Repair, Alteration and Construction IDIQ GS05P11SVD0042 Various Locations State of Michigan

Technical Specifications TOC- 1

Technical Specifications - Table of Contents

SECTION 01010 – SUMMARY OF THE WORK

PART 1 – GENERAL

1.1 Related Documents

1.2 Work of the Contract

1.3 Items Furnished By The Government And Installed By The Contractor

1.4 Contractor Use of Premises

1.5 Government Occupancy

1.6 Inspection by Regulatory Authorities

1.7 Miscellaneous and General Provisions

PART 2 - PRODUCTS - (NOT APPLICABLE)

PART 3 – EXECUTION – (NOT APPLICABLE)

APPENDIX A

STANDARD METHODS OF MEASUREMENT

PRICE SCHEDULE UNIT DEFINITIONS

APPENDIX B

SUPPLEMENTARY CONDITIONS

PART 1 - Supplementary Conditions for Price Schedule Items

1.1 Related Documents

1.2 Price Scheduling Notes

1.3 Quantity Measurement Standards

1.4 General Notes

1.5 Division and Individual Line-Item, Supplemental Notes and Conditions

SELECTIVE DEMOLITION 02070

702-2500 CEILING DEMOLITION

704-7500 Cutout Demolition 706-4000 Door Demolition 708-2800 Electrical Demolition 712-4200 Flooring Demolition 718-3800 HVAC Demolition 720-3800 Millwork and Trim Demolition 724-6200 Plumbing Demolition 732-3900 Walls and Partition Demolition 734-5100 Window Demolition

FINISH CARPENTRY 06220/06224

208-0600 Moldings and Base

STEEL DOORS AND FRAMES 08110/08118

Technical Specifications TOC- 2

103-2000 Commercial Steel Doors 118-8100 Steel Doors and Frames

WOOD DOORS 08210

054-5000 Wood Frames 062-5000 Wood Doors

STEEL WINDOWS 08510

104-2200 Steel Windows & Frames

FINISH HARDWARE 08710

132-0100 Finish Hardware

WEATHER-STRIPPING 08700

306-5200 Door Weather-Stripping

GLASS AND GLAZING 08800

186-0100 Glass

LATH AND PLASTER 09200

124-0100 Gypsum Plaster

GYPSUM DRYWALL 09250

620-9500 Partition Wall

ACOUSTICAL CEILINGS 09510

104-3800 Suspended Acoustic Ceiling Tile 106-2600 Suspension System

ACOUSTICAL SPACE PANELS 09520

254-1100 Sound Absorbing Panels

RESILIENT FLOORING 09650

601-9000 Resilient Tile & Base

CARPETING 09680

852-0010 Carpet

PAINTING 09900

210-0100 Interior Painting

WALL COVERINGS 09550

701-6100 Vinyl Wall Covering

WINDOW TREATMENT 12500

103-6600 Blinds

STANDPIPE AND SPRINKLER SYSTEM 15325

170-9700 Automatic Fire Suppression Systems

LOW PRESSURE DUCTWORK 15720

157-4500 Diffusers 157-4750 Control Systems: Pneumatic 490-7700 Accessories

TESTING, ADJUSTING AND BALANCING 15760

Technical Specifications TOC- 3

601-4700 Air Balancing

METAL DUCTWORK 15891

252-0100 Ductwork

RACEWAYS 16020

251-0100 Raceway Conduits 260-4500 Cutting and Drilling 290-9300 Wiremold Raceway

WIRES AND CABLES (600 VOLTS AND LESS 16120

165-6200 Conductors

TELECOMMUNICATIONS 16121

155-4000 Telecommunications 170-9600 Fire Alarm Devices

BOXES AND WIRING DEVICES 16121

140-8400 Boxes 300-7400 Wiring Devices

WIRING DEVICES 16140

310-8110 Low Voltage Switching

PANEL BOARDS 16470

290-3300 Circuit Breakers

INTERIOR BUILDING LIGHTING 16510

135-5500 Interior Lighting Fixtures

SECTION 01040 - PROJECT COORDINATION

SECTION 01045 - CUTTING AND PATCHING

PART 1 – GENERAL

1.1 Related Documents

1.2 Summary

1.3 Submittals

1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Materials

PART 3 - EXECUTION

3.1 Inspection

3.2 Preparation

3.3 Performance

3.4 Cleaning

SECTION 01090 - DEFINITIONS AND STANDARDS

PART 1 - GENERAL

1.1 Related Documents

1.2 Summary

Technical Specifications TOC- 4

1.3 Definitions

1.4 Specification Format and Content Explanation

1.5 Drawing Symbols

1.6 Industry Standards

1.7 Governing Regulations/Authorities

1.8 Submittals

PART 2 – PRODUCTS

PART 3 - EXECUTION

SECTION 01205 - PROCEDURES AND CONTROLS

PART 1 - GENERAL

1.1 Description of Work

1.2 Coordination and Meetings

1.3 Limitations for Use of Site

1.4 Special Reports

PART 2 – PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.1 General Installation Provisions

3.2 Cleaning and Protection

3.3 Environmental Protection

SECTION 01340 - SUBMITTALS

PART 1 - GENERAL

1.1 Description of Requirements

1.2 General Submittal Requirements

1.3 Specific Category Submittal Requirements

1.4 Action on Submittals

PART 2 - PRODUCTS

PART 3 - EXECUTION

SECTION 01505 - TEMPORARY FACILITIES

PART 1 - GENERAL

1.1 Description of Requirements

1.2 Job Conditions

PARTS 2 - PRODUCTS

2.1 Temporary Utility Services

2.2 Temporary Construction Facilities

2.3 Security Provisions

2.4 Temporary Support Facilities

PART 3 - EXECUTION

SECTION 01546 - SAFETY AND HEALTH

PART 1 - GENERAL

Technical Specifications TOC- 5

1.1 Applicable Publications

1.2 Work Covered by This Section

1.3 Definition of Hazardous Materials

1.4 Quality Assurance

1.5 Submittals

1.6 Cautionary Procedures at Existing Vaults

PART 2 - PRODUCTS

2.1 Materials and Equipment

2.2 Hazardous Materials

PART 3 - EXECUTION

3.1 Stop Work Orders

3.2 Protection

SECTION 01593 - SECURITY REGULATIONS

PART 1 – GENERAL SECURITY REQUIREMENTS

1.1 SUITABILITY DETERMINATIONS

1.2 GSA Criteria for Adjudication

1.3 COMPLIANCE WITH SECURITY REQUIREMENTS

1.4 IDENTIFICATION CREDENTIAL

1.5 Escort Requirements

Part 2 – PRODUCTS (Not used) Part 3 – EXECUTION (Not used)

SECTION 01605 - PRODUCTS

PART 1 - GENERAL

1.1 Description of Requirements

1.2 Quality Assurance

1.3 Submittals

1.4 Product Delivery, Storage, Handling

1.5 Warranties (Guarantees)

PART 2 - PRODUCTS

2.1 General Product Compliances

2.2 General Project Requirements

2.3 Labels and Nameplates

PART 3 - EXECUTION

SECTION 01705 - PROJECT CLOSEOUT

PART 1 - GENERAL

1.1 Description of Requirements

1.2 Prerequisites to Final Acceptance

1.3 Record Document Submittals

1.4 Operation and Maintenance Manuals

Technical Specifications TOC- 6

PART 2 - PRODUCTS

PART 3 - EXECUTION

3.1 Final Cleaning

SECTION 02070 - SELECTIVE DEMOLITION

Part 1 - General

1.1 Description of Requirements

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

SECTION 02085 – ASBESTOS ABATEMENT

PART 1 – GENERAL

1.1 Scope of Work

PART 2 - SUBMITTALS

2.1 Asbestos Abatement Submittals

2.2 Alternate Procedures And Variances

2.3 Notification Form

PART 3 - PROCEDURES

3.1 Work Place Entry and Exit Procedures

3.2 Building Protection

3.3 Work Area Preparation

3.4 Worker Decontamination Enclosure System

3.5 Remote Decontamination Enclosure System

3.6 Equipment Decontamination Enclosure System

3.7 Separation Barriers

3.8 Maintenance of Decontamination Enclosure System and Work Place Barriers

3.9 Commencement of Work

3.10 Removal Procedures

3.11 Clean-Up Procedures

3.12 Clearance Air Sampling and Analysis

3.13 Disposal Procedures

3.14 Glovebag Procedures

SECTION 02086 – LEAD-BASED PAINT MITIGATION

PART 1 – GENERAL

1.1 Scope of Work

PART 2 - LEAD MITIGATION SUBMITTALS

2.1 Submittals

2.2 Alternate Procedures and Variances

2.3 Notification Form

PART 3 - PROCEDURES

3.1 Work Place Entry and Exit Procedures

Technical Specifications TOC- 7

3.2 Building Protection

3.3 WORK AREA PREPARATION (For Aggressive Demolition and Renovation)

3.4 Worker Decontamination Enclosure System

3.5 Remote Decontamination Enclosure System

3.6 Equipment Decontamination Enclosure System

3.7 Separation Barriers

3.8 Soil Removal

3.9 Protection of Building Occupants

3.10 Removal Methods

3.11 Procedures for Channel Cutting In Walls and Ceilings

3.12 Clean-Up Procedures

3.13 Clearance Sampling

3.14 Drilling In Walls, Floors, and Ceilings

3.15 Lead Waste

3.16 Exterior Projects

3.17 Contractor Certification

SECTION 02511 – ASPHALT CONCRETE PAVING/MARKING

PART 1 - GENERAL

1.1 Pavement-Marking Paint

PART 2 - PRODUCTS

2.1 Pavement-Marking Paint

PART 3 - EXECUTION

1.3 Application

SECTION 06200 - FINISH CARPENTRY

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Product Delivery, Storage and Handling

1.5 Job Conditions

PART 2 - PRODUCTS

2.1 Wood Product Quality Standards

2.2 Materials

2.3 Wood Treatment

PART 3 - EXECUTION

3.1 Preparation

3.2 Installation

3.3 Adjustment, Cleaning, Finishing and Protection

SECTION 07841 – THROUGH-PENETRATION FIRESTOP SYSTEMS

Technical Specifications TOC- 8

PART 1 - GENERAL

1.1 Summary

1.2 Performance Requirements

1.3 Submittals

1.4 Quality Assurance

PART 2 - PRODUCTS

2.1 Manufacturers

2.2 Firestopping

PART – 3 EXECUTION

3.1 Through-Penetration Firestop System Installation

3.2 Field Quality Control

3.3 Through-Penetration Firestop System Schedule

SECTION 08110 - STEEL DOORS AND FRAMES

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage and Handling

PART 2 - PRODUCTS

2.1 Materials

2.2 Fabrication, General

2.3 Standard Steel Doors

2.4 Standard Steel Frames

PART 3 - EXECUTION

3.1 Installation

3.2 Adjust and Clean

SECTION 08210 - WOOD DOORS

PART 1 - GENERAL

1.1 Quality Standards

PART 2 – PRODUCTS

2.1 Products

PART 3 - EXECUTION

3.1 Installation

SECTION 08510 - STEEL WINDOWS

PART 1 - GENERAL

1.1 Standards

PART 2 - PRODUCTS

2.1 Materials/Fabrication

PART 3 - EXECUTION

Technical Specifications TOC- 9

3.1 Installation/Erection

SECTION 08710 - FINISH HARDWARE

PART 1 - GENERAL

1.1 Description Of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Product Handling

PART 2 - PRODUCTS

2.1 Scheduled Hardware

2.2 Materials and Fabrication

2.3 Hinges, Butts & Pivots

2.4 Lock Cylinders and Keying

2.5 Locks, Latches and Bolts

2.6 Push/Pull Units

2.7 Closers and Door Control Devices

2.8 Door Trim Units

2.9 Thresholds

2.10 Hardware Finishes

PART 3 - EXECUTION

3.1 Installation

3.2 Adjust And Clean

3.3 Hardware Schedule

SECTION 08800 - GLASS AND GLAZING

PART 1 - GENERAL

1.1 Description of Work

1.2 System Performances

1.3 Quality Assurance

1.4 Submittals

1.5 Delivery, Storage, and Handling

1.6 Project Conditions

1.7 Specified Product Warranty

PART 2 - PRODUCTS

2.1 Glass Products, General

2.2 Primary Glass Products

2.3 Glazing Sealants

2.4 Glazing Gaskets

2.5 Miscellaneous Glazing Materials

PART 3 - EXECUTION

3.1 Inspection

Technical Specifications TOC- 10

3.2 Preparation

3.3 Glazing General

3.4 Glazing

3.5 Protection and Cleaning

SECTION 09210 - GYPSUM PLASTER

PART 1 – GENERAL

1.1 Submittals

PART 2 – PRODUCTS

2.1 Plasters

PART 3 – EXECUTION

3.1 Installation

SECTION 09250 - GYPSUM DRYWALL

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage And Handling

1.5 Project Conditions

PART 2 - PRODUCTS

2.1 Metal Support Materials

2.2 Gypsum Board

2.3 Trim Accessories

2.4 Joint Treatment Materials

2.5 Miscellaneous Materials

Mineral Fiber Type: Fibers manufactured from glass

PART 3 - EXECUTION

3.1 Installation of Metal Support Systems

3.2 General Gypsum Board Installation Requirements

3.3 Methods of Gypsum Drywall Application

3.4 Installation of Drywall Trim Accessories

3.5 Finishing of Drywall

3.6 Protection of Work

SECTION 09251 - FACTORY-FINISHED GYPSUM BOARD

PART 1 – GENERAL

1.0 Related Documents

1.1 Summary

1.2 Submittals

1.3 Quality Assurance

1.4 Delivery, Storage and Handling

Technical Specifications TOC- 11

1.5 Project Conditions

1.6 Extra Materials

PART 2 – PRODUCTS

2.1 List Level 2 Factory-Finished Gypsum Board

2.2 Miscellaneous Materials

PART 3 – EXECUTION

3.1 List Level 3 Preparation

3.2 Installation

SECTION 09510 - ACOUSTICAL CEILINGS

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage and Handling

1.5 Project Conditions

PART 2 - PRODUCTS

2.1 Acoustical Ceiling Units, General

2.2 Acoustical Panels

2.3 Acoustical Tiles

PART 3 - EXECUTION

3.1 Preparation

3.2 Installation

3.3 Adjust and Clean

SECTION 09520 - ACOUSTICAL WALL SYSTEM

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Product Handling

1.5 Project Conditions

PART 2 - PRODUCTS

2.1 Materials

PART 3 - EXECUTION

3.1 Installation

3.2 Extra Stock

SECTION 09650 - RESILIENT FLOORING

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

Technical Specifications TOC- 12

1.3 Submittals

1.4 Project Conditions

PART 2 - PRODUCTS

2.1 Resilient Flooring Colors And Patterns

2.2 Tile Flooring

2.3 Accessories

PART 3 - EXECUTION

3.1 Inspection

3.2 Preparation

3.3 Installation, General

3.4 Installation of Tile Floors

3.5 Installation of Accessories

3.6 Cleaning and Protection

SECTION 09680 - CARPETING

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Extra Stock

1.5 Product Delivery and Storage

PART 2 - PRODUCTS

2.1 Carpet

2.2 Carpet Accessories

PART 3 - EXECUTION

3.1 Pre-Installation Requirements

3.2 Installation

3.3 Cleaning and Protection

SECTION 09900 - PAINTING

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery and Storage

1.5 Job Conditions

PART 2 - PRODUCTS

2.1 Materials

PART 3 - EXECUTION

3.1 Inspection

3.2 Surface Preparation

Technical Specifications TOC- 13

3.3 Materials Preparation

3.4 Application

3.5 Field Quality Control

3.6 Clean-Up and Protection

3.7 Paint Schedule

SECTION 09950 – WALL COVERINGS

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery and Storage

1.5 Job Conditions

PART 2 - PRODUCTS

2.1 Vinyl Wallcovering

2.2 Accessory Items

PART 3 - EXECUTION

3.1 General

3.2 Installation

3.3 Adjust and Clean

SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SECTION 12500 - WINDOW TREATMENT

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

PART 2 - PRODUCTS

2.1 Horizontal Blinds

2.2 Fabrication and Operation

PART 3 - EXECUTION

3.1 Installation

SECTION 13700 – ARMOR PROTECTION

PART 1 - GENERAL

1.1 Related Documents

1.2 Description of Work

1.3 Quality Assurance

1.4 Shop Drawings

1.5 Certification

1.6 Test Procedure

1.7 Delivery, Storage And Handling

Technical Specifications TOC- 14

PART 2 – PRODUCTS

2.1 Acceptable Manufacturers

PART 3 – EXECUTION

3.1 Armor material

SECTION 15081 - DUCT INSULATION

PART 1 - GENERAL

1.1 Related Documents

1.2 Summary

1.3 Submittals

1.4 Quality Assurance

1.5 Delivery, Storage, and Handling

1.6 Coordination

1.7 Scheduling

PART 2 – PRODUCTS

2.1 Manufacturers

2.2 Insulation Materials

2.3 Field-Applied Jackets

2.4 Accessories and Attachments

2.5 Vapor Retarders

PART 3 - EXECUTION

3.1 Examination

3.2 Preparation

3.3 General Application Requirements

3.4 Mineral-Fiber Insulation Application

3.5 Duct System Applications

3.6 Indoor Duct And Plenum Application Schedule

SECTION 15325 - STANDPIPE AND SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 Related Documents

1.2 Summary

1.3 Definitions

1.4 System Description

1.5 System Performance Requirements

1.6 Submittals

1.7 Quality Assurance

PART 2 - PRODUCTS

2.1 Manufacturers

2.2 Pipes and Tubes

2.3 Pipe and Tube Fittings

Technical Specifications TOC- 15

2.4 Joining Materials

2.5 Sprinklers

2.6 Specialty Sprinkler Fittings

PART 3 - EXECUTION

3.1 Examination

3.2 Sprinkler System Piping Applications

3.3 Joint Construction

3.4 Piping Installations

3.5 Specialty Sprinkler Fitting Installations

3.6 Sprinkler Applications

3.7 Sprinkler Installations

3.8 Field Quality Control

3.9 Cleaning

3.10 Commissioning

3.11 Demonstration

SECTION 15720 - LOW PRESSURE DUCTWORK

PART 1- GENERAL

1.1 Description Of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage, And Handling

PART 2 – PRODUCTS

2.1 Exposed Ductwork Materials

2.2 Sheet Metal

2.3 Miscellaneous Materials

2.4 Fabrication

2.5 Factory-Fabricated Ductwork

PART 3 – EXECUTION

3.1 Installation of Ductwork

3.2 Cleaning and Protection

SECTION 15815 - METAL DUCTS

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage, and Handling

PART 2 – PRODUCTS

2.1 Exposed Ductwork Materials

2.2 Sheet Metal

Technical Specifications TOC- 16

2.3 Miscellaneous Materials

2.4 Fabrication

2.5 Factory-Fabricated Ductwork

PART 3 - EXECUTION

3.1 Installation Of Ductwork

3.2 Cleaning and Protection

SECTION 15820 - DUCT ACCESSORIES

PART 1 – GENERAL

1.1 Related Documents

1.2 Summary

1.3 Submittals

1.4 Quality Assurance

PART 2 – PRODUCTS

2.1 Manual-Volume Dampers

2.2 Duct-Mounted Access Doors and Panels

2.3 Flexible Ducts

2.4 Accessory Hardware

PART 3 - EXECUTION

3.1 Installation

3.2 Adjusting

SECTION 15990 - TESTING, ADJUSTING AND BALANCING

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Job Conditions

PART 2 - PRODUCTS

2.1 Patching Materials

2.2 Test Instruments

PART 3 - EXECUTION

3.1 Field Work

3.2 Reports

3.3 Final Tests, Inspection and Acceptance

SECTION 16020 - RACEWAYS

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

PART 2 - PRODUCTS

Technical Specifications TOC- 17

2.1 Metal Conduit and Tubing

2.2 Wire-Ways

PART 3 - EXECUTION

3.1 Installation of Electrical Raceways

SECTION 16120 – WIRES AND CABLES (600 volts and less)

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

1.4 Delivery, Storage, and Handling

PART 2 - PRODUCTS

2.1 Wire, Cable and Connectors

PART 3 - EXECUTION

3.1 Installation of Wires And Cables

3.2 Field Quality Control

SECTION 16121 - CONTROL/SIGNAL TRANSMISSION MEDIA

PART 1 – GENERAL

1.1 Description Of Work

1.2 Products

1.3 Installation

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

SECTION 16135 - ELECTRICAL BOXES AND FITTINGS

PART 1 - GENERAL

1.1 Description of Work

1.2 Quality Assurance

1.3 Submittals

PART 2 - PRODUCTS

2.1 Fabricated Materials

PART 3 - EXECUTION

3.1 Installation of Electrical Boxes and Fittings

3.2 Grounding