Sheet1
GENERAL SERVICES ADMINISTRATION
| | | IDIQ PRICE PROPOSAL / BID FORMAT | | | | |
| | | | 1442 Bid Schedule | | | |
| | | PROJECT TASK ORDER # | | | | |
| Contractor Name: | | | | | | | Date: |
| Division | | | | | | | |
| Item # | | Description | Unit | Cost | Quantity | Total | Comments |
| 1000 | GENERAL CONDITIONS | | | | | | |
| 1 | Project Manager | | Hrs | $ - 0 | | $ - 0 | |
| 2 | Field Personnel: Superintendant | | Hrs | $ - 0 | | $ - 0 | |
| 3 | Field Personnel: General Labor | | Hrs | $ - 0 | | $ - 0 | |
| 4 | Insurance | | LS | $ - 0 | | $ - 0 | |
| 5 | Permits | | LS | $ - 0 | | $ - 0 | |
| 6 | Small Tools | | LS | $ - 0 | | $ - 0 | |
| 7 | Equipment Rental | | LS | $ - 0 | | $ - 0 | |
| 8 | Final Clean-up | | LS | $ - 0 | | $ - 0 | |
| 9 | Trash Handling | | LS | $ - 0 | | $ - 0 | |
| | | | | Sub-Total | $ - 0 | |
| 6000 | WOOD & PLASTICS | | | | |
| Base & Upper Cabinets | L.F. | $ - 0 | | $ - 0 |
| Countertops | L.F. | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 7000 | THERMAL & MOISTURE PROTECTION | | | | |
| Insulation (sound batts) | Sqr. Ft. | $ - 0 | | $ - 0 |
| Caulking and Sealants | L.F. | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 8000 | DOORS & WINDOWS | | | | | |
| Door Frames - Interior Offices/Rooms | each | $ - 0 | | $ - 0 | |
| Door Frames - Suite Entry | each | $ - 0 | | $ - 0 | |
| Prefinished Wood Doors | each | $ - 0 | | $ - 0 | |
| Door Hardware (Averaged) | each | $ - 0 | | $ - 0 | Average cost of door hardware |
| Clear Tempered Glass | Sqr. Ft. | $ - 0 | | $ - 0 | |
| | | | Sub-Total | $ - 0 | |
| 9000 | FINISHES | | | | | |
| Interior tenant office walls | Sqr. Ft. | $ - 0 | | $ - 0 | Metal stud framed wall with GWB, taped and finished. |
| GWB at Perimeter walls | Sqr. Ft. | $ - 0 | | $ - 0 | GWB, tape & finish |
| Acoustical Ceiling Tile | Sqr. Ft. | $ - 0 | | $ - 0 | |
| Resilient Flooring - Rubber Base | Sqr. Ft. | $ - 0 | | $ - 0 | |
| Resilient Flooring - Sheet Vinyl | Sqr. Ft. | $ - 0 | | $ - 0 | |
| Carpet Tile | Sqr. Yd. | $ - 0 | | $ - 0 | |
| Painting - Walls | Sqr. Ft. | $ - 0 | | $ - 0 | |
| Painting - Door Frames | each | $ - 0 | | $ - 0 | |
| | | | Sub-Total | $ - 0 | |
| 10000 | SPECIALTIES | | | | |
| Fire Extinguisher and Cabinet | each | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 15000 | PLUMBING (includes rough-in) | | | | |
| Plumbing System and Fixtures | LS | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 15000 | HVAC (includes controls) | | | | |
| Heating, Ventilation, Air Conditioning | LS | $ - 0 | | $ - 0 |
| | | | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 16000 | ELECTRICAL | | | | |
| Power and Lighting | LS | $ - 0 | | $ - 0 |
| Fire Alarm / Smoke Detection | LS | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| 21000 | FIRE PROTECTION - SPRINKLER SYSTEM | | | | |
| Modifications to Sprinkler Layout | LS | $ - 0 | | $ - 0 |
| | | | Sub-Total | $ - 0 |
| Sub-Total Construction Cost | | | $ - 0 |
| 1000 | GENERAL REQUIREMENTS | | | |
| General Conditions | % | $ - 0 | $ - 0 |
| 56 | Over Head | % | $ - 0 | $ - 0 |
| 57 | Profit | % | $ - 0 | $ - 0 |
| 58 | Bond | % | $ - 0 | $ - 0 |
| | TOTAL CONSTRUCTION COST | | $ - 0 |
TOTAL CONSTRUCTION COSTS Sqr.Ft. $ - 0 ERROR:#DIV/0!
Date Authorized Negotiator Signature
| NOTES | |
| 1 | Each Comment should have a note number and be explained in the notes section |
2 Spreadsheet may be expanded as necessary for CSI Divisions and/or additional line items
| 4 | This Price Proposal Format will be the only format accepted by GSA. This format will |
| also serve as the subsequent Contract Schedule of Values used for Progress Payments |