8(a) MACC IDIQ_Task Order_Wage Determination CO140004 4.4.2014.pdf
PDF 69 KB Posted
- Attached to
- Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- GS-08P-14-JB-D-0024
About this file
Seed Project_Task Order Wage Determination
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO140004 04/04/2014 CO4
Superseded General Decision Number: CO20130004
State: Colorado
Construction Type: Building
County: Denver County in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/03/2014
1 01/17/2014
2 01/24/2014
3 01/31/2014
4 02/07/2014
5 03/07/2014
6 04/04/2014
ASBE0028-001 10/01/2013
Rates Fringes
Asbestos Workers/Insulator
(Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 28.83 13.18
BRCO0007-001 09/01/2013
BRICKLAYER.......................$ 23.68 8.34
BRCO0007-005 05/16/2013
TILE SETTER......................$ 27.15 7.63
* CARP0001-004 05/01/2013
Carpenters:
Acoustical, Drywall
Hanging/Framing and Metal
Stud, Form Building/Setting.$ 25.00 5.39
CARP1607-002 06/01/2012
MILLWRIGHT.......................$ 28.95 11.10
ELEC0068-002 12/01/2012
ELECTRICIAN
(Includes Low Voltage
Wiring and Installation of
Fire alarms, Security
Systems, Telephones, Computers and Temperature
Controls)...................$ 32.10 12.53
ELEV0025-002 01/01/2014
Elevator Constructor.............$ 40.10 26.785
FOOTNOTE:
a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit.
PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day.
ENGI0009-003 10/23/2013
Power equipment operator -crane
141 tons and over...........$ 25.97 9.15
50 tons and under...........$ 24.88 9.15
51 to 90 tons...............$ 25.04 9.15
91 to 140 tons..............$ 25.19 9.15
IRON0024-001 11/01/2013
IRONWORKER, STRUCTURAL...........$ 24.80 10.14
LABO0720-003 05/01/2009
Laborers:
Concrete/Mason Tenders......$ 16.52 6.84
PAIN0079-002 01/01/2014
Drywall Finisher/Taper
Hand........................$ 19.40 6.66
Tool........................$ 19.75 6.66
Painters:........................$ 18.70 6.66
PAPERHANGER......................$ 19.40 6.66
PAIN0930-001 07/01/2013
GLAZIER..........................$ 28.67 7.52
PLAS0577-001 05/01/2013
Cement Mason/Concrete Finisher...$ 23.25 10.23
PLUM0003-001 07/01/2013
PLUMBER
(Excluding HVAC work).......$ 33.18 12.44
PLUM0208-001 07/01/2013
PIPEFITTER
(Including HVAC pipe).......$ 33.35 12.27
SFCO0669-001 07/01/2013
SPRINKLER FITTER.................$ 33.09 18.60
SHEE0009-001 07/01/2013
Sheet metal worker
(Includes HVAC duct and installation of HVAC systems)....................$ 32.04 13.13
SUCO2001-011 12/20/2001
Carpenters:
All Other Work..............$ 16.12 2.84
Ironworkers:
Reinforcing.................$ 18.49 3.87
Laborers:
Brick Finisher/Tender.......$ 12.78 1.41
Common......................$ 10.62 2.09
Power equipment operators:
Mechanic....................$ 18.48
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .