Amendment_0003_EPA.pdf
PDF 3 MB Posted
- Solicitation number
- GS-08P-16-JB-C-7031
About this file
SF30 Amendment 0003
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
3198 Speer Boulevard
Denver Colorado 80211
303 294 9448
Fax 303 294 0762 amd@amdarchitects.com
ADDENDUM N0. 06 - Construction Documents
Date: 12 October 2016
Project #: 2009121.11
Project: EPA Building 25 Co-Location Project
Bid Documents Issued: 100% Construction Documents dated 15 April 2016
The Drawings, Specifications, and Contract Documents on the project are modified, corrected, supplemented, and/or superseded as hereinafter described. It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herewith. This addendum may affect pricing. Failure to acknowledge this addendum may be cause for rejection of bid.
DRAWINGS:
1. A-101D
a. Added keynote #187
2. A-502
a. Revised Finished Schedule
3. M-401
a. Revised Exhaust Fan Schedule
4. P-111A
a. Revised drawing 1/P-111A
b. Revised keynotes #2 and #15
5. P-111B
a. Revised keynote #2
6. P-111C
a. Revised drawing 1/P-111C
b. Revised keynotes #2 and #27
7. P-604
a. Revised drawing 5/P-604
PROJECT MANUAL:
None
Attachments: As described above.
End of Addendum
WORK NOTES GENERAL NOTES
7. REPAIR ALL EXISTING SURFACES WHERE EXISTING MOUNTED ITEMS HAVE BEEN
REMOVED, MATCH EXISTING ADJACENT SURFACE FINISH.
8. PROVIDE BLOCKING IN WALLS FOR ALL MOUNTED ITEMS.
9. AT LOCATIONS WHERE EXISTING WALLS ARE REMOVED, REPAIR REMAINING
WALLS ADJACENT TO THE DEMO AREA, MATCH ADJACENT SURFACE FINISH.
10. COORDINATE CONSTRUCTION ACTIVITIES WITH CONTINUOUS BUILDING
OCCUPANCY. MAINTAIN REQUIRED EXIT AND LIFE SAFETY SYSTEMS. MAINTAIN
OPERATIONAL RESTROOM FACILITIES. PROVIDE TEMPORARY PARTITIONS TO
SEPARATE CONSTRUCTION ACTIVITIES FROM OCCUPIED AREAS AND EGRESS. ALLOW
FOR DELIVERIES AND EMERGENCY ACCESS.
11. PROVIDE 48" TALL POWDER-COATED STAINLESS STEEL CORNER GUARDS AT ALL
OUTSIDE GB WALL CORNERS IN THE LAB CORRIDORS.
12. INTERIOR DIMENSIONS ARE TO FINISHED FACE OF PARTITION, U.O.N.
13. ALL CHANGES IN FLOOR MATERIAL AT DOORS OCCUR AT INSIDE CORNER OF
THE STOP AT THE DOOR SIDE
1. FIELD VERIFY ALL EXISTING CONDITIONS. NOTIFY ARCHITECT PRIOR TO
START OF WORK IF ANY EXISTING CONDITIONS AFFECT ANY NEW WORK
SHOWN. THIS ALSO APPLIES TO WORK SHOWN ON STRUCTURAL,
LABORATORY, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION
DRAWINGS.
2. ALL PARTITIONS, NEW INFILL AND EXTENSIONS AT EXISTING WALLS SHALL BE
PARTITION TYPE 'B', UON., MATCH THICKNESS OF EXISTING PARTITION AT INFILL
AND EXTENSIONS. EXTEND PARTITIONS FULL HEIGHT TO BOTTOM OF DECK
ABOVE, UON.
3. REFERENCE CODE PLANS FOR LOCATIONS OF FIRE RATED WALLS.
4. REFERENCE LABORATORY PLANS FOR LAB INFORMATION.
5. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND NOTIFY ARCHITECT
OF ANY DISCREPANCIES BETWEEN ACTUAL FIELD CONDITIONS AND INFORMATION
SHOWN IN THESE DOCUMENTS PRIOR TO START OF ANY WORK.
6. AT LOCATIONS WHERE EXISTING FLOORS, WALLS, OR CEILINGS ARE OPENED
FOR NEW WORK, REPAIR TO MATCH ADJACENT CONSTRUCTION AND FINISH.
LEGEND
EXISTING WALLS
NEW DOORS
MATCHLINE
NEW PARTITIONS, COLUMN
WRAPS, AND FUR OUTS
EXISTING DOORS
PROJECT BOUNDARY
25242322212019181716
L
M
N
O
P
Q
R
SHARED
ORGANIC
INSTRUMENTS
1C-045
R8
MICROBIOLOGY
1C-085
NEIC VOA
1C-115
SHARED
SEM/TEM
1C-630
(E) NEIC AIR
TOXICS LAB
1D-525
CHILLER
1C-620
ESAT METALS
1C-120
SHARED PCR
1C-090
NEIC ORGANIC
PREP
1C-060
INERGEN
CYLINDER
ROOM
1C-145A
R8 AIR
CALIBRATION
ROOM
1C-425
NEIC DRUM
TUMBLER
1C-365
NEIC CYANIDE
& SULFIDE
1C-325
ESAT TEM
PREP
1D-520
R8 TRACE
LEVEL
ELEMENTAL
LAB
1C-150
NEIC
ELEMENTAL
ANALYSIS
1C-520
SHARED GAS
CYLINDER
STORAGE
1C-540B
SHARED
ORGANIC
STORAGE
1C-540A
GAS CLOSET
1C-515
SHARED LCs
1C-420
NEIC
INORGANIC
PREP
1C-360
R8 WET
CHEMISTRY
1C-320
NEIC LABWARE
CLEANING
1C-340B
SHARED IC /
IC-MS
1C-005
(E) NEIC TCLP
1C-305
(E) NEIC X-RAY
FLOURESCENCE
/ DIFFRACTION
1C-130
NEIC
ASBESTOS
1C-610
TRACE LEVEL
PREP
1C-180
SHARED
TRACE LEVEL
PREP
1C-170
ACID
NEUTRALIZATION
1C-535
(E) NEIC NMR
1C-405
(E) NEIC
ENVIRONMENTAL
SAMPLE
RECEIPT &
STORAGE
1C-210
R8 AIR
CALIBRATION
1C-425B
SECURITY
1C-325A
SHARED DI
1C-355
ORGANIC
STORAGE
1C-145B
GAS CLOSET
1C-410
GAS CLOSET
IC-415
GAS CLOSET
IC-315
GAS CLOSET
1C-440
GAS CLOSET
IC-310
NEIC X-RAY
1C-130A
GAS CLOSET
1D-505
GAS CLOSET
1D-515
COMPRESSOR
ROOM
1F-185
GAS CLOSET
1C-140
GAS CLOSET
1C-510
GAS CLOSET
1C-530
(E) VESTIBULE
1C-010
(E) WOMEN
1C-020
(E) MEN
1C-040
(E)
ELECTRICAL
1C-050
(E) LAN
1C-240
(E) TELECOM
1C-230
JAN.
1C-030
GAS CLOSET
1C-035
GAS CLOSET
1C-054
GAS CLOSET
1C-075
GAS CLOSET
1C-105
GAS CLOSET
1C-080
GAS CLOSET
1C-110
NEIC TRACE
LEVEL
ELEMENTAL
LAB
1C-160
C
-0
D
-5
1C-145A.1 1C-145A.2
C
-3
A
RE: 1 / A-101C
R E
A
-1 A
R E
A
-1 B
RE: 1 / A-101C
VESTIBULE
VE-06
LAB CORRIDOR
C1C5
LAB CORRIDOR
C1C4
LAB CORRIDOR
C1C0
LAB CORRIDOR
C1D5
LAB CORRIDOR
C1C6
LAB CORRIDOR
C1C1
LAB CORRIDOR
C1C3
LAB CORRIDOR
C1C2
HF-3
UP
UP
RE: 1 / A-101A
(E) UPS
1D-460
101101
101101
CORRIDOR
C1B5
CL
EQ EQ
DN
DN DN
138129129
C
C
39' - 0"
C1F1
CORRIDOR
MAIN
ELECTRICAL
1D-535
142129
C
-3
A
CC
FE(E) FE(E)
FE(E)
FE(E)
FE(E)
FE(E)
FE(E)
158158158
1C-145B
INORGANIC
STORAGE
1C-145C
C
-5
8' - 3"
DF(E)
DF(E)
R8 VOA
1C-095
(E )1
C -2
(E )1
C -3
R8 LABWARE
CLEANING
1C-340A
A-421
8' - 4 7/8" 10' - 0"
129129
C6
2' - 5"
129129
129 C6
44' - 2"
C
-2
1C-145C
169169 169 169
C
-3
51C-160.1
1C-150.1
TYP, ALL
(4) WALLS
101 101
DN
1C-160
1C-150
UP
DN
4' - 0"
V
IF
(E) WOMEN
1D-530
DN
129129
FE-1
FE(E)
FE-1
EQ EQ
FE-1
9' - 0"
FE-1
15' - 8"
FE-1
10' - 5"
FE-1 FE-1
16' - 0"
FE-1
2' - 0"
FE-1
9' - 6"
FE-1
A
A
169169
169169169
CORRIDOR
C1B5
169 169
169 169
169169169169
100' - 6"100' - 2"
(E) WOMEN
1D-540
(E) MEN
1D-550
1' - 11"
SLOPE
1:12 MIN(E) (E)
129129
129129
137 137
EQ EQ
B
-2
901 TYP, ALL
(4) WALLS1
Addendum
187 Addendum
Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
GENERAL SERVICES ADMINISTRATION
ROCKY MOUNTAIN REGION
MOUNTAIN PLAINS SERVICE CENTER (8PSMP)
P.O. BOX 25546
BUILDING 41
DENVER FEDERAL CENTER
DENVER, CO 80225
303-236-2854
AndersonMasonDale Architects, P.C.
3198 Speer Boulevard
Denver, CO, 80211
Telephone: 303-294-9448
FAX: 303-294-0762
Architect
Iron Horse Architects
475 17th Street, Suite 720
Denver, CO, 80202
Telephone: 720-855-7572
Laboratory Planning
Martin Martin
12499 West Colfax Avenue
Lakewood, CO, 80215
Telephone: 303-431-6100
Structural Engineering
Farnsworth Group
4755 Forge Road, Suite 150
Colorado Springs, CO, 80907
Telephone: 303-692-8838
Mechanical Engineering
MEP Engineering
6402 South Troy Circle, Suite 100
Centennial, CO, 80111-6439
Telephone: 303-936-1633
Electrical Engineering
Jensen Hughes, Inc
520 Courtney Way, Suite A
Lafayette, CO, 80026
Telephone: 303-439-0485
Fire Protection
Advanced Consulting Engineers, Inc
3900 S. Wadsworth Blvd., Suite 595
Lakewood, CO, 80235
Telephone: 720-981-4150
Code Consultant
1A
1B
1C
1D
PLAN KEY
Parametrix, Inc
7186 South Highland Drive
Salt Lake City, UT, 84121
Telephone: 801-733-5900
Cost Estimator
GSA PROJECT NO. N10565510
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Seal
Do not remove this notice.
Properly destroy or return document when no longer needed.
/1
/2
:1
:0
P M
A-101D
LEVEL 1 FLOOR PLAN - AREA 1D
2009121.11
JF
CO
DP
EPA BUILDING 25
CO-LOCATION PROJECT
DENVER FEDERAL CENTER
BUILDING 25, LAKEWOOD, CO
15 APRIL 2016100% Construction Documents
182 NEW POURED IN PLACE CONCRETE RAMP
187 ACID NEUTRALIZATION VAULT, RE: MECH
AND STRUC, PROVIDE WATERPROOFING
AT ALL SIDES AND TOP
901 PROVIDE 3-1/2" SOUND ATTENUATION
BLANKET WITHIN EXISTING STUD WALL
CAVITY
137 PREPARE EXISTING EPOXY FLOOR FOR
NEW EPOXY FLOOR INSTALLATION
138 FURR-OUT EXISTING WALL WITH METAL
FURRING, STUDS AND 5/8" GYPSUM
BOARD AS REQUIRED TO ALIGN WITH
EXISTING ADJACENT WALL (MATCH
EXISTING ADJACENT WALL FINISH)
142 CENTER DOORS BETWEEN SIDE WALLS
154 REPAIR WALL OPENING WHERE DOOR
AND DOOR FRAME WERE REMOVED
158 EXISTING CONCRETE CURB TO REMAIN
169 FIRE SEALANT AT BASE OF EXISTING
WALL, BS, FOR 1 HR RATED PARTITION,
RE: CODE PLANS; INSTALL NEW WALL
BASE AS SCHEDULED
174 RE-FRAME COLUMN SURROUND TO ALIGN
WITH EXISTING PARTITION, RE PLANS
178 SAW CUT SLAB AT DASHED LINES FOR
VIBRATION SEPARATION, RE: STRUC
101 NO ARCHITECTURAL WORK AT THIS
SPACE EXCEPT REQUIRED REPAIRS
RESULTING FROM OTHER WORK THAT
MAY BE REQUIRED AND UON
(MECHANICAL, ELECTRICAL, FIRE
PROTECTION, ETC.)
129 ALIGN
130 NEW PARTITION INFILL SIMILAR TO
PARTITION TO TYPE B - MATCH EXISTING
ADJACENT WALL THICKNESS, PAINT AND
FINISH OF ADJACENT WALL SURFACE AT
BOTH SIDES
131 LOCATE NEW PARTITION TO ALIGN WITH
EXISTING COLUMNS (GYPSUM BOARD AT
THIS SIDE OF PARTITION TO RUN
CONTINUOUS ACROSS COLUMN FACE)
132 WRAP EXISTING GYPSUM FURRED
COLUMNS WITH ONE LAYER OF 5/8" TYPE
'X' GYPSUM BOARD FULL HEIGHT
4' 16'2' 8' A-101D 1/8" = 1'-0"
1LEVEL 1 FLOOR PLAN - AREA 1D
TRUE NORTH
Addendum 01 27 MAY 2016
Addendum 02 05 AUGUST 2016
Addendum 06 12 OCT 2016
Addendum
1. REFER TO THE DOOR SCHEDULE FOR DOOR AND
DOOR FRAME FINISHES.
2. ALL ORIENTATION BASED ON PLAN NORTH
3. WHERE NEW PAINT IS SHOWN AT CEILINGS OF
ROOMS SHOWN TO BE OPEN TO STRUCTURE, PAINT
ALL EXPOSED STRUCTURE, FLOOR DECK, EXPOSED
CONDUIT AND BOXES, EXPOSED DUCTS AND
HANGERS, AND ALL OTHER UNLESS SHOWN TO
HAVE FACTORY FINISH.
4. WHERE NEW PAINT IS SHOWN AT WALLS OF ROOMS
WITHOUT CEILINGS, WALLS SHALL BE PAINTED FULL
HEIGHT.
5. REFERENCE FLOOR PLANS FOR ADDITIONAL FINISH
REQUIREMENTS.
6. MATERIAL AND FINISH TYPES WITH "-E" SUFFIX
INDICATE EXISTING MATERIAL OR FINISH TO REMAIN.
7. SEE FINISH PLANS FOR SPOT AREAS OF PAINTING.
8. INSTALL RUBBER BASE (RB-1) AT LOCATIONS WHERE
FIRE CAULKING IS INSTALLED AT EXISTING
PARTITIONS, UNO
ABBREVIATIONS GENERAL NOTESBASIS OF DESIGN FINISHES KEY TO "REMARKS"
ASD ANTISTATIC DISSIPATIVE FLOORING
CONC CONCRETE
CT-E EXISTING CERAMIC TILE
CPT CARPET
GB GYPSUM BOARD
E EXISTING
ECONC EPOXY PAINT CONCRETE
EPNT EPOXY PAINT
ES EXPOSED STRUCTURE
MAS MASONRY UNITS
NA NOT APPLICABLE
NO NONE REQUIRED
PNT PAINT
RB RUBBER BASE
RES RESINOUS FLOORING
RSF RESILIENT SHEET FLOORING
VCT VINYL COMPOSITION TILE
SC SEALER ON CONCRETE
TB TERAZZO TILE BASE
TT TERAZZO TILE
VCT VINYL COMPOSITION TILE
APC-1 MFR: Armstrong
STYLE/COLOR: Cortega Tegular 2X4 / White
REMARKS: Match existing
APC-2 MFR: Armstrong
STYLE/COLOR: Clean Room VL Square 2X4 / White
CPT-1 MFR: Milliken
STYLE COLOR: Design Rhythms / Custom
REMARKS: Match existing (owner stock provided)
RB-1MFR: Johnsonite
STYLE/COLOR: 4" H cove base / #47 Brown
REMARKS: Match existing
RB-2MFR: VPI
STYLE/COLOR: 4"H cove base / 40 Sandstone
REMARKS: Scheme 1 and 3, match existing
RB-3MFR: VPI
STYLE/COLOR: 4"H cove base / 86 Tudor Gray
REMARKS: Scheme 2, match existing
RSF-1 MFR: Nora Systems
STYLE/COLOR: Sentica 3MM / 6505 Silk
REMARKS: Scheme 1, 2 and 3
RSF-2 MFR: Nora Systems
STYLE/COLOR: Environcare 3MM / 2953 Agave
REMARKS: Scheme 1
RSF-3 MFR: Nora Systems
STYLE/COLOR: Environcare 3MM / 2936 Flax
REMARKS: Scheme 2
RSF-4 MFR: Nora Systems
STYLE/COLOR: Environcare 3MM / 2930 Wildflower
REMARKS: Scheme 3
VCT-1 MFR: Mannington
STYLE/COLOR: Essentials / 131 Oyster White
VCT-2 MFR: Mannington
STYLE/COLOR: Progressions / 55137 Sandrift
RES-1 MFR: DUR-A-FLEX
STYLE/COLOR: Dur-A-Quartz Armor Top / Q28-23
1. EXISTING CEILING TO REMAIN, REPAIR AREAS AFFECTED
BY CONSTRUCTION, MATCH FINISH AND TEXTURE OF
EXISTING CEILING
2. PATCH FLOOR TO MATCH ADJACENT MATERIAL AND
FINISH AT DOOR/WALL REMOVAL, RE: PLANS
3. LEVEL SUB FLOOR PRIOR TO INSTALLATION OF FINISH
FLOOR. MATCH HEIGHT TO EXISTING ADJACENT SUB
FLOOR, UON.
4. RESTRICT PAINTING TO AREA NOTED ON FINISH PLAN
5. PATCH AND LEVEL FLOOR AT LOCATIONS OF EWSS
REMOVAL, PRIOR TO INSTALLATION OF NEW FINISH
FLOOR; RE: DEMO DRAWINGS LOCATIONS.
6. GSA TO PROVIDE ATTIC STOCK OF CPT-1 FOR
CONTRACTOR TO INSTALL
DOOR TYPE SCHEDULE
WD-2WD-3WD-4
WD-6 WD-5
6" 6"RE: SCHRE: SCH 6" 6"
6" 6" 6" 6"
3' - 0"
3' - 0"
R E
S
C H
R E
S
C H
R E
S
C H
R E
S
C H
R E
S
C H
EQEQ
RE: SCH
EQEQ
RE: SCH
RE: SCH RE: SCH
R E
S
C H
WD-1
WD-4HM-4 WD-1
WD-6
HM-1
HM-6
HF-1
2" 2"
FRAME TYPE SCHEDULE
R E
S
C H
RE: SCH
GENERAL NOTES
1. FIRE RATINGS ARE IN MINUTES
2. 4'-0" WIDE OPENINGS CORRESPONDING WITH DOOR
TYPES WD-2, HM-2, WD-3 OR HM-3 HAVE 3'-0' WIDE ACTIVE
DOOR LEAF AND 1'-0" WIDE INACTIVE LEAF.
3. WOOD DOORS ARE 1 3/4" SOLID CORE WITH PLAIN SLICED
WHITE BIRCH VENEER WITH LIGHT RED STAIN (CONFIRM
VENEER TYPE AND STAIN COLOR MATCH TO EXISTING
DOORS).
4. COORDINATE UNDERCUT REQUIREMENTS WITH FLOOR
FINISHES AND DOOR BOTTOMS.
5. ALL INTERIOR GLAZING IS TEMPERED U.O.N.
6. ALL GLASS IN DOORS, SIDELITES AND OTHER LOCATIONS,
DEFINED AS HAZARDOUS PER 2015 IBC SECTION 2406.4
SHALL BE TEMPERED TO MEET THE REQUIREMENTS OF
ANSI 297.1 AND CPSC 16 CFR 1201 CATERGORY 1 AND 2.
ABBREVIATIONS
AD ALUMINUM FRAME
FG FIRE-RATED GLASS
FR FIRE-RATED ALUMINUM FRAME
HD HOLLOW METAL DOOR
HF HOLLOW METAL FRAME
MG MONOLITHIC GLASS
NA NOT APPLICABLE
NO NONE REQUIRED
PNT PAINT
STN STAIN
WD WOOD DOOR
(E) EXISTING
KEY TO "REMARKS"
1. EXISTING DOOR AND FRAME,
REPLACE OPERATING MECHANICS
2. RE-USE EXISTING DOOR FRAME
3. EXISTING DOOR AND FRAME, PREP
FOR NEW CARD READER
4. RE-USE EXISTING DOOR HARDWARE
5. RE-USE EXISTING CARD READER
GLAZING SCHEDULE
MG-1 1/4" CLEAR FLOAT GLASS
MG-2 1/2" CLEAR FLOAT GLASS
FG-45 45 MINUTE RATED CERAMIC GLASS
FG-60 60 MINUTE RATED CERAMIC GLASS
5' - 2"
HF-3
2" 2' - 4" 2"
2' - 4" 2"
7' - 2"
AFF
A-501
MG-1 MG-1
FLOOR LINE
A-501
SIM
A-501
SIM
RE: PLANS FOR PARTITION TYPE
LINE OF INTERSECTING WALL
(WHERE APPLICABLE) -
PARTITION TYPE PER PLANS
2" 2"
DOOR, RE: DOOR SCHEDULE
HM FRAME
SEALANT, BOTH SIDES
SPOT GROUT AT ANCHOR POINTS
(HEAD SIM)
/2
T
Y P
JAMB ANCHOR, GROUT SOLID
WHERE REQUIRED FOR FIRE
RATING, MINERAL WOOL
INSULATION, OTHERWISE
RE: PLANS FOR PARTITION TYPE
(HEAD SIM)
STOP AT ROOM SIDE2"
/2
T
Y P
SEALANT, BOTH SIDES
GLAZING , RE: WINDOW SCHEDULE
E Q
E Q
JAMB ANCHOR
HOLLOW METAL FRAME EQEQ
(JAMB SIM)
5/8" GYPSUM BOARD, TYP
METAL FRAMING, MATCH EXISTING
STEEL ANGLES, RE: STRUC
SHIM, AS REQUIRED
3/8" SEALANT AND BACKER ROD, BS
DOOR
HM FRAME
BY ORDER OF THE FIRE MARSHAL
MAXIMUM STORAGE
HEIGHT - 12FT
/2
T
Y P
/2
/4
/4
"1
1' - 2"
CL
Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
GENERAL SERVICES ADMINISTRATION
ROCKY MOUNTAIN REGION
MOUNTAIN PLAINS SERVICE CENTER (8PSMP)
P.O. BOX 25546
BUILDING 41
DENVER FEDERAL CENTER
DENVER, CO 80225
303-236-2854
AndersonMasonDale Architects, P.C.
3198 Speer Boulevard
Denver, CO, 80211
Telephone: 303-294-9448
FAX: 303-294-0762
Architect
Iron Horse Architects
475 17th Street, Suite 720
Denver, CO, 80202
Telephone: 720-855-7572
Laboratory Planning
Martin Martin
12499 West Colfax Avenue
Lakewood, CO, 80215
Telephone: 303-431-6100
Structural Engineering
Farnsworth Group
4755 Forge Road, Suite 150
Colorado Springs, CO, 80907
Telephone: 303-692-8838
Mechanical Engineering
MEP Engineering
6402 South Troy Circle, Suite 100
Centennial, CO, 80111-6439
Telephone: 303-936-1633
Electrical Engineering
Jensen Hughes, Inc
520 Courtney Way, Suite A
Lafayette, CO, 80026
Telephone: 303-439-0485
Fire Protection
Advanced Consulting Engineers, Inc
3900 S. Wadsworth Blvd., Suite 595
Lakewood, CO, 80235
Telephone: 720-981-4150
Code Consultant
Parametrix, Inc
7186 South Highland Drive
Salt Lake City, UT, 84121
Telephone: 801-733-5900
Cost Estimator
GSA PROJECT NO. N10565510
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Seal
Do not remove this notice.
Properly destroy or return document when no longer needed.
/1
/2
:1
:0
P M
A-501
SCHEDULES AND INTERIOR
OPENINGS
2009121.11
JF
CO
DP
EPA BUILDING 25
CO-LOCATION PROJECT
DENVER FEDERAL CENTER
BUILDING 25, LAKEWOOD, CO
15 APRIL 2016100% Construction Documents
ROOM FINISH SCHEDULE
NO NAME FLOORING
BASE NORTH EAST SOUTH WEST CEILING
REMARKSMTL MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
LEVEL 1
1A-005 (E) OPEN OFFICE CPT-E RB-1 GB-E PNT-E GB-E PNT-E GB-E PNT-E GB-E PNT-E APC-E NA 1
1A-110 R8 FIELD PREP ECONC RB-1 GB PNT-2 GB PNT-2 GB PNT-2 GB PNT-2 ES NO
1A-120 ACID LIFT SC RB-3 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 ES NO
1A-220 R8 SUPPLIES SC RB-3 GB PNT-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 APC-1 NA
1A-231 GAS CLOSET SC RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 ES NO
1A-235 ESAT INSTRUMENTS RSF-1/4 RB-3 GB PNT-2 GB PNT-2 GB PNT-2 GB PNT-2 APC-1 NA
1A-245 ESAT TOXICOLOGY & GENERAL BIO RES-1 RES-1 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2
1A-246 GAS CLOSET SC RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 NO NA
1A-250 R8 CLLE RES-1 RES-1 GB PNT-2 GB PNT-2 GB PNT-2 GB-E PNT-2 APC-1 NA
1A-254 GAS CLOSET SC RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 NO NA
1A-255 ESAT ASBESTOS PLM RES-1 RES-1 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2
1A-255A ESAT ASBESTOS RES-1 RES-1 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2 GB EPNT-2
1A-256 GAS CLOSET SC RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 NO NA
1A-260 R8 MACROBIOLOGY RSF-1/4 RB-3 GB PNT-2 GB PNT-2 GB PNT-2 GB PNT-2 APC-1 NA
1A-265 SHARED METAL PREP RSF-1/4 RB-3 GB PNT-2 GB PNT-2 GB PNT-2 GB PNT-2 APC-1 NA
1A-270 R8 ORGANIC PREP RSF-1/4 RB-3 GB PNT-2 GB PNT-2 GB PNT-2 GB PNT-2 APC-1 NA
1A-340 NEIC FIELD STORAGE & STAGING SC RB-1 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2 ES NA
1A-345 CID STAGING AND STORAGE SC RB-1 GB PNT-1 GB-E PNT-1 GB-E PNT-1 GB/GB-E PNT-1 ES NA
1A-360 SAF HALL SC RB-1 GB-E PNT-1 GB PNT-1 GB PNT-1 GB/GB-E PNT-1 APC-1 NA
1B-010 (E) ATRIUM CPT-E/TT-E TB-E GB-E NO GB-E NO GB-E NO GB-E NO GB/GB-E PNT-1/NO
1B-035 MECHANICAL SC-E RB-E GB-E PNT-E GB-E PNT-E GB/GB-E PNT-1 GB-E PNT-E NO NA
1B-170 ESAT LAB SUPPLY VCT-1 RB-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 GB-E PNT-1 APC-1 NA
1B-225 R8 LAB SUPPLY VCT-1 RB-1 GB PNT-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 APC-1 NA
1B-265 NEIC LAB SUPPLY VCT-1 RB-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 APC-1 NA
1C-005 SHARED IC / IC-MS RSF-1/3 RB-3 GB-E PNT-2 GB/GB-E PNT-2 GB PNT-2 GB-E PNT-2 APC-1 NA
1C-045 SHARED ORGANIC INSTRUMENTS RSF-1/3 RB-3 GB PNT-2 GB/GB-E PNT-2 GB-E PNT-2 GB/GB-E PNT-2 APC-1 NA
1C-060 NEIC ORGANIC PREP RSF-1/3 RB-3 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA 1
1C-085 R8 MICROBIOLOGY RSF-1/3 RB-3 GB-E PNT-2 GB-E PNT-2 GB PNT-2 GB-E PNT-2 APC-1 NA
1C-090 SHARED PCR RES-1 RES-1 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-095 R8 VOA RSF-1/3 RB-3 GB PNT-2 GB-E PNT-2 GB PNT-2 GB-E PNT-2 APC-1 NA
1C-115 NEIC VOA RSF-1/3 RB-3 GB PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-120 ESAT METALS RSF-1/3 RB-3 GB/GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-145A INERGEN CYLINDER ROOM (E) RB-1 GB PNT-1 GB-E PNT-E GB-E PNT-E GB-E PNT-E ES NO
1C-145B ORGANIC STORAGE ECONC RB-1 GB PNT-1 GB-E PNT-1 GB PNT-1 GB-E PNT-1 NO NA
1C-145C INORGANIC STORAGE ECONC RB-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 GB-E PNT-1 NO NO
1C-150 R8 TRACE LEVEL ELEMENTAL LAB RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB/APC-E PNT-2 1, 3
1C-150A VESTIBULE RSF-1 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2 GB PNT-2
1C-160 NEIC TRACE LEVEL ELEMENTAL LAB RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB/APC-1 PNT-2 1
1C-160A VESTIBULE RSF-1 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2 GB PNT-2
1C-170 SHARED TRACE LEVEL PREP RSF-1 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-E NA 1
1C-180 TRACE LEVEL PREP RSF-1 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-E NA 1
1C-225A SHARED HAZARDOUS SAMPLES RECEIPT & STORAGE RES-1 RES-1 GB-E PNT-2 GB PNT-2 GB-E PNT-2 GB-E PNT-2 APC-E NA 1
1C-225B R8 SAMPLE RECEIVING & STORAGE RES-1 RES-1 GB-E PNT-2 GB-E PNT-2 GB/GB-E PNT-2 GB PNT-2 APC-1 NA
1C-320 R8 WET CHEMISTRY RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-325 NEIC CYANIDE & SULFIDE RSF-1/2 RB-2 GB-E PNT-2 GB/GB-E PNT-2 GB/GB-E PNT-2 GB/GB-E PNT-2 APC-1 NA
1C-325A SECURITY SC-E RB-1 GB PNT-1 GB PNT-1 GB-E PNT-1 GB-E PNT-1 ES NO
1C-340A R8 LABWARE CLEANING RES-1 RES-1 GB-E EPNT-2 GB-E EPNT-2 GB-E EPNT-2 GB/GB-E EPNT-2 GB EPNT-2
1C-340B NEIC LABWARE CLEANING RES-1 RES-1 GB-E EPNT-2 GB-E EPNT-2 GB-E EPNT-2 GB-E EPNT-2 GB EPNT-2
1C-360 NEIC INORGANIC PREP RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-365 NEIC DRUM TUMBLER RES-1 RES-1 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-420 SHARED LCs RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB/GB-E PNT-2 APC-1 NA
1C-425 R8 AIR CALIBRATION ROOM RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2 APC-1 NA
1C-425B R8 AIR CALIBRATION RSF-1 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2
1C-515 GAS CLOSET SC RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB-E PNT-1 ES NO
1C-520 NEIC ELEMENTAL ANALYSIS RSF-1/2 RB-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 APC-1 NA
1C-610 NEIC ASBESTOS VCT-E RB-E GB-E PNT-E GB-E PNT-E GB-E PNT-2 GB-E PNT-E ES-E PNT-2
1C-620 CHILLER SC RB-1 GB-E PNT-1 GB/GB-E PNT-1 GB/GB-E PNT-1 GB-E PNT-1 GB PNT-1
1C-630 SHARED SEM/TEM ASD-E RB-E GB/GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB/GB-E PNT-2 APC-2 NA
1D-520 ESAT TEM PREP RSF-1/3 RB-3 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB-E PNT-2 GB PNT-2
1D-525 (E) NEIC AIR TOXICS LAB VCT-E RB-E GB/GB-E PNT-E/PNT-2 GB-E PNT-E GB/GB-E PNT-E/PNT-2 GB-E PNT-E APC-E NA
1D-530 (E) WOMEN (E) (E) GB-E CT-E/PNT-1 GB CT-E/PNT-1 GB-E CT-E/PNT-1 GB-E CT-E/PNT-1 GB-E PNT-1
1F-185 COMPRESSOR ROOM SC-E RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 ES NO
C1A0 CORRIDOR CPT-1/CPT-E RB-1/RB-E GB-E PNT-1 GB/GB-E PNT-1 GB-E PNT-1 GB/GB-E PNT-1 GB/APC-1 PNT-1/NA 6
C1A1 SERVICE CORRIDOR SC-E RB-1 GB-E PNT-1 NA NA GB PNT-1 GB PNT-1 ES-E NO
C1A2 LAB CORRIDOR VCT-1/2 RB-1 GB PNT-1 GB PNT-1 GB PNT-1 GB PNT-1 APC-1/GB NA/PNT-1
C1A3 SERVICE HALL SC-E RB-E GB-E PNT-1 GB/GB-E PNT-1 NA NA GB-E PNT-1 ES-E NO
C1A4 SERVICE CORRIDOR SC-E RB-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 GB PNT-1 ES-E NO
C1A5 LAB CORRIDOR VCT-1/2 RB-1/RB-E GB PNT-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 APC-1 NA
C1B5 CORRIDOR CPT-E RB-1 NA NA GB-E PNT-E GB-E PNT-1 GB/GB-E PNT-1 APC-E NA 1
C1C0 LAB CORRIDOR VCT-1/2 RB-1 NA NA GB-E PNT-1 NA NA GB/GB-E PNT-1 APC-1 NA 5
C1C1 LAB CORRIDOR VCT-1/2 RB-1 GB-E PNT-1 NA NA GB-E PNT-1 GB PNT-1 APC-1 NA 5
C1C2 LAB CORRIDOR VCT-1/2 RB-1 GB/GB-E PNT-1 NA NA GB-E PNT-1 GB-E PNT-1 APC-1 NA
C1C3 LAB CORRIDOR VCT-1/2 RB-1 GB/GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 APC-1 NA 5
C1C4 LAB CORRIDOR VCT-1/2 RB-1 NA NA GB/GB-E PNT-1 NA NA GB/GB-E PNT-1 APC-1 NA 5
C1C5 LAB CORRIDOR VCT-1/2 RB-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 NA NA APC-1 NA 5
C1C6 LAB CORRIDOR VCT-1/2 RB-1 GB-E PNT-1 NA NA GB-E PNT-1 GB-E PNT-1 APC-1 NA 5
C1D5 LAB CORRIDOR VCT-1/2 RB-1 NA NA GB/GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 APC-1 NA
VE-06 VESTIBULE VCT-1/2 RB-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 GB-E PNT-1
LEVEL 2
2B-030 (E) OFFICE (E) RB-1 GB-E PNT-E GB/GB-E PNT-E GB-E PNT-E GB/GB-E PNT-1 APC-E NA
2B-125 (E) OFFICE CPT-E RB-1 GB-E PNT-1 GB-E PNT-1 GB PNT-1 GB-E PNT-1 APC-1 NA
2B-135 (E) OFFICE CPT-1 RB-1 GB PNT GB-E PNT-1 GB-E PNT-1 GB-E PNT-1 APC-E NA 1, 6
2C-110 (E) TELE VCT-E RB-1/RB-E GB-E PNT-1 GB/GB-E PNT-1 GB-E PNT-1 GB/GB-E PNT-1 ES-E NO
2C-120 (E) LAN VCT-E RB-1/RB-E GB-E PNT-1 GB/GB-E PNT-1 GB-E PNT-1 GB/GB-E PNT-1 ES-E NO
C2B0 CORRIDOR CPT-E RB-1/RB-E GB-E PNT-E NA NA GB-E PNT-E GB PNT-1 APC-E NA 1
C2B1 CORRIDOR CPT-E RB-1/RB-E NA NA GB-E PNT-E GB PNT-1 GB-E PNT-E APC-E NA 1
DOOR NO
OPENING SIZE DOOR
TYPE
DOOR
FINISH
FRAME
TYPE
FRAME
FINISH HEAD JAMB FIRE RAT'G GLASS TYPE HDW
ACCESS
CONTROL REMARKSWIDTH HEIGHT
LEVEL 1
(E)1B-275 3' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 1.06 YES 3
(E)1C-210 4' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 22 YES 1
(E)1C-225A 6' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 22 YES 1
(E)1C-225B 4' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 22 YES 1
(E)1C-305 4' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 22 YES 1
1A-110 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 07 YES
1A-120 6' - 0" 7' - 0" WD-5 STN HF-1 PNT 1/A501 NA 17
1A-220 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 07 YES
1A-231 5' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 10
1A-235 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-245 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-246 5' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 10
1A-250 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-254 5' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 10.01
1A-255 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-255A 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01
1A-256.1 5' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 10.02
1A-256.2 5' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 10.03
1A-260 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-265 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-270 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1A-340 6' - 0" 7' - 0" HM-6 PNT HF-1 PNT 1/A501 MG-1 01.02 YES
1A-345 4' - 0" 7' - 0" HM-4 PNT HF-1 PNT 1/A501 MG-1 12 YES
1A-360 3' - 0" 7' - 0" HM-1 PNT HF-1 PNT 1/A501 NA 03.01 YES
1B-215 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 YES 5
1C-005 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.01 YES
1C-145A.1 4' - 0" 7' - 0" WD-1 STN HF-1 PNT 1/A501 45 NA 03
1C-145A.2 4' - 0" 7' - 0" WD-1 STN HF-1 PNT 1/A501 45 NA 04 YES
1C-145B 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 02
1C-145C 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 45 FG-45 02.01 YES
1C-150 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.04 YES
1C-150.1 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01
1C-160 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01.04 YES
1C-160.1 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 MG-1 01
1C-225A.1 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A502 MG-1 13.01 YES
1C-230 3' - 6" 7' - 0" WD-1 STN (E) PNT 1/A501 45 NA 06.01 YES 5
1C-325A 3' - 0" 7' - 0" WD-1 STN HF-1 PNT 1/A501 NA 03.02 YES
1C-340A 6' - 0" 8' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 01.01A YES
1C-355 3' - 0" 7' - 0" WD-2 STN (E) (E) (E) 45 FG-45 23 YES 2, 4
1C-515 3' - 0" 7' - 0" WD-2 STN HF-1 PNT 1/A501 MG-1 14
1D-520 4' - 0" 7' - 0" WD-4 STN HF-1 PNT 1/A501 NA 02.01 YES
C1A1 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 18
C1A2 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 19.01 YES
C1A5 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 19.01 YES
C1A6 6' - 0" 7' - 0" WD-6 STN HF-1 PNT 1/A501 MG-1 19.02
ST-01.1 3' - 0" 7' - 0" WD-1 STN (E) PNT NA 60 NA 20 2
ST-02.1 3' - 0" 7' - 0" WD-1 STN (E) PNT NA 60 NA 20 2
LEVEL 2
(E)2B-505 3' - 0" 7' - 0" (E) (E) (E) (E) (E) (E) 04.02 YES 3
2C-110 3' - 0" 7' - 0" WD-1 STN HF-1 PNT 1/A501 45 NA 03.02A YES
2C-120 3' - 0" 7' - 0" WD-1 STN HF-1 PNT 1/A501 45 NA 03.02A YES
C2B0 3' - 0" 7' - 0" WD-2 STN HF-1 PNT 1/A501 MG-1 03.02B YES
C2B1 3' - 0" 7' - 0" WD-2 STN HF-1 PNT 1/A501 MG-1 03.02B YES
ST-01.2 6' - 0" 7' - 0" WD-5 STN (E) PNT NA NA 21 2
ST-02.2 3' - 0" 7' - 0" WD-1 STN (E) PNT NA NA 20 2
DOOR SCHEDULE
2" 8"1" 4" A-501 3" = 1'-0"
1HM DOOR JAMB
2" 8"1" 4" A-501 3" = 1'-0"
3HM WINDOW JAMB
2" 8"1" 4" A-501 3" = 1'-0"
2SECTION DETAIL - HEAD @ MASONRY
2" 8"1" 4" A-501 3" = 1'-0"
4SIGN TYPE - A
Addendum 01 27 MAY 2016
Addendum 06 12 OCT 2016
Addendum
Addendum
Addendum
Addendum
Addendum
EXHAUST FAN SCHEDULE
MARK
NEW/
EXISITNG
MANUFACTURER MODEL TYPE DRIVE SERVICE CFM ESP
(IN. W.C.)
TOTAL
FLOW
CFM
PLUME
HEIGHT
(FT)
FAN
RPM
TIP
SPEED
(FPM)
NOZZLE/
OUTLET
VELOCITY
(FPM)
SOUND
ROOF OPENING MOTOR ELECTRICAL DATA PHYSICAL DATA
REMARKS
L (IN.) W (IN.) BHP RPM
HP/
WATTS
V/PH BRANCH L
(IN.)
W
(IN.)
H
(IN.)
WT.
(LBS.)
EF-1201A,B NEW MK PLASTICS AXIJET-FSW 3000 ROOF STACK EXH BELT 1200 LAB EXH 12,700 4.0 22,665 29 1491 11,710 5226 92 LwA N/A N/A 13.8 1800 20 480/3 EMERG. 77 58 163 1375 1,2,3,9,12,13,14
EF-1201C,D NEW MK PLASTICS AXIJET-F 1225 ROOF STACK EXH DIRECT 1A-260A HOOD 1500 5.2 2,803 9 3660 11,977 3846 94 LwA N/A N/A 2.31 3500 3 480/3 EMERG. 38.5 24 103 236 1,2,4,9,12,13,14
EF-1303 EXISTING MK PLASTICS AXIJET-S 1825 ROOF STACK EXH BELT 1300 SOLVENT STOR 2500 1.5 5,750 19.9 1390 6555 3012 76 LwA N/A N/A 0.97 1750 1.5 480/3 EMERG. 49 36 77 662 1,2,5,13
EF-2401A,B,C EXISTING MK PLASTICS AXIJET 3650 ROOF STACK EXH BELT 1300 LAB EXH 18,600 4 30,000 52 1163 11,122 4845 93 LwA N/A N/A 20.2 1750 20 480/3 EMERG. 81 70 155 2640 1,2,7,9,10,13
EF-2402A,B,C EXISTING MK PLASTICS AXIJET 3650 ROOF STACK EXH BELT 1300 LAB EXH 18,600 4 30,000 52 1163 11,122 4845 93 LwA N/A N/A 20.2 1750 20 480/3 EMERG. 81 70 155 2640 1,2,7,9,10,13
EF-2412A,B EXISTING MK PLASTICS AXIJET-S 1825 ROOF STACK EXH BELT 1200 & 1300 LAB EXH 5710 4.2 13,133 37.2 3011 14,200 6880 98 LwA N/A N/A 9.33 3450 15 480/3 EMERG. 49 36 77 737 1,2,5,9,10,13
EF-GEN-1 NEW MK PLASTICS AXIJET-HTS 2700 GENSET EXH BELT EMERGENCY GENERATOR
15,660/ 15,816
0.5 27,888 39.6 1803 12,745 7961 95 LwA N/A N/A 10.4/ 13.6
1800 15 480/3 EMERG. 69 52 119 996 1,2,8,13
EF-DV NEW FANTECH DEDPV-705 INLINE DIRECT 1A-340 DRYER 173 2559 N/A N/A 72 W 120/1 NORMAL 10 1,11,13
VF-1401 NEW COOK 270SQN-B INLINE BELT 1F-185 6,000 0.3 571 N/A N/A 0.764 1725 1 480/3 EMERG. 37.5 40 40 357 1,9,10,13
NOTES:
1. ALL AIRFLOW IS AT 5518 FEET ELEVATION 8. AIRFLOW AND BHP ARE HOT/COLD AIRSTREAM VALUES
2. PLUME HEIGHT EXCLUDES STACK EXTENSIONS. 9. NEW VFD WITH BYPASS, INTEGRAL DISCONNECT, AND BACNET COMMUNICATION
3. STACK DISCHARGE AT 15' ABOVE ROOF 10. NEW VFD RATED MOTOR
4. AMCA TYPE A - SPARK RESISTANT, STACK DISCHARGE AT 19' ABOVE ROOF 11. LED INDICATOR, METAL EPOXY COATED DISCHARGE HOOD WITH BACKDRAFT DAMPER (COLOR BY ARCH.), DUCT CLAMPS, DUCT PRESSURE SENSOR
5. REBALANCED EXISTING FAN 12. PROVIDE SUPPORT RING ON STACK WITH GUY WIRES TO ROOF ANCHOR POINTS. REFER TO STRUCT AND ARCH.
6. RELOCATED EXISTING FAN 13. EMERGENCY POWER
7. REBALANCED EXISTING FAN WITH NEW MOTOR, 1388 MAX FAN RPM 14. CURB RAILS FOR FAN SUPPORT SHALL BE MINIMUM 14" HIGH
PUMP SCHEDULE
MARK MANUFACTURER MODEL SIZE LOCATION SERVICE TYPE FLOW
(GPM)
HEAD
(FT)
FLUID
OPER.
TEMP.
(DEG F)
MOTOR ELECTRICAL
WT.
(LB.)
REMARKS
HP RPM V/PH FLA MCA
CP-1201 BELL & GOSSETT SERIES 60 612 AHU-1201 HEATING COIL CIRC INLINE 78.3 25 130 1.0 1750 480/3
NOTES:
AIR DEVICE SCHEDULE
TAG SERVICE MFR. MODEL FRAME MATERIAL FINISH FACE SIZE
(IN)
NOMINAL
DUCT SIZE
(IN)
REMARKS
SD-1 SUPPLY TITUS TDC TYPE 3 STEEL WHITE 24X24 SEE DWG
SD-2 SUPPLY TITUS TDC TYPE 1 STEEL WHITE 24X24 SEE DWG
SD-3 SUPPLY TITUS TRITEC TYPE 3 STEEL WHITE SEE DWG SEE DWG 24X24 OR 24X48 FACE
SD-4 SUPPLY TITUS TMRA NA STEEL WHITE SEE DWG SEE DWG
SD-5 SUPPLY TITUS TDC-FR TYPE 1 STEEL WHITE 24X24 SEE DWG 3 HR RATED SQUARE NECK
SD-6 SUPPLY FLANDERS TH54 TYPE 3 ALUMINUM WHITE 24X24 SEE DWG FLANDERS MODEL TH54-E0491
SD-7 SUPPLY FLANDERS TH54 TYPE 1 ALUMINUM WHITE 24X24 SEE DWG FLANDERS MODEL TH54-E0491
SD-8 SUPPLY TITUS TMRA NA STEEL WHITE SEE DWG SEE DWG
SD-9 SUPPLY TITUS TDC TYPE 3 STEEL WHITE 24X24 SEE DWG
SD-10 SUPPLY NAILOR 48LL1 TYPE 1 ALUMINUM WHITE 48" LINEAR SEE DWG
SD-11 SUPPLY TITUS 300RS TYPE 1 STEEL WHITE SEE DWG SEE DWG PROVIDE WITH OPPOSED BLADE DAMPER
SD-12 SUPPLY METALAIRE HRD-CL BORDER 6 SS WHITE 12X48 8
SR-1 SUPPLY TITUS 300RL-HD TYPE 1 STEEL STD. SEE DWG SEE DWG REGISTER
RG-1 RETURN TITUS PAR TYPE 1 & 3 STEEL STD. 24X24 SEE DWG
RG-2 RETURN TITUS 350FS TYPE 1 STEEL STD. SEE DWG SEE DWG
RG-3 RETURN TITUS 33RL TYPE 1 STEEL STD. SEE DWG SEE DWG HEAVY DUTY GYM TYPE
RG-4 RETURN TITUS PAR TYPE 1 & 3 STEEL STD. 24X24 22X22
TG-1 TRANSFER TITUS PAR TYPE 3 STEEL STD. 24X24 22X22
TG-2 TRANSFER TITUS PAR TYPE 1 STEEL STD. 16X16 14X14
EG-1 EXHAUST TITUS PAR TYPE 1 STEEL STD. 12X12 SEE DWG
EG-2 EXHAUST TITUS PAR TYPE 1 STEEL STD. 16X16 14X14
EG-3 EXHAUST TITUS 350FS TYPE 1 ALUMINUM STD. SEE DWG SEE DWG FOR SHOWERS AND OTHER WET AREAS
EG-4 EXHAUST NAILOR 71 DH TYPE 1 ALUMINUM ANODIZED SEE DWG SEE DWG COLOR BY ARCH., INSECT SCREEN
EG-5 EXHAUST TITUS PAR TYPE 1 & 3 STEEL STD. 24X24 22X22
EG-6 EXHAUST TITUS PAR TYPE 1 & 3 STEEL STD. 24X24 SEE DWG
EG-7 EXHAUST TITUS PAR TYPE 1 & 3 STEEL STD. 12X12 SEE DWG
NOTES:
1. TYPE 1 - SURFACE MOUNT 2. TYPE 3 - LAY IN CEILING 3. NOT ALL TYPES USED 4. BORDER 6 - LAY IN CEILING
AIR TERMINAL UNITS
TAG MFR. MODEL
ASSOCIATED
AHU
AREA
SERVED
MAX COOL
& HEAT
CFM
MIN COOL
& HEAT
CFM
HEATING COIL
REMARKSSEN. CAP
(MBH)
EAT
(°F)
LAT
(°F)
EWT
(°F)
LWT
(°F)
ROWS
PD
(FT WC)
GPM
ATU-1 TITUS DESV-14 AHU-1201 A 2,130 330 57.28 55 85 130 110 2 3.95 8.00
NOTES
FAN COIL UNITS
TAG MANUFACTURER MODEL
AREA
SERVED
UNIT TYPE
FAN COOLING COIL ELECTRICAL
WEIGHT
(LBS.)
REMARKS
CFM
MIN
CFM
ESP
(IN. WC)
TSP
(IN. WC)
BHP HP SEN. CAP
(MBH)
FACE
VEL
(FPM)
EAT
DB
(°F)
EAT
WB
(°F)
EWT
(°F)
ROWS
PD
(FT
WC)
GPM VOLT/PH MCA FLA
FCU-1 TRANE BCHD024
1A-270, 1C-320, CH CLOSETS
HORIZ CONCEALED 800 0 0.5 0.9 0.2 1/2 12.9 480.0 72 58 45 4-HC 1.2 2.8 277/1 4.7 3.8 126 1,2,3,4,5,6,7,8,9
FCU-2 TRANE BCHD036 1C-005, 1C-630 HORIZ CONCEALED 1,200 0 0.5 0.8 0.3 1/2 17.6 430.0 72 58 45 4-HC 1.4 2.7 277/1 4.7 3.8 151 1,2,3,4,5,6,7,8,9
FCU-3 TRANE BCHD054 1C-095 HORIZ CONCEALED 1,800 0 0.5 0.9 0.5 1 27.4 465.0 72 58 45 4-HC 1.1 5.8 277/1 8.4 6.7 212 1,2,3,4,5,6,7,8,9
FCU-4 TRANE BCHD072
1C-120, CH CLOSET
HORIZ CONCEALED 2,300 0 0.5 0.9 0.7 1 34.4 460.0 72 58 45 4 1.2 8.5 277/1 8.4 6.7 219 1,2,3,4,5,6,7,8,9
FCU-5 TRANE BCHD072 1C-340 HORIZ CONCEALED 2,500 0 0.5 0.9 0.8 1 38.3 500.0 72 58 45 4 1.2 8.5 277/1 8.4 6.7 219 1,2,3,4,5,6,7,8,9
FCU-6 TRANE BCHD090 1C-420 (2 FCUs) HORIZ CONCEALED 2,800 0 0.5 0.8 0.9 1 41.4 420.0 72 58 45 4 1.0 10.2 277/1 8.4 6.7 259 1,2,3,4,5,6,7,8,9
FCU-7 MULTIAQUA MHCFC4W-08-1
1C-150, 1C-160, 1C-520 CASSETTE 550 0 0.0 - 130 W - 17.4 80 67 45 4 7.2 8.5 208 1.0 0.65 71 1,2,3,4,5,6,8,9
BCU-1404 TRANE BCHD090 1F-185 HORIZ 3,500 0 0.25 1.144 1.569 1-1/2 93.5 560.0 80 67 45 6 6.63 15.78 480/3 4.13 3.30 339.8 1,2,3,4,5,6,7,8,9
NOTES:
1. SITE ELVATION = 5,518' ASL 5. PROVIDE WITH BACNET COMMUNICATION INTERFACE 9. PROVIDE MINIMUM MERV 8 FILTERS
2. PROVIDE WITH AUXILLARY DRAIN PAN 6. PREMIUM EFFICIENCY ECM DIRECT DRIVE MOTOR
3. PROVIDE UNIT WITH CONDENSATE OVERFLOW SWITCH (DRAIN PAN) 7. PROVIDE WITH RUBBER IN SHEAR VIBRATION ISOLATORS AND MOUNTING PACKAGE TO SUSPEND FROM STRUCTURE ABOVE
4. PROVIDE PRESSURE-TEMPERATURE PORTS AND AIR VENT ON COIL 8. EMERGENCY POWER
ELECTRIC HEATING COILS
TAG MFR. MODEL
NOMINAL
DUCT
DIMENSIONS
(IN.)
AREA
SERVED
CFM SEN. CAP
(MBH)
EAT
(°F)
LAT
(°F)
TOTAL
HEATER
POWER
(kW)
STAGES ELECTRICAL REMARKS
EHC-1 GREENHECK IDHB 24WX18H 1C-360 1,850 49.75 55 85 15 1 480V/3Ø/60 1
NOTES:
1. MUST MAINTAIN 1200 CFM ACROSS COIL WITH HEATER ON.
CABINET UNIT HEATERS
TAG MANUFACTURER MODEL
AREA
SERVED
FAN HEATING COIL ELECTRICAL
FILTER
SHIPPING
WEIGHT
(LBS.)
REMARKS
CFM
MIN
CFM
ESP
(IN. WC)
BHP HP TOT. CAP
(MBH)
EAT
(°F)
LAT
(°F)
EWT
(°F)
ROWS
PD
(FT WC)
GPM VOLT/PH MCA MOP FLA
CUH-5 ZEHNDER RITTLING FW-270-06 ST-02 220 0 0.00 0.02 1/25 12.8 50.0 115.3 130 2 1.5 3.0 120/1 0.9 15A 0.68 1"
THROW
AWAY
125 1
NOTES:
1. SITE ELEVATION = 5,518' ASL
AIR HANDLER SCHEDULE
MARK
NEW OR
EXISTING
MANUFACTURER MODEL LOCATION SERVICE
SUPPLY FAN EXHAUST FAN HEATING COIL COOLING COIL FILTER PHYSICAL DATA
REMARKS
MAX CFM
(FUTURE)
MAX CFM
(CURRENT)
% SPARE
CAPACITY
MIN
CFM
MIN.
OA
CFM
TSP
(IN.
W.C.)
ESP
(IN.
W.C.)
V/PH HP BHP RPM CFM
(FUTURE)
CFM
(CURRENT)
TSP
(IN.
W.C.)
ESP
(IN.
W.C.)
V/PH HP RPM
MAX.
AIR P.D.
(IN. W.C.)
TOTAL
CAP.
(MBH)
HEATING
CFM
FLOW
(GPM)
MAX.
FLUID P.D.
(FT. W.C.)
EWT
(DEG
F)
EAT
(DEG
F)
LAT
(DEG
F)
MAX.
FACE VEL.
(FPM)
MAX.
AIR P.D.
(IN. W.C.)
TOTAL
CAP.
(MBH)
SENS.
CAP.
(MBH)
FLOW
(GPM)
ROWS
MAX.
FLUID P.D.
(FT. W.C.)
EWT
(°F)
EDB
(°F)
EWB
(°F)
LDB
(°F)
LWB
(°F)
PRE FINAL
L
(IN.)
W
(IN.)
H
(IN.)
WT.
(LB.)TYPE MERV TYPE MERV
RTU-1101 EXISTING TRANE TSCX-17 ROOF-A GARAGE 7,500 7,500 0% 3,750 3,750 2.81 1.5 460/3 7.5 6.6 1856 N/A - - - - - - 0.182 669.7 7,500 46 0.9 130 -20 80 447 0.24 257 257.00 54.99 6 6.83 45 93 61 55 47.2 PANEL 8 BAG 14 184 80 54.5 4166 2,3
AHU-1201 EXISTING TRANE MCC-50 1B-035 1ST FL A 25,510 24,060 6% 3,510 3,510 4.1 3.0 460/3 25 - 1383 25510 0.75 0.75 460/3 7.5 322 0.087 781.2 24,060 78 1.19 130 35 71.4 487 0.249 689 689 98.2 - 7.34 45 86 61 55 49 PANEL 8 BAG 14 - - - - 1,3,4
RTU-1301 EXISTING TRANE TSCX-35 ROOF-C 1ST FL D LABS 17,750 14,595 18% 7,785 7,785 4.9 2.25 460/3 25 19.3 1812 N/A - - - - - - 0.21 1293.8 17,750 85 2.38 130 -10 71.6 520 0.356 639.7 639.7 100.4 6 11.08 45 95 61 55 46.4 PANEL 8 BAG 14 243 100 68 7581 1,3
RTU-1302 EXISTING TRANE TSCX-35 ROOF-C 1ST FL D LABS 17,750 17,110 4% 9,460 9,460 4.9 2.25 460/3 25 19.3 1812 N/A - - - - - - 0.21 1293.8 17,750 85 2.38 130 -10 71.6 520 0.356 639.7 639.7 100.4 6 11.08 45 95 61 55 46.4 PANEL 8 BAG 14 243 100 68 7581 1,3
RTU-1303 EXISTING TRANE TSCX-35 ROOF-C 1ST FL D LABS 17,750 12,800 28% 5,985 5,985 4.9 2.25 460/3 25 19.3 1812 N/A - - - - - - 0.21 1293.8 17,750 85 2.38 130 -10 71.6 520 0.356 639.7 639.7 100.4 6 11.08 45 95 61 55 46.4 PANEL 8 BAG 14 243 100 68 7581 1,3
RTU-1304 EXISTING TRANE TSCX-35 ROOF-C 1ST FL D LABS 17,750 15,230 14% 6,710 6,710 4.9 2.25 460/3 25 19.3 1812 N/A - - - - - - 0.21 1293.8 17,750 85 2.38 130 -10 71.6 520 0.356 639.7 639.7 100.4 6 11.08 45 95 61 55 46.4 PANEL 8 BAG 14 243 100 68 7581 1,3
RTU-1305 EXISTING TRANE TSCX-35 ROOF-C 1ST FL D LABS 17,750 16,810 5% 8,385 8,385 4.9 2.25 460/3 25 19.3 1812 N/A - - - - - - 0.21 1293.8 17,750 85 2.38 130 -10 71.6 520 0.356 639.7 639.7 100.4 6 11.08 45 95 61 55 46.4 PANEL 8 BAG 14 243 100 68 7581 1,3
NOTES: REMARKS:
1. ALL AIRFLOWS ARE AT 5518 FEET ELEVATION 1. EXISITING UNIT WITH AIR AND WATER REBALANCE
2. ALTERNATE #2 - EXISITING UNIT WITH AIR AND WATER REBALANCE AND HEATING COIL REPLACEMENT
3. EXTERNAL STATIC INCLUDES 1" FOR DIRTY FILTER LOADING
4. EXISTING UNIT WITH REPLACED HOT WATER COIL.
FILTERS
TAG
AREA
SERVED
PREFILTER FINAL FILTER REMARKS
QTY.
MERV
RATING
THICKNESS
(IN.)
DIMENSION
(IN.)
QTY.
MERV
RATING
THICKNESS
(IN.)
DIMENSION
(IN.)
F-1 EF1202CD 2 8 2 24X24 2 17 12 24X24 1
NOTES
1. SITE ELVATION = 5,518' ASL
CEILING MOUNTED HEATERS
TAG MANUFACTURER MODEL
AREA
SERVED
FAN HEATING COIL ELECTRICAL SHIPPING
WEIGHT
(LBS.)
REMARKS
CFM
MIN
CFM
ESP
(IN. WC)
TOTAL CAPACITY
(kW)
VOLT/PH FLA
CMH-1 QMARK CDF-547 RESTROOMS 300 0 0.00 3.0 277/1 10.80 125 1,2,3
NOTES:
1. SITE ELEVATION = 5,518' ASL 2. PROVIDE WITH GYP CEILING MOUNTING BRACKETS 3. PROVIDE WITH 'CDFRENW' RECESSED MOUNTING ENCLOSURE
AIR CURTAIN
TAG MANUFACTURER MODEL
AREA
SERVED
MAX
CFM
MAX VELOCITY
ELECTRICAL
dBA
SHIPPING
WEIGHT
(LBS.)
REMARKS
VOLT/PH FLA
AC-180 MARS AIR LPV2 36 1C-180 900 1,800 120/1 2.40 49 32 1
NOTES:
1. SITE ELEVATION = 5,518' ASL
EXHAUST FAN SOUND ATTENUATORS
TAG MANUFACTURER MODEL AREA SERVED CFM VELOCITY (FPM)
DIMENSIONS (IN)
P.D. (IN WG) MATERIAL MEDIA TYPE
DYNAMIC INSERTION LOSS
REMARKS
W H L 63 125 250 500 1000 2000 4000 8000
S-1 VIBRO-ACOUSTICS RNM-XV-FX EF-1201AB 12,700 -1,814 36 28 120 0.32 SS 304 NONE 11 10 8 19 21 25 12 9 1,2,3,4,5
S-2 VIBRO-ACOUSTICS CUSTOM EF-1201CD 700 -1,283 10 ID/30X30 OD 144 0.18 SS 304 NONE 12 25 31 36 15 14 13 13 1,2,3,4,5
S-3 VIBRO-ACOUSTICS CNM-XV-FX EF-2412AB 5,000 -1,894 22 ID/32x32 OD 60 0.18 SS 304 NONE 11 15 33 27 15 12 8 8 1,2,3,4,5
NOTES:
1. CONTRACTOR/SILENCER MANUFACTURER SHALL PROVIDE ACOUSTICAL CALCULATIONS WITH PE STAMP FOR BREAKOUT/DUCT BORNE NOISE TO CERTIFY MAX. 55 DBA IN THE ROOM.
2. CONTRACTOR/SILENCER MANUFACTURER SHALL PROVIDE PRESSURE DROP CALCULATIONS WITH PE STAMP TO CERTIFY THE PRESSURE INCL. SYSTEM EFFECTS, INCLUDING THE NON-IDEAL DUCT ENTRY AND OUTLET CONDITIONS PER PLANS, AS SCHEDULED.
3. FOR NON-BASIS OF DESIGN PRODUCT SUPPLIED, CONTRACTOR IS FINANCIALLY RESPONSIBLE TO ENSURE THE REQUIRED NOISE CONTROL SOLUTION IS DELIEVERED TO ACHIEVE MAX 55 DBA IN ROOM.
4. ALTERNATE MANUFACTURER SHALL PROVIDE SILENCER INTERNAL GEOMETRY FOR ENGINEER'S APPROVAL.
5. SUPPORT ATTENUATOR FROM ROOF MOUNTED DUCT SUPPORTS. DESIGN SUPPORTS TO ACCOUNT FOR INCREASED SIZE OF ATTENATOR BODY AND HAVE SUPPORT STRAPS OVER TOP OF ATTENUATOR.
Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
GENERAL SERVICES ADMINISTRATION
ROCKY MOUNTAIN REGION
MOUNTAIN PLAINS SERVICE CENTER (8PSMP)
P.O. BOX 25546
BUILDING 41
DENVER FEDERAL CENTER
DENVER, CO 80225
303-236-2854
AndersonMasonDale Architects, P.C.
3198 Speer Boulevard
Denver, CO, 80211
Telephone: 303-294-9448
FAX: 303-294-0762
Architect
Iron Horse Architects
475 17th Street, Suite 720
Denver, CO, 80202
Telephone: 720-855-7572
Laboratory Planning
Martin Martin
12499 West Colfax Avenue
Lakewood, CO, 80215
Telephone: 303-431-6100
Structural Engineering
Farnsworth Group
4755 Forge Road, Suite 150
Colorado Springs, CO, 80907
Telephone: 719-590-9194
Mechanical Engineering
MEP Engineering
6402 South Troy Circle, Suite 100
Centennial, CO, 80111-6439
Telephone: 303-936-1633
Electrical Engineering
Jensen Hughes Associates, Inc
520 Courtney Way, Suite A
Lafayette, CO, 80026
Telephone: 303-439-0485
Fire Protection
Advanced Consulting Engineers, Inc
3900 S. Wadsworth Blvd., Suite 595
Lakewood, CO, 80235
Telephone: 720-981-4150
Code Consultant
Parametrix, Inc
7186 South Highland Drive
Salt Lake City, UT, 84121
Telephone: 801-733-5900
Cost Estimator
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice.
Properly destroy or return document when no longer needed.
/1
/2
:0
:0
P M
M-401
MECHANICAL SCHEDULES
2009121.11
KC
TS
TS
EPA BUILDING 25
CO-LOCATION
PROJECT
DENVER FEDERAL CENTER
BUILDING 25, LAKEWOOD, CO
2009121.11
15 APRIL 2016100% Construction Documents
Addendum 01 27 MAY 2016
Addendum 02 05 AUG 2016
Addendum 06 12 OCT 2016
10/12/16
A
A A
I
2928272625
J
K
L
M
(E) SECURITY
1A-080
(E) OFFICE
1A-090
(E) OPEN OFFICE
1A-005
(E) OFFICE
1A-015
(E) OFFICE
1A-025
(E) OFFICE
1A-035
(E) OFFICE
1A-045
(E) OFFICE
1A-055
(E) OFFICE
1A-085
(E) OFFICE
1A-075
(E) OFFICE
1A-110
R8 FIELD PREP
1A-110
ESAT
INSTRUMENTS
1A-235
ESAT
TOXICOLOGY &
GENERAL BIO
1A-245
R8
MACROBIOLOGY
1A-260
SHARED METAL
PREP
1A-265
R8 ORGANIC PREP
1A-270
ESAT ASBESTOS
1A-255A
ESAT ASBESTOS
PLM
1A-255
R8 CLLE
1A-250
MECHANICAL
1B-035
(E) ELEC
1B-025
NEIC FIELD
STORAGE &
STAGING
1A-340
LAB CORRIDOR
C1A5
GAS CLOSET
1A-231
SUPPORT
1A-210
STAIR
ST-02
L A
B C
O R
R
ID
O R
C 1C
"A
W
4"AW
/2 "D
I
AW
/2 "D
I
(E )3
/4 "C
A
(E)4"AW
(E)4"AW
(E )3
/4 "C
A
(E)3/4"CA
(E)1 1/2"DI
(E)1 1/2"DI
(E)1 1/2"DI
1 1
II
JJ
KK
LL
MM
P-201
1 1/2"DI
1 1/2"DI
/4
"V A
C
1"VAC
WCO-1
WCO-1
"A
W
2"AW
(E) NEIC FIELD
SUPPORT
1A-135
(E) NEIC FIELD
SHOP
1A-145
(E) RESTROOM
1A-115
"A
V "A
V
/2 "D
I
(E) TELE ROOM
1B-030
R8 SUPPLIES
1A-220
ACID LIFT
1A-120
SERVICE HALL
C1A3
(E )3
/4 "A
R
(E) OFFICE
1A-095
SERVICE
CORRIDOR
C1A1
CID STAGING AND
STORAGE
1A-345
SERVICE
CORRIDOR
C1A4
GAS CLOSET
1A-254
GAS CLOSET
1A-246
/2 "D
I
2"CA
2" CA FROM AC-3, CONNECT TO PVC
HEADER FOR FISH TANK BUBBLERS,
SEE LAB FURNISHING PLANS
(E)3/4"CA
(E)3/4"CA
(E )3
/4 "C
A (E
)3 /4
"C A
(E)3/4"CA
(E)1 1/2"DI
2"AW(E)4"AW
7 7
WCO-1
1/2"CA
N
HE
N2
CA
CA
HE
N
/2 "A
V
AV
AW
"A
W
4"AW 4"AW
4"AW
"A
V
"A
W
2"AV
2"AV
2"AW
AW PIPING
ABOVE GRADE
AW PIPING
BELOW GRADE
1 1/2"N2
1 1/2"N2
1 1/2"N2
GENERAL NOTES
Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
GENERAL SERVICES ADMINISTRATION
ROCKY MOUNTAIN REGION
MOUNTAIN PLAINS SERVICE CENTER (8PSMP)
P.O. BOX 25546
BUILDING 41
DENVER FEDERAL CENTER
DENVER, CO 80225
303-236-2854
AndersonMasonDale Architects, P.C.
3198 Speer Boulevard
Denver, CO, 80211
Telephone: 303-294-9448
FAX: 303-294-0762
Architect
Iron Horse Architects
475 17th Street, Suite 720
Denver, CO, 80202
Telephone: 720-855-7572
Laboratory Planning
Martin Martin
12499 West Colfax Avenue
Lakewood, CO, 80215
Telephone: 303-431-6100
Structural Engineering
Farnsworth Group
4755 Forge Road, Suite 150
Colorado Springs, CO, 80907
Telephone: 719-590-9194
Mechanical Engineering
MEP Engineering
6402 South Troy Circle, Suite 100
Centennial, CO, 80111-6439
Telephone: 303-936-1633
Electrical Engineering
Jensen Hughes Associates, Inc
520 Courtney Way, Suite A
Lafayette, CO, 80026
Telephone: 303-439-0485
Fire Protection
Advanced Consulting Engineers, Inc
3900 S. Wadsworth Blvd., Suite 595
Lakewood, CO, 80235
Telephone: 720-981-4150
Code Consultant
1A
1B
1C
1D
PLAN KEYPLAN KEY
Parametrix, Inc
7186 South Highland Drive
Salt Lake City, UT, 84121
Telephone: 801-733-5900
Cost Estimator
SENSITIVE BUT UNCLASSIFIED (SBU)
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do not remove this notice.
Properly destroy or return document when no longer needed.
/1
/2
:0
:0
P M
P-111A
FIRST LEVEL LAB PLUMBING PLAN -
AREA A
2009121.11
JB
RF
TS
EPA BUILDING 25
CO-LOCATION
PROJECT
DENVER FEDERAL CENTER
BUILDING 25, LAKEWOOD, CO
2009121.11
15 APRIL 2016100% Construction Documents
1/8" = 1'-0"1
FIRST LEVEL LAB PLUMBING PLAN -
AREA A
1. PROVIDE 1/2" DEIONIZED WATER TO OUTLETS. PROVIDE 1-1/2" ACID VENT, CONNECT TO EXISTING PIPE ABOVE CEILING.
2. ALL SPECIALTY GAS CYLINDERS AND DEWARS PROVIDED AND INSTALLED BY OWNER'S GAS VENDOR. COORDINATE WITH VENDOR FOR INSTALLATION REQUIREMENTS AND DELIVERY. FROM CYLINDER OR DEWAR IN GAS CLOSET, TUBING IS ROUTED ABOVE CEILING, DOWN TO OVERHEAD CARIER (WITH ESCHUTECHEON PLATE AT CEILING PENETRATION) AND ROUTED ALONG OVERHEAD CARRIER , WHERE PRESENT. REFER TO LAB PLAN DRAWINGS FOR LOCATIONS OF OUTLETS AND PROVIDE AND INSTALL VALVED SPIGOT FOR LOCAL ISOLATION AND PRESSURE REDUCING VALVE AT EACH TAP SHOWN ON LAB PLANS. FINAL TUBING CONNECTION FROM ISOLATION AND PRESSURE REDUCING VALVES TO LAB
EQUIPMENT BY LAB EQUIPMENT INSTALLER. SEE DETAIL 5/P-604.
3. INSTALL DUPLEX PUMP ACID WASTE LIFT STATION. CONNECT PUMPED ACID WASTE LINE TO EXISTING GRAVITY DRAIN ACID
WASTE SYSTEM. PLACE ON EMERGENCY POWER.
4. PROPOSED NEW TO EXISTING ACID WASTE POINT OF CONNECTION. ELEVATION AT POINT OF CONNECTION TO BE
DETERMINED.
5. PROVIDE HIGH VOLUME DI TAP [1-1/2"] WITH THREADED END FOR HOSE CONNECTION. PROVIDE WITH LOCKABLE - BALANCE
VALVE TO RESTRICT FLOW WITHIN MAKE-UP LIMIT OF DI SYSTEM.
6. OVERHEAD SERVICE CARRIER. REFER TO ENLARGED LAB PLANS FOR QUANTITY AND TYPE OF CONNECTIONS. TYPICAL ALL.
# KEY NOTES
RE: 1/P-111B
R E
/P
-1
B
R E
/P
-1
D
RE: 1/P-111D
7. ADD STUB OUT WITH DIAPHRAGM VALVE FOR FUTURE POLISHER CONNECTION, WHERE THERE IS NO EXISTING STUB. SEE DETAIL 3/P-604
FOR PIPING, REFER TO LF SHEETS FOR POLISHER INFO.
8. GAS CLOSET FOR ESAT INSTRUMENTS LAB. PROVIDE (3) 1/4" SS TUBES FROM 4'-0" AFF IN GAS CLOSET TO OUTLETS. SEE DETAIL 5/P-604.
9. GAS CLOSET FOR R8 CLLE LAB.
10. CONNECT 3/4" CD FROM HUB DRAIN TO WASTE PIPING, SEE HUB DRAIN DIAGRAM 1/P-604. SEE P-101A FOR HUB DRAIN LOCATION.
11. (NOT USED)
12. EXTEND VACUUM SERVICE PIPE TO ABOVE-COUNTER SPIGOT ON BOTH SIDES OF WALL, SEE LAB FURNISHING PLAN FOR EXACT LOCATION.
13. ROUTE N2 PIPING MAIN DOWN IN ARCHITECTURAL COLUMN TO COUNTER HEIGHT AND EXTEND TO OUTLETS. SEE LAB FURNISHING PLAN FOR
EXACT LOCATION. COORDINATE ROUTING WITH EXHAUST DUCTING.
14. ROUTE AIR MAIN THROUGH CEILING AND CONNECT TO DISTRIBUTION PIPING. SEE LAB FURNISHING PLANS FOR DISTRIBUTION PIPING.
15. GAS VENDOR SHALL PROVIDE AND INSTALL MANIFOLD ON WALL ABOVE CYLINDERS FOR CONNECTION OF GAS CYLINDERS. ROUTE PIPING FROM MANIFOLD INTO THE WALL AND UP TO ABOVE CEILING. ROUTE TO DROPS AS SHOWN ON PLANS. DROPS SHALL BE WITHIN WALLS AND LAB CASEWORK AND EXTEND OUT OF WALL TO PRESSURE REDUCING VALVE AND ISOLATION VALVE. PIPING SHALL BE SIMILAR TO 5/P-604 FOR GAS
PIPING FROM GAS CLOSET.
1. ALL RENOVATION WORK IS PHASED. WORK AREA SHALL BE GROUPED AS REQUIRED BY OWNER. REFER TO ARCHITECTURAL PHASING PACKAGE TO BE ISSUED BY ADDENDUM. ALL SERVICES SHALL BE MAINTAINED TO AREAS NOT WITHIN THE RENOVATION AREA OF EACH PHASE. COORDINATE SYSTEM OUTAGES OF COMPRESSED AIR, DEIONIZED WATER AND ACID WASTE WITH OWNER, MINIMUM 3 WEEKS IN ADVANCE. OUTAGES ARE SCHEDULED AS BEST ACCOMMODATES OWNER SCHEDULE. PROVIDE TEMPORARY SERVICES FOR OUTAGES LASTING LONGER THAN SCHEDULED – SUBMIT PLAN FOR TEMPORARY SERVICES. PROVIDE PIPING CONNECTIONS FOR TEMPORARY SERVICES TO ALLOW FOR FULL USE OF BUILDING AREAS NOT PART OF CURRENT
RENOVATION PHASE.
2. DO NOT USE PIPE DOPE ON THREADED PIPING CONNECTIONS FOR LAB GAS PIPING SYSTEMS.
3. GAS TUBING TO LAB EQUIPMENT FROM CYLINDERS IN LABS (CYLINDERS NOT IN GAS CLOSETS) IS PROVIDED BY
LAB EQUIPMENT INSTALLER, UNLESS OTHERWISE NOTED.
1 1
Addendum 01 27 MAY 2016
Addendum 02 05 AUG 2016
Addendum 06 12 OCT 2016
A A
A A A
3332313029282726
L
M
N
O
P
Q
NEIC FIELD
STORAGE &
STAGING
1A-340
(E) SAF
COMMUNICATION
ROOM
1A-370
SAF HALL
1A-360
SHARED
HAZARDOUS
SAMPLES
RECEIPT &
STORAGE
1C-225A
R8 SAMPLE
RECEIVING &
STORAGE
1C-225B
(E )3
/4 "C
A
(E)AW
(E )4
"A W
(E )A
W
(E)AW
(E)3/4"CA
(E)1/2"CA
(E)1/2"CA
(E )1
/2 "C
A
(E)1 1/2"DI
(E)1 1/2"DI
(E)AR
(E)1 1/2"DI
(E)AR
LL
MM
NN
OO
PP
3/4"CA
DI
(E) NEIC FIELD
SHOP
1A-145
(E) NEIC FIELD
CALIBRATION
1A-355
UP TO 3" AVTR
SERVICE HALL
C1A3
CID STAGING AND
STORAGE
1A-345
(E) ELEC
1A-350
(STAIR
ST-01
(E) SHIPPING /
RECEIVING
VESTIBULE
1A-475
SERVICE
CORRIDOR
C1A4
(E) CONFERENCE
1A-465(E) VESTIBULE /
AUTOCLAVE
1A-455
(E) SCREENING
LAB
1A-460
(E) SHOWER
1A-461
(E) LOCKER
1A-462
(E) RESTROOM
1A-463
(E) GAS CLOSET
1C-464
(E) SHIPPING /
RECEIVING
1A-505
(E) VESTIBULE
1A-466
(E) RECEIVING
AND MAIL
1C-516
(E) MAIL ROOM
OFFICE
1C-517
(E) SHARED
GRINDING LAB
1C-245
SHARED GARAGE
BAY
1A-375
3"AV1/2"CA
UP TO 3" AVTR
(E)3/4"CA
(E)1 1/2"DI
(E)3/4"CA
(E)3/4"CA
(E)3/4"CA
(E)3/4"CA
(E )3
/4 "C
A
(E)3/4"CA
(E )3
/4 "C
A
(E )A
W
(E )1
"C A
(E )4
"A W
(E )D
I (E
)1 "C
A (E
)D I
1/2"DI
(E)AW, BELOW SLAB
PIPING ABOVE
CEILING.
PIPING ABOVE
CEILING.
ROUTE IN
CARRIER.
1 1/2"AV
1 1/2"AW
1 1/2"AV
1 1/2"AW
2"AW
GENERAL NOTES
Project Number:
Drawn By:
Reviewed By:
Approved By:
Issue Date
GENERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .