1c - Technical Specifications - GS05P11SVD0042.pdf
PDF 2 MB Posted
- Solicitation number
- GS-05P-11-SV-D-0042
About this file
Technical Specifications
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair, Alteration and Construction IDIQ GS05P11SVD0042 Various Locations State of Michigan
Technical Specifications TOC- 1
Technical Specifications - Table of Contents
SECTION 01010 – SUMMARY OF THE WORK
PART 1 – GENERAL
1.1 Related Documents
1.2 Work of the Contract
1.3 Items Furnished By The Government And Installed By The Contractor
1.4 Contractor Use of Premises
1.5 Government Occupancy
1.6 Inspection by Regulatory Authorities
1.7 Miscellaneous and General Provisions
PART 2 - PRODUCTS - (NOT APPLICABLE)
PART 3 – EXECUTION – (NOT APPLICABLE)
APPENDIX A
STANDARD METHODS OF MEASUREMENT
PRICE SCHEDULE UNIT DEFINITIONS
APPENDIX B
SUPPLEMENTARY CONDITIONS
PART 1 - Supplementary Conditions for Price Schedule Items
1.1 Related Documents
1.2 Price Scheduling Notes
1.3 Quantity Measurement Standards
1.4 General Notes
1.5 Division and Individual Line-Item, Supplemental Notes and Conditions
SELECTIVE DEMOLITION 02070
702-2500 CEILING DEMOLITION
704-7500 Cutout Demolition 706-4000 Door Demolition 708-2800 Electrical Demolition 712-4200 Flooring Demolition 718-3800 HVAC Demolition 720-3800 Millwork and Trim Demolition 724-6200 Plumbing Demolition 732-3900 Walls and Partition Demolition 734-5100 Window Demolition
FINISH CARPENTRY 06220/06224
208-0600 Moldings and Base
STEEL DOORS AND FRAMES 08110/08118
Technical Specifications TOC- 2
103-2000 Commercial Steel Doors 118-8100 Steel Doors and Frames
WOOD DOORS 08210
054-5000 Wood Frames 062-5000 Wood Doors
STEEL WINDOWS 08510
104-2200 Steel Windows & Frames
FINISH HARDWARE 08710
132-0100 Finish Hardware
WEATHER-STRIPPING 08700
306-5200 Door Weather-Stripping
GLASS AND GLAZING 08800
186-0100 Glass
LATH AND PLASTER 09200
124-0100 Gypsum Plaster
GYPSUM DRYWALL 09250
620-9500 Partition Wall
ACOUSTICAL CEILINGS 09510
104-3800 Suspended Acoustic Ceiling Tile 106-2600 Suspension System
ACOUSTICAL SPACE PANELS 09520
254-1100 Sound Absorbing Panels
RESILIENT FLOORING 09650
601-9000 Resilient Tile & Base
CARPETING 09680
852-0010 Carpet
PAINTING 09900
210-0100 Interior Painting
WALL COVERINGS 09550
701-6100 Vinyl Wall Covering
WINDOW TREATMENT 12500
103-6600 Blinds
STANDPIPE AND SPRINKLER SYSTEM 15325
170-9700 Automatic Fire Suppression Systems
LOW PRESSURE DUCTWORK 15720
157-4500 Diffusers 157-4750 Control Systems: Pneumatic 490-7700 Accessories
TESTING, ADJUSTING AND BALANCING 15760
Technical Specifications TOC- 3
601-4700 Air Balancing
METAL DUCTWORK 15891
252-0100 Ductwork
RACEWAYS 16020
251-0100 Raceway Conduits 260-4500 Cutting and Drilling 290-9300 Wiremold Raceway
WIRES AND CABLES (600 VOLTS AND LESS 16120
165-6200 Conductors
TELECOMMUNICATIONS 16121
155-4000 Telecommunications 170-9600 Fire Alarm Devices
BOXES AND WIRING DEVICES 16121
140-8400 Boxes 300-7400 Wiring Devices
WIRING DEVICES 16140
310-8110 Low Voltage Switching
PANEL BOARDS 16470
290-3300 Circuit Breakers
INTERIOR BUILDING LIGHTING 16510
135-5500 Interior Lighting Fixtures
SECTION 01040 - PROJECT COORDINATION
SECTION 01045 - CUTTING AND PATCHING
PART 1 – GENERAL
1.1 Related Documents
1.2 Summary
1.3 Submittals
1.4 Quality Assurance
PART 2 - PRODUCTS
2.1 Materials
PART 3 - EXECUTION
3.1 Inspection
3.2 Preparation
3.3 Performance
3.4 Cleaning
SECTION 01090 - DEFINITIONS AND STANDARDS
PART 1 - GENERAL
1.1 Related Documents
1.2 Summary
Technical Specifications TOC- 4
1.3 Definitions
1.4 Specification Format and Content Explanation
1.5 Drawing Symbols
1.6 Industry Standards
1.7 Governing Regulations/Authorities
1.8 Submittals
PART 2 – PRODUCTS
PART 3 - EXECUTION
SECTION 01205 - PROCEDURES AND CONTROLS
PART 1 - GENERAL
1.1 Description of Work
1.2 Coordination and Meetings
1.3 Limitations for Use of Site
1.4 Special Reports
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 General Installation Provisions
3.2 Cleaning and Protection
3.3 Environmental Protection
SECTION 01340 - SUBMITTALS
PART 1 - GENERAL
1.1 Description of Requirements
1.2 General Submittal Requirements
1.3 Specific Category Submittal Requirements
1.4 Action on Submittals
PART 2 - PRODUCTS
PART 3 - EXECUTION
SECTION 01505 - TEMPORARY FACILITIES
PART 1 - GENERAL
1.1 Description of Requirements
1.2 Job Conditions
PARTS 2 - PRODUCTS
2.1 Temporary Utility Services
2.2 Temporary Construction Facilities
2.3 Security Provisions
2.4 Temporary Support Facilities
PART 3 - EXECUTION
SECTION 01546 - SAFETY AND HEALTH
PART 1 - GENERAL
Technical Specifications TOC- 5
1.1 Applicable Publications
1.2 Work Covered by This Section
1.3 Definition of Hazardous Materials
1.4 Quality Assurance
1.5 Submittals
1.6 Cautionary Procedures at Existing Vaults
PART 2 - PRODUCTS
2.1 Materials and Equipment
2.2 Hazardous Materials
PART 3 - EXECUTION
3.1 Stop Work Orders
3.2 Protection
SECTION 01593 - SECURITY REGULATIONS
PART 1 – GENERAL SECURITY REQUIREMENTS
1.1 SUITABILITY DETERMINATIONS
1.2 GSA Criteria for Adjudication
1.3 COMPLIANCE WITH SECURITY REQUIREMENTS
1.4 IDENTIFICATION CREDENTIAL
1.5 Escort Requirements
Part 2 – PRODUCTS (Not used) Part 3 – EXECUTION (Not used)
SECTION 01605 - PRODUCTS
PART 1 - GENERAL
1.1 Description of Requirements
1.2 Quality Assurance
1.3 Submittals
1.4 Product Delivery, Storage, Handling
1.5 Warranties (Guarantees)
PART 2 - PRODUCTS
2.1 General Product Compliances
2.2 General Project Requirements
2.3 Labels and Nameplates
PART 3 - EXECUTION
SECTION 01705 - PROJECT CLOSEOUT
PART 1 - GENERAL
1.1 Description of Requirements
1.2 Prerequisites to Final Acceptance
1.3 Record Document Submittals
1.4 Operation and Maintenance Manuals
Technical Specifications TOC- 6
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.1 Final Cleaning
SECTION 02070 - SELECTIVE DEMOLITION
Part 1 - General
1.1 Description of Requirements
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
SECTION 02085 – ASBESTOS ABATEMENT
PART 1 – GENERAL
1.1 Scope of Work
PART 2 - SUBMITTALS
2.1 Asbestos Abatement Submittals
2.2 Alternate Procedures And Variances
2.3 Notification Form
PART 3 - PROCEDURES
3.1 Work Place Entry and Exit Procedures
3.2 Building Protection
3.3 Work Area Preparation
3.4 Worker Decontamination Enclosure System
3.5 Remote Decontamination Enclosure System
3.6 Equipment Decontamination Enclosure System
3.7 Separation Barriers
3.8 Maintenance of Decontamination Enclosure System and Work Place Barriers
3.9 Commencement of Work
3.10 Removal Procedures
3.11 Clean-Up Procedures
3.12 Clearance Air Sampling and Analysis
3.13 Disposal Procedures
3.14 Glovebag Procedures
SECTION 02086 – LEAD-BASED PAINT MITIGATION
PART 1 – GENERAL
1.1 Scope of Work
PART 2 - LEAD MITIGATION SUBMITTALS
2.1 Submittals
2.2 Alternate Procedures and Variances
2.3 Notification Form
PART 3 - PROCEDURES
3.1 Work Place Entry and Exit Procedures
Technical Specifications TOC- 7
3.2 Building Protection
3.3 WORK AREA PREPARATION (For Aggressive Demolition and Renovation)
3.4 Worker Decontamination Enclosure System
3.5 Remote Decontamination Enclosure System
3.6 Equipment Decontamination Enclosure System
3.7 Separation Barriers
3.8 Soil Removal
3.9 Protection of Building Occupants
3.10 Removal Methods
3.11 Procedures for Channel Cutting In Walls and Ceilings
3.12 Clean-Up Procedures
3.13 Clearance Sampling
3.14 Drilling In Walls, Floors, and Ceilings
3.15 Lead Waste
3.16 Exterior Projects
3.17 Contractor Certification
SECTION 02511 – ASPHALT CONCRETE PAVING/MARKING
PART 1 - GENERAL
1.1 Pavement-Marking Paint
PART 2 - PRODUCTS
2.1 Pavement-Marking Paint
PART 3 - EXECUTION
1.3 Application
SECTION 06200 - FINISH CARPENTRY
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Product Delivery, Storage and Handling
1.5 Job Conditions
PART 2 - PRODUCTS
2.1 Wood Product Quality Standards
2.2 Materials
2.3 Wood Treatment
PART 3 - EXECUTION
3.1 Preparation
3.2 Installation
3.3 Adjustment, Cleaning, Finishing and Protection
SECTION 07841 – THROUGH-PENETRATION FIRESTOP SYSTEMS
Technical Specifications TOC- 8
PART 1 - GENERAL
1.1 Summary
1.2 Performance Requirements
1.3 Submittals
1.4 Quality Assurance
PART 2 - PRODUCTS
2.1 Manufacturers
2.2 Firestopping
PART – 3 EXECUTION
3.1 Through-Penetration Firestop System Installation
3.2 Field Quality Control
3.3 Through-Penetration Firestop System Schedule
SECTION 08110 - STEEL DOORS AND FRAMES
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage and Handling
PART 2 - PRODUCTS
2.1 Materials
2.2 Fabrication, General
2.3 Standard Steel Doors
2.4 Standard Steel Frames
PART 3 - EXECUTION
3.1 Installation
3.2 Adjust and Clean
SECTION 08210 - WOOD DOORS
PART 1 - GENERAL
1.1 Quality Standards
PART 2 – PRODUCTS
2.1 Products
PART 3 - EXECUTION
3.1 Installation
SECTION 08510 - STEEL WINDOWS
PART 1 - GENERAL
1.1 Standards
PART 2 - PRODUCTS
2.1 Materials/Fabrication
PART 3 - EXECUTION
Technical Specifications TOC- 9
3.1 Installation/Erection
SECTION 08710 - FINISH HARDWARE
PART 1 - GENERAL
1.1 Description Of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Product Handling
PART 2 - PRODUCTS
2.1 Scheduled Hardware
2.2 Materials and Fabrication
2.3 Hinges, Butts & Pivots
2.4 Lock Cylinders and Keying
2.5 Locks, Latches and Bolts
2.6 Push/Pull Units
2.7 Closers and Door Control Devices
2.8 Door Trim Units
2.9 Thresholds
2.10 Hardware Finishes
PART 3 - EXECUTION
3.1 Installation
3.2 Adjust And Clean
3.3 Hardware Schedule
SECTION 08800 - GLASS AND GLAZING
PART 1 - GENERAL
1.1 Description of Work
1.2 System Performances
1.3 Quality Assurance
1.4 Submittals
1.5 Delivery, Storage, and Handling
1.6 Project Conditions
1.7 Specified Product Warranty
PART 2 - PRODUCTS
2.1 Glass Products, General
2.2 Primary Glass Products
2.3 Glazing Sealants
2.4 Glazing Gaskets
2.5 Miscellaneous Glazing Materials
PART 3 - EXECUTION
3.1 Inspection
Technical Specifications TOC- 10
3.2 Preparation
3.3 Glazing General
3.4 Glazing
3.5 Protection and Cleaning
SECTION 09210 - GYPSUM PLASTER
PART 1 – GENERAL
1.1 Submittals
PART 2 – PRODUCTS
2.1 Plasters
PART 3 – EXECUTION
3.1 Installation
SECTION 09250 - GYPSUM DRYWALL
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage And Handling
1.5 Project Conditions
PART 2 - PRODUCTS
2.1 Metal Support Materials
2.2 Gypsum Board
2.3 Trim Accessories
2.4 Joint Treatment Materials
2.5 Miscellaneous Materials
Mineral Fiber Type: Fibers manufactured from glass
PART 3 - EXECUTION
3.1 Installation of Metal Support Systems
3.2 General Gypsum Board Installation Requirements
3.3 Methods of Gypsum Drywall Application
3.4 Installation of Drywall Trim Accessories
3.5 Finishing of Drywall
3.6 Protection of Work
SECTION 09251 - FACTORY-FINISHED GYPSUM BOARD
PART 1 – GENERAL
1.0 Related Documents
1.1 Summary
1.2 Submittals
1.3 Quality Assurance
1.4 Delivery, Storage and Handling
Technical Specifications TOC- 11
1.5 Project Conditions
1.6 Extra Materials
PART 2 – PRODUCTS
2.1 List Level 2 Factory-Finished Gypsum Board
2.2 Miscellaneous Materials
PART 3 – EXECUTION
3.1 List Level 3 Preparation
3.2 Installation
SECTION 09510 - ACOUSTICAL CEILINGS
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage and Handling
1.5 Project Conditions
PART 2 - PRODUCTS
2.1 Acoustical Ceiling Units, General
2.2 Acoustical Panels
2.3 Acoustical Tiles
PART 3 - EXECUTION
3.1 Preparation
3.2 Installation
3.3 Adjust and Clean
SECTION 09520 - ACOUSTICAL WALL SYSTEM
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Product Handling
1.5 Project Conditions
PART 2 - PRODUCTS
2.1 Materials
PART 3 - EXECUTION
3.1 Installation
3.2 Extra Stock
SECTION 09650 - RESILIENT FLOORING
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
Technical Specifications TOC- 12
1.3 Submittals
1.4 Project Conditions
PART 2 - PRODUCTS
2.1 Resilient Flooring Colors And Patterns
2.2 Tile Flooring
2.3 Accessories
PART 3 - EXECUTION
3.1 Inspection
3.2 Preparation
3.3 Installation, General
3.4 Installation of Tile Floors
3.5 Installation of Accessories
3.6 Cleaning and Protection
SECTION 09680 - CARPETING
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Extra Stock
1.5 Product Delivery and Storage
PART 2 - PRODUCTS
2.1 Carpet
2.2 Carpet Accessories
PART 3 - EXECUTION
3.1 Pre-Installation Requirements
3.2 Installation
3.3 Cleaning and Protection
SECTION 09900 - PAINTING
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery and Storage
1.5 Job Conditions
PART 2 - PRODUCTS
2.1 Materials
PART 3 - EXECUTION
3.1 Inspection
3.2 Surface Preparation
Technical Specifications TOC- 13
3.3 Materials Preparation
3.4 Application
3.5 Field Quality Control
3.6 Clean-Up and Protection
3.7 Paint Schedule
SECTION 09950 – WALL COVERINGS
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery and Storage
1.5 Job Conditions
PART 2 - PRODUCTS
2.1 Vinyl Wallcovering
2.2 Accessory Items
PART 3 - EXECUTION
3.1 General
3.2 Installation
3.3 Adjust and Clean
SECTION 01 74 19 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
SECTION 12500 - WINDOW TREATMENT
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
PART 2 - PRODUCTS
2.1 Horizontal Blinds
2.2 Fabrication and Operation
PART 3 - EXECUTION
3.1 Installation
SECTION 13700 – ARMOR PROTECTION
PART 1 - GENERAL
1.1 Related Documents
1.2 Description of Work
1.3 Quality Assurance
1.4 Shop Drawings
1.5 Certification
1.6 Test Procedure
1.7 Delivery, Storage And Handling
Technical Specifications TOC- 14
PART 2 – PRODUCTS
2.1 Acceptable Manufacturers
PART 3 – EXECUTION
3.1 Armor material
SECTION 15081 - DUCT INSULATION
PART 1 - GENERAL
1.1 Related Documents
1.2 Summary
1.3 Submittals
1.4 Quality Assurance
1.5 Delivery, Storage, and Handling
1.6 Coordination
1.7 Scheduling
PART 2 – PRODUCTS
2.1 Manufacturers
2.2 Insulation Materials
2.3 Field-Applied Jackets
2.4 Accessories and Attachments
2.5 Vapor Retarders
PART 3 - EXECUTION
3.1 Examination
3.2 Preparation
3.3 General Application Requirements
3.4 Mineral-Fiber Insulation Application
3.5 Duct System Applications
3.6 Indoor Duct And Plenum Application Schedule
SECTION 15325 - STANDPIPE AND SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 Related Documents
1.2 Summary
1.3 Definitions
1.4 System Description
1.5 System Performance Requirements
1.6 Submittals
1.7 Quality Assurance
PART 2 - PRODUCTS
2.1 Manufacturers
2.2 Pipes and Tubes
2.3 Pipe and Tube Fittings
Technical Specifications TOC- 15
2.4 Joining Materials
2.5 Sprinklers
2.6 Specialty Sprinkler Fittings
PART 3 - EXECUTION
3.1 Examination
3.2 Sprinkler System Piping Applications
3.3 Joint Construction
3.4 Piping Installations
3.5 Specialty Sprinkler Fitting Installations
3.6 Sprinkler Applications
3.7 Sprinkler Installations
3.8 Field Quality Control
3.9 Cleaning
3.10 Commissioning
3.11 Demonstration
SECTION 15720 - LOW PRESSURE DUCTWORK
PART 1- GENERAL
1.1 Description Of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage, And Handling
PART 2 – PRODUCTS
2.1 Exposed Ductwork Materials
2.2 Sheet Metal
2.3 Miscellaneous Materials
2.4 Fabrication
2.5 Factory-Fabricated Ductwork
PART 3 – EXECUTION
3.1 Installation of Ductwork
3.2 Cleaning and Protection
SECTION 15815 - METAL DUCTS
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage, and Handling
PART 2 – PRODUCTS
2.1 Exposed Ductwork Materials
2.2 Sheet Metal
Technical Specifications TOC- 16
2.3 Miscellaneous Materials
2.4 Fabrication
2.5 Factory-Fabricated Ductwork
PART 3 - EXECUTION
3.1 Installation Of Ductwork
3.2 Cleaning and Protection
SECTION 15820 - DUCT ACCESSORIES
PART 1 – GENERAL
1.1 Related Documents
1.2 Summary
1.3 Submittals
1.4 Quality Assurance
PART 2 – PRODUCTS
2.1 Manual-Volume Dampers
2.2 Duct-Mounted Access Doors and Panels
2.3 Flexible Ducts
2.4 Accessory Hardware
PART 3 - EXECUTION
3.1 Installation
3.2 Adjusting
SECTION 15990 - TESTING, ADJUSTING AND BALANCING
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Job Conditions
PART 2 - PRODUCTS
2.1 Patching Materials
2.2 Test Instruments
PART 3 - EXECUTION
3.1 Field Work
3.2 Reports
3.3 Final Tests, Inspection and Acceptance
SECTION 16020 - RACEWAYS
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
PART 2 - PRODUCTS
Technical Specifications TOC- 17
2.1 Metal Conduit and Tubing
2.2 Wire-Ways
PART 3 - EXECUTION
3.1 Installation of Electrical Raceways
SECTION 16120 – WIRES AND CABLES (600 volts and less)
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
1.4 Delivery, Storage, and Handling
PART 2 - PRODUCTS
2.1 Wire, Cable and Connectors
PART 3 - EXECUTION
3.1 Installation of Wires And Cables
3.2 Field Quality Control
SECTION 16121 - CONTROL/SIGNAL TRANSMISSION MEDIA
PART 1 – GENERAL
1.1 Description Of Work
1.2 Products
1.3 Installation
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
SECTION 16135 - ELECTRICAL BOXES AND FITTINGS
PART 1 - GENERAL
1.1 Description of Work
1.2 Quality Assurance
1.3 Submittals
PART 2 - PRODUCTS
2.1 Fabricated Materials
PART 3 - EXECUTION
3.1 Installation of Electrical Boxes and Fittings
3.2 Grounding
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .