Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
SF30 List of Accounting Strings
Accounting String
4PC1N-15-5008.2015.192X.04.P04T0001.PG54.PG414.N20.RFL00309.FL0061ZZ.088
4PC1N-15-5008.2015.192X.04.P04T0001.PG54.PGL26.K01.RFL11209.FL0061ZZ.089
4PC1N-15-5008.2015.192X.04.P04T0001.PG54.PG211.N20.RFL00308.FL0061ZZ.087
4PC1N-15-5008.2015.192X.04.P04T0001.PG54.PG413.N20.RFL00308.FL0061ZZ.087
4PC1N-15-5008.2015.192X.04.P0440001.PG80.PG211.K01..FL0061ZZ..N1278239
4PC1N-15-5008.2015.192X.04.P0440001.PG80.PG413.K01..FL0061ZZ..N1278239
Description of Amendment/Modification Amendment 2 is hereby issued as follows:
1. To provide the SF30 (Amendment 2).
2. To provide an updated DB201A-SB/APR 2015 (Solicitation). DB201A-SB/APR 2015, Section II.D.(1)(7) will change FROM The total project construction cost at award of the construction contract(s) was not less than $10 million TO The total project construction cost at award of the construction contract(s) was not less than $2 million.
3. To provide Questions and Answers.
4. To provide July 09, 2015 Pre-proposal Conference Sign-in Sheet.
5. To provide as-built original drawings.
6. To provide Attachment F â Construction Requirements â Graphic Walls â Revised with Attachment #2.
7. To provide Attachment L â Furniture-Surface Requirement â High density Filing System â Revised with Amendment #2.
8. To provide an updated Statement of Work (SOW), dated July 23, 2015. The SOW update is as follows:
1.4 Reference Materials Reference materials provided to the DB Contractor include the following:
*Attachment F - Construction Requirements - Graphic Walls - Revised with Amendment #2.
*Attachment J - Phone Requirements - Avaya UC (Was Omitted) *Attachment L - Furniture-Surface Requirements - High Density Filing System - Revised with Amendment #2
5.2.3.2 New Construction Phase
17) Provide new finishes in public corridors on 5th, 14th & 15th Floors. This includes finishes in public corridors, elevator lobbies, and restroom vestibules on all three floors. Provide new carpet, base, ceiling tile, ceiling grid and prep and paint all walls, doors and door frames.
18) Design and install 5 graphics walls throughout the OMHA space. Examples of graphics walls installed in other offices are shown in revised Attachment F. Attachment F was revised with Amendment #1. The DB Contractor and project team will meet with the Miami OMHA office to gather ideas and suggestions for the graphics walls during the design phase.
5.2.6 Building Automation System (BAS) Requirements
1) Provide a new DDC BAS controller for each new piece of HVAC equipment (e.g. terminal boxes) provided; pneumatic controls (e.g.
actuators and control valves) are not allowed. New controllers shall be compatible with the existing DDC BAS, existing BAS enterprise level software, and existing network management tools. Controller programming shall be accessible to authorized GSA personnel either in person or via remote connection over the secure GSA network. Provide all software tools and plug-ins required for controller reprogramming.
2) For each new terminal box controller, provide a thermostat OR space sensor in compliance with the building standard (i.e. similar to what is provided for the other building spaces in terms of appearance, functionality, and adjustability). For each new thermostat provided, limit the adjustability to +/- 2 degrees F deadband.
3) Provide commissioning and functional testing for each new controller. Verify DESIGN sequences have been implemented. Verify proper 2-way communication between new controllers and enterprise level software.
4) During the project DESIGN phase, submit cuts sheets to GSA for review and approval for the following items: DDC BAS controllers, software tools and plug-ins, space thermostat and temperature sensors. Also provide BAS Points List, sequences of operation, and Cx/ functional testing plan to GSA for approval.
5) Update BAS graphical pages to include points for each new controller provided, as well as revisions to points for existing controllers.
6) After all new controllers have been installed and commissioned, provide GSA a copy (on CD) of the new, updated BAS backup database and files.
7) RH sensors to keep space below 60% relative humidity or dew point control to keep space below 55 degrees maximum dew point required for each zone.
5.2.9 High-Density Filing Systems
5.2.9.2 DB Contractorâs structural engineer shall provide a written report of the existing conditions with complete load calculations of the 15th Floor. DB Contractorâs A/E team and filing system manufacturer shall design and install a filing system that meets the existing structural requirements of the building. If the system can not designed within the acceptable structural requirements of the building, DB contractor shall modify the floor slab as needed to properly support the new load.
*****Nothing Else Follows*****
| SF30 List of Accounting Strings |
| Description of Amendment/Modification |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0002 |
| Code[0]: 4PQAP |
| Code[1]: |
| AccountingData[0]: See Addendum |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: Julius Teal |
| Description[0]: See Addendum |
| FacilityCode[0]: |
| Code[2]: 4PQAP |
| IssuedBy[0]: 77 FORSYTH ST SW |
ATLANTA, GA 30303-3490United States
| NameandAddress[0]: |
| AdministeredBy[0]: 77 FORSYTH ST SW |
ATLANTA, GA 30303-3490United States
| ContractIDCode[0]: |
| ReqNumber[0]: EQ4PC1N-15-5008 |
| AmendmentNo[1]: GS-04-P-15-BV-C-7002 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 7/2/2015 |
| Dated9B[0]: 7/2/2015 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: |
| CheckBox11[0]: |
| CheckBox13A[0]: |
| CheckBox13B[0]: |
| CheckBox13C[0]: |
| CheckBox13D[0]: |
| IsNot[0]: |
| Is[0]: 1 |
| Extended[0]: 0 |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: Not Provided |
| CopiesReturned[0]: 1 |
File details come from the government source that posted it. Updated .