ST ALBANS SKA'S.PDF

PDF 493 KB Posted

Attached to
RECOVERY: St. Albans Federal Building, First Floor Space Alterations, St. Albans, VT
Solicitation number
GS-01P-10-BZ-C-0014
Issued by

About this file

Attachment B of Amendment 0004.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Q A - 5.pdf PDF
Amendment 0006.pdf PDF
Q A - 4.pdf PDF
Q A - 3.pdf PDF
Amendment 0005.pdf PDF
Q A - 2.pdf PDF
A501 ---ST ALBANS.PDF PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Q A - 1.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Pre Bid Meeting Sign-in Sheet.pdf PDF
Pre Bid Meeting Minutes.pdf PDF
General Decision VT080042 12-18-2009.pdf PDF
PRE BID LETTER.pdf PDF
1. The Agreement.pdf PDF
2. The Solicitation.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEN

WOMEN

R

EF

0A

1A

1 1

4' - 7" 2' - 4" 3' - 1"

2' - 6" 5' - 6"

V.I.F. V.I.F.

Scale

Project number Date Drawn by Checked by 1/4" = 1'-0"

2/19/2010 9:36:06 AM

SKA -1

TOILET LAYOUT

Project Number

AMENDMENT, ALTERATIONS TO

1ST FLOOR AT ST. ALBANS

FEDERAL BUILDING

02/18/2010

JC

JD

1/4" = 1'-0". LAYOUT PLAN

NEW SLAB TO SLAB PARTITION

TYPE INSTALL SLAB-TO-SLAB

PARTITION PER BUILDING

STANDARDS, OR INSTALL

PARTITION TO CEILING AND

INSTALL WIRE MESH FROM

TOP OF WALL TO STRUCTURAL

SLAB OR METAL DECK ABOVE.

MESH SHALL BE 9 GAUGE

WELDED WIRE MESH WELDED

OR SCREWED (USE) TAMPER

RESISTANT/ NON REMOVABLE

SCREWS) TO STRUCTURE AT

9" O.C. MAX. OPENINGS THRU

SECURE-WALL ASSEMBLY FOR

VENTS OR OTHER PURPOSES

WILL NOT EXCEED 96 SQ. IN.

OR WILL BE SECURED WITH 9

GAUGE WELDED MESH OR

MAN-BARS. REFER TO TYP.

PARTITION DETAIL 1. ON THIS

SHEET.

PARTITION TYPE LEGEND

robertdbudlong TextBox Attachment B of Amendment 0004

MEN

WOMEN

OS

REFLECTED CEILING PLAN LEGEND:

2' x 4' T5 FIXTURE

EXISTING HARD CEILING

ACOUSTICAL CEILING TILES

GYPSUM CEILING

1' x 4' SURFACE MOUNTED LIGHT FIXTURE

-TYPICAL CEILING HEIGHT 9'-0" AFF U.N.O.

-TYPICAL SOFFIT HEIGHT 8'-0" AFF U.N.O.

RECESSED DOWN LIGHTS

GENERAL NOTE

SUPPLY DIFFUSER

RETURN DIFFUSER

EXHAUST DIFFUSER

EXIT SIGN

OS OCCUPANCY SENSOR

RECESSED SPRINKLER HEAD

Scale

Project number Date Drawn by Checked by As indicated

2/19/2010 9:36:06 AM

SKA -2

TOILET ROOM LAYOUT

Project Number

AMENDMENT, ALTERATIONS TO

1ST FLOOR AT ST. ALBANS

FEDERAL BUILDING

02/18/2010

JC

JD

1/4" = 1'-0". REFLECTED CEILING PLAN

REFERENCE DRAWING A102

robertdbudlong TextBox

Amenement 0004

REMOVE / REROUTE EXISTING HOT WATER

SUPPLY/RETURN, CONDENSATE DRAIN, CHILLED

WATER LINES AND ANY ADDITIONAL MEP SERVICE

LOCATED IN CLOSET.

NOTE: ALL BASES TO BE REMOVED

DURING FLOOR DEMOLITION.

LEGEND:

INDICATES REMOVAL / DEMOLITION

INDICATES EXISTING TO REMAIN

FLOORING TO BE REMOVED

Scale

Project number Date Drawn by Checked by As indicated

2/19/2010 9:36:07 AM

SKA -3

TOILTET ROOM DEMO

Project Number

AMENDMENT, ALTERATIONS TO

1ST FLOOR AT ST. ALBANS

FEDERAL BUILDING

02/18/2010

JC

JD

1/4" = 1'-0". DEMOLITION PLAN

robertdbudlong TextBox

Scale

Project number Date Drawn by Checked by

2/19/2010 9:36:07 AM

SKA -4

DOOR SCHEDULE

Project Number

AMENDMENT, ALTERATIONS TO

1ST FLOOR AT ST. ALBANS

FEDERAL BUILDING

02/18/2010

JC

JD

DOOR TYPE:

A. NEW 36" WIDE DOOR WITH WELDED FRAME

NOTE: REFERENCE DRAWINGS A701

robertdbudlong TextBox

File details come from the government source that posted it. Updated .