Response to Round One RFI's
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1st Round
| SSA E-Vault Questions GS-08-P-17-JA-C-0005 | ||
| QUESTION | RECOMMENDED ADDENDUM TERMINOLOGY | |
| 1 | Factor 2, Past Experience, requires two or more similar contracts/task orders, substantially completed within the past seven years, to include whether initial construction or retrofit of an existing building, and further states that a more favorable evaluation may be provided for data center retrofit experience versus data center initial construction and for Tier III Data Center experience. Each of these prerequisites has the effect of limiting competition. This factor goes on to require similar Data Center building construction with both 10,000 GSF or more and a total project construction cost exceeding $10,000,000. Such limitations may further unduly restrict competition by excluding relevant past performance that does not meet these two thresholds. 1) When taken as a whole, the requirements appear to favor large businesses; please consider relaxing the 10,000 GSF and $10,000,000 minimums. 2) Please clarify how past performance for major subcontractors which are meaningfully involved in the planned project will be considered. 3) Please confirm that commercial projects may be used as Past Performance references. | Factor 2 - ADD: Summary) Data Center facilities are very complex; The goal is to ascertain the Data Center & construction knowledge of the bidders and select the most qualified for the most reasonable price. A project of this size and magnatude requires a Prime contractor that has experience managing all aspects of a multi-million dollar project. The main subcontractors (Electrical & Mechanical) shall be designated in the bid submittal. |
| 2 | The pricing excel sheet provided as part of the bid documents does not have a location for the Optional Extended Warranty line items identified in spec section 001200-4 3.5 Extended Warranty. Is the provision for pricing the extended warranty required and how should it be presented? | ADD: to the SF 1442 the 5 year warranty for all major electrical equipment: generators, ATS' + UPS', and switchboards |
| 3 | Spec section 001200 section 3.6.C requires a Factory Witness Test (FWT) of the complete power system. This is very costly and will have a significant impact on the overall construction duration. | Specification section 001200 section 3.6.C. ADD: Contractors will provide provisions for "Factory Witness Testing" (FWT) as stated in the specifications. |
| 4 | Specification section 013200 Section 1.1.C references Division 1 Section “Network Analysis Schedules”. This division 1 specification is not included in the current specification set. Please provide this specification section. | "Network Analysis Schedules" is as stated in section 013200, Part 1.2 and is entitled "CONSTRUCTION PROGRESS SCHEDULING". |
| 5 | Specification Section 001200 Part 3.4 Unit prices requires the submission of two unit prices, in accordance with 3.4.B and 3.4.C. Please add both of these unit prices to the SF1442 Pricing sheet. | These items (General Conditions Costs & Excavation of "unsuitable soil excavation" as stated in section 001200 / 3.11 - Geo-Tech Requirements) will be ADDED to the "Supplemental Pricing Sheet". Additionally, bidders may provide "DEDUCT" if "Office / Storage" trailer function is IN south end of building 94 in lieu of exterior / rented trailers. Subdivision of the space (approximately 5,600 SF) is at the GCs expense. |
| 6 | There is no requirement for unit prices for the cast in place drilled pile in the contract. This work is typically performed on a unit price basis so over runs and under runs are easily accounted for. Will a unit price for piling be added to the pricing sheet? If not will over runs in piling operations be addressed through the Differing Site Conditions Clause? | ADD Section 001200 part 3.4 / D: LUMP Sum price based on drawings and specifications - considering the "Geo-Technical" Report- AND - Provide a "Unit Price" per lineal foot of cast-in-place "DRILLED PIERS" over the dimensions indicated on the drawings. As stated in section 316326 / 1.3 AND this will be added to the GSA "Supplemental Pricing Sheet". |
| 7 | Specification Section 001200 Part 3.2 Identifies the basis of award as lowest price for the base bid under “Contract award – Sealed Bidding”. This contradicts section VI. Method of Award which identifies the use of best value to determine award. Please verify that the evaluation for award will be based on best value in accordance with section VI. Method of Award. | Specification section 001200 part 3.2.A ADD: "Contract Award shall be based on "Overall Best Value"". |
| 8 | Please clarify the extent of the High Voltage electrical work to be completed under this contract? | The DFC distribution voltage operator (Sturgeon) is the onsite Dever Federal Center coordinator of the high voltage portion of the project. |
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | ||
| 34 | ||
| 35 | ||
| 36 | ||
| 37 | ||
| 38 |
2nd Round
3rd Round
4th Round
| EPA QUESTIONS GS-08P-16-JB-C-7031 | |||
| QUESTION | ANSWER | ||
| 48 | No Question. | ||
| 49 | Drawing P-000, plumbing general note 18, indicates domestic hot and cold water piping above ground to be Type L copper. | ||
| Spec section 22 10 05-3, 2.04 A indicates Type K copper? | Type L copper may be used for above grade domestic water services. | ||
| 50 | Please provide designation of lighting fixtures on sheet E331, Lab 1C-630. Currently the indirect fixtures are identified as LED. Should they be Type FP? | Fixture should be Type FP. | |
| 51 | Will x-rays/scans be required for second floor penetrations? | X-ray is not required. Structural will provide penetration support detail post-bid | |
| 52 | Refer to drawing M-111D, keynote 18. What size is the existing pipe in this location? | The record drawings from the previous renovation show these lines to be 1-1/2". Piping shall be field verified for sizing prior to ordering meters. | |
| 53 | Refer to drawing M-201. New pumps indicated by keynote 2 are not scheduled? | Boiler room portion of project, including referenced pumps, has been removed from this project scope in Addendum #1 and released as an independent project. | |
| 54 | Refer to drawing M-103A, keynote 1 & 2. Don’t know what this is. Duct / pipe ? | The venting to offset is piping. Refer to picture of existing condition. | |
| 55 | They are showing two new HWP's but there is no schedule for them can we get some information on them so I can get a quote for them? | Boiler room portion of project, including referenced pumps, has been removed from this project scope in Addendum #1 and released as an independent project. | |
| 56 | MD-111A Note one says to demolish existing terminal unit thermostat, wiring and controls. Is there a terminal box with piping that has to be demolished or is it just the controls? | Terminal unit and all associated service are to be demolished. New terminal unit ATU-1 is installed to replace it. | |
| 57 | MD-111D Note one says to demolish existing Phoenix Valves and associated hot water coil at supply air valves. Demolish HWS/R piping back to isolation valve cap and valve off. It does not show any piping to these units. | Some units with tags are exhaust air valves. The note indicates that piping associated with coils at supply air valves are to be demolished. Refer to duct sheet MD-101D for clarification on if valves serve supply or exhaust system to lab. All supply air valves shall be assumed to have a heating coil with piping whether shown on plans or not. | |
| 58 | Is this a 100% domestic material job | This project must abide by the Buy American Act per division 1 spec 016000 section 2.02 , products must be “domestic” |
The Buy American Act imposes a two-part test:
(1) The end-product must be manufactured in the United States, and
(2) more than 50 percent of the cost of all the component parts must also be manufactured in the United States.
If a product meets this two-part test, then a product can be considered a "domestic end product" under the Buy American Act.
The solicitation document also incorporates a Buy American Act Clause.
| 59 | They are calling for 1-1/2" Pipe but the original lines look to be 3/4". Are we to demo these lines and run new from the main? | In reviewing the existing mains, these are 3/4" mains. The existing mains from (E) PHX-1303-01 to the 3" mains in corridor shall be removed and replaced with new 1-1/2" mains. Provide new 3/4" tap from 1-1/2" mains and connect to existing to remain coil at (E) PHX-1303-01. |
| 60 | M-111D Are we piping to the chillers that are in the ceilings in area D and Area A? | The chillers are lab equipment and are air cooled. Piping is indicated on M-111D to be routed concealed for from house connection and isolation valves in chiller room 1C-620 to wall outlets in 1C-630 for service to lab equipment and are installed by mechanical contractor. Connection from chiller to piping and from valves to equipment is by lab equipment installer. On M-111A, piping is to be installed concealed from the 2 chiller rooms associated with 1A-250 to spigots at the counter. Refer to lab drawings for exact quantity and locations of spigots. The concealed piping, connection fittings and isolation valves in chiller closets and spigots on counters to be provided and installed by mechanical contractor. Connection from chiller to piping and from spigots to equipment shall be by lab installer. Chilled water piping shown in 1C-1150, 1C-160 and 1C-520 routed to chiller cabinets is for service to fan coil units (FCU-7) mounted in chiller cabinet. Piping to route above ceiling and drop down into cabinet for service to FCU. |
| 61 | Are the Btu Meters new locations or are they replacement meters? | All BTU meters shown are new installations. There are no existing meters being replaced. |
| 62 | Are all Phoenix Valves getting replaced? | No, some are intended to remain with new replacement controls to convert from the existing pneumatics to electric actuators. The schedules on M-402 and M-403 indicate in the notes if valve is existing and planned for a new controller. All other valves not such noted are new. As clarified in Addendum 05, all air valves serving a single lab shall be by one manufacturer and that any modified Phoenix valve shall have new controller by Phoenix. The contractor has the option to replace all Phoenix air valves as desired if alternate manufacturer is preferred to using Phoenix valves. |
| 63 | Are all terminal boxes getting replaced? | No, existing terminal units shown to remain (noted by "(E)" before the unit tag number) will be rebalanced for indicated airflows. Only one new terminal unit is planned and this is scheduled on M-401. |
| 64 | The spec is calling out 2” and under to be threaded steel pipe or type K copper, is this correct? | Correct, it is contractor option to use sch 40 black steel piping or Type K copper for piping 2" and under. Proper di-electric connections will be required between dis-similar piping materials. Above 2" to be sch 40 black steel welded fittings with flange connections at valves and equipment. |
| 65 | M-111B It says to extend new branch to new FCU but there is no location for the FCU shown on the prints. | Note incorrectly located. There is not a FCU in this location. No piping needed. Nearest FCU is to south in corridor for service to 1A-270 as shown on M-111A. |
| 66 | 234000 What is the specific application for the Bag-In Bag-Out housing? (industrial, pharmaceutical, biological) | The housing is for the HEPA filters installed in the exhaust air stream to EF-1201-C,D indicated by tag F-1 and key note 4 as shown on M-103A. The exhaust is from fume hood in asbestos lab and is for filtering any residual particles in airstream prior to discharge to atmosphere. |
| 67 | 234000 What material should the housing be made from? (304 S/S or 316 S/S) | Spec section 23 40 00 2.08 A, indicates the material to be 304 SS for the filter housing. |
| 68 | 234000 What is the expected CFM on this system? | The housing is for service to EF-1201-C,D. One fan is to run at a time. Refer to schedule on M-401 for fan capacity. |
| 69 | 234000 Will the pre-filter and final filter be accessed through a single door or will they require separate access? (two doors) | Two doors as noted in 23 40 00 2.08 E that notes each tier of filtration will have a door. |
| 70 | 234000 Which side of the unit should the access door(s) be located? | Doors would be expected to be installed on the west side (left looking at inlet of housing) to allow maximum service access. Final determination will need to be coordinated with installer prior to order. |
| 71 | 234000 Is a test section required? | A dedicated test section is not intended. Please refer to 23 40 00 2.08 K that indicates the desired test ports and their locations. Also note item J that calls for static pressure ports to be installed across each filter bank (pre and HEPA) for indication of filter loading. Magnehelic gauges are also required in item L. |
| 72 | 234000 Will the housing require inlet and outlet transitions and dampers? If yes, please specify inlet an outlet ducting sizes. | The housing will require inlet and outlet transitions as shown on M-103A. It is at the discretion of the installing contractor if the transitions are to be provided with the housing or shop fabricated with the welded stainless steel exhaust ductwork. Refer to plans for duct inlet sizing. No dampers are planned since there is a single housing serving only one hood. |
| 73 | 234000 Is there a requirement for decontamination ports? | It is intended that the test/challenge ports will be used for decontamination if required. |
| 74 | 234000 Key Notes #4 specifies mounting the housing on rood curb rails. Will the unit sit directly on these rails or are stilts required on the housing? | Housing can sit on curb or may need to be raised up depending on construction of inlet and out transitions and the connection to the fan plenum box. This will need to be reviewed and detailed by the installing contractor. |
| 75 | 234000 The final filter is called out as a MERV 17 rating. Is this expected to be a HEPA level efficiency? If yes, what efficiency is expected? | Yes, the filters for housing F-1 are to be HEPA grade filters with 99.97% efficiency. Refer to 23 40 00 2.05 (note - item 2.05 C incorrectly notes MERV 15, should be MERV 17 per schedule. Section 2.05 shows similar to AAF AstroCel1 at 99.97% eff) |
| 76 | Ceilings There seems to be discrepancies between the finish schedule and the RCP legend in terms of where the new ceiling tile is to be applied. For example: 1D-525 on the Finish Schedule states ACP-1. When you look at it on the RCP it is hatched as if it were to be Existing to Remain. Please confirm if the RCP plans take precedence in these cases. | The RCP drawings are correct and should be followed for ceiling material. |
| 77 | 115300 & 132114 Both of these specficiation sections appear to cover the cold room. Please confirm which specification takes precedence in cases of conflict. | 132114 shall take precedence. |
| 78 | 071326 Locations for waterproofing could not be found in the plans. Please confirm where this system will be required. Is this located at the new concrete pits? | Provide exterior waterproofing at acid vault, please refer to spec section 07 13 26-1.02.A.1 |
| 79 | M-111C, Level 1, Area C. I do not have a print for area C new piping | No renovation piping installed in area C. This is indicated on the legend on M-000 that does not have a sheet listed for this area. |
| 80 | M-111B, Note 4. Only one location is shown, is that correct? | Correct, there is one drop for the two condenser connections. Exact location and piping will need to be coordianted with the vendor supplying the coolers. |
| 81 | The lab drawings list a spec number for a Haws emergency shower but the plumbing only indicate a rough-in and final connection. Who is supplying the fixture? | These are under lab equipment as specified in 11 53 00. |
| 82 | Note 2 on drawing P-111D indicates that the lab gas is supplied and installed by the lab equipment installer. Does that reference all lab piping or just at the cylinder manifolds | NOTE 2 is intended to clarify lab equipment installer is to run tubing from equipment to nearest local dewar or valve provided at overhead carrier. It is the understanding of the design team that all laboratory gas piping, whether it be from a cylinder manifold or from house systems to overhead service carriers, will be installed by a plumbing contractor. Lab Equipment installers are contracted for the installation and commissioning of the laboratory instrumentation itself, not the routing of plumbing lines. Division of scope is to be verified general contractor. |