Sheet1
| Line Item No. | Line Item Description of the Work | |||||||||
| Zone 1 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | ||
| (K) | (L) | (M) | (N) | (O) | (P) | (Q) | ||||
| 1001 | 702-2530 - Remove existing lay-in fiberglass or mineral type acoustical ceiling- | SF | 100 | $0.68 | 70 | $47.60 | $0.88 | 30 | $26.40 | |
| 1002 | 702-2540 - Remove existing acoustical ceiling grid suspension system for discard- | SF | 6,000 | $0.85 | 4,200 | $3,570.00 | $1.11 | 1800 | $1,998.00 | |
| 1003 | 706-4010 -Remove metal door/window and frame for discard- | EA | 20 | $25.00 | 14 | $350.00 | $32.50 | 6 | $195.00 | |
| 1004 | 706-4030 -Remove metal or wood door to Government designated storage. (Gov't Reserved Item) | EA | 110 | $18.75 | 77 | $1,443.75 | $24.38 | 33 | $804.54 | |
| 1005 | 706-4040 -Remove hardware from metal or wood door and frame(s). (Government Reserved Item)- | EA | 40 | $39.25 | 28 | $1,099.00 | $51.03 | 12 | $612.36 | |
| 1006 | 708-2810 - Remove EMT 1/2 inch to 3/4 inch- | LF | 1,000 | $1.74 | 700 | $1,218.00 | $2.26 | 300 | $678.00 | |
| 1007 | 708-2842 - Remove outlet from floor duct 120 volt (also remove conductors back to next receptacle or circuit breaker - note legend of panel if circuit breaker becomes spare) (Government Reserved item, except conductors) - | EA | 100 | $69.60 | 70 | $4,872.00 | $90.48 | 30 | $2,714.40 | |
| 1008 | 708-2843 - Remove outlet from floor duct - Telephone Housing- (Gov't Reserved Item, except conductors). | EA | 300 | $24.00 | 210 | $5,040.00 | $31.20 | 90 | $2,808.00 | |
| 1009 | 708-2851 - Remove existing wall box and Receptacles device- | EA | 25 | $20.43 | 18 | $357.53 | $26.56 | 8 | $199.20 | |
| 1010 | 708-2852 - Remove existing wall box and switch device- | EA | 25 | $20.43 | 18 | $357.53 | $26.56 | 8 | $199.20 | |
| 1011 | 708-2853 - Remove existing wall box and telephone connection- | EA | 25 | $24.00 | 18 | $420.00 | $31.20 | 8 | $234.00 | |
| 1012 | 708-2861 - Remove existing light fixtures - Lay-in fluorescent (for storage-Gov't Reserved) - | EA | 20 | $42.00 | 14 | $588.00 | $54.60 | 6 | $327.60 | |
| 1013 | 708-2871 - Switch and receptacle removal - Remove and cap wall switch- | EA | 25 | $25.33 | 18 | $443.28 | $32.12 | 8 | $240.90 | |
| 1014 | 708-2872 - Switch and receptacle removal - Removal of switch leg regardless of the number of fixtures involved- | EA | 25 | $33.08 | 18 | $578.90 | $43.00 | 8 | $322.50 | |
| 1015 | 712-4220 -Remove existing premolded vinyl base for discard- | LF | 1,500 | $0.77 | 1,050 | $808.50 | $1.00 | 450 | $450.00 | |
| 1016 | 712-4230 -Remove existing carpet for discard- | SY | 800 | $0.99 | 560 | $554.40 | $1.29 | 240 | $309.60 | |
| 1017 | 712-4240 -Remove existing glued down carpet for discard- | SY | 1,000 | $2.89 | 700 | $2,023.00 | $3.76 | 300 | $1,128.00 | |
| 1018 | 712-4250 -Remove excess carpet glue from concrete floor to provide smooth finish- | SY | 2,000 | $1.76 | 1,400 | $2,464.00 | $2.29 | 600 | $1,374.00 | |
| 1019 | 718-3830 - Remove existing ductwork with insulation, remove diffusers, grilles, vents, etc. (Gov't Reserved Item)- | EA | 20 | $30.45 | 14 | $426.30 | $39.59 | 6 | $237.54 | |
| 1020 | 718-3850 - Remove existing ductwork with insulation, remove pneumatic temp. Control (T-Stat) - | EA | 20 | $104.75 | 14 | $1,466.50 | $136.18 | 6 | $817.08 | |
| 1021 | 724-6220 - Remove existing escutcheon (gov't reserved item)- | EA | 25 | $18.30 | 18 | $320.25 | $23.79 | 8 | $178.43 | |
| 1022 | 724-6231 - Remove sprinkler piping (Size 1 inch I.P.S. - 2 inch)- | LF | 100 | $3.68 | 70 | $257.60 | $4.78 | 30 | $143.40 | |
| 1023 | 724-6235 - Remove sprinkler piping (Size 2 inch I.P.S. over 14 feet AFF)- | LF | 10 | $4.90 | 7 | $34.30 | $6.37 | 3 | $19.11 | |
| 1024 | 732-3912 - Demolish partitions for discard: Pre-Finished Vinyl or painted gypsum board- | SF | 2,000 | $2.98 | 1,400 | $4,172.00 | $3.87 | 600 | $2,322.00 | |
| 1025 | 734-5120 - Remove existing draperies and/or blinds and transverse rods per opening. Alter reinstall to fit and dry clean/wash - | EA | 12 | $432.00 | 8 | $3,628.80 | $561.60 | 4 | $2,021.76 | |
| 1026 | 103-2011 - Furnish and install new hollow metal door 1-3/4 inch thick 2 feet - 6 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inch max. - | EA | 35 | $505.00 | 25 | $12,372.50 | $527.80 | 11 | $5,541.90 | |
| 1027 | 118-8111 - Furnish and install new hollow metal door frames - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | EA | 30 | $305.00 | 21 | $6,405.00 | $330.83 | 9 | $2,977.47 | |
| 1028 | 118-8131- Install Government furnished frames - 3 feet - 0 inches x 6 feet - 8 inches to 3 feet - 6 inches x 7 feet - 0 inches max. - | EA | 10 | $85.44 | 7 | $598.08 | $111.07 | 3 | $333.21 | |
| 1029 | 118-0121 - Furnish and install new insulated metal door - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | EA | 40 | $590.00 | 28 | $16,520.00 | $616.85 | 12 | $7,402.20 | |
| 1030 | 132-0111- Furnish and Install new finish hardware (hinges, match existing)- | PR | 5 | $51.00 | 4 | $178.50 | $66.30 | 2 | $99.45 | |
| Line Item No. | Line Item Description of the Work Zone 1 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (K) | (L) | (M) | (N) | (O) | (P) | (Q) | ||||
| 1031 | 132-0112- Furnish and Install new Lock set, (match existing) - | EA | 50 | $315.00 | 35 | $11,025.00 | $338.55 | 15 | $5,078.25 | |
| 1032 | 132-0121- Furnish and Install Door Stop: Wall mount (match existing)- | EA | 15 | $31.00 | 11 | $325.50 | $36.92 | 5 | $166.14 | |
| 1033 | 132-0122- Furnish and Install Door Stop: Floor mount (match existing)- | EA | 50 | $26.50 | 35 | $927.50 | $32.39 | 15 | $485.85 | |
| 1034 | 132-0130-Door closing device - | EA | 50 | $298.00 | 35 | $10,430.00 | $327.01 | 15 | $4,905.15 | |
| 1035 | 132-0170 -Install Government Furnished Hardware Set- | EA | 20 | $57.77 | 14 | $808.78 | $78.86 | 6 | $473.16 | |
| 1036 | 132-0180 - Furnish and install push button heavy duty combination controlled access lock set without bypass key - | EA | 6 | $365.00 | 4 | $1,533.00 | $386.72 | 2 | $696.10 | |
| 1037 | 132-0190 - Furnish and install access combination type lockset with bypass- | EA | 6 | $400.00 | 4 | $1,680.00 | $421.00 | 2 | $757.80 | |
| 1038 | 620-9512 - Furnish and Install new pre-finished vinyl covered, gypsum board partition complete on metal studs(two face finished)- | SF | 10,000 | $9.79 | 7,000 | $68,530.00 | $10.62 | 3000 | $31,860.00 | |
| 1039 | 620-9531 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed and taped, ready for priming (or prep for vinyl wall cover finish)-one face finished - | SF | 100 | $3.83 | 70 | $268.10 | $4.71 | 30 | $141.30 | |
| 1040 | 620-9532 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed an taped, ready for priming (or prep for vinyl cover finish)-two face finished - | SF | 1,000 | $5.86 | 700 | $4,102.00 | $7.23 | 300 | $2,169.00 | |
| 1041 | 620-9580 - Furnish and Install sound control batt insulation 2-3/4 inch, R-7, unfaced glass fiber type- | SF | 5,000 | $0.82 | 3,500 | $2,870.00 | $0.98 | 1500 | $1,470.00 | |
| 1042 | 104-3820 - Install government furnished acoustical ceiling panel- | SF | 1,000 | $1.10 | 700 | $770.00 | $1.43 | 300 | $429.00 | |
| 1043 | 110-2611 - Furnish and Install ceiling suspension system 2' x 2' tile size 100- | SF | 100 | $1.82 | 70 | $127.40 | $2.11 | 30 | $63.30 | |
| 1044 | 110-2612 - Furnish and Install ceiling suspension system 2' x 4' tile size 100- | SF | 10,000 | $1.47 | 7,000 | $10,290.00 | $1.71 | 3000 | $5,130.00 | |
| 1045 | 601-9020 - Furnish and Install new premolded vinyl base- | LF | 3,000 | $2.79 | 2,100 | $5,859.00 | $3.36 | 900 | $3,024.00 | |
| 1046 | 852-9820 - Install government furnished carpet (glue down) - | SY | 1,000 | $9.50 | 700 | $6,650.00 | $12.03 | 300 | $3,609.00 | |
| 1047 | 852-9870 - Install government furnished carpeting tiles- | SY | 20,000 | $8.43 | 14,000 | $118,020.00 | $10.66 | 6000 | $63,960.00 | |
| 1048 | 852-9875 - Furnish and install broadloom carpet (glue down) - 38 ounce, face weight synthetic, (nylon or equal) commercial grade carpet (direct glue-down method). | SY | 5,000 | $44.10 | 3,500 | $154,350.00 | $46.45 | 1500 | $69,675.00 | |
| 1049 | 852-9877 - Furnish and install broadloom carpet (glue down) - 42 ounce, face weight synthetic, (nylon or equal) commercial grade carpet over a synthetic fiber cushion (double glue down process). | SY | 5,000 | $58.71 | 3,500 | $205,485.00 | $62.45 | 1500 | $93,675.00 | |
| 1050 | 852-9880 - Install feature strip- | LF | 500 | $2.45 | 350 | $857.50 | $2.93 | 150 | $439.50 | |
| 1051 | 210-0131 - Paint Flat Surfaces - Up to 12 ft - Up to 500 SF- | SF | 500 | $1.70 | 350 | $595.00 | $2.16 | 150 | $324.00 | |
| 1052 | 210-0132 - Paint Flat Surfaces - Up to 12 ft - 501 to 2000 SF- | SF | 3,000 | $1.70 | 2,100 | $3,570.00 | $2.16 | 900 | $1,944.00 | |
| 1053 | 210-0133 - Paint Flat Surfaces - Up to 12 ft - Over 2000 SF- | SF | 3,000 | $1.70 | 2,100 | $3,570.00 | $2.16 | 900 | $1,944.00 | |
| 1054 | 210-0151 - Paint Prime Door(s) - Both faces, all edges, top and bottom- | EA | 50 | $37.49 | 35 | $1,312.15 | $47.38 | 15 | $710.70 | |
| 1055 | 210-0152 - Paint Prime Door(s) - Door and window frames including trim- | LF | 1,000 | $1.03 | 700 | $721.00 | $1.32 | 300 | $396.00 | |
| 1056 | 210-0171 - Flat surfaces - Up to 9 ft - 6 in AFF. - | LF | 9,000 | $1.70 | 6,300 | $10,710.00 | $2.16 | 2700 | $5,832.00 | |
| 1057 | 210-0192 - Paint Door(s) - Door frames and window frames including trim.- | LF | 1,600 | $1.04 | 1,120 | $1,164.80 | $1.33 | 480 | $638.40 | |
| 1058 | 210-0201 - Mechanical Items - Prime and paint - Convector cabinets- | SF | 500 | $1.68 | 350 | $588.00 | $2.14 | 150 | $321.00 | |
| 1059 | 210-0205 - Mechanical Items - Prime and paint piping 1" - 4" diameter | LF | 10,000 | $0.53 | 7,000 | $3,710.00 | $0.67 | 3000 | $2,010.00 | |
| 1060 | 701-6111 - Furnish and Install new vinyl wall covering on flat surfaces- | SF | 5,000 | $2.47 | 3,500 | $8,645.00 | $2.87 | 1500 | $4,305.00 | |
| 1061 | 170-9710 - Install government furnished sprinkler head- | SF | 5 | $72.60 | 4 | $254.10 | $92.66 | 2 | $138.99 | |
| 1062 | 170-9720 - Furnished and Install sprinkler head- | EA | 5 | $82.00 | 4 | $287.00 | $102.06 | 2 | $153.09 | |
| Line Item No. | Line Item Description of the Work Zone 1 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (K) | (L) | (M) | (N) | (O) | (P) | (Q) | ||||
| 1063 | 170-9741 - Furnished and Install sprinkler Piping in size: 1 inch I.P.S- | LF | 100 | $16.85 | 70 | $1,179.50 | $20.46 | 30 | $613.80 | |
| 1064 | 170-9760 - Tap into system, install ' T ' (up to 3 inch)- | EA | 5 | $374.10 | 4 | $1,309.35 | $453.50 | 2 | $680.25 | |
| 1065 | 157-4751 - Relocate pneumatic stat and repair wall if required- | EA | 2 | $189.00 | 1 | $264.60 | $240.73 | 1 | $144.44 | |
| 1066 | 490-7722 -Furnish and install new spin-on connection to fit connection with damper- | EA | 5 | $29.15 | 4 | $102.03 | $37.90 | 2 | $56.85 | |
| 1067 | 601-4710 - Balance supply air terminals- other than | EA | 10 | $78.50 | 7 | $549.50 | $102.05 | 3 | $306.15 | |
| 1068 | 252-0141 - Furnish and install new round insulated flexible ducts-14 ft AFF and less, in sizes - 4 inches to 7 inches - | LF | 10 | $9.54 | 7 | $66.78 | $11.31 | 3 | $33.93 | |
| 1069 | 252-0161 - Furnish and install new air terminal - Supply - | EA | 10 | $66.32 | 7 | $464.24 | $76.26 | 3 | $228.78 | |
| 1070 | 252-0162 - Furnish and install new air terminal - Return- | EA | 10 | $56.36 | 7 | $394.52 | $66.14 | 3 | $198.42 | |
| 1071 | 251-0111 - Furnish and install, Greenfield, 1/2 inch- | LF | 5,000 | $4.16 | 3,500 | $14,560.00 | $5.19 | 1500 | $7,785.00 | |
| 1072 | 251-0120 - Furnish and install, surface metal raceway 1/2" | LF | 3,000 | $7.95 | 2,100 | $16,695.00 | $10.00 | 900 | $9,000.00 | |
| 1073 | 251-0130 - Furnish and install, 500 wiremold. | LF | 1,000 | $6.25 | 700 | $4,375.00 | $7.53 | 300 | $2,259.00 | |
| 1074 | 251-0112 - Furnish and install, Greenfield, 3/4 in | LF | 500 | $5.30 | 350 | $1,855.00 | $6.59 | 150 | $988.50 | |
| 1075 | 251-0112 - Furnish and install, surface metal raceway 3/4" | LF | 2,000 | $8.10 | 1,400 | $11,340.00 | $10.15 | 600 | $6,090.00 | |
| 1076 | 251-0112 - Furnish and install, 700 wiremold. | LF | 2,000 | $8.50 | 1,400 | $11,900.00 | $10.09 | 600 | $6,054.00 | |
| 1077 | 260-4551-Core drill hole in concrete for installation of outlets in cellular type under floor ducts- | EA | 20 | $97.09 | 14 | $1,359.26 | $114.28 | 6 | $685.68 | |
| 1078 | 260-4552 - Chip out hole in concrete for installation of outlets in underfloor ducts- | EA | 400 | $45.66 | 280 | $12,784.80 | $51.18 | 120 | $6,141.60 | |
| 1079 | 260-4561 - Furnish and install inserts in under floor ducts- | EA | 1 | $86.50 | 1 | $60.55 | $96.78 | 0 | $29.03 | |
| 1080 | 260-4562 - Furnish and install Walker #1043 insert and steel blanking plate on existing hole in Walker floor duct- | EA | 200 | $59.50 | 140 | $8,330.00 | $73.09 | 60 | $4,385.40 | |
| 1081 | 165-6211 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 12- | LF | 20,000 | $0.76 | 14,000 | $10,640.00 | $0.94 | 6000 | $5,640.00 | |
| 1082 | 165-6212 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 10- | LF | 20,000 | $0.89 | 14,000 | $12,460.00 | $1.09 | 6000 | $6,540.00 | |
| 1083 | 155-4030 - Relocate Speakers- | LF | 5 | $74.00 | 4 | $259.00 | $99.50 | 2 | $149.25 | |
| 1084 | 300-7412 - Furnish and install outlet in underfloor duct - 240V or 120V plus service fitting- | EA | 20 | $263.00 | 14 | $3,682.00 | $309.61 | 6 | $1,857.66 | |
| 1085 | 300-7413 - Furnish and install outlet in underfloor duct - Telephone - Data- | EA | 50 | $42.15 | 35 | $1,475.25 | $52.72 | 15 | $790.80 | |
| 1086 | 300-7423 - Install Government furnished outlet in under floor duct-wire mold telephone- | EA | 550 | $34.59 | 385 | $13,317.15 | $45.16 | 165 | $7,451.40 | |
| 1087 | 300-7440 - Furnish and install (in under floor duct) 120V, 20amp, isolated ground- | EA | 15 | $95.50 | 11 | $1,002.75 | $113.33 | 5 | $509.99 | |
| 1088 | 300-7491 - Furnish and install wall box - single gang, utility or surface mount metal raceway for: receptacle device- | EA | 25 | $56.50 | 18 | $988.75 | $69.44 | 8 | $520.80 | |
| 1089 | 300-7492 - Furnish and install wall box - single gang, utility or surface mount metal raceway for : Switch device (2 and 3 way)- | EA | 25 | $56.50 | 18 | $988.75 | $69.44 | 8 | $520.80 | |
| 1090 | 290-3321 - Furnish and install circuit breakers to match existing - 20A 110- | EA | 25 | $70.00 | 18 | $1,225.00 | $87.30 | 8 | $654.75 | |
| 1091 | 135-5510 - Install government Furnished light fixtures, lay-in fluorescent- | EA | 20 | $106.92 | 14 | $1,496.88 | $143.13 | 6 | $858.78 | |
| 1092 | 135-5561 - Rewire existing fluorescent light fixture(s) for new switch leg or new grouping- | EA | 75 | $172.00 | 53 | $9,030.00 | $223.60 | 23 | $5,031.00 | |
| Base Year Zone 1 Price Schedule Totals | $856,806.79 | $419,846.03 | ||||||||
| Line Item No. | Line Item Description of the Work | |||||||||
| Zone 2 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | ||
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 2001 | 702-2530 - Remove existing lay-in fiberglass or mineral type acoustical ceiling- | SF | 100 | $0.55 | 70 | $38.50 | $0.72 | 30 | $21.60 | |
| 2002 | 702-2540 - Remove existing acoustical ceiling grid suspension system for discard- | SF | 6,000 | $0.69 | 4,200 | $2,898.00 | $0.90 | 1800 | $1,620.00 | |
| 2003 | 706-4010 -Remove metal door/window and frame for discard- | EA | 20 | $19.25 | 14 | $269.50 | $25.03 | 6 | $150.18 | |
| 2004 | 706-4030 -Remove metal or wood door to Government designated storage. (Gov't Reserved Item) | EA | 110 | $14.44 | 77 | $1,111.88 | $18.77 | 33 | $619.41 | |
| 2005 | 706-4040 -Remove hardware from metal or wood door and frame(s). (Government Reserved Item)- | EA | 40 | $30.25 | 28 | $847.00 | $39.33 | 12 | $471.96 | |
| 2006 | 708-2810 - Remove EMT 1/2 inch to 3/4 inch- | LF | 1,000 | $1.33 | 700 | $931.00 | $1.73 | 300 | $519.00 | |
| 2007 | 708-2842 - Remove outlet from floor duct 120 volt (also remove conductors back to next receptacle or circuit breaker - note legend of panel if circuit breaker becomes spare) (Government Reserved item, except conductors) - | EA | 100 | $53.09 | 70 | $3,716.30 | $69.02 | 30 | $2,070.60 | |
| 2008 | 708-2843 - Remove outlet from floor duct - Telephone Housing- (Gov't Reserved Item, except conductors). | EA | 300 | $18.29 | 210 | $3,840.90 | $23.78 | 90 | $2,140.20 | |
| 2009 | 708-2851 - Remove existing wall box and Receptacles device- | EA | 25 | $15.61 | 18 | $273.18 | $20.29 | 8 | $152.18 | |
| 2010 | 708-2852 - Remove existing wall box and switch device- | EA | 25 | $15.61 | 18 | $273.18 | $20.29 | 8 | $152.18 | |
| 2011 | 708-2853 - Remove existing wall box and telephone connection- | EA | 25 | $18.29 | 18 | $320.08 | $23.78 | 8 | $178.35 | |
| 2012 | 708-2861 - Remove existing light fixtures - Lay-in fluorescent (for storage-Gov't Reserved) - | EA | 20 | $32.00 | 14 | $448.00 | $41.60 | 6 | $249.60 | |
| 2013 | 708-2871 - Switch and receptacle removal - Remove and cap wall switch- | EA | 25 | $19.86 | 18 | $347.55 | $25.03 | 8 | $187.73 | |
| 2014 | 708-2872 - Switch and receptacle removal - Removal of switch leg regardless of the number of fixtures involved- | EA | 25 | $25.28 | 18 | $442.40 | $32.86 | 8 | $246.45 | |
| 2015 | 712-4220 -Remove existing premolded vinyl base for discard- | LF | 1,500 | $0.62 | 1,050 | $651.00 | $0.81 | 450 | $364.50 | |
| 2016 | 712-4230 -Remove existing carpet for discard- | SY | 800 | $0.81 | 560 | $453.60 | $1.05 | 240 | $252.00 | |
| 2017 | 712-4240 -Remove existing glued down carpet for discard- | SY | 1,000 | $2.25 | 700 | $1,575.00 | $2.93 | 300 | $879.00 | |
| 2018 | 712-4250 -Remove excess carpet glue from concrete floor to provide smooth finish- | SY | 2,000 | $1.44 | 1,400 | $2,016.00 | $1.87 | 600 | $1,122.00 | |
| 2019 | 718-3830 - Remove existing ductwork with insulation, remove diffusers, grilles, vents, etc. (Gov't Reserved Item)- | EA | 20 | $25.20 | 14 | $352.80 | $32.76 | 6 | $196.56 | |
| 2020 | 718-3850 - Remove existing ductwork with insulation, remove pneumatic temp. Control (T-Stat) - | EA | 20 | $86.75 | 14 | $1,214.50 | $112.78 | 6 | $676.68 | |
| 2021 | 724-6220 - Remove existing escutcheon (gov't reserved item)- | EA | 25 | $15.08 | 18 | $263.90 | $19.60 | 8 | $147.00 | |
| 2022 | 724-6231 - Remove sprinkler piping (Size 1 inch I.P.S. - 2 inch)- | LF | 100 | $3.05 | 70 | $213.50 | $3.97 | 30 | $119.10 | |
| 2023 | 724-6235 - Remove sprinkler piping (Size 2 inch I.P.S. over 14 feet AFF)- | LF | 10 | $4.06 | 7 | $28.42 | $5.28 | 3 | $15.84 | |
| 2024 | 732-3912 - Demolish partitions for discard: Pre-Finished Vinyl or painted gypsum board- | SF | 2,000 | $2.42 | 1,400 | $3,388.00 | $3.15 | 600 | $1,890.00 | |
| 2025 | 734-5120 - Remove existing draperies and/or blinds and transverse rods per opening. Alter reinstall to fit and dry clean/wash - | EA | 12 | $432.00 | 8 | $3,628.80 | $561.10 | 4 | $2,019.96 | |
| 2026 | 103-2011 - Furnish and install new hollow metal door 1-3/4 inch thick 2 feet - 6 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inch max. - | EA | 35 | $450.00 | 25 | $11,025.00 | $467.85 | 11 | $4,912.43 | |
| 2027 | 118-8111 - Furnish and install new hollow metal door frames - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | EA | 30 | $265.00 | 21 | $5,565.00 | $285.10 | 9 | $2,565.90 | |
| 2028 | 118-8131 - Install Government furnished frames - 3 feet - 0 inches x 6 feet - 8 inches to 3 feet - 6 inches x 7 feet - 0 inches max. - | EA | 10 | $67.28 | 7 | $470.96 | $87.47 | 3 | $262.41 | |
| 2029 | 118-8121 - Furnish and install new insulated metal door - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | EA | 40 | $520.00 | 28 | $14,560.00 | $540.70 | 12 | $6,488.40 | |
| 2030 | 132-0111- Furnish and Install new finish hardware (hinges, match existing)- | PR | 5 | $50.25 | 4 | $175.88 | $65.33 | 2 | $98.00 | |
| Line Item No. | Line Item Description of the Work Zone 2 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 2031 | 132-0112- Furnish and Install new Lock set, (match existing) - | EA | 50 | $294.00 | 35 | $10,290.00 | $312.24 | 15 | $4,683.60 | |
| 2032 | 132-0121- Furnish and Install Door Stop: Wall mount (match existing)- | EA | 15 | $26.00 | 11 | $273.00 | $30.48 | 5 | $137.16 | |
| 2033 | 132-0122- Furnish and Install Door Stop: Floor mount (match existing)- | EA | 50 | $22.00 | 35 | $770.00 | $26.57 | 15 | $398.55 | |
| 2034 | 132-0130-Door closing device - | EA | 50 | $272.00 | 35 | $9,520.00 | $294.53 | 15 | $4,417.95 | |
| 2035 | 132-0170 -Install Government Furnished Hardware Set- | EA | 20 | $41.27 | 14 | $577.78 | $57.35 | 6 | $344.10 | |
| 2036 | 132-0180 - Furnish and install push button heavy duty combination controlled access lock set without bypass key - | EA | 6 | $345.00 | 4 | $1,449.00 | $362.37 | 2 | $652.27 | |
| 2037 | 132-0190 - Furnish and install access combination type lockset with bypass- | EA | 6 | $375.00 | 4 | $1,575.00 | $390.48 | 2 | $702.86 | |
| 2038 | 620-9512 - Furnish and Install new pre-finished vinyl covered, gypsum board partition complete on metal studs(two face finished)- | SF | 10,000 | $9.74 | 7,000 | $68,180.00 | $10.55 | 3000 | $31,650.00 | |
| 2039 | 620-9531 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed and taped, ready for priming (or prep for vinyl wall cover finish)-one face finished - | SF | 100 | $3.11 | 70 | $217.70 | $3.80 | 30 | $114.00 | |
| 2040 | 620-9532 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed an taped, ready for priming (or prep for vinyl cover finish)-two face finished - | SF | 1,000 | $4.75 | 700 | $3,325.00 | $5.82 | 300 | $1,746.00 | |
| 2041 | 620-9580 - Furnish and Install sound control batt insulation 2-3/4 inch, R-7, unfaced glass fiber type- | SF | 5,000 | $0.65 | 3,500 | $2,275.00 | $0.76 | 1500 | $1,140.00 | |
| 2042 | 104-3820 - Install government furnished acoustical ceiling panel- | SF | 1,000 | $0.86 | 700 | $602.00 | $1.12 | 300 | $336.00 | |
| 2043 | 110-2611 - Furnish and Install ceiling suspension system 2' x 2' tile size 100- | SF | 100 | $1.57 | 70 | $109.90 | $1.80 | 30 | $54.00 | |
| 2044 | 110-2612 - Furnish and Install ceiling suspension system 2' x 4' tile size 100- | SF | 10,000 | $1.27 | 7,000 | $8,890.00 | $1.46 | 3000 | $4,380.00 | |
| 2045 | 601-9020 - Furnish and Install new premolded vinyl base- | LF | 3,000 | $2.52 | 2,100 | $5,292.00 | $2.99 | 900 | $2,691.00 | |
| 2046 | 852 - 9820 - Install government furnished carpet (glue down) - | SY | 1,000 | $8.06 | 700 | $5,642.00 | $10.11 | 300 | $3,033.00 | |
| 2047 | 852-9870 - Install government furnished carpeting tiles- | SY | 20,000 | $7.17 | 14,000 | $100,380.00 | $8.97 | 6000 | $53,820.00 | |
| 2048 | 852-9875 - Furnish and install broadloom carpet (glue down) - 38 ounce, face weight synthetic, (nylon or equal) commercial grade carpet (direct glue-down method). | SY | 5,000 | $46.22 | 3,500 | $161,770.00 | $48.16 | 1500 | $72,240.00 | |
| 2049 | 852-9877 - Furnish and install broadloom carpet (glue down) - 42 ounce, face weight synthetic, (nylon or equal) commercial grade carpet over a synthetic fiber cushion (double glue down process). | SY | 5,000 | $60.63 | 3,500 | $212,205.00 | $63.57 | 1500 | $95,355.00 | |
| 2050 | 852-9880 - Install feature strip- | LF | 500 | $2.24 | 350 | $784.00 | $2.63 | 150 | $394.50 | |
| 2051 | 210-0131 - Paint Flat Surfaces - Up to 12 ft - Up to 500 SF- | SF | 500 | $1.40 | 350 | $490.00 | $1.76 | 150 | $264.00 | |
| 2052 | 210-0132 - Paint Flat Surfaces - Up to 12 ft - 501 to 2000 SF- | SF | 3,000 | $1.40 | 2,100 | $2,940.00 | $1.76 | 900 | $1,584.00 | |
| 2053 | 210-0133 - Paint Flat Surfaces - Up to 12 ft - Over 2000 SF- | SF | 3,000 | $1.40 | 2,100 | $2,940.00 | $1.76 | 900 | $1,584.00 | |
| 2054 | 210-0151 - Paint Prime Door(s) - Both faces, all edges, top and bottom- | EA | 50 | $30.89 | 35 | $1,081.15 | $38.75 | 15 | $581.25 | |
| 2055 | 210-0152 - Paint Prime Door(s) - Door and window frames including trim- | LF | 1,000 | $0.83 | 700 | $581.00 | $1.06 | 300 | $318.00 | |
| 2056 | 210-0171 - Flat surfaces - Up to 9 ft - 6 in AFF. - | LF | 9,000 | $1.40 | 6,300 | $8,820.00 | $1.76 | 2700 | $4,752.00 | |
| 2057 | 210-0192 - Paint Door(s) - Door frames and window frames including trim.- | LF | 1,600 | $0.84 | 1,120 | $940.80 | $1.07 | 480 | $513.60 | |
| 2058 | 210-0201 - Mechanical Items - Prime and paint - Convector cabinets- | SF | 500 | $1.36 | 350 | $476.00 | $1.72 | 150 | $258.00 | |
| 2059 | 210-0205 - Mechanical Items - Prime and paint piping 1" - 4" diameter | LF | 10,000 | $0.43 | 7,000 | $3,010.00 | $0.54 | 3000 | $1,620.00 | |
| 2060 | 701-6111 - Furnish and Install new vinyl wall covering on flat surfaces- | SF | 5,000 | $2.23 | 3,500 | $7,805.00 | $2.56 | 1500 | $3,840.00 | |
| 2061 | 170-9710 - Install government furnished sprinkler head- | SF | 5 | $61.50 | 4 | $215.25 | $78.23 | 2 | $117.35 | |
| 2062 | 170-9720 - Furnished and Install sprinkler head- | EA | 5 | $70.90 | 4 | $248.15 | $87.63 | 2 | $131.45 | |
| Line Item No. | Line Item Description of the Work Zone 2 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 2063 | 170-9741 - Furnished and Install sprinkler Piping in size: 1 inch I.P.S- | LF | 100 | $14.80 | 70 | $1,036.00 | $17.80 | 30 | $534.00 | |
| 2064 | 170-9760 - Tap into system, install ' T ' (up to 3 inch)- | EA | 5 | $329.60 | 4 | $1,153.60 | $395.65 | 2 | $593.48 | |
| 2065 | 157-4751 - Relocate pneumatic stat and repair wall if required- | EA | 2 | $160.00 | 1 | $224.00 | $203.03 | 1 | $121.82 | |
| 2066 | 490-7722 -Furnish and install new spin-on connection to fit connection with damper- | EA | 5 | $18.46 | 4 | $64.61 | $24.00 | 2 | $36.00 | |
| 2067 | 601-4710 - Balance supply air terminals- other than | EA | 10 | $72.50 | 7 | $507.50 | $94.25 | 3 | $282.75 | |
| 2068 | 252-0141 - Furnish and install new round insulated flexible ducts-14 ft AFF and less, in sizes - 4 inches to 7 inches - | LF | 10 | $8.33 | 7 | $58.31 | $9.77 | 3 | $29.31 | |
| 2069 | 252-0161 - Furnish and install new air terminal - Supply - | EA | 10 | $59.82 | 7 | $418.74 | $67.81 | 3 | $203.43 | |
| 2070 | 252-0162 - Furnish and install new air terminal - Return- | EA | 10 | $49.86 | 7 | $349.02 | $57.69 | 3 | $173.07 | |
| 2071 | 251-0111 - Furnish and install, Greenfield, 1/2 inch- | LF | 5,000 | $3.33 | 3,500 | $11,655.00 | $4.12 | 1500 | $6,180.00 | |
| 2072 | 251-0120 - Furnish and install, surface metal raceway 1/2" | LF | 3,000 | $6.30 | 2,100 | $13,230.00 | $7.87 | 900 | $7,083.00 | |
| 2073 | 251-0130 - Furnish and install, 500 wiremold. | LF | 1,000 | $5.20 | 700 | $3,640.00 | $6.19 | 300 | $1,857.00 | |
| 2074 | 251-0112 - Furnish and install, Greenfield, 3/4 in | LF | 500 | $4.25 | 350 | $1,487.50 | $5.23 | 150 | $784.50 | |
| 2075 | 251-0112 - Furnish and install, surface metal raceway 3/4" | LF | 2,000 | $6.45 | 1,400 | $9,030.00 | $8.02 | 600 | $4,812.00 | |
| 2076 | 251-0112 - Furnish and install, 700 wiremold. | LF | 2,000 | $7.15 | 1,400 | $10,010.00 | $8.36 | 600 | $5,016.00 | |
| 2077 | 260-4551 - Core drill hole in concrete for installation of outlets in cellular type under floor ducts- | EA | 20 | $84.93 | 14 | $1,189.02 | $98.06 | 6 | $588.36 | |
| 2078 | 260-4552 - Chip out hole in concrete for installation of outlets in underfloor ducts- | EA | 400 | $44.24 | 280 | $12,387.20 | $48.86 | 120 | $5,863.20 | |
| 2079 | 260-4561 - Furnish and install inserts in under floor ducts- | EA | 1 | $76.50 | 1 | $53.55 | $84.27 | 0 | $25.28 | |
| 2080 | 260-4562 - Furnish and install Walker #1043 insert and steel blanking plate on existing hole in Walker floor duct- | EA | 200 | $49.00 | 140 | $6,860.00 | $59.58 | 60 | $3,574.80 | |
| 2081 | 165-6211 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 12- | LF | 20,000 | $0.60 | 14,000 | $8,400.00 | $0.74 | 6000 | $4,440.00 | |
| 2082 | 165-6212 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 10- | LF | 20,000 | $0.72 | 14,000 | $10,080.00 | $0.88 | 6000 | $5,280.00 | |
| 2083 | 155-4030 - Relocate Speakers- | LF | 5 | $54.80 | 4 | $191.80 | $74.42 | 2 | $111.63 | |
| 2084 | 300-7412 - Furnish and install outlet in underfloor duct - 240V or 120V plus service fitting- | EA | 20 | $223.50 | 14 | $3,129.00 | $259.20 | 6 | $1,555.20 | |
| 2085 | 300-7413 - Furnish and install outlet in underfloor duct - Telephone - Data- | EA | 50 | $33.80 | 35 | $1,183.00 | $41.93 | 15 | $628.95 | |
| 2086 | 300-7423 - Install Government furnished outlet in under floor duct-wire mold telephone- | EA | 550 | $26.24 | 385 | $10,102.40 | $34.62 | 165 | $5,712.30 | |
| 2087 | 300-7440 - Furnish and install (in under floor duct) 120V, 20amp, isolated ground- | EA | 15 | $80.50 | 11 | $845.25 | $94.24 | 5 | $424.08 | |
| 2088 | 300-7491 - Furnish and install wall box - single gang, utility or surface mount metal raceway for: receptacle device- | EA | 25 | $46.00 | 18 | $805.00 | $55.92 | 8 | $419.40 | |
| 2089 | 300-7492 - Furnish and install wall box - single gang, utility or surface mount metal raceway for : Switch device (2 and 3 way)- | EA | 25 | $46.00 | 18 | $805.00 | $55.92 | 8 | $419.40 | |
| 2090 | 290-3321 - Furnish and install circuit breakers to match existing - 20A 110- | EA | 25 | $56.00 | 18 | $980.00 | $69.22 | 8 | $519.15 | |
| 2091 | 135-5510 - Install government Furnished light fixtures, lay-in fluorescent- | EA | 20 | $79.64 | 14 | $1,114.96 | $107.51 | 6 | $645.06 | |
| 2092 | 135-5561 - Rewire existing fluorescent light fixture(s) for new switch leg or new grouping- | EA | 75 | $131.00 | 53 | $6,877.50 | $170.30 | 23 | $3,831.75 | |
| Base Year Zone 2 Price Schedule Totals | $802,882.50 | $386,387.74 | ||||||||
| Line Item No. | Line Item Description of the Work | |||||||||
| Zone 3 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | ||
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 3001 | 702-2530 - Remove existing lay-in fiberglass or mineral type acoustical ceiling- | SF | 100 | $0.40 | 70 | $28.00 | $0.52 | 30 | $15.60 | |
| 3002 | 702-2540 - Remove existing acoustical ceiling grid suspension system for discard- | SF | 6,000 | $0.50 | 4,200 | $2,100.00 | $0.65 | 1800 | $1,170.00 | |
| 3003 | 706-4010 -Remove metal door/window and frame for discard- | EA | 20 | $15.90 | 14 | $222.60 | $20.67 | 6 | $124.02 | |
| 3004 | 706-4030 -Remove metal or wood door to Government designated storage. (Gov't Reserved Item) | EA | 110 | $11.93 | 77 | $918.61 | $15.50 | 33 | $511.50 | |
| 3005 | 706-4040 -Remove hardware from metal or wood door and frame(s). (Government Reserved Item)- | EA | 40 | $24.88 | 28 | $696.64 | $32.34 | 12 | $388.08 | |
| 3006 | 708-2810 - Remove EMT 1/2 inch to 3/4 inch- | LF | 1,000 | $0.78 | 700 | $546.00 | $1.01 | 300 | $303.00 | |
| 3007 | 708-2842 - Remove outlet from floor duct 120 volt (also remove conductors back to next receptacle or circuit breaker - note legend of panel if circuit breaker becomes spare) (Government Reserved item, except conductors) - | EA | 100 | $31.15 | 70 | $2,180.50 | $40.50 | 30 | $1,215.00 | |
| 3008 | 708-2843 - Remove outlet from floor duct - Telephone Housing- (Gov't Reserved Item, except conductors). | EA | 300 | $10.65 | 210 | $2,236.50 | $13.85 | 90 | $1,246.50 | |
| 3009 | 708-2851 - Remove existing wall box and Receptacles device- | EA | 25 | $9.15 | 18 | $160.13 | $11.90 | 8 | $89.25 | |
| 3010 | 708-2852 - Remove existing wall box and switch device- | EA | 25 | $9.15 | 18 | $160.13 | $11.90 | 8 | $89.25 | |
| 3011 | 708-2853 - Remove existing wall box and telephone connection- | EA | 25 | $10.65 | 18 | $186.29 | $13.85 | 8 | $103.88 | |
| 3012 | 708-2861 - Remove existing light fixtures - Lay-in fluorescent (for storage-Gov't Reserved) - | EA | 20 | $18.70 | 14 | $261.80 | $24.31 | 6 | $145.86 | |
| 3013 | 708-2871 - Switch and receptacle removal - Remove and cap wall switch- | EA | 25 | $12.98 | 18 | $227.15 | $16.02 | 8 | $120.15 | |
| 3014 | 708-2872 - Switch and receptacle removal - Removal of switch leg regardless of the number of fixtures involved- | EA | 25 | $14.82 | 18 | $259.35 | $19.27 | 8 | $144.53 | |
| 3015 | 712-4220 -Remove existing premolded vinyl base for discard- | LF | 1,500 | $0.45 | 1,050 | $472.50 | $0.59 | 450 | $265.50 | |
| 3016 | 712-4230 -Remove existing carpet for discard- | SY | 800 | $0.63 | 560 | $352.80 | $0.82 | 240 | $196.80 | |
| 3017 | 712-4240 -Remove existing glued down carpet for discard- | SY | 1,000 | $1.65 | 700 | $1,155.00 | $2.15 | 300 | $645.00 | |
| 3018 | 712-4250 -Remove excess carpet glue from concrete floor to provide smooth finish- | SY | 2,000 | $1.05 | 1,400 | $1,470.00 | $1.37 | 600 | $822.00 | |
| 3019 | 718-3830 - Remove existing ductwork with insulation, remove diffusers, grilles, vents, etc. (Gov't Reserved Item)- | EA | 20 | $22.10 | 14 | $309.40 | $28.73 | 6 | $172.38 | |
| 3020 | 718-3850 - Remove existing ductwork with insulation, remove pneumatic temp. Control (T-Stat) - | EA | 20 | $74.35 | 14 | $1,040.90 | $96.66 | 6 | $579.96 | |
| 3021 | 724-6220 - Remove existing escutcheon (gov't reserved item)- | EA | 25 | $13.28 | 18 | $232.40 | $17.26 | 8 | $129.45 | |
| 3022 | 724-6231 - Remove sprinkler piping (Size 1 inch I.P.S. - 2 inch)- | LF | 100 | $2.67 | 70 | $186.90 | $3.47 | 30 | $104.10 | |
| 3023 | 724-6235 - Remove sprinkler piping (Size 2 inch I.P.S. over 14 feet AFF)- | LF | 10 | $3.55 | 7 | $24.85 | $4.62 | 3 | $13.86 | |
| 3024 | 732-3912 - Demolish partitions for discard: Pre-Finished Vinyl or painted gypsum board- | SF | 2,000 | $1.77 | 1,400 | $2,478.00 | $2.30 | 600 | $1,380.00 | |
| 3025 | 734-5120 - Remove existing draperies and/or blinds and transverse rods per opening. Alter reinstall to fit and dry clean/wash - | EA | 12 | $423.00 | 8 | $3,553.20 | $549.90 | 4 | $1,979.64 | |
| 3026 | 103-2011 - Furnish and install new hollow metal door 1-3/4 inch thick 2 feet - 6 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inch max. - | EA | 35 | $470.00 | 25 | $11,515.00 | $485.60 | 11 | $5,098.80 | |
| 3027 | 118-8111 - Furnish and install new hollow metal door frames - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | EA | 30 | $274.00 | 21 | $5,754.00 | $292.51 | 9 | $2,632.59 | |
| 3028 | 118-8131- Install Government furnished frames - 3 feet - 0 inches x 6 feet - 8 inches to 3 feet - 6 inches x 7 feet - 0 inches max. - | EA | 10 | $62.48 | 7 | $437.36 | $81.22 | 3 | $243.66 | |
| 3029 | 118-8121 - Furnish and install new insulated metal door - 3 feet - 0 inch x 6 feet - 8 inch to 3 feet - 6 inch x 7 feet - 0 inches max - | 40 | $545.00 | 28 | $15,260.00 | $563.30 | 12 | $6,759.60 | ||
| 3030 | 132-0111- Furnish and Install new finish hardware (hinges, match existing)- | PR | 5 | $52.50 | 4 | $183.75 | $68.25 | 2 | $102.38 | |
| Line Item No. | Line Item Description of the Work Zone 3 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 3031 | 132-0112- Furnish and Install new Lock set, (match existing) - | EA | 50 | $292.00 | 35 | $10,220.00 | $307.00 | 15 | $4,605.00 | |
| 3032 | 132-0121- Furnish and Install Door Stop: Wall mount (match existing)- | EA | 15 | $24.00 | 11 | $252.00 | $27.74 | 5 | $124.83 | |
| 3033 | 132-0122- Furnish and Install Door Stop: Floor mount (match existing)- | EA | 50 | $19.50 | 35 | $682.50 | $23.24 | 15 | $348.60 | |
| 3034 | 132-0130-Door closing device - | EA | 50 | $267.00 | 35 | $9,345.00 | $285.39 | 15 | $4,280.85 | |
| 3035 | 132-0170 -Install Government Furnished Hardware Set- | EA | 20 | $32.10 | 14 | $449.40 | $45.57 | 6 | $273.42 | |
| 3036 | 132-0180 - Furnish and install push button heavy duty combination controlled access lock set without bypass key - | EA | 6 | $345.00 | 4 | $1,449.00 | $358.74 | 2 | $645.73 | |
| 3037 | 132-0190 - Furnish and install access combination type lockset with bypass- | EA | 6 | $380.00 | 4 | $1,596.00 | $393.35 | 2 | $708.03 | |
| 3038 | 620-9512 - Furnish and Install new pre-finished vinyl covered, gypsum board partition complete on metal studs(two face finished)- | SF | 10,000 | $9.68 | 7,000 | $67,760.00 | $10.48 | 3000 | $31,440.00 | |
| 3039 | 620-9531 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed and taped, ready for priming (or prep for vinyl wall cover finish)-one face finished - | SF | 100 | $2.80 | 70 | $196.00 | $3.39 | 30 | $101.70 | |
| 3040 | 620-9532 - Furnish and Install new 5/8 inch gypsum board partition complete with metal studs, bed an taped, ready for priming (or prep for vinyl cover finish)-two face finished - | SF | 1,000 | $4.27 | 700 | $2,989.00 | $5.19 | 300 | $1,557.00 | |
| 3041 | 620-9580 - Furnish and Install sound control batt insulation 2-3/4 inch, R-7, unfaced glass fiber type- | SF | 5,000 | $0.47 | 3,500 | $1,645.00 | $0.53 | 1500 | $795.00 | |
| 3042 | 104-3820 - Install government furnished acoustical ceiling panel- | SF | 1,000 | $0.75 | 700 | $525.00 | $0.97 | 300 | $291.00 | |
| 3043 | 110-2611 - Furnish and Install ceiling suspension system 2' x 2' tile size 100- | SF | 100 | $1.46 | 70 | $102.20 | $1.66 | 30 | $49.80 | |
| 3044 | 110-2612 - Furnish and Install ceiling suspension system 2' x 4' tile size 100- | SF | 10,000 | $1.17 | 7,000 | $8,190.00 | $1.33 | 3000 | $3,990.00 | |
| 3045 | 601-9020 - Furnish and Install new premolded vinyl base- | LF | 3,000 | $1.54 | 2,100 | $3,234.00 | $1.71 | 900 | $1,539.00 | |
| 3046 | 852 - 9820 - Install government furnished carpet (glue down) - | SY | 1,000 | $3.74 | 700 | $2,618.00 | $4.49 | 300 | $1,347.00 | |
| 3047 | 852-9870 - Install government furnished carpeting tiles- | SY | 20,000 | $3.35 | 14,000 | $46,900.00 | $4.02 | 6000 | $24,120.00 | |
| 3048 | 852-9875 - Furnish and install broadloom carpet (glue down) - 38 ounce, face weight synthetic, (nylon or equal) commercial grade carpet (direct glue-down method). | SY | 5,000 | $42.22 | 3,500 | $147,770.00 | $42.96 | 1500 | $64,440.00 | |
| 3049 | 852-9877 - Furnish and install broadloom carpet (glue down) - 42 ounce, face weight synthetic, (nylon or equal) commercial grade carpet over a synthetic fiber cushion (double glue down process). | SY | 5,000 | $54.58 | 3,500 | $191,030.00 | $55.70 | 1500 | $83,550.00 | |
| 3050 | 852-9880 - Install feature strip- | LF | 500 | $1.42 | 350 | $497.00 | $1.56 | 150 | $234.00 | |
| 3051 | 210-0131 - Paint Flat Surfaces - Up to 12 ft - Up to 500 SF- | SF | 500 | $0.70 | 350 | $245.00 | $0.85 | 150 | $127.50 | |
| 3052 | 210-0132 - Paint Flat Surfaces - Up to 12 ft - 501 to 2000 SF- | SF | 3,000 | $0.70 | 2,100 | $1,470.00 | $0.85 | 900 | $765.00 | |
| 3053 | 210-0133 - Paint Flat Surfaces - Up to 12 ft - Over 2000 SF- | SF | 3,000 | $0.70 | 2,100 | $1,470.00 | $0.85 | 900 | $765.00 | |
| 3054 | 210-0151 - Paint Prime Door(s) - Both faces, all edges, top and bottom- | EA | 50 | $15.54 | 35 | $543.90 | $18.80 | 15 | $282.00 | |
| 3055 | 210-0152 - Paint Prime Door(s) - Door and window frames including trim- | LF | 1,000 | $0.38 | 700 | $266.00 | $0.48 | 300 | $144.00 | |
| 3056 | 210-0171 - Flat surfaces - Up to 9 ft - 6 in AFF. - | LF | 9,000 | $0.70 | 6,300 | $4,410.00 | $0.85 | 2700 | $2,295.00 | |
| 3057 | 210-0192 - Paint Door(s) - Door frames and window frames including trim.- | LF | 1,600 | $0.39 | 1,120 | $436.80 | $0.49 | 480 | $235.20 | |
| 3058 | 210-0201 - Mechanical Items - Prime and paint - Convector cabinets- | SF | 500 | $0.66 | 350 | $231.00 | $0.81 | 150 | $121.50 | |
| 3059 | 210-0205 - Mechanical Items - Prime and paint piping 1" - 4" diameter | 10,000 | $0.22 | 7,000 | $1,540.00 | $0.27 | 3000 | $810.00 | ||
| 3060 | 701-6111 - Furnish and Install new vinyl wall covering on flat surfaces- | SF | 5,000 | $1.61 | 3,500 | $5,635.00 | $1.75 | 1500 | $2,625.00 | |
| 3061 | 170-9710 - Install government furnished sprinkler head- | SF | 5 | $53.45 | 4 | $187.08 | $67.76 | 2 | $101.64 | |
| 3062 | 170-9720 - Furnished and Install sprinkler head- | EA | 5 | $62.85 | 4 | $219.98 | $77.16 | 2 | $115.74 | |
| Line Item No. | Line Item Description of the Work Zone 3 | Unit Issue | Estimated Quantities Per Year | Line Item Cost Estimate (Per Unit) - Standard Hours | Estimated Quantity - Standard Hours (70%) | Standard Hour Total Price | Line Item Cost Estimate (Per Unit) - Non-Standard Hours | Estimated Quantity - Non-Standard Hours (30%) | Non-Standard Hour Total Price | |
| (L) | (M) | (N) | (O) | (P) | (Q) | |||||
| 3063 | 170-9741 - Furnished and Install sprinkler Piping in size: 1 inch I.P.S- | LF | 100 | $13.65 | 70 | $955.50 | $16.30 | 30 | $489.00 | |
| 3064 | 170-9760 - Tap into system, install ' T ' (up to 3 inch)- | EA | 5 | $304.40 | 4 | $1,065.40 | $362.89 | 2 | $544.34 | |
| 3065 | 157-4751 - Relocate pneumatic stat and repair wall if required- | EA | 2 | $76.00 | 1 | $106.40 | $98.80 | 1 | $59.28 | |
| 3066 | 490-7722 -Furnish and install new spin-on connection to fit connection with damper- | EA | 5 | $16.75 | 4 | $58.63 | $21.78 | 2 | $32.67 | |
| 3067 | 601-4710 - Balance supply air terminals- other than | EA | 10 | $69.00 | 7 | $483.00 | $89.70 | 3 | $269.10 | |
| 3068 | 252-0141 - Furnish and install new round insulated flexible ducts-14 ft AFF and less, in sizes - 4 inches to 7 inches - | LF | 10 | $7.78 | 7 | $54.46 | $9.07 | 3 | $27.21 | |
| 3069 | 252-0161 - Furnish and install new air terminal - Supply - | EA | 10 | $57.32 | 7 | $401.24 | $64.56 | 3 | $193.68 | |
| 3070 | 252-0162 - Furnish and install new air terminal - Return- | EA | 10 | $47.36 | 7 | $331.52 | $54.44 | 3 | $163.32 | |
| 3071 | 251-0111- Furnish and install, Greenfield, 1/2 inch- | LF | 5,000 | $2.31 | 3,500 | $8,085.00 | $2.77 | 1500 | $4,155.00 | |
| 3072 | 251-0120 - Furnish and install, surface metal raceway 1/2" | LF | 3,000 | $4.24 | 2,100 | $8,904.00 | $5.16 | 900 | $4,644.00 | |
| 3073 | 251-0130 - Furnish and install, 500 wiremold. | LF | 1,000 | $4.00 | 700 | $2,800.00 | $4.57 | 300 | $1,371.00 | |
| 3074 | 251-0112 - Furnish and install, Greenfield, 3/4 in | LF | 500 | $2.97 | 350 | $1,039.50 | $3.54 | 150 | $531.00 | |
| 3075 | 251-0112 - Furnish and install, surface metal raceway 3/4" | LF | 2,000 | $4.39 | 1,400 | $6,146.00 | $5.31 | 600 | $3,186.00 | |
| 3076 | 251-0112 - Furnish and install, 700 wiremold. | LF | 2,000 | $5.75 | 1,400 | $8,050.00 | $6.46 | 600 | $3,876.00 | |
| 3077 | 260-4551 - Core drill hole in concrete for installation of outlets in cellular type under floor ducts- | EA | 20 | $66.51 | 14 | $931.14 | $74.10 | 6 | $444.60 | |
| 3078 | 260-4552 - Chip out hole in concrete for installation of outlets in underfloor ducts- | EA | 400 | $42.96 | 280 | $12,028.80 | $47.21 | 120 | $5,665.20 | |
| 3079 | 260-4561 - Furnish and install inserts in under floor ducts- | EA | 1 | $70.00 | 1 | $49.00 | $74.50 | 0 | $22.35 | |
| 3080 | 260-4562 - Furnish and install Walker #1043 insert and steel blanking plate on existing hole in Walker floor duct- | EA | 200 | $35.50 | 140 | $4,970.00 | $41.66 | 60 | $2,499.60 | |
| 3081 | 165-6211 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 12- | LF | 20,000 | $0.42 | 14,000 | $5,880.00 | $0.50 | 6000 | $3,000.00 | |
| 3082 | 165-6212 - Furnish and install THW or THHN wire conductors in EMT raceway (conduit or underfloor duct) No. 10- | LF | 20,000 | $0.52 | 14,000 | $7,280.00 | $0.61 | 6000 | $3,660.00 | |
| 3083 | 155-4030 - Relocate Speakers- | LF | 5 | $28.00 | 4 | $98.00 | $39.85 | 2 | $59.78 | |
| 3084 | 300-7412 - Furnish and install outlet in underfloor duct - 240V or 120V plus service fitting- | EA | 20 | $183.50 | 14 | $2,569.00 | $204.43 | 6 | $1,226.58 | |
| 3085 | 300-7413 - Furnish and install outlet in underfloor duct - Telephone - Data- | EA | 50 | $23.05 | 35 | $806.75 | $27.78 | 15 | $416.70 | |
| 3086 | 300-7423 - Install Government furnished outlet in under floor duct-wire mold telephone- | EA | 550 | $15.49 | 385 | $5,963.65 | $19.84 | 165 | $3,273.60 | |
| 3087 | 300-7440 - Furnish and install (in under floor duct) 120V, 20amp, isolated ground- | EA | 15 | $64.50 | 11 | $677.25 | $72.38 | 5 | $325.71 | |
| 3088 | 300-7491 - Furnish and install wall box - single gang, utility or surface mount metal raceway for: receptacle device- | EA | 25 | $33.50 | 18 | $586.25 | $39.33 | 8 | $294.98 | |
| 3089 | 300-7492 - Furnish and install wall box - single gang, utility or surface mount metal raceway for : Switch device (2 and 3 way)- | EA | 25 | $33.50 | 18 | $586.25 | $39.33 | 8 | $294.98 | |
| 3090 | 290-3321 - Furnish and install circuit breakers to match existing - 20A 110- | EA | 25 | $38.50 | 18 | $673.75 | $46.16 | 8 | $346.20 | |
| 3091 | 135-5510 - Install government Furnished light fixtures, lay-in fluorescent- | EA | 20 | $40.52 | 14 | $567.28 | $57.01 | 6 | $342.06 | |
| 3092 | 135-5561 - Rewire existing fluorescent light fixture(s) for new switch leg or new grouping- | EA | 75 | $77.00 | 53 | $4,042.50 | $11.10 | 23 | $249.75 | |
| Base Year Zone 3 Price Schedule Totals | $654,904.86 | $301,284.54 |
&LRepair, Alteration and Construction IDIQ Various Locations State of Michigan &CSOLICITATION PRICE SCHEDULE&RGS05P11SVD0042