2016-09-30_EPA_Building_Addendum_05.pdf

PDF 922 KB Posted

Attached to
EPA CO Relocation and renovation of Building 25 at the Denver Federal Center
Solicitation number
GS-08P-16-JB-C-7031
Issued by

About this file

Addendum 05 for specifications and drawings

View the file

Other files

File Type Posted
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005_EPA.pdf PDF
Amendment_0002_EPA.pdf PDF
Amendment_0004_EPA.pdf PDF
Amendment_0001_EPA.pdf PDF
Amendment_0003_EPA.pdf PDF
2016-10-12_EPA_Building_Addendum_06.pdf PDF
Questions_ _Answers_4th_Set__10122016.doc DOC document
DB_Heavy_Jefferson_06032016.doc DOC document
Questions_ _Answers_3rd_Set__10072016.doc DOC document
DB_Building_Jefferson__08052016.doc DOC document
Questions_2nd_Round__10052016.doc DOC document
Storm_Water.pdf PDF
Questions_09272016.doc DOC document
2016-09-21_EPA_Building_Addendum_04.pdf PDF
Siemens_Sole_Brand_Justification.pdf PDF
SITE_VISIT_EPA_09222016.doc DOC document
SITE_VISIT_EPA_09082016.doc DOC document
Attachment_3_-_Offeror_Experience_Information_Document.doc DOC document
C301_GC_Reps_ _Certs_EPA.doc DOC document
Attachment_4_-_Offeror_Past_Performance_Survey.doc DOC document
Attachment_2_Request_for_Solicitation_Documents_Form.doc DOC document
Scope_of_Work_EPA_08242016.pdf PDF
Cover_Letter_GS-08P-16-JB-C-7031.pdf PDF
Attachment_1_SBU_Form_GS08P16JBC7031.docx DOCX document
C201_GC_Solicitation_EPA_Final.doc DOC document
GSA_527.pdf PDF
C101_GC_Agreement_EPA_Final.doc DOC document
SF1442_GS-08-P-16-JB-C-7031.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3198 Speer Boulevard

Denver Colorado 80211

303 294 9448

Fax 303 294 0762 amd@amdarchitects.com

N:\2009121_GSA_IDIQ_REGION8\2009121_11_EPA-LAB\06-CONSTRUCTION\ADDENDA\ADDENDUM

05\ADDENDUM_05.DOC

ADDENDUM # 005

Date: 30 September 2016

Project #: 2009121.11

Project: Building 25 - EPA Lab

U.S. General Services Administration

Bid Documents Issued: 30 August 2016

The Drawings, Specifications, and Contract Documents on the project are modified, corrected, supplemented, and/or superseded as hereinafter described. It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herewith. This addendum may affect pricing. Failure to acknowledge this addendum may be cause for rejection of bid.

DRAWINGS:

ARCHITECTURAL

A-101A Remove Work Note 173 for 6” concrete curb and associated dimension strings from 1A-250, R8 CLLE Lab

ADDENDUM # 005

30 September 2016

LABORATORY FURNISHINGS

LF-304 Concrete curb removed from Enlarged Lab Plan 1 & 2 Detail reference removed form Enlarged Lab Plan 1 & 2 Concrete curb removed from Elevation 3 & 6

LF-801 Detail 1 removed from sheet

Attachments:

Sections as indicated above.

End of Addendum

CENTRIFUGAL HVAC FANS 23 34 16-1

(Addendum 05, 9/30/16) (Addendum 01, 5/27/16)

SECTION 23 34 16 - CENTRIFUGAL HVAC FANS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Dryer Exhaust Duct Power Ventilator

1.02 RELATED REQUIREMENTS

A. Section 23 05 13 - Common Motor Requirements for HVAC Equipment.

B. Section 23 05 48 - Vibration Controls for HVAC Piping and Equipment.

C. Section 23 07 13 - Duct Insulation.

D. Section 23 33 00 - Air Duct Accessories: Backdraft dampers.

E. Section 01 91 13: Commissioning requirements that apply to all types of work.

F. Section 23 08 00 - Commissioning of HVAC.

1.03 REFERENCE STANDARDS

A. ABMA STD 9 - Load Ratings and Fatigue Life for Ball Bearings; American Bearing

Manufacturers Association, Inc.; 1990 (Reapproved 2008).

B. ABMA STD 11 - Load Ratings and Fatigue Life for Roller Bearings; American Bearing

Manufacturers Association, Inc.; 2014.

C. AMCA 99 - Standards Handbook; Air Movement and Control Association International, Inc.;

2010.

D. AMCA 210 - Laboratory Methods of Testing Fans for Aerodynamic Performance Rating; Air

Movement and Control Association International, Inc.; 2007 (ANSI/AMCA 210, same as

ANSI/ASHRAE 51).

E. AMCA (DIR) - [Directory of] Products Licensed Under AMCA International Certified Ratings Program; Air Movement and Control Association International, Inc.;

http://www.amca.org/certified/search/company.aspx.

F. AMCA 300 - Reverberant Room Method for Sound Testing of Fans; Air Movement and Control Association International, Inc.; 2008.

G. AMCA 301 - Methods for Calculating Fan Sound Ratings from Laboratory Test Data; Air Movement and Control Association International, Inc.; 2007.

H. SMACNA (DCS) - HVAC Duct Construction Standards; 2005.

I. UL DEDPV Supplement to UL705

1.04 PERFORMANCE REQUIREMENTS

A. Performance Ratings: Determined in accordance with AMCA 210 and bearing the AMCA

Certified Rating Seal.

B. Sound Ratings: AMCA 301, tested to AMCA 300, and bear AMCA Certified Sound Rating

Seal.

C. Fabrication: Conform to AMCA 99.

D. Performance Base: 5500 foot elevation conditions.

E. Static and Dynamic Balance: Eliminate vibration or noise transmission to occupied areas.

1.05 SUBMITTALS

A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

SENSITIVE BUT UNCLASSIFIED (SBU)

CENTRIFUGAL HVAC FANS 23 34 16-2

B. Product Data: Provide data on centrifugal fans and accessories, fan curves, sound power levels for both fan inlet and outlet at rated capacity, and electrical characteristics and connection requirements.

C. Shop Drawings: Indicate assembly of centrifugal fans and accessories including fan curves with specified operating point clearly plotted, sound power levels for both fan inlet and outlet at rated capacity, and electrical characteristics and connection requirements.

D. Manufacturer's Instructions: Include complete installation instructions.

E. Maintenance Data: Include instructions for lubrication, motor and drive replacement, spare parts list, and wiring diagrams.

1.06 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.

B. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories Inc. as suitable for the purpose specified and indicated.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Protect motors, shafts, and bearings from weather and construction dust.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Fantech B. Substitutions: See Section 01 60 00 - Product Requirements.

A. Greenheck (AD 01) B. Loren-Cook (AD 01) C. Acme (AD 01) D. PennBarry (AD 01) E. Twin City Fans (AD 05)

2.02 DRYER EXHAUST DUCT POWER VENTILATOR

A. MANUFACTURERS (AD 01)

1. Fantech (AD 01)

2. Substitutions: See Section 01 60 00 - Product Requirements. (AD 01)

B. Dryer Exhaust Duct power ventilator shall be furnished with all accessories for installation including fan, pressure switch, LED indicator panel and duct clamps for smooth duct installation.

2.03 CENTRIFUGAL INLINE FAN

A. Drives: Variable pitch V-belt drives or direct driven as scheduled.

B. Housings: Hinged, heavy gauge aluminum enclosing motor outside airstream.

C. Motor: Ball bearing type, designed for heavy duty vertical mounting. Isolate motors and fans from base with rubber isolators. Select motor such that motor BHP does not exceed nameplate at rated conditions.

D. Fans: Centrifugal type, statically and dynamically balanced.

E. Provide:

1. Lubricated lifetime sealed ball bearings.

2. Disconnect switch on 3-phase units furnished under Division 26, unless noted as a fan accessory on fan schedule.

3. Bird screen on fan intake.

4. Provide with rubber-n-shear isolation hangers

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

CENTRIFUGAL HVAC FANS 23 34 16-3

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Install a minimum of 5 feet from the dryer outlet.

C. Install LED indicator panel on wall adjacent to the dryer location.

D. Pressure switch shall be connected to automatically turn fan on when dryer is in use and turn off after dryer stops. Fan shall continue to run for short period of time after dryer shuts down to reduce temperature of duct and dryer.

E. Fan shall shutdown if dryer exhaust rises above 165 degrees F.

END OF SECTION

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

VENTURI AIR VALVES 23 36 05-1

(Addendum 02, 8/5/16)

SECTION 23 36 05 - VENTURI AIR VALVES

PART 1 - GENERAL

1.01 VENTURI VALVES

1.02 SECTION INCLUDES

A. Venturi Valves - Electronic Variable Air Volume Supply B. Venturi Valves - Constant Volume

C. RELATED SECTIONS

1. Section 23 07 16 - HVAC Equipment Insulation (AD 02)

2. Section 23 31 00 – HVAC Ducts and Casings.

3. Section 23 09 13 - Instrumentation and Control Devices for HVAC

4. Section 23 09 23 – Direct-Digital Control System for HVAC

5. Section 01 91 13 - Commissioning requirements that apply to all types of work.

6. Section 23 08 00 - Commissioning of HVAC.

D. REFERENCES

1. NFPA 90A - Standard for the Installation of Air Conditioning and Ventilation Systems;

National Fire Protection Association.

2. UL 181 - Standard for Factory-Made Air Ducts and Air Connectors; Underwriters

Laboratories Inc.

E. SUBMITTALS

1. See Section 013300 - Submittal Procedures.

2. Product Data: Provide data indicating configuration, general assembly, and materials used in fabrication. Include catalog performance ratings which indicate air flow, static pressure, and NC designation. Include electrical characteristics and connection requirements.

3. Shop Drawings: Indicate configuration, general assembly, and materials used in fabrication, and electrical characteristics and connection requirements.

4. Manufacturer's Installation Instructions: Indicate support and hanging details, and service clearances required.

5. Project Record Documents: Record actual locations of units.

6. Operation and Maintenance Data: Include manufacturer's descriptive literature, operating instructions, maintenance and repair data, and parts lists. Include directions for resetting constant volume regulators.

7. Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

F. QUALITY ASSURANCE

1. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.

2. Products Requiring Electrical Connection: Listed and classified by Underwriters

Laboratories Inc. as suitable for the purpose specified and indicated.

G. WARRANTY

1. See Section 017700 - Closeout Procedures, for additional warranty requirements.

2. Provide three (3) year manufacturer warranty for venturi valves.

H. ATTIC STOCK

1. Provide two of each size actuator and two of each type of controller used in the scope of work for attic stock. Provide to owner before substantial completion of project. (AD02)

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

VENTURI AIR VALVES 23 36 05-2

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Products shall be provided by one of the following manufacturers:

1. Phoenix Controls; Product Medium Pressure Venturi Valves: Constant or Variable Volume

(refer to drawings), and Base Upgradable.

2. CRC (Critical Room Control) – www.criticalroom.com

3. TSI Incorporated

4. Triatek, LLC

5. Siemens Building Technologies, Inc.

6. Engineer-approved equal. Each lab shall have a single manufacturer for air valves.

Labs may not have a mix of manufacturers to ensure that full functionality and compatibility is maintained for fast acting control to maintain required room airflow offsets. (AD05)

a. All existing Phoenix Air Valves to have retrofit from pneumatic to electric actuators shall be Phoenix controllers. No other brand allowed, except for if alternate method in item d below is used.

b. All labs that have existing Phoenix supply air valves with added exhaust air valves, the new valves shall be Phoenix to allow for full compatibility and function. No other brand allowed, except for if alternate method in item d below is used.

c. Any labs with new supply and exhaust air valves, the valves may be of the brands listed above.

d. Alternately, at contractor option, for any spaces with existing or retrofitted Phoenix valves, the existing valve(s) may be replaced in its entirety with one of the manufacturers listed above to provide a single. Replacement will include all modifications to ductwork to accommodate new valve and all connections to electrical and control system.

B. MANUFACTURED UNITS

1. Identify each valve with clearly marked identification label and air flow indicator. Include unit nominal air flow, maximum factory set airflow, minimum factory set air flow, and coil type.

C. ELECTRONIC VARIABLE VOLUME VALVE

1. The airflow control device shall be a variable volume venturi valve.

2. The valve assembly manufacturer's Quality Management System shall be registered to

ISO 9001:2000.

3. The airflow control device shall be pressure independent over its specified differential static pressure operating range (0.6" to 3.0" W.C. pressure drop across the valve). An integral pressure independent assembly shall respond and maintain specific airflow within one second of a change in duct static pressure irrespective of the magnitude of pressure and/or flow change or quantity of airflow controllers on a manifold system.

4. The airflow control device shall maintain a factory calibrated flow set point based on a digital signal. Devices requiring feedback shall generate a 0 to 10 volt or 4 to 20 mA feedback signal that is linearly proportional to its airflow. Full interoperability with the BACnet BCS is required. Technology for peer-to-peer communication between room controllers shall be included.

5. Device shall track airflow supplied and exhausted from room served to ensure negative laboratory pressure.

6. Device shall send alarm on low airflow.

7. Device shall fail in mode that ensures negative laboratory pressure.

8. Actuators shall be high speed electronic. (AD 02)

9. All supply air valves shall be supplied with factory applied external insulation. (AD 02)

D. ELECTRONIC CONSTANT VOLUME VALVE

1. The airflow control device shall be a venturi valve.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

VENTURI AIR VALVES 23 36 05-3

2. The valve assembly manufacturer's Quality Management System shall be registered to

ISO 9001:2000.

3. The airflow control device shall be pressure independent over its specified differential static pressure operating range (0.6" to 3.0" W.C. pressure drop across the valve). An integral pressure independent assembly shall respond and maintain specific airflow within one second of a change in duct static pressure irrespective of the magnitude of pressure and/or flow change or quantity of airflow controllers on a manifold system.

4. The airflow control device shall maintain a factory calibrated flow set point based on a locked pivot arm. The pivot arm position shall be field adjustable to maintain constant flow corresponding to the locked arm position. Full interoperability with the BACnet BCS is required. Technology for peer-to-peer communication between room controllers shall be included.

5. Device shall track airflow supplied and exhausted from room served to ensure negative laboratory pressure.

6. Device shall send alarm on low airflow.

7. Device shall fail in mode that ensures negative laboratory pressure.

8. Actuators shall be high speed electronic. (AD 02)

E. SASH POSITION SENSOR

1. Refer to section 23 09 13 Instrumentation and Control Devices for HVAC.

F. ZONE OCCUPANCY SENSOR

1. Occupancy sensor shall be provided and installed by division 26. Coordinate with division

26 from proper placement for control of air valves and lighting systems.

2. Follow manufacturer installation instructions to fully install and integrate zone occupancy sensor into venturi valve room controller.

G. VENTURI VALVE ROOM CONTROLLER

1. Refer to section 23 09 13 Instrumentation and Control Devices for HVAC.

H. CERTIFICATION

1. Each airflow control device shall be factory calibrated to the job specific airflows as detailed on the plans and specifications using NIST traceable air stations and instrumentation have a combined accuracy of no more than ± 1% of signal over the entire range of measurement. Electronic airflow control devices shall be further calibrated and their accuracy verified to ± 5% of signal at a minimum of eight different airflows across the full operating range of the device.

2. All airflow control devices shall be individually marked with device specific and factory characterization data. As a minimum, include: tag number, serial number, model number, characterization information (for electronic devices), and quality control inspection numbers. All information shall be stored by the manufacturer. Job related information, such as tag number, serial number and model number, shall be stored by the manufacturer for use with as-built documentation.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions, paying special attention to airflow direction and mounting position requirements.

B. Support venturi valves individually from structure. Do not support from adjacent ductwork.

Orient as required by manufacturer. Coordinate all units that are not installed horizontal prior to ordering.

C. Connect all airflow control valve linkages.

D. Provide and install insulation in accordance with Section 230700.

E. Connect to ductwork in accordance with Section 233113.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

VENTURI AIR VALVES 23 36 05-4

F. Provide and install electronic controls to actuators, and provide and install all sash position sensors, occupancy sensors, room controllers and interconnecting wiring to form a fully-functional lab supply/exhaust system that communicates with the building BCS.

END OF SECTION

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

CABINET, DUCT AND UNIT

HEATERS (AD 01)

23 81 01-1

(Addendum 05, 9/30/16) (Addendum 01, 5/27/16)

SECTION 23 81 01 – CABINET, DUCT AND UNIT HEATERS (AD 01)

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Unit Ceiling mounted heaters. (AD 01) B. Cabinet unit heaters.

C. Electric Duct Heater (AD 01)

1.02 RELATED REQUIREMENTS

A. Section 23 05 13 - Common Motor Requirements for HVAC Equipment.

B. Section 26 27 17 - Equipment Wiring: Electrical characteristics and wiring connections.

Installation of room thermostats. Electrical supply to units.

1.03 SUBMITTALS

A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide typical catalog of information including arrangements.

C. Shop Drawings:

1. Indicate cross sections of cabinets, grilles, bracing and reinforcing, and typical elevations.

2. Submit schedules of equipment and enclosures typically indicating length and number of pieces of element and enclosure, corner pieces, end caps, cap strips, access doors, pilaster covers, and comparison of specified heat required to actual heat output provided.

3. Indicate mechanical and electrical service locations and requirements., D. Manufacturer's Instructions: Indicate installation instructions and recommendations.

E. Operation and Maintenance Data: Include manufacturers descriptive literature, operating instructions, installation instructions, maintenance and repair data, and parts listings.

F. Warranty: Submit manufacturer's warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

G. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. See Section 01 60 00 - Product Requirements, for additional provisions.

2. Extra Filters: One set of each type and size.

1.04 QUALITY ASSURANCE

A. Products Requiring Electrical Connection: Listed and classified by Underwriters Laboratories

Inc. as suitable for the purpose specified and indicated.

1.05 WARRANTY

A. See Section 01 78 00 - Closeout Submittals, for additional warranty requirements.

B. Provide five year manufacturers warranty for unit heater motors.

PART 2 PRODUCTS

2.01 UNIT CEILING MOUNTED HEATERS

A. Manufacturers:

1. Trane Inc: www.trane.com.

2. Marley-QMark; Model CDF.

3. Modine (AD 05)

43. Substitutions: See Section 01 60 00 - Product Requirements.

B. Casing: 20 gauge recessed steel chasis, 7" deep.

C. Face: 20 gauge steel with adjustable louvers. Provide with ceiling mounting ring.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

CABINET, DUCT AND 23 81 01-2

UNIT HEATERS (AD 01)

D. Fan: Direct drive propeller type, statically and dynamically balanced, with fan guard; horizontal models with permanently lubricated sleeve bearings; vertical models with grease lubricated ball bearings.

E. Air Outlet: Adjustable pattern diffuser on projection models and two way louvers on horizontal throw models.

F. The heating elements shall be guaranteed for five years and shall be of non-glowing design consisting of 80/20 NiCh resistance wire, enclosed in a steel sheath, to which steel plate fins are brazed. The elements shall cover the entire air intake area to ensure uniform heating of all discharged air.

2.02 CABINET UNIT HEATERS

A. Manufacturers:

1. Trane Inc; Model ______: www.trane.com. (AD 01)

2. Zehnder Rittling; Model FW-270.

3. Substitutions: See Section 01 60 00 - Product Requirements.

B. Coils: Evenly spaced aluminum fins mechanically bonded to copper tubes, 1/2" nominal 0.016"thick copper tubes tested to 300 psig. with manual air vents.

C. Casing: 14 gauge steel cabinet and panel with 1/2" foil faced insulation.

D. Finish: Factory applied baked enamel of white color as selected on visible surfaces of enclosure or cabinet.

E. Fans: Centrifugal forward-curved double-width wheels, statically and dynamically balanced, direct driven.

F. Motor: ECM, resiliently mounted.

2.03 ELECTRIC DUCT HEATERS (AD 01)

A. Electric heating coils shall be provided of the capacity shown on the drawings.

B. Units with heaters shall be U.L. or ETL listed for zero clearance and shall bear the proper listing mark and label. Each heater shall meet all requirements of the National Electrical Code.

C. Each heater terminal box and frame shall be constructed of minimum 20 gauge corrosion resistant metal. Heating elements shall be constructed of high grade nickel/chromium wire and shall not glow when operating at the rated quantities.

D. Heaters shall be provided with factory supplied and prewired branch circuit fusing as required by NEC and U.L. including control fusing on primary voltage hot line, and heater fusing on all sizes.

E. Main power connections to be supplied integral with each unit by the heater manufacturer to break all ungrounded conductors. All units shall have door interlocked fused disconnect switch and a control disconnect.

F. Provide 24 VAC transformer for controls. Factory mount transformer in control enclosure.

G. Electric heating coil shall be removable without disturbing the duct system.

H. Each heater shall be complete with:

a. Primary automatic thermal cutoff and a manual reset thermal secondary safety device to de-energize the heater in case of overheating.

b. Proportional electronic airflow sensor which shall be totally independent of the duct static pressure and shall adjust the heater capacity according to the available airflow. The heaters shall deliver maximum heating when needed with normal minimum airflow, reduce heating with lower than minimum airflow and stop heating with no airflow.

I. Heaters shall be equipped with full proportional SCR controller to modulate the heater load according to the temperature control signal. The electronic controller shall be compatible with the following input signals:- Variable voltage signal 0-10 VDC, Pulse width modulation AC or

DC

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed http://www.trane.com/

CABINET, DUCT AND 23 81 01-3

UNIT HEATERS (AD 01)

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturer's instructions.

B. Install equipment exposed to finished areas after walls and ceiling are finished and painted. Do not damage equipment or finishes.

C. Protection: Provide finished cabinet units with protective covers during balance of construction.

D. Unit Heaters: Hang from building structure, with pipe hangers anchored to building, not from piping. Mount as high as possible to maintain greatest headroom unless otherwise indicated.

E. Cabinet Unit Heaters: Install as indicated. Coordinate to assure correct recess size for recessed units.

F. Install electric heating equipment including devices furnished by manufacturer but not factory-mounted. Furnish copy of manufacturer's wiring diagram submittal. Install electrical wiring in accordance with manufacturer's submittals and Section 26 27 17.

END OF SECTION

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

AIR COILS 23 82 16-1

SECTION 23 82 16 - AIR COILS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Water heating coils.

1.02 RELATED REQUIREMENTS

A. Section 23 07 19 - HVAC Piping Insulation.

B. Section 23 21 14 - Hydronic Specialties.

C. Section 23 31 00 - HVAC Ducts and Casings: Installation of duct coils.

D. Section 01 91 13: Commissioning requirements that apply to all types of work.

E. Section 23 08 00 - Commissioning of HVAC.

1.03 REFERENCE STANDARDS

A. AHRI 410 - Standard for Forced-Circulation Air-Cooling and Air-Heating Coils; Air-Conditioning, Heating, and Refrigeration Institute; 2001 (R2011).

B. SMACNA (DCS) - HVAC Duct Construction Standards; Sheet Metal and Air Conditioning

Contractors' National Association; 2005.

1.04 SUBMITTALS

A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

B. Product Data: Provide coil and frame configurations, dimensions, materials, rows, connections, and rough-in dimensions.

C. Shop Drawings: Indicate coil and frame configurations, dimensions, materials, rows, connections, and rough-in dimensions.

D. Warranty: Submit manufacturer's warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

1.05 DELIVERY, STORAGE, AND HANDLING

A. Protect coil fins from crushing and bending by leaving in shipping cases until installation, and by storing indoors.

B. Protect coils from entry of dirt and debris with pipe caps or plugs.

PART 2 PRODUCTS

2.01 MANUFACTURERS

A. Aerofin Corporation: www.aerofin.com.

B. Luvata: www.luvata.com.

C. Trane Inc: www.trane.com.

D. Titus (AD 05) D. Substitutions: See Section 01 60 00 - Product Requirements.

2.02 WATER HEATING COILS

A. Tubes: 5/8 inch (16 mm) OD seamless copper or brass arranged in parallel or staggered pattern, expanded into fins, silver brazed joints.

B. Fins: Aluminum or copper continuous plate type with full fin collars.

C. Casing: Die formed channel frame of 16 gage, 0.0598 inch (1.52 mm) galvanized steel with mounting holes on 3 inch (75 mm) centers. Provide tube supports for coils longer than 36 inches (900 mm).

D. Headers: Cast iron with tubes expanded into header.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed http://www.trane.com/

AIR COILS 23 82 16-2

E. Testing: Air test under water to 200 psi (1380 kPa) for working pressure of 200 psi (1380 kPa) and 220 degrees F (104 degrees C).

F. Configuration: Drainable, with threaded plugs for drain and vent.

G. Fin Spacing: 8 fins per inch (3.1 mm on center).

PART 3 EXECUTION

3.01 INSTALLATION

A. Install in accordance with manufacturers written instructions.

B. Install in ducts and casings in accordance with SMACNA (DCS).

1. Support coil sections independent of piping on steel channel or double angle frames and secure to casings.

2. Arrange supports to avoid piercing drain pans.

3. Provide airtight seal between coil and duct or casing.

C. Protect coils to prevent damage to fins and flanges. Comb out bent fins.

D. Install coils level. Install cleanable tube coils with 1:50 pitch.

E. Make connections to coils with unions and flanges.

F. Hydronic Coils:

1. Hydronic Coils: Connect water supply to leaving air side of coil (counterflow arrangement).

2. Provide shut-off valve on supply line and lockshield balancing valve with memory stop on return line.

3. Locate water supply at bottom of supply header and return water connection at top.

4. Provide manual air vents at high points complete with stop valve.

5. Ensure water coils are drainable and provide drain connection at low points.

G. Insulate headers located outside air flow as specified for piping. Refer to Section 22 07 19.

END OF SECTION

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

FAN COIL UNITS 23 82 19-1

SECTION 23 82 19 - FAN COIL UNITS

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Provide fan coil units and air curtains in sizes and capacities shown on mechanical drawings and in locations shown on drawings. Characteristics of equipment shall be as shown herein.

1.02 RELATED WORK

A. Section 23 09 13: Instrumentation and Control Devices for HVAC B. Section 23 21 13: Hydronic Piping C. Section 23 21 14: Hydronic Specialties D. Section 01 91 13: Commissioning requirements that apply to all types of work.

E. Section 23 08 00 - Commissioning of HVAC.

1.03 SUBMITTALS

A. Submit product data for review.

PART 2 - PRODUCTS

2.01 ACCEPTABLE MANUFACTURERS

A. Trane B. Carrier C. McQuay/Daiken D. York/JCI E. Air Therm F. International Environmental G. MultiAqua (for chiller cabinets in 1C-150, 160, 520) Model type: MHCFC4W Cassette H. Mars - air curtain for 1C-180

2.02 FAN COIL EQUIPMENT REQUIREMENTS

A. Units to be complete with fan, ECM motor, outside casing, filter track and 2" MERV 8 filter, double wall insulated panels(except chiller cabinet units), insulated drain pan, and separate copper tube aluminum finned cooling and heating coils, all arranged for mounting as called for on schedule. Insulate units internally to prevent external sweating and heat loss. Cabinets to have removable front panels for access.

B. Fan Motors: ECM type. Motor watt draw not to exceed maximum scheduled on drawings.

(Chiller cabinet is PSC type, direct drive, direct drive.) ECM motor shall be supplied for all sizes available in manufacturers catalog listings. If ECM motor is not available in manufacturer’s standard line, or in some larger unit sizes scheduled on plans, manufacturer may provide a variable frequency drive(VFD) in lieu of ECM motor. VFD shall be per section 23 05 14, except the enclosure can be NEMA 1 instead of NEMA 3R.

Contractor shall provide all required connections to the building controls system and required programming to allow for modulation of the fan coil unit airflow. Contractor shall coordinate required additional wiring with the electrical contractor. No additional costs shall be allowed to the contract for substitution of VFDs. (AD 05)

C. Manual air vent to be located at highest point of supply or return lines.

D. Auxiliary insulated drain pans to be sufficient to collect condensation from coil connections and shutoff valves.

E. Unit hanger suspension and accessories.

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

FAN COIL UNITS 23 82 19-2

F. Provide new and unused filters at time building is turned over to Owner. Do not operate units without filters. Position filter rack access door to allow for accessible filter replacement from side or bottom of unit as allowed by field installation requirements.

G. Units to have sufficient space for maintaining heating and cooling control package consisting of:

H. Automatic cooling coil valve: 2-way (by Control Contractor) I. Valve shutoff package: (By unit manufacturer) J. Control Package: Valves and room type thermostat for ceiling mounted units, valves and unit mounted thermostats for floor mounted units.

K. Provide condensate pump package, connected to unit electrical service with no separate wiring requirements, as required by field conditions to allow for proper condensate drainage.

2.03 AIR CURTAIN EQUIPMENT REQUIREMENTS

A. Wall mounted unit with dynamically balanced fan, ECM motor, variable speed controller, low profile design, wall mounting brackets, white powder coat finish.

B. Maximum sound discharge of 49dBA at 10'.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install fan coil units at locations designated on drawings in accordance with manufacturer's published instructions.

B. Provide piping connections per diagram on drawings.

C. Insure proper condensate drainage.

D. Chiller cabinet units shall be piped to have both primary and secondary coils in parallel on the chilled water piping per manufacturer's instructions. Provide supplemental steel supports up from chiller support structure to support fan coil unit at the top of the chiller cabinet. Trim edge of the face plate to allow for installation of unit in cabinet to allow for closing of door. Provide thermostat in cabinet to allow for modulation of fan coil unit.

3.02 START-UP AND TEST

A. Start-up unit, check for satisfactory performance as required by plans and specifications.

B. Test units for fan operation and coil performance.

C. Insure that system piping is thoroughly vented, cleaned and all debris is removed from control valves to insure specified water flow.

D. Demonstrate operation to Owner's maintenance personnel and instruct them in system operation.

END OF SECTION

Bid Set 30 August, 2016

EPA Building 25 Co-Location Project

2009121.11 PROPERTY OF THE UNITED STATES GOVERNMENT - FOR OFFICIAL USE ONLY. Do not remove this notice. Properly destroy document when no longer needed

I

2928272625

J

K

L

M

(E) SECURITY

1A-080

(E) OFFICE

1A-090

(E) OPEN

OFFICE

1A-005

(E) OFFICE

1A-015

(E) OFFICE

1A-025

(E) OFFICE

1A-035

(E) OFFICE

1A-045

(E) OFFICE

1A-055

(E) OFFICE

1A-085

(E) OFFICE

1A-075

(E) OFFICE

1A-110

R8 FIELD PREP

1A-110

ESAT

INSTRUMENTS

1A-235

ESAT

TOXICOLOGY &

GENERAL BIO

1A-245

R8

MACROBIOLOGY

1A-260

SHARED

METAL PREP

1A-265

R8 ORGANIC

PREP

1A-270

ESAT

ASBESTOS

1A-255A

ESAT

ASBESTOS

PLM

1A-255

R8 CLLE

1A-250

(E) ELEC

1B-025

(E) RESTROOM

1A-115

(E) NEIC FIELD

SUPPORT

1A-135

(E) NEIC FIELD

SHOP

1A-145

LAB CORRIDOR

C1A2

SERVICE

CORRIDOR

C1A1

SERVICE

CORRIDOR

C1A4

C

A

1A-245

1A-260 1A-255

1A-270 1A-265

1A-235

C

A

A-4212 1

ACID LIFT

1A-120

RE: 1 / A-101D

RE: 1 / A-101C

RE: 1 / A-101B

GAS CLOSET

1A-231

1A-231

1A-120

R E

A

-1 B

R E

A

-1 D

LAB CORRIDOR

C1A5

CORRIDOR

C1A0

STAIR

ST-02

A-421

101101101

RE: 1 / A-101B

C6

C

129129

G

G

C

C

C

C

C

F2

1A-110

129129

F

129129129

129129 129129

G

FE(E)

FE(E)

FE-1

S T

-0

.1

R8 SUPPLIES

1A-220

(E) TELE ROOM

1B-030

MECHANICAL

1B-035

1A-220

(E) OFFICE

1A-095

C

GAS CLOSET

1A-246

GAS CLOSET

1A-254

1A-255A

C1A5

F2

F2

F2

7' - 0"

7' - 7" 7' - 3"

129129

129129

TYP

3' - 0"

3' - 0"

/4

129129

129129

129129

/4

/4

129129

CLR

5' - 0"

1A-250

/2

C

C

C

B

12' - 5"

/2

1A-246

1A-254

169169 100 101101

/4

" SERVICE

CORRIDOR

C1A1

FE-1

FE-1

CL

CL

B

B6

B6

CCC

C6

GAS CLOSET

1A-256

1A-256.1

1A-256.2

F2

129129

B6

4' - 6"

TYP

3' - 0"

TYP

3' - 0"

3' - 4" 1' - 6"

10' - 0"

13' - 1 1/4"

A-621

10' - 0"

16' - 0"

CL

CL

FE-1

FE-1

A-621

1' - 11" 34' - 7"

WORK NOTES GENERAL NOTES

7. REPAIR ALL EXISTING SURFACES WHERE EXISTING MOUNTED ITEMS HAVE BEEN

REMOVED, MATCH EXISTING ADJACENT SURFACE FINISH.

8. PROVIDE BLOCKING IN WALLS FOR ALL MOUNTED ITEMS.

9. AT LOCATIONS WHERE EXISTING WALLS ARE REMOVED, REPAIR REMAINING

WALLS ADJACENT TO THE DEMO AREA, MATCH ADJACENT SURFACE FINISH.

10. COORDINATE CONSTRUCTION ACTIVITIES WITH CONTINUOUS BUILDING

OCCUPANCY. MAINTAIN REQUIRED EXIT AND LIFE SAFETY SYSTEMS. MAINTAIN

OPERATIONAL RESTROOM FACILITIES. PROVIDE TEMPORARY PARTITIONS TO

SEPARATE CONSTRUCTION ACTIVITIES FROM OCCUPIED AREAS AND EGRESS. ALLOW

FOR DELIVERIES AND EMERGENCY ACCESS.

11. PROVIDE 48" TALL POWDER-COATED STAINLESS STEEL CORNER GUARDS AT ALL

OUTSIDE GB WALL CORNERS IN THE LAB CORRIDORS.

12. INTERIOR DIMENSIONS ARE TO FINISHED FACE OF PARTITION, U.O.N.

13. ALL CHANGES IN FLOOR MATERIAL AT DOORS OCCUR AT INSIDE CORNER OF

THE STOP AT THE DOOR SIDE

1. FIELD VERIFY ALL EXISTING CONDITIONS. NOTIFY ARCHITECT PRIOR TO

START OF WORK IF ANY EXISTING CONDITIONS AFFECT ANY NEW WORK

SHOWN. THIS ALSO APPLIES TO WORK SHOWN ON STRUCTURAL,

LABORATORY, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION

DRAWINGS.

2. ALL PARTITIONS, NEW INFILL AND EXTENSIONS AT EXISTING WALLS SHALL BE

PARTITION TYPE 'B', UON., MATCH THICKNESS OF EXISTING PARTITION AT INFILL

AND EXTENSIONS. EXTEND PARTITIONS FULL HEIGHT TO BOTTOM OF DECK

ABOVE, UON.

3. REFERENCE CODE PLANS FOR LOCATIONS OF FIRE RATED WALLS.

4. REFERENCE LABORATORY PLANS FOR LAB INFORMATION.

5. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND NOTIFY ARCHITECT

OF ANY DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND INFORMATION

SHOWN IN THESE DOCUMENTS PRIOR TO START OF ANY WORK.

6. AT LOCATIONS WHERE EXISTING FLOORS, WALLS, OR CEILINGS ARE OPENED

FOR NEW WORK, REPAIR TO MATCH ADJACENT CONSTRUCTION AND FINISH.

LEGEND

EXISTING WALLS

NEW DOORS

MATCHLINE

NEW PARTITIONS, COLUMN

WRAPS, AND FUR OUTS

EXISTING DOORS

PROJECT BOUNDARY

Project Number:

Drawn By:

Reviewed By:

Approved By:

Issue Date

GENERAL SERVICES ADMINISTRATION

ROCKY MOUNTAIN REGION

MOUNTAIN PLAINS SERVICE CENTER (8PSMP)

P.O. BOX 25546

BUILDING 41

DENVER FEDERAL CENTER

DENVER, CO 80225

303-236-2854

AndersonMasonDale Architects, P.C.

3198 Speer Boulevard

Denver, CO, 80211

Telephone: 303-294-9448

FAX: 303-294-0762

Architect

Iron Horse Architects

475 17th Street, Suite 720

Denver, CO, 80202

Telephone: 720-855-7572

Laboratory Planning

Martin Martin

12499 West Colfax Avenue

Lakewood, CO, 80215

Telephone: 303-431-6100

Structural Engineering

Farnsworth Group

4755 Forge Road, Suite 150

Colorado Springs, CO, 80907

Telephone: 303-692-8838

Mechanical Engineering

MEP Engineering

6402 South Troy Circle, Suite 100

Centennial, CO, 80111-6439

Telephone: 303-936-1633

Electrical Engineering

Jensen Hughes, Inc

520 Courtney Way, Suite A

Lafayette, CO, 80026

Telephone: 303-439-0485

Fire Protection

Advanced Consulting Engineers, Inc

3900 S. Wadsworth Blvd., Suite 595

Lakewood, CO, 80235

Telephone: 720-981-4150

Code Consultant

1A

1B

1C

1D

PLAN KEY

Parametrix, Inc

7186 South Highland Drive

Salt Lake City, UT, 84121

Telephone: 801-733-5900

Cost Estimator

GSA PROJECT NO. N10565510

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Seal

Do not remove this notice.

Properly destroy or return document when no longer needed.

/2

/2

:1 :5

P

M

A-101A

LEVEL 1 FLOOR PLAN - AREA 1A

2009121.11

JF

CO

DP

EPA BUILDING 25

CO-LOCATION PROJECT

DENVER FEDERAL CENTER

BUILDING 25, LAKEWOOD, CO

15 APRIL 2016100% Construction Documents

4' 16'2' 8' A-101A 1/8" = 1'-0"

1LEVEL 1 FLOOR PLAN - AREA 1A

160 CONFRIM CLOSET DIMENSIONS WITH

NEW CHILLER UNIT, OFCI

169 FIRE SEALANT AT BASE OF EXISTING

WALL, BS, FOR 1 HR RATED PARTITION,

RE: CODE PLANS; INSTALL NEW WALL

BASE AS SCHEDULED

178 SAW CUT SLAB AT DASHED LINES FOR

VIBRATION SEPARATION, RE: STRUC

101 NO ARCHITECTURAL WORK AT THIS

SPACE EXCEPT REQUIRED REPAIRS

RESULTING FROM OTHER WORK THAT

MAY BE REQUIRED AND UON

(MECHANICAL, ELECTRICAL, FIRE

PROTECTION, ETC.)

121 NEW 6" CONCRETE HOUSEKEEPING PAD

AT HATCHED AREA, RE: MECH/STRUC

129 ALIGN

130 NEW PARTITION INFILL SIMILAR TO

PARTITION TO TYPE B - MATCH EXISTING

ADJACENT WALL THICKNESS, PAINT AND

FINISH OF ADJACENT WALL SURFACE AT

BOTH SIDES

142 CENTER DOORS BETWEEN SIDE WALLS

151 PATCH AND FILL EXISTING SLOPED

FLOOR, AREA TO BE FLUSH WITH TOP OF

ADJACENT SLAB, TYP., RE: STRUC

156 PATCH AND FILL EXISTING VAULT, AREA

TO BE FLUSH WITH TOP OF ADJACENT

SLAB, RE: STRUC

TRUE NORTH

Addendum 05 30 SEPT 2016

KK

LF-304

LF-304

LF-3047

CW CW CW CW CW

CW CW CW CW CW

TYP

R8 CLLE

1A-250

LAB CORRIDOR

C1A2

E Q

E Q

5'-0"

S-04

1' - 6"

ESEW-1

1' - 9" 6" 4' - 6" 6" 4' - 6" 6" 4' - 6" 6" 4' - 6" 6"

1' - 9" 6" 4' - 6" 6" 4' - 6" 6" 4' - 6" 6" 4' - 6" 6"

TYP.

E Q

E Q

1' - 4"

TYP

Level 1 100' - 2"

CW CW CW CW CWCWCWCWCWCW

LB6-36 LB6-36 LB6-36 LB2-36 LB6-36 LB2-36 LB6-36 LB2-36VN2-48

ALIGN

Level 1 100' - 2"

CW CW CW CW CWCW CW CW CWCW

LB2-36 LB6-36 LB2-36 LB6-36 LB2-36 LB6-36 LB2-36 LB6-36

ALIGN

WR-1

Level 1 100' - 2"

LB2-36 LB6-36 LB2-36 LB6-36 LB2-36LB2-36

Level 1

100' - 2"LB2-36 LB6-36 LB2-36 LB6-36 LB6-36 LB6-36

Level 1

100' - 2"LS1-36 LB2-36

KK

RC-04 CH-01

CH-02

SR-01

R8 CLLE

1A-250

Project Number:

Drawn By:

Reviewed By:

Approved By:

Issue Date

GENERAL SERVICES ADMINISTRATION

ROCKY MOUNTAIN REGION

MOUNTAIN PLAINS SERVICE CENTER (8PSMP)

P.O. BOX 25546

BUILDING 41

DENVER FEDERAL CENTER

DENVER, CO 80225

303-236-2854

AndersonMasonDale Architects, P.C.

3198 Speer Boulevard

Denver, CO, 80211 Telephone: 303-294-9448

FAX: 303-294-0762

Architect

Iron Horse Architects 475 17th Street, Suite 720

Denver, CO, 80202 Telephone: 720-855-7572

Laboratory Planning

Martin Martin 12499 West Colfax Avenue

Lakewood, CO, 80215 Telephone: 303-431-6100

Structural Engineering

Farnsworth Group 4755 Forge Road, Suite 150

Colorado Springs, CO, 80907 Telephone: 303-692-8838

Mechanical Engineering

MEP Engineering 6402 South Troy Circle, Suite 100

Centennial, CO, 80111-6439 Telephone: 303-936-1633

Electrical Engineering

Jensen Hughes Associates, Inc 520 Courtney Way, Suite A

Lafayette, CO, 80026 Telephone: 303-439-0485

Fire Protection

Advanced Consulting Engineers, Inc 3900 S. Wadsworth Blvd., Suite 595

Lakewood, CO, 80235 Telephone: 720-981-4150

Code Consultant

1A

1B

1C

1D

PLAN KEY

Parametrix, Inc 7186 South Highland Drive

Salt Lake City, UT, 84121 Telephone: 801-733-5900

Cost Estimator

GSA PROJECT NO. N10565510

Seal

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice.

Properly destroy or return document when no longer needed.

100% Construction Documents 15 APRIL 2016

No.

/2

/2

:5 :0

P

M

LF-304

ENLARGED LAB PLAN - 1A-250

201505.000

RG

VD

VD

EPA BUILDING 25

CO-LOCATION PROJECT

DENVER FEDERAL CENTER

BUILDING 25, LAKEWOOD, CO

1' 2'0' 8'

TRUE NORTH

4'4'

1/4" = 1'-0"LF-304

ENLARGED LAB PLAN - 1A-250 - R8 CLLE1

1' 2'0' 8'4'4'

1/4" = 1'-0"LF-304

INTERIOR ELEVATION - 1A-250 - EAST6

1' 2'0' 8'4'4'

1/4" = 1'-0"LF-304

INTERIOR ELEVATION - 1A-250 - WEST3

1' 2'0' 8'4'4'

1/4" = 1'-0"LF-304

INTERIOR ELEVATION - 1A-250 - EAST 24

1' 2'0' 8'4'4'

1/4" = 1'-0"LF-304

INTERIOR ELEVATION - 1A-250 - WEST 25

LAB KEYNOTES

1 NEW LABORATORY CASEWORK, RE: ELEVATION FOR

TYPE

2 NEW FLOOR DRAIN, RE: PLUMB

3 NEW FLAMMABLE STORAGE CABINET,RE: SPECS

4 NEW VENTED STORAGE CABINET, RE: ELEVATION FOR

TYPE

5 NEW ADJUSTABLE HEIGHT TABLE FRAME

6 EXTENTS OF LABORATORY PLANNING SCOPE TO

INCLUDE FUME HOOD RETROFIT ONLY - AS NOTED IN

PLANS

7 REQUIRED ADA CLEARANCE

8 PROVIDE GAS CYLINDER MANIFOLD AT WALL, RE: SPECS

9 NEW CANOPY HOOD EXHAUST - 18GA 316 STAINLESS

STEEL. GRIND AND POLISH ALL WELDS. SUPPORT FROM

STRUCTURE AS REQUIRED. PROVIDE GUTTERS WITH

HEMMED EDGES. RE: MECH FOR DUCT SIZE AND

CONNECTION.

10 NEW OVERHEAD SERVICE CARRIER @ 7'-0" AFF, RE:

SPECS

11 VENTED CABINET - OFCI

12 PROVIDE NEW WALL MOUNTED GAS CYLINDER

RESTRAINT, RE: SPECS

13 EXISTING TO REMAIN

14 REPLACE/ADD (AS REQUIRED) SELF CLOSING

MECHANISM, PER MANUFACTURERS DETAILS TO

COMPLY WITH 2015 IFC 5704.3.2.1.3, RE: SPECIFICATIONS

15 EXTENTS OF LABORATORY PLANNING SCOPE TO

INCLUDE FUME HOOD RETROFIT AND EYE WASH SAFETY

SHOWER COMBINATION UNIT ONLY - AS NOTED IN PLANS

16 TIE INTO EXISTING VENTING ABOVE, RE: MECH

17 NEW TALL CABINET, RE: ELEVATION FOR SIZE AND TYPE

18 NO LABORATORY PLANNING SCOPE WITHIN THIS ROOM

19 EXTENTS OF LABORATORY PLANNING SCOPE TO

INCLUDE REPLACEMENT OF EYE WASH & SAFETY

SHOWER COMBINATION UNIT ONLY - AS NOTED IN PLANS

20 NEW STORAGE SHELVING - SECURE AS REQUIRED, RE:

SPECS

22 NEW CHAIN LINK ENCLOSURE - RE: ARCH

25 NEW SHOWER & EYE WASH - HAWS 8309WC OR SIM

26 NEW FLEXIBLE SNORKEL ARM (ABOVE), RE: SPECS - RE:

MECH FOR CONTINUATION

27 PROVIDE ACID WASTE, RE: PLUMB

29 STORAGE RACK - OFOI

30 GAS CYLINDER, OFOI

32 TABLE FRAME - OFOI, TYP, UNO

36 BALANCE TABLE - OFOI

37 UNDER COUNTER TASK LIGHTING, TYP, RE: ELEC

38 NEW WATER PURIFICATION UNIT AT SINK

39 PRO UNIT AT SINK - OFOI

40 NEW CORROSIVE STORAGE CABINET, VENT AS

REQUIRED (RE: MECH.)

41 FLAMMABLE STORAGE CABINET - OFCI

42 SALVAGE & REUSE CASEWORK

44 SALVAGE & REUSE CURRENT QUANTITIES OF

CASEWORK

46 EXISTING OVERHEAD EXHAUST TO REMAIN

47 NEW PVC AIR DELIVERY SYSTEM (ABOVE), RE:

ELEVATION FOR HEIGHT & SPIGOT LOCATIONS

48 MOBILE LAB CART - OFOI

49 EXISTING BIOSAFETY CABINET, RELOCATED

50 EXISTING EXHAUST TO BE REPLACED

52 PROVIDE NEW FLEXIBLE EXHAUST, RE: MECH

53 PROVIDE NEW RIGID VENT PIPE, RE: MECH

56 NEW 4" PVC AIR EXHAUST SYSTEM (ABOVE) - OFOI

57 EXISTING SAFETY SHOWER AND EYE WASH TO BE

REPLACED, RE: SPECS

58 VENTED CABINET RELOCATED FROM GAS CLOSET

1C-415

59 SPECIALTY GAS TURRENT, RE: MECH PLANS FOR

SOURCE LOCATION

60 WATER SPIGOT , RE: PLUMBING

61 COOLER CONDENSING UNITS STACK MOUNTED TO THIS

WALL. COOLER MANUFACTURER TO PROVIDE RACK -

COORDINATE WALL BLOCKING

62 REFER TO PLUMBING DRAWINGS FOR PIPE CONNECTION

AND VAVLE TYPE

*** NOTE: NOT ALL KEYNOTES ARE USED ON EVERY SHEET

1' 2'0' 8'4'4'

1/4" = 1'-0"LF-304

INTERIOR ELEVATION - 1A-250 - SOUTH7

1A-250 - EQUIPMENT SCHEDULE

EQUIPMENT DESCRIPTION DIMENSIONS ELECTRICAL

Cupsink Data Comments System

Grouping Equip Mark Property # Furn/Inst Equip Name Model MFR Room Origin Width Depth Height

Normal Power

Standby Power UPS Light

CH-01 R8 Chiller 3' - 11" 2' - 4 3/4" 4' - 3 5/8" Yes No No

CH-02 R8 Chiller HX-500 NESLAB 3' - 10" 2' - 4 3/4" 4' - 3 5/8" Yes No No

RC-04 E10263 R8 Refrigerated Circulator CFT-33 Neslab 1' - 2 3/4" 1' - 10" 2' - 0 1/2" Yes No No

SR-01 E10264 R8 Solvent Recycler M490 B/R Instruments D128 3' - 2" 2' - 0" 7' - 0" Yes No No

1' 2'0' 8'

TRUE NORTH

4'4'

1/4" = 1'-0"LF-304

ENLARGED LAB PLAN - 1A-250 - R8 CLLE EQUIPMENT2

3 Addendum 02 05 AUG 2016

4 Addendum 03 30 SEPT 2016

Addendum 05 30 SEPT 2016Addendum 05

PHENOLIC RESIN

COUNTERTOP, TYP

FACE OF BASE CABINET

3/16" RADIUS DRIP

GROOVE, TYP

1"

1/2"

/4

CHAMFER EDGE, TYP

SECTION @ BRACKET (AS REQUIRED) SECTION @ AIR SPIGOT (2'-0" O.C.)

2" DIA. PVC PIPE, RE: ENALRGED LAB

PLAN AND ELEVATIONS FOR EXTENTS

WALL MOUNTED PIPE

BRACKET - SPACING AS

REQUIRED

PVC REDUCING TEE

AXONOMETRIC (N.T.S.)

PVC REDUCING TEE

2" PVC PIPE

WALL MOUNTED PIPE

BRACKET - SPACING AS

REQUIRED. PROVIDE

CONCEALED BLOCKING.

AIR SPIGOT, RE: SPECS

EXTEND FLOOR FINISH, PROVIDED UNDER DIV.

9,WALL TO WALL UNDER CASEWORK

BASE, PROVIDED UNDER DIV. 9, AT CABINETS

AND KNEE SPACES

BASE CABINET WHERE INDICATED ON

LABORATORY CASEWORK PLANS AND

ELEVATIONS

3/4" PHENOLIC RESIN BENCHTOP

LAB TURRET, BEYOND - SEE LABORATORY

PLANS & ELEVATIONS FOR LOCATION AND

TYPE

WIREMOLD, SEE LABORATORY ELEVATIONS

FOR EXTENT

SHELF RETAINING CLIP STRIP, TYP

ADJUSTABLE METAL SHELF UNIT WITH

3-PRONG CONNECTION TO VERTICAL FRAME,

REFER TO ELEVATIONS FOR WIDTH OF EACH UNIT.

CORE FRAME SYSTEM, BY MFR.

UNDERSHELF LIGHT, RE: ELECTRICAL

DRAWINGS

2' - 5" 1' - 0" 2' - 5"

STRUCTURAL FRAMING/BRACING, AS

REQUIRED

DUCTWORK - COORDINATE LOCATION,

SIZE, CONNECTIONS, ETC.

SECTION

7'-0" A.F.F

TYP, MATCH

EXISTING WHERE

APPLICABLE

7'-0" A.F.F

TYP, MATCH

EXISTING WHERE

APPLICABLE

ELEVATION

UNISTRUT, BY

CASEWORK MFR.

CEILING, RE:

ARCH DRAWINGS

EXISTING

STRUCTURE, VIF.

WIREMOLD, BY

CASEWORK MFR.

1' - 7"

MATCH EXISTING,

WHERE APPLICABLE

RE: ENLARGED LAB PLANS

BRACE AS REQ'D -

BOTH DIRECTIONS

CABLE TRAY, BY

CASEWORK MFR.

CEILING

PENETRATION

COLLAR, BY

CASEWORK MFR.

Project Number:

Drawn By:

Reviewed By:

Approved By:

Issue Date

GENERAL SERVICES ADMINISTRATION

ROCKY MOUNTAIN REGION

MOUNTAIN PLAINS SERVICE CENTER (8PSMP)

P.O. BOX 25546

BUILDING 41

DENVER FEDERAL CENTER

DENVER, CO 80225

303-236-2854

AndersonMasonDale Architects, P.C.

3198 Speer Boulevard

Denver, CO, 80211 Telephone: 303-294-9448

FAX: 303-294-0762

Architect

Iron Horse Architects 475 17th Street, Suite 720

Denver, CO, 80202 Telephone: 720-855-7572

Laboratory Planning

Martin Martin 12499 West Colfax Avenue

Lakewood, CO, 80215 Telephone: 303-431-6100

Structural Engineering

Farnsworth Group 4755 Forge Road, Suite 150

Colorado Springs, CO, 80907 Telephone: 303-692-8838

Mechanical Engineering

MEP Engineering 6402 South Troy Circle, Suite 100

Centennial, CO, 80111-6439 Telephone: 303-936-1633

Electrical Engineering

Jensen Hughes Associates, Inc 520 Courtney Way, Suite A

Lafayette, CO, 80026 Telephone: 303-439-0485

Fire Protection

Advanced Consulting Engineers, Inc 3900 S. Wadsworth Blvd., Suite 595

Lakewood, CO, 80235 Telephone: 720-981-4150

Code Consultant

Parametrix, Inc 7186 South Highland Drive

Salt Lake City, UT, 84121 Telephone: 801-733-5900

Cost Estimator

GSA PROJECT NO. N10565510

Seal

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

FOR OFFICIAL USE ONLY

Do not remove this notice.

Properly destroy or return document when no longer needed.

100% Construction Documents 15 APRIL 2016

No.

/2

/2

:5 :0

P

M

LF-801

DETAILS

201505.000

Author

Checker

Approver

EPA BUILDING 25

CO-LOCATION PROJECT

DENVER FEDERAL CENTER

BUILDING 25, LAKEWOOD, CO

12" = 1'-0"LF-801

TYPICAL DRIP EDGE SECTION2

6" = 1'-0"LF-801

PVC AIR DELIVER SYSTEM3

3/4" = 1'-0"LF-801

VENTED ISLAND - 1A-270 - R8 ORGANIC PREP5

1 1/2" = 1'-0"LF-801

Overhead Service Carrier6

1 Addendum 01 27 MAY 2016

4 Addendum 03 30 SEPT 2016

Addendum 05

AD05 Specifications.pdf
23 34 16 - Centrifugal HVAC Fans
23 36 05 - Venturi Air Valves
23 81 01 - CABINET, DUCT AND UNIT HEATERS
23 82 16 - Air Coils
23 82 19 - FAN COIL UNITS AD05
AD05 Drawings.pdf
Sheets
A-101A - LEVEL 1 FLOOR PLAN - AREA 1A

File details come from the government source that posted it. Updated .