systems. Section A provides a list if steel members that are not related to this project that are required to be covered under this section. Please clarify the locations/steel members on the project for which specification section 09 91 00 is applicable.(JFD) - Section 3.10 was inadvertantly included in this specification. Therefore, this section #3.10 (only) shall be removed from this specification. The main part of this section regarding the "STATIC CONTROL SEALER FOR CONCRETE SUBSTRATES" shall remain.
32Specification section 09 65 00 Resilient Wall Base does not identify locations within the project where the product is to be installed. Please provide a room finish schedule for Resilient Wall Base(JFD) - Room Finish Schedule (dwg A-6.3) can be requested from Sarah Callies via email sarah.callies@gsa.gov.
33Specification Section 09 65 19 Resilient Tile Flooring and Specification Section 09 68 13 Carpet Tile do not contain installation locations for the respective products. Please provide a complete room finish schedule to identify locations inside of the project that receive each type of flooring.(JFD) - Room Finish Schedule (dwg A-6.3) was issued with the responses to Round 2. Can be requested from Sarah Callies via email sarah.callies@gmail.com
34Specification Section 09 91 00 Paints and Coatings Section 2.2Applications/Scope includes numerous surfaces both interior and exterior that require painting and coatings that are not included in this project. Please provide a complete room finish schedule to indicate all finishing requirements on the project.(JFD) - Room Finish Schedule (dwg A-6.3) was issued with the responses to Round 2. Can be requested from Sarah Callies via email sarah.callies@gmail.com
35Please provide specification sections for the security entrance products identified on sheet A1.5 Including the Electromagnetic Security Screening tower, X-ray Screening Unit and the Glass Security Entry Cylinder.The tenant (SSA) shall provide the " Electromagnetic Security Screening tower & X-ray Screening Unit". The "Glass Security Entry Cylinder" is specified in section #084233 "SECURITY DOORS"; and indicated / detailed on drawing #A-6.2.
36Will the successful bidder be required to utilize Sturgeon Electric for the High Voltage work on the project?Sturgeon Electric has an existing contract with the Denver Federal Center as the (insert their official title or role here). The use of Sturgeon Electric is not required. However, coordination with Sturgeon Electric is required, much like you would coordinate with any city’s utility provider if you were to connect to or work with their system as part of a construction project. In this scenario consider Sturgeon Electric as the “city” electrical utility company of the Denver Federal Center with whom notifications and coordination will be necessary.
37If the use of Sturgeon Electric is required, resulting in sole sourcing of work under this contract, can the GSA provide the cost for the High Voltage work from Sturgeon to each of the bidders?GSA?
38If the use of Sturgeon Electric for the High Voltage work is not required, and all the work indicated on the project plans is required under the performance of this contract, can the GSA provide complete plans, specifically including the full site electrical infrastructure layout, for the high voltage systems to allow other electrical contractors to perform take offs for the entire high voltage package.GSA?
39Can one Utility transformer carry the load for MDS-A and MDS-B (TX-A and TX-B)?Yes, TX-A or TX-B is capable of supporting entire building load.
40Why transfer both sides on a single Utility loss? Does this have to do with a single generator maintaining load for one side?This is a reliability issue. It is preferable to go to a stable, generator, source at the first failure event for both sides as it is not uncommon for a utility outage to one source adversely affecting the alternate utility source. Typically this can be changed with programming at a later stage if desired.
41There is no paralleling bus for these generators before connecting to the load. Is it possible to have a generator overload situation if only one of the three generators connects to the bus? How long after Utility voltage is lost do two generators have to be paralleled and connected to the bus?Paralleling is not required except in a limited number of scenarios. In the event it is desired to feed the entire load from one side via generator, MDS-A or MDS-B, the sequence would be to open the tie breakers, parallel the C generator to the selected generator and then close the ties to assume load of the opposite side.
422.11.E.2 shows load demand start/stop. We can't do this without an isolated Generator paralleling bus.Generator C can parallel to either side MDS-A or MDS-B as discussed above. There is no load demand start/stop needed other than to require 2 generators to run as a minimum.
432.11.G.5 indicates <100 ms transfers. The system before this only indicates paralleling with soft loading/ unloading of the generators. Where would this <100 ms transfers occur?This section is specifying the capabilities of the transfer controller. The design is for open transition transfers only but the controller needs to have the capability for fast transfer closed transition transfers. No soft loading or extended duration generator to utility paralleling is required.
442.17.B we cannot do this. We must take exception to it.Noted
45In Sec 28 20 00 -3 and 28 20 00-5 in the Spec sheets calls out for the (Qognify / NICE Systems) server equipment and storage upgrades on the new Video Surveillance System shall be provided by the owner. Will the owner be providing the software, licensing and programming?End-user will provide all software, licensing, and programming. The contractor will be responsible for programming IP address, aiming, and focusing cameras. Coordination between the end-user and contractor will be required during installation.
46The Spec calls out for HID PAM modules to provide for the authentication of the PIV badges. Lenel now has a panel with the PAM built-into the Mercury panel. This eliminates extra hardware and drastically reduces the physical foot print on the wall. Would the new panel be an acceptable replacement?The End-user currently does not have any of these in use, however if the new Lenel product is on the GSA approved products list and is compatible with the existing system these panels will be acceptable
47In the Design Narrative (Section 5) page 2 the request is for a Bosch IDS system. Would DMP be an acceptable manufacturer?DMP is acceptable
48Drawings do not show housekeeping pads for interior electrical and mechanical equipment. Are they required?All equipment is required to be on housekeeping pads.
49Other than in the Wet-Pipe Sprinkler Systems Section, we see no reference to permitting authorities. For standard building permits, who is the appropriate permitting authority?GSA?
50Is there any particular jurisdiction where a general contractor must be licensed in order to submit a qualifying bid for this project?No
51Are there any requirements for the Bonding of subcontractors or sub-subcontractors? Is there a preference for such Bonding?The General Contractor has the responsibility to obtain bonding.

4th Round

SSA E-VAULT QUESTIONS GS-08-P-17-JA-C-0005
QUESTIONANSWER
52We do not see any information regarding sales and use taxes. Should the GC (and their subs) expect to pay sales tax on their respective material and equipment purchases? If there are no sales taxes, where can we find information regarding sales tax exemptions?
53We note that Amendment 4 to the solicitation includes an SF30 for Amendment 0004. However, Amendment 3, which was posted on 18 AUG, does not have an SF30. Was this an oversight?Yes, this was an oversight and will be attached as it's own amendment.
54The scope of work May 10, 2017 Attachment 7 in the solicitation lists a Project Duration of 459 calendar days. However, the C101 E-Vault Agreement details a Period of Performance of 358 days of substantial completion, plus 60 additional days for contract completion. This total of 418 days is different than the 459 days listed in the scope of work. Which number controls for Liquidated Damages?
Data Hall IDEC Managers (2 managers & 4 IDECs) SCP-1:
As per specification section 230900-sequence of operation IDEC unit comes with internal, pre-programmed controller & the EMCS will integrate to these controllers. It also mentions all DP/Temp transmitters will be wired to the IDEC master manager. Please see below screen shots. However, point list given in spec. 230900 mentions hardwired IO points such as DP/Temp sensors etc.
55Please confirm- 1. DDC control or only Interface via BACnet interface to these units.