8(a)_MACC_IDIQ_Solicitation_-_Q_ _A_Chavez_EDA_TI_(Seed_Project)_Part_2_Final.pdf

PDF 70 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
GS-08P-14-JB-D-0024
Issued by
General Services Administration Public Buildings Service Region 8

About this file

Chavez EDA Task Order Seed Project (Questions/Answers_Part 2)

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8(a) Competitive Acquisition

Region 8 Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for the states of Colorado, Montana, Utah, North Dakota, South Dakota, and Wyoming (GSA, PBS Region 8)

GS-08P-14-JB-D-0024

QUESTIONS & ANSWERS

Cesar Chavez EDA Tenant Improvement (Seed Project for 1st Task Order)

15Q. Specification Section 011000, 1.6.D indicates “Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.” Can you provide further delineation of activities that would be considered high levels noise, vibration, odors or other disruption? Will the use of power actuated fastners, screw guns and duct work “tin banging”, core drilling, etc. be considered high level noise? Core drilling is definitely a high noise level activity and would have to be coordinated after hours. I believe drywall finishing and painting can be done during regular hours with the proper equipment and precautions (making sure the space is sealed, dust eaters). Any type of noise that would bleed through drywall into the adjacent office space has the potential to be a disturbance. Contractor should coordinate operation to mitigate disturbances either by insulating the noise from adjacent space or doing the work after hours.

16Q. If work is performed between 6:00 PM to 6:00 AM with an after-hours escort, will the contractor be responsible for paying for after hours escort? Can the majority of work (noise producing) be performed between 6:00 PM and 6:00 AM to avoid disruption of other tenants? The contractor can do all work after hours if they wish. The only requirement is for the contractor to have a badged employee for after hours. A employee with a badge can escort up to five un-badge employees.

17Q. SOW indicates that building cannot accommodate a contractor field office. Is it acceptable to set up a field office and storage in the shell space to the south of build out. This area will have fire protection system being modified as part of this task order? The contractor can store materials and utilize the shell space for a field office; however, modifying the fire protection system in the non-Tenant Improvement area of the fourth floor is not part of this task order. Any field office or material storage in the “shell space” portion of the fourth floor would have to be approved by GSA’s regional fire protection engineer.

18Q. Would it be acceptable to remove a lite of glass from the fourth floor exterior to allow for delivery by crane of large construction items such as metal studs, drywall, piping and equipment? This opening could be secured with plywood during construction framing and rough in stages. Freight elevator cab size is too small for several construction items. It is not acceptable to remove glass or disassemble the exterior curtain wall. Other floors of this building have been built-out using the freight elevator to deliver materials to the upper floors.

19Q. Drawing A1.1 has a note in conference room indicating “provide 5/8” type X GWB over existing metal studs to 6” above ceiling along entire wall this side.” During site visit it was noted that there is already drywall on this wall. Should note be changed to patch and repair wall as required after electrical installation? Change note to “Where GWB does not exist on tenant side at demising walls- provide 5/8” type X GWB over existing metal studs to 6” above ceiling.

Offerors should search for solicitation GS-08P-14-JB-D-0024 to access solicitation documents and any amendments. INTERESTED PARTIES ARE STRONGLY ENCOURAGED TO

REGISTER TO RECEIVE NOTIFICATION OF ACTIONS INCLUDING POSTING OF THE

SOLICITATION AND ANY AMENDMENTS. HOWEVER, OFFERORS ARE ADVISED TO

CHECK THE SIGHT FREQUENTLY AS THEY ARE RESPONSIBLE FOR OBTAINING

AMENDMENTS.