Pricing Worksheet Blank.xlsx
XLSX spreadsheet 69 KB Posted
- Solicitation number
- GS-01P-12-BZ-D-0015
About this file
Attachment D Pricing Worksheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FormSF30.pdf | ||
| Amendment 0004 Attachment 1 Addendum No. 1 Montpelier Federal Building - 07-19-12 1 .zip | ZIP file | |
| Q A 4.pdf | ||
| Q A 3.pdf | ||
| Q A 2.pdf | ||
| FormSF30.pdf | ||
| Sign In Site Visit 2.pdf | ||
| FormSF30.pdf | ||
| Q A 1.pdf | ||
| Notice of 2nd Site Visit.pdf | ||
| Preproposal Minutes Post.pdf | ||
| FormSF30.pdf | ||
| Per-Proposal Conf Notice.pdf | ||
| Pricing Worksheet Blank.xlsx | XLSX spreadsheet | |
| RFP Post Final.pdf | ||
| RFP Final No Spec.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| ORIGINATING OFFICE | DATE SUBMITTED | PROJECT NO. | CONTRACT NO. | ||||
| RVT00068 | GS-01P-12-BZ-D-0018 | ||||||
| ESTIMATE | PROJECT AND CITY | PURPOSE | |||||
| WORKSHEET | GSA USDA Renovation at Third Floor | MEP ID/ IQ | |||||
| Montpelier Federal Building | ITEM | ||||||
| 85 State Street Montpelier, VT | SUMMARY | ||||||
| ESTIMATE VALID TO: | ESTIMATED BY | DATE | SHEET NO. | OF |
| SYSTEM ELEMENTS | Total |
| GC Construction | $ - |
| Existing Conditions & demolition | $ - |
| Concrete | $ - |
| Wood and Plastic | $ - |
| Moisture Protection | $ - |
| Finishes | $ - |
| Doors and Windows | $ - |
| Specialties | $ - |
| Mechanical Demolition | $ - |
| Mechanical | $ - |
| Plumbing | $ - |
| Fire Protection | $ - |
| Fire Alarm | $ - |
| Fire Alarm Demolition | $ - |
| Electrical | $ - |
| Electrical Demolition | $ - |
| Communications/Security | $ - |
| $ - | |
| $ - | |
| $ - | |
| $ - | |
| $ - | |
| $ - |
| Trade Costs | $ - |
| Construction Costs | $ - |
| GC | % | ERROR:#VALUE! |
| OH Profit | % | ERROR:#VALUE! |
| Contingency | % | ERROR:#VALUE! |
Price to Government: ERROR:#VALUE!
Arch
| ORIGINATING OFFICE | DATE SUBMITTED | PROJECT NO. | CONTRACT NO. | ||||
| RVT00068 | GS-01P-12-BZ-D-0018 | ||||||
| ESTIMATE | PROJECT AND CITY | PURPOSE | |||||
| WORKSHEET | GSA USDA Renovation at Third Floor | MEP ID/ IQ | |||||
| Montpelier Federal Building | ITEM | ||||||
| 85 State Street Montpelier, VT | ARCHITECTURAL & STRUCTURAL | ||||||
| ESTIMATE VALID TO: | ESTIMATED BY | DATE | SHEET NO. | OF |
| QUANTITY | MATERIAL | LABOR | |||||
| DESCRIPTION OF WORK | NO. | UNIT | PER | PER | SUBTOTALS | ||
| UNITS | MEAS. | UNIT | SUBTOTAL | UNIT | SUBTOTAL |
| Division 1 General Conditions Construction | $0.00 | $0.00 | $0.00 | $0.00 |
| security clearance, parking, transport, per diem, | ||||
| consumables, water, security, small tools, safety equip | Sub Total | $0.00 | ||
| These are examples of General Conditions. |
| Selective Demolition & Cutting and Patching | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Architectural Demolition | ||||
| CMU Wall | $0.00 | $0.00 | $0.00 | $0.00 |
| Metal Stud/Gyp Bd Wall | $0.00 | $0.00 | $0.00 | $0.00 |
| Door/Frame and Hardware | $0.00 | $0.00 | $0.00 | $0.00 |
| Carpet and Adhesive | $0.00 | $0.00 | $0.00 | $0.00 |
| Ceramic Tile Flooring | $0.00 | $0.00 | $0.00 | $0.00 |
| Gyp Bd Ceiling | $0.00 | $0.00 | $0.00 | $0.00 |
| Concrete Pad | $0.00 | $0.00 | $0.00 | $0.00 |
| Dumpsters / disposal | $0.00 | $0.00 | $0.00 | $0.00 |
| Roof Pentrations & reseal, re-roofing, Pitch Pocket, sleepers | $0.00 | $0.00 | $0.00 | $0.00 |
| Salvage Marble for Government | $0.00 | $0.00 | $0.00 | $0.00 |
| Acoustical Tile Ceiling | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 |
| Division 1 | ||||
| Temporary wall enclosures, protection | $0.00 | $0.00 | $0.00 | $0.00 |
| Premium for 3rd Shift and weekend work | $0.00 | $0.00 | $0.00 | $0.00 |
| FPS Security to support 3rd shift | $0.00 | $0.00 | $0.00 | $0.00 |
| FPS Security to support [2]weekend days | $0.00 | $0.00 | $0.00 | $0.00 |
| Temporary ventilation of work enclosures [See Mechanical] | $0.00 | $0.00 | $0.00 | $0.00 |
| Nightly Clean to original condition[2 person x 4hours ea x 3days] | $0.00 | $0.00 | $0.00 | $0.00 |
| Weekend Clean to original condition [2 persons x 8 hrs ea ] | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 3 Concrete | ||||
| Concrete Fill at Slab_Duct Shaft Infill | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 6 Wood and Plastic | ||||
| Blocking | $0.00 | $0.00 | $0.00 | $0.00 |
| Sheathing @ Roof opening | $0.00 | $0.00 | $0.00 | $0.00 |
| Base Cabinets | $0.00 | $0.00 | $0.00 | $0.00 |
| Upper Cabinets | $0.00 | $0.00 | $0.00 | $0.00 |
| Plastic Laminate Countertop | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 7 Moisture Protection | ||||
| Roofing | $0.00 | $0.00 | $0.00 | $0.00 |
| Insulation | $0.00 | $0.00 | $0.00 | $0.00 |
| Flashing | $0.00 | $0.00 | $0.00 | $0.00 |
| Fire stopping, Fire sealants | $0.00 | $0.00 | $0.00 | $0.00 |
| Sealants | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 8 Doors and Windows | ||||
| Wood Door/Frame and Hardware | $0.00 | $0.00 | $0.00 | $0.00 |
| Borrowed lites | $0.00 | $0.00 | $0.00 | $0.00 |
| Security access control locks at vestibules | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 9 Finishes | ||||
| SAT Ceiling System | $0.00 | $0.00 | $0.00 | $0.00 |
| Repair Ceilings on 2nd floor | $0.00 | $0.00 | $0.00 | $0.00 |
| SAT Ceiling System | $0.00 | $0.00 | $0.00 | $0.00 |
| SAT Ceiling System - Remove and reinstall panels only | $0.00 | $0.00 | $0.00 | $0.00 |
| Floor Patch and Leveling | $0.00 | $0.00 | $0.00 | $0.00 |
| Misc Wall Patch/Paint | $0.00 | $0.00 | $0.00 | $0.00 |
| 3-5/8" Mtl Stud & Gyp Bd Wall Assembly | $0.00 | $0.00 | $0.00 | $0.00 |
| Carpet Tile | $0.00 | $0.00 | $0.00 | $0.00 |
| Resilient Flooring | $0.00 | $0.00 | $0.00 | $0.00 |
| Wall Base Resilient | $0.00 | $0.00 | $0.00 | $0.00 |
| SAT Ceiling System | $0.00 | $0.00 | $0.00 | $0.00 |
| Gyp Bd Soffits | $0.00 | $0.00 | $0.00 | $0.00 |
| Interior Paint (walls) | $0.00 | $0.00 | $0.00 | $0.00 |
| Paint Interior Door Frames | $0.00 | $0.00 | $0.00 | $0.00 |
| Paint Interior Doors | $0.00 | $0.00 | $0.00 | $0.00 |
| Sound Attenuation Batts in Walls | $0.00 | $0.00 | $0.00 | $0.00 |
| Wrapped - Plenum Rated Acoustic Batts (used above ceilings) | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Division 10 Specialties | ||||
| Whiteboards | $0.00 | $0.00 | $0.00 | $0.00 |
| Operable Partition | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 |
Page TOTAL: $0.00
Mech
| ORIGINATING OFFICE | DATE SUBMITTED | PROJECT NO. | CONTRACT NO. | ||||
| RVT00068 | GS-01P-12-BZ-D-0018 | ||||||
| ESTIMATE | PROJECT AND CITY | PURPOSE | |||||
| WORKSHEET | GSA USDA Renovation at Third Floor | MEP ID/ IQ | |||||
| Montpelier Federal Building | ITEM | ||||||
| 85 State Street Montpelier, VT | MECHANICAL & FIRE PROTECTION | ||||||
| ESTIMATE VALID TO: | ESTIMATED BY | DATE | SHEET NO. | OF |
| QUANTITY | MATERIAL | LABOR | |||||
| DESCRIPTION OF WORK | NO. | UNIT | PER | PER | SUBTOTALS | ||
| UNITS | MEAS. | UNIT | SUBTOTAL | UNIT | SUBTOTAL |
INTERIOR RENOVATION
Mechanical
| Mechanical Demolition | ||||
| Remove refigerant piping for ductless split systems | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove concealed fan coil units | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove perimeter finned tube radiation | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove ductwork, third floor | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove exhaust grilles | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove light troffer duct supply connections | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove light troffer duct return air connections | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove judge's chambers air handling unit | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove judge's chamber exhaust fan | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove rooftop exhaust air fan | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove courtroom air handling unit | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove courtroom return air fan | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove ductwork, penthouse duct corridors | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove large penthouse ductwork | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove penthouse chilled water piping | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove penthouse heating hot water piping | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove floor mounted fan coil units and temporarily store units | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 |
| Mechanical | ||||
| Fan coil unit to replace concealed, 1- ton | $0.00 | $0.00 | $0.00 | $0.00 |
| Fan coil unit to replace concealed & FTR, 2- ton | $0.00 | $0.00 | $0.00 | $0.00 |
| Clean FCU interiors following HazMat removals | $0.00 | $0.00 | $0.00 | $0.00 |
| Insulate FCU piping above floor and firestop floor penetration | $0.00 | $0.00 | $0.00 | $0.00 |
| VAV cooling air handling unit - 22 tons | $0.00 | $0.00 | $0.00 | $0.00 |
| In-Line return air fan - 3 HP | $0.00 | $0.00 | $0.00 | $0.00 |
| VFD for return air fan | $0.00 | $0.00 | $0.00 | $0.00 |
| Rooftop exhaust fan - existing curb | $0.00 | $0.00 | $0.00 | $0.00 |
| Concrete housekeeping pad extension for AHU | $0.00 | $0.00 | $0.00 | $0.00 |
| VAV system ductwork mains, insulated (50%) | $0.00 | $0.00 | $0.00 | $0.00 |
| Additional cost for ductwork install at 25' high roof deck (20%) | $0.00 | $0.00 | $0.00 | $0.00 |
| Light troffer return air duct connections - acoustically lined | $0.00 | $0.00 | $0.00 | $0.00 |
| Slab opening for ductwork | $0.00 | $0.00 | $0.00 | $0.00 |
| Preliminary TAB Work | $0.00 | $0.00 | $0.00 | $0.00 |
| Final TAB Work (30%) | $0.00 | $0.00 | $0.00 | $0.00 |
| DDC Controls for fan coil unit zones | $0.00 | $0.00 | $0.00 | $0.00 |
| DDC Controls head end equipment and start-up | $0.00 | $0.00 | $0.00 | $0.00 |
| DDC Controls for VAV AHU | $0.00 | $0.00 | $0.00 | $0.00 |
| Re-install existing fan coil units | $0.00 | $0.00 | $0.00 | $0.00 |
| Energy recovery ventilator with heating and cooling coils - 2500 cfm | $0.00 | $0.00 | $0.00 | $0.00 |
| Ventilation system distribution ductwork, insulated | $0.00 | $0.00 | $0.00 | $0.00 |
| DDC Controls for Ventilation VAV | $0.00 | $0.00 | $0.00 | $0.00 |
| 200 cfm VAV box, branch duct, diffuser and controls - cooling only zones | $0.00 | $0.00 | $0.00 | $0.00 |
| 400 cfm VAV box, branch duct, diffuser and controls - cooling only zones | $0.00 | $0.00 | $0.00 | $0.00 |
| 600 cfm VAV box, branch duct, diffuser and controls - cooling only zones | $0.00 | $0.00 | $0.00 | $0.00 |
| VAV system ductwork mains, insulated (50%) | $0.00 | $0.00 | $0.00 | $0.00 |
| Additional cost for ductwork install at 25' high roof deck (20%) | $0.00 | $0.00 | $0.00 | $0.00 |
| Server Rm ductless split system, 1 ton | $0.00 | $0.00 | $0.00 | $0.00 |
| Final TAB Work (70%) | $0.00 | $0.00 | $0.00 | $0.00 |
| CAV/VAV box for ventilation zones | $0.00 | $0.00 | $0.00 | $0.00 |
| Ventilation system diffusers and grilles | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Mechanical Total: | Sub Total | $0.00 |
Plumbing
| Plumbing Demolition | ||||
| Remove floor mounted water closet | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove wall hung lavatory | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove detention cell lavatories | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove detention cell water closets | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove floor mounted electric water cooler | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove floor drain and cap piping below floor | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove domestic water piping | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove sanitary waste and vent piping | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove storm drainage piping | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove wall hung electric water cooler | $0.00 | $0.00 | $0.00 | $0.00 |
| Slab patching at removed piping - SAN, ST, Dom Water | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Plumbing | ||||
| 3" cast-iron vent piping, no-hub, relocated | $0.00 | $0.00 | $0.00 | $0.00 |
| 4" cast-iron storm drain piping, no-hub, relocated | $0.00 | $0.00 | $0.00 | $0.00 |
| 5" cast-iron storm drain piping, no-hub, relocated | $0.00 | $0.00 | $0.00 | $0.00 |
| 1" fiberglass pipe insulation, 4" CI line, relocated | $0.00 | $0.00 | $0.00 | $0.00 |
| 1" fiberglass pipe insulation, 5" CI line, relocated | $0.00 | $0.00 | $0.00 | $0.00 |
| Core drilling for relocated storm drain & vent risers | $0.00 | $0.00 | $0.00 | $0.00 |
| Electric water cooler, wall mounted, dual height, ADA | $0.00 | $0.00 | $0.00 | $0.00 |
| General purpose sink, stainless steel, countertop, manual faucet | $0.00 | $0.00 | $0.00 | $0.00 |
| 1/2" domestic water piping | $0.00 | $0.00 | $0.00 | $0.00 |
| 1" fiberglass pipe insulation, 1/2" copper line | $0.00 | $0.00 | $0.00 | $0.00 |
| 1-1/2" cast-iron waste and vent piping, no-hub | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Plumbing Total : | Sub Total | $0.00 |
Fire Protection/Sprinkler Upgrades [Code]
| Design/Submit/Permits/Logistics/Testing | ea | $0.00 | $0.00 | $0.00 | $0.00 |
| Provide New Sprinklers | $0.00 | $0.00 | $0.00 | $0.00 | |
| F/A Devices #rd FL A/V Labor & Material Complete | $0.00 | $0.00 | $0.00 | $0.00 | |
| Miscellaneous Device Relocations | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| Fire Protection/Sprinkler Total: | Sub Total | $0.00 |
Page TOTAL: $0.00
Elec,Com,Sec.
| ORIGINATING OFFICE | DATE SUBMITTED | PROJECT NO. | CONTRACT NO. | ||||
| RVT00068 | GS-01P-12-BZ-D-0018 | ||||||
| ESTIMATE | PROJECT AND CITY | PURPOSE | |||||
| WORKSHEET | GSA USDA Renovation at Third Floor | MEP ID/ IQ | |||||
| Montpelier Federal Building | ITEM | ||||||
| 85 State Street Montpelier, VT | ELECTRICAL & FIRE ALARM | ||||||
| ESTIMATE VALID TO: | ESTIMATED BY | DATE | SHEET NO. | OF |
| QUANTITY | MATERIAL | LABOR | |||||
| DESCRIPTION OF WORK | NO. | UNIT | PER | PER | TOTALS | ||
| UNITS | MEAS. | UNIT | SUBTOTAL | UNIT | SUBTOTAL |
| Electrical | ||||
| Electrical Demolition | ||||
| Remove Light-1x4 troffer and salvage | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove fluorescent fixture in exist courtroom | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove switch | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove exit sign | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove emergency battery unit | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove receptacle | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove panelboard | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove voice/data outlet | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove 4 pair voice/data cable | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove conduit 1/2 to 1" and wire | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove conduit 1-1/4 to 2" and wire | $0.00 | $0.00 | $0.00 | $0.00 |
| Remove conduit 2-1/2 to 3-1/2" and wire | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Electrical | ||||
| Receptacle,duplex,120V,20A | $0.00 | $0.00 | $0.00 | $0.00 |
| Install GSA furnished Panelboard 120/208V 225A | $0.00 | $0.00 | $0.00 | $0.00 |
| Panelboard 120/208V 225A 42P | $0.00 | $0.00 | $0.00 | $0.00 |
| Panelboard 277/480V 225A 30P,MLO | $0.00 | $0.00 | $0.00 | $0.00 |
| Transformer,three phase,45kVA | $0.00 | $0.00 | $0.00 | $0.00 |
| Enclosed circuit breaker-3P 225A-NEMA 1 | $0.00 | $0.00 | $0.00 | $0.00 |
| Safety switch,fused 600V 30A | $0.00 | $0.00 | $0.00 | $0.00 |
| Safety switch,fused 600V 60A | $0.00 | $0.00 | $0.00 | $0.00 |
| Reinstall Light-1x4 troffer | $0.00 | $0.00 | $0.00 | $0.00 |
| Light-1x4 2L lens troffer | $0.00 | $0.00 | $0.00 | $0.00 |
| Occupancy sensor-ceiling-dual tech | $0.00 | $0.00 | $0.00 | $0.00 |
| Remote power pack | $0.00 | $0.00 | $0.00 | $0.00 |
| Exit sign 2 face LED w/ battery | $0.00 | $0.00 | $0.00 | $0.00 |
| Fluorescent emergency ballast-2 lamp | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 3/4" | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 1-1/2" | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 2" | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 2-1/2" | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #12 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #10 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #8 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #6 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #4 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #1/0 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #4/0 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| Receptacle,duplex,120V,20A | $0.00 | $0.00 | $0.00 | $0.00 |
| Receptacle,duplex,120V,20A,IG | $0.00 | $0.00 | $0.00 | $0.00 |
| Receptacle,duplex,120V,20A,GFI | $0.00 | $0.00 | $0.00 | $0.00 |
| Safety switch,fused 600V 30A | $0.00 | $0.00 | $0.00 | $0.00 |
| Floor boxes, Power | $0.00 | $0.00 | $0.00 | $0.00 |
| Light-2x4 and 2x2 recessed indirect fixture | $0.00 | $0.00 | $0.00 | $0.00 |
| Toggle switch 1 pole 20A | $0.00 | $0.00 | $0.00 | $0.00 |
| Fluorescent dimmer switch 1000W | $0.00 | $0.00 | $0.00 | $0.00 |
| Occupancy sensor-ceiling-dual tech | $0.00 | $0.00 | $0.00 | $0.00 |
| Remote power pack | $0.00 | $0.00 | $0.00 | $0.00 |
| Lighting Controller and power supply | $0.00 | $0.00 | $0.00 | $0.00 |
| Photocell interior | $0.00 | $0.00 | $0.00 | $0.00 |
| Exit sign 2 face LED w/ battery | $0.00 | $0.00 | $0.00 | $0.00 |
| Fluorescent emergency ballast-2 lamp | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 3/4" | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #12 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| 600V #10 cable | $0.00 | $0.00 | $0.00 | $0.00 |
| Box,plate for tel/data drops | $0.00 | $0.00 | $0.00 | $0.00 |
| Floor boxes, Comm | $0.00 | $0.00 | $0.00 | $0.00 |
| 1 telephone,2 data jacks | $0.00 | $0.00 | $0.00 | $0.00 |
| Category 6 #24 4 pair plenum | $0.00 | $0.00 | $0.00 | $0.00 |
| Fiber optic cable, backbone plenum | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 1" | $0.00 | $0.00 | $0.00 | $0.00 |
| Cable tray, basket type | $0.00 | $0.00 | $0.00 | $0.00 |
| Network rack | $0.00 | $0.00 | $0.00 | $0.00 |
| Fiber optic patch panel-12 port | $0.00 | $0.00 | $0.00 | $0.00 |
| Patch Panel, RJ-45/110 type, 48 port | $0.00 | $0.00 | $0.00 | $0.00 |
| Box,plate | $0.00 | $0.00 | $0.00 | $0.00 |
| EMT conduit 3/4" | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Fire Alarm Removals | ||||
| Selective Demolition for F/A | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | |||
| Fire Alarm | ||||
| Pull Stations | $0.00 | $0.00 | $0.00 | $0.00 |
| Monitor Modules | $0.00 | $0.00 | $0.00 | $0.00 |
| Smoke detector,duct addressable | $0.00 | $0.00 | $0.00 | $0.00 |
| Strobe and speaker | $0.00 | $0.00 | $0.00 | $0.00 |
| Control panel addressable w/ voice | $0.00 | $0.00 | $0.00 | $0.00 |
| Programming | $0.00 | $0.00 | $0.00 | $0.00 |
| FPLP/FEP Teflon #18, 1pair [10,000LF] | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 |
| Communications/Security | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 |
Page TOTAL: $0.00
File details come from the government source that posted it. Updated .