SOLICITATION GS-08P-16-JB-C-7031 QUESTIONS
September 27, 2016
1) Currently the GSA is asking for each Offeror reference to complete the Attachment 4 and send directly to the Government. We are requesting that the GSA reconsiders and allows the Offeror to use Past Performance Questionnaires that we already have on file and that the PPQs can be submitted in the books versus being sent directly to the Government.
Questionaires must be submitted in order for an offer to be considered responsive. You may reference a CPARS evaluation on the forms or provide a copy if you choose to do so.
2) The Phasing Schedule references areas labeled Blocks "B" thru "I", but these areas don't seem to be identified elsewhere in the documents. Can a drawing and/or narrative be provided that identifies the limits of these Blocks?
The “blocks” referred to in the Phasing Schedule generically correspond with the mechanical zones in the building. Referencing mechanical sheet, M101.1, the following schedule applies:
Block B = RHU-2402 Block C = AHU 1201 Block D =RHU-1301 Block E = RHU-1303 Block F = RHU-1302 Block G = RHU-1304 Block H = RHU-1305 Block I = AHU-1101 Block J = Level 2
Specific rooms associated with each phase are identified below:
Phase 1a / 1b Areas Area 1A: ST-02, 1A-010, 1A-020, 1A-030, 1A-040, 1A-060, 1A-070, 1A-075, 1A-135, 1A-145, 1A-225, 1A-226, 1A-325, 1A-410, 1A-420, 1B-035, and C1A5 Area 1B between grids 28 and 30: 1A-355, 1A-420, 1A-340, 1A-360, ST-01 Area 1C: 1B-165, 1B-170, 1B-175, 1B-215, 1B-225, 1B-245, 1B-265, 1B-275, C1B5 Area 2 (level 2): 2B-135, 2B-125, C2B1, 2C-120, 2C-110, C2B0, 2B-505, ST-02, and ST-01
Phase 2 Areas Area 1B Labs along C1C3 corridor: 1C-225, 1C-245 Area 1D Labs between grids L and O: 1C-610, 1C-630, 1D-520, 1D-540, 1D-550, 1C-130, C1D5, 1C-115, 1C-120, 1C-090, 1C-085, 1C-045, 1C-060, C1C0, 1C-025, 1C-005, 1C-210, 1C-305, , 1C-540A, 1C-540B, 1F-185, C1C0, C1C2, C1C3, C1D5, C1F1 and associated gas closets as needed
Phase 3 Areas Area 1D Labs from gridline O to the east: 1C-150, 1C-160, 1C-170, 1C-180, 1C-320, 1C-325, 1C-325A, 1C-340A, 1C-340B, 1C-360, 1C-365, 1C-405, 1C-420, 1C-425, 1C-425B, 1C-520, C1C1, C1C4, C1C5, VE-06, and associated gas closets as needed
Phase 4 Areas Area 1A Labs Final Renovation: 1A-220, 1A-110, 1A-235, 1A-250, 1A-245, 1A-260, 1A-255, 1A-225A, 1A-270, 1A-265, C1A2 and associated gas closets as needed Area 1B: 1A-375
3) These spec sections reference several alternates and unit prices which do not appear on the Pricing Schedule included with the SF1442. Will a revised Pricing Schedule be issued to include these items?
In reference to spec seciton 012200 and 012300, Please provide alternate unit prices for the control system on a supplemental pricing sheet.
4) Section 1.6, Quality Assurance - Please confirm if costs for the Certified Asbestos Building Inspector are to be paid for by the Contractor or are covered by the Owner.
The costs for the CABI are to be paid for by the Contractor.
5) Will Earthwork or SWPPP specifications be issued for this project?
See posted: Storm Water
6) Section V.2, Proposal Requirements - Item 2 references submission of a Detailed Price Proposal in Uniformat, Level 4. Please confirm if this is required in addition to the SF 1442 Pricing Schedule. If required, we respectfully request that Offerer's be allowed to submit the detailed breakdown within 24 hours following the proposal submission date.
Both the SF1442 and a detailed price breakout using the Uniformat is required. No additional days will be added for the detailed breakdown. All must be submitted for consideration.
7) General Note #3 states "Contractor will deconstruct and salvage valuable building components (e.g. windows and sills, facades, doors)". Please provide a specific list of items required to be salvaged and turned over to the Owner.
EPA has requested that the contractor salvage all items, which should all go to EPA (Karon Johncox and Tim Essman). EPA will then determine the disposition of each item and work with GSA wherever possible for the items to be repurposed or excessed.
The O&M has requested that the controls for the hoods that are being replaced and any VAV boxes for air supply that are not being used in the renovation be salvaged and returned to the O&M.