About this file

Claude Pepper Option 10

View the file

Other files

File Type Posted
DB101-SB_APR_2015_The_Agreement.pdf PDF
SF30_Amendment_0006.pdf PDF
DB101-SB_APR_2015_The_Agreement.pdf PDF
DB201A-SB_APR_2015_The_Solicitation_.pdf PDF
SF30_Amendment_0005.pdf PDF
SF30_Amendment_0003.pdf PDF
SF30_Amendment_0004.pdf PDF
FL-FT-LAU-FB-CTHS-21-22-3-18-1961.tif TIF image
OMHA_Graphic_Wall_Design_Concept_(KC).pdf PDF
GSA_HHS_OMHA_graphics_UPDATED_DESERT_COLLAGE.PDF PDF
Question_and_Answers.pdf PDF
DB201A-SB_APR_2015_The_Solicitation_Amendment_2.pdf PDF
FL-FT-LAU-FB-CTHS-27-13-9-5-2-1963.tif TIF image
Scope_of_Work_Revised_Dated_July_23_2015.pdf PDF
DSC00452.JPG JPG image
SF30_Amendment_2.pdf PDF
DSC00427.JPG JPG image
FL-FT-LAU-FB-CTHS-27-13-4-5-2-1963.tif TIF image
DSC00422.JPG JPG image
DSC00453.JPG JPG image
DSC00424.JPG JPG image
Attachment_L_-_HDFS_Examples_-_Revised.pdf PDF
FL-FT-LAU-FB-CTHS-21-19-3-18-1961.tif TIF image
FL-FT-LAU-FB-CTHS-21-21-3-18-1961.tif TIF image
FL-FT-LAU-FB-CTHS-21-20-3-18-1961.tif TIF image
FL-FT-LAU-FB-CTHS-27-13-26-5-2-1963.tif TIF image
FL-FT-LAU-FB-CTHS-21-23-3-18-1961.tif TIF image
Preproposal_Conference_Sign_In_Sheet.pdf PDF
GSA_HHS_OMHA_graphics_updated2.pdf PDF
FL-FT-LAU-FB-CTHS-27-13-35A-5-2-1963.tif TIF image
FL-FT-LAU-FB-CTHS-27-13-40-5-2-1963.tif TIF image
FL-FT-LAU-FB-CTHS-21-22-6-3-1959.tif TIF image
FL-FT-LAU-FB-CTHS-27-13-36-5-2-1963.tif TIF image
DB201A-SB_APR_2015_The_Solicitation_(2)_Amendment_1.pdf PDF
SF30.pdf PDF
SF1442.pdf PDF
SF1442_Line_Items.pdf PDF
Attachment_2_Registration_Form_for_PreSolicitation_Conference_Sample.pdf PDF
SF_1442_Line_Items.pdf PDF
Contract_Price_Form.pdf PDF
Attachment_I_-_OMHA_Workplace_Recommendations_Report_(HOK_POR).pdf PDF
SF_24.pdf PDF
Attachment_L_-_Security_Requirements_-_SOW___Product_Sheets.pdf PDF
Attachment_N_-_Claude_Pepper_Structural_Floor_Framing_Plan_-_Typical.pdf PDF
Attachment_G_-_Construction_Requirements_-_Acoustical_Wall_Systems.pdf PDF
Attachment_E_-_Construction_Requirements_-_Graphic_Walls.pdf PDF
GSA_Test_Fit_Space_Plan_Option_10.pdf PDF
SF1442.pdf PDF
Wage_Determination.pdf PDF
Attachment_D_-_OMHA_Construction_Requirements_062515.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Possible relocation for multipurpose conference room from 14th. The current multipurpose room is 882 SF, we can go down as low as 730 SF for this space.

Possible area along the wall for counter top break area (with fridge, microwave, storage, and bar height seating).

Security Closet will need to be 80 SF in order to accommodate security equipment. Security closet must be located on this floor.

Enlarge.

Move attorney office to 14th (to make room for larger copy/print room or security closet and to backfill vacated space left by moving multipurpose room).

The employees on this floor need a place to sit and eat.

We suggest moving the multipurpose room from 14 to this floor and adding a break bar (see other note on this page).

HR wall will need additional soundproofing, if conference room is next door.

Will the Space Saver HDFS fit the way this room is configured?

Atty Off.

Relo from 14

Remove. Suggest storage in its place.

Move ALJ offices to area vacated by multipurpose room.

Awkward location for QR. Suggest removing/relocating.

Relocate team to area vacated by multipurpose room.

Use area for enclosed large break room with tables/chairs

Relocate hoteling area to 15.

Remove seating, retain break nook with under counter fridge, microwave, etc.

Still prefer these storage spaces to be on 5 with Admin.

Relocate to upper right corner of floor. This area could accommodate another support staff location with the relocation of the equipment closet as well.

Open doorway.

Vestibule is a portion of the mail room SF.

Suggested relo for hoteling on 14.

HDFS Expanded right.

Arrows indicate recommended hallway.

Bulk storage still not accessible enough.

Suggest move next to mail room.

This cubicle does not appear to be represented in the counts below.

The mail room/ docket/HDFS spaces are better suited

Because of the inventory and vendor traffic anticipated near this area, we are concerned about disruptions with the Tax Court across the hall. Is it possible to reinforce the floor on 5 so we can relocate this entire area there instead? It also makes more business sense functionally speaking.

File details come from the government source that posted it. Updated .