GENERAL SERVICES ADMINISTRATION

UPSTATE SERVICE CENTER

Amendment Notice

PROJECT: FAÇADE REPAIR AND RESTORATION

JAMES T. FOLEY USCH, ALBANY, NY

SOLICITATION NUMBER: GS-02P-07-PWC-0028

Amendment 0003

See attached page for changes to the Solicitation

THE LINK BELOW PROVIDES ACCESS TO THE COMPLETE SOLICITATION AT

FEDTEDS SECURE INTERNET SITE:

https://www.fedteds.gov/fedteds/start.nsf/frm.VendorLogin?OpenForm&Solicita tionNumber=GS02P07PWC0028

PROPOSALS DUE:

DATE:

3:00 p. m. LOCAL TIME

March 13, 2008

SUBMIT PROPOSALS TO: GSA-PBS

HEIDI CRAWLEY

JAMES M. HANLEY FEDERAL BUILDING

100 SOUTH CLINTON STREET

13TH FLOOR, ROOM 1350

SYRACUSE, NEW YORK 13261-7005

Contract Specialist: Heidi Crawley e-mail: heidi.crawley@gsa.gov

Phone: 315-448-0959

Fax: 315-448-0968

Change #1 In section 014523 Special Inspections and Testing – paragraph 1.4 and 1.5 are amended to read as follows:

1.4 Payment

A. The Contractor shall engage and pay for the services of initial inspection and testing agents, per part E- Required Special Inspections and Testing Schedule, to verify work is acceptable per the contractor's responsibility requirements for quality control, prior to scheduling the GSA quality assurance testing and inspection by the special inspector. The contractor will provide the results of all quality control testing to the

GSA.

B. The GSA shall be responsible for quality assurance testing & the service of the special inspector.

C. The Contractor shall be responsible for the cost of retesting or re-inspecting any work failing to comply with the requirements of the Contract Documents.

1.5 Contractor Responsibilities

A. The Contractor shall engage and schedule the services of initial inspection and testing agents, per part E- Required Special Inspections and Testing Schedule, to verify work is acceptable per the contractor's responsibility requirements for quality control, prior to scheduling the GSA quality assurance testing and inspection by the special inspector. The contractor will provide the results of all quality control testing to the

GSA.

Change #2 Detail 10 of drawing A 102 should state: 1/A202, additionally, detail 1/A202 should state detail 10/A102, not 7/A102

ALL OTHER TERMS AND CONDITION REMAIN UNCHANGED