Wage VA15.pdf
PDF 12 KB Posted
- Solicitation number
- GS-03P-10-QM-D-0037
About this file
Wage VA15
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment No. 0002.pdf | ||
| Amendment No. 0001.pdf | ||
| SPECIFICATIONS.pdf | ||
| SUPPLEMANT SHEET TO STANDARD FORM 1442.pdf | ||
| Wage VA53.pdf | ||
| GSA 527 1 .pdf | ||
| Wage VA59.pdf | ||
| C201_Solicitation.pdf | ||
| Wage VA12.pdf | ||
| IDIQ Lines Item Prices.pdf | ||
| SF1442 1 .pdf | ||
| C101_Supplemental to Agreement.pdf | ||
| C201_Supplemental to Solicitation.pdf | ||
| Wage VA5.pdf | ||
| C101_Agreement.pdf | ||
| SUPPLEMANT SHEET TO STANDARD FORM 1442.pdf | ||
| SF 24 1 .pdf | ||
| Wage VA8.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: VA100015 05/07/2010 VA15
Superseded General Decision Number: VA20080015
State: Virginia
Construction Type: Building
Counties: Chesapeake*, Norfolk*, Portsmouth*, Suffolk* and Virginia Beach* Counties in Virginia.
*INDEPENDENT CITIES
BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 05/07/2010
BRVA0001-001 07/01/2008
Rates Fringes
BRICKLAYER.......................$ 21.26 6.86
CARP0613-005 05/01/2006
Rates Fringes
Carpenters (Including Drywall Hanging, Acoustical Ceiling and Formsetting).................$ 18.85 5.29+2%
ELEC0080-002 09/01/2009
Rates Fringes
Electricians.....................$ 23.05 14.5%+4.50+a
a. Workmen shall take off 2 hours with pay, at the discretion of the employer, on State and National Election days;
Tuesday following the first Monday in November, provided they are qualified and vote.
ELEV0052-001 01/01/2010
Rates Fringes
ELEVATOR MECHANIC................$ 33.96 20.035+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 (five) years based on regular hourly rate and 8% men over 5 (five) years based on regular hourly rate for all hours worked.
* ENGI0147-019 05/01/2010
Rates Fringes
Power equipment operator -
5/21/2010mhtml:file://H:\data\IDIQ STUFF\New IDIQ Solicitation\VA15_dvb.mht forklift.........................$ 22.52 8.69%+5.75
IRON0079-003 05/01/2009
Rates Fringes
Ironworker, reinforcing and structural.......................$ 23.40 6.5%+9.72
LABO0388-001 03/01/2006
Rates Fringes
Mason tender, brick..............$ 13.20 3.30
PAIN0051-013 06/01/2008
Rates Fringes
Painters, Brush and Roller (Including Drywall Finishing)....$ 17.42 7.56
* PLUM0110-003 05/02/2010
Rates Fringes
Plumbers and Pipefitters.........$ 24.30 14.15
SUVA2002-001 11/15/2002
Rates Fringes
Cement Mason/Finisher............$ 13.79 0.61
Laborers:
Fence Erectors..............$ 12.93 2.25 Mason Tenders, Cement.......$ 8.50 0.24 Pipelayers..................$ 10.91 0.79 Unskilled Laborers..........$ 8.71
Power equipment operators:
Backhoes....................$ 13.27 Bulldozers..................$ 15.00 0.73 Cranes......................$ 17.33 Graders.....................$ 10.00
Roofers..........................$ 12.65 0.59
Sheet Metal Worker...............$ 14.00 0.97
Truck drivers 2 Axle......................$ 12.00 1.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .