Amendment 0001.pdf
PDF 562 KB Posted
- Solicitation number
- GS-01P-10-BZ-C-0014
About this file
Amendment 0001.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Q A - 5.pdf | ||
| Amendment 0006.pdf | ||
| Q A - 4.pdf | ||
| Q A - 3.pdf | ||
| Amendment 0005.pdf | ||
| Q A - 2.pdf | ||
| ST ALBANS SKA'S.PDF | ||
| A501 ---ST ALBANS.PDF | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Q A - 1.pdf | ||
| Amendment 0002.pdf | ||
| Pre Bid Meeting Sign-in Sheet.pdf | ||
| Pre Bid Meeting Minutes.pdf | ||
| General Decision VT080042 12-18-2009.pdf | ||
| PRE BID LETTER.pdf | ||
| 1. The Agreement.pdf | ||
| 2. The Solicitation.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED
(SEE
ITEM
11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
2. ADD "Install Holding Cell and Bench" as follows: Furnish and install Holding Cell and Bench w/Handcuff bar as indicated on Drawing No 49170-0001 as manufactured by WireCrafters or an approved equal. Holding cell and bench will need to be installed and secured to the floor with manufacturer provided and approved fastening methods. The attached drawings have a standard size holding cell size and are for informational purposes only. Contractor is responsible for obtaining shop drawings from the manufacturer for review and approval to fit the actual opening being constructed as part of the renovation project which is approximately 6’ x 6’.
Room 153 on Sheet A100 references “GC TO SUPPLY PRE FAB HOLDING CELL”. This is the location where the holding cell will be installed. See attachment B.
3. ADD "Security Upgrades" as follows: Furnish and install the "Security Upgrades" in accordance with attachment C. Exact Locations of equipment will be coordinated with COTR.
4. CHANGE: in section 01035-1 under "Option No. 1: DOS-Passport Service, Tenant Improvements (TI)" subsection A, delete "Section 01036" and replace with "General Definition Notes of sheet A002 of the drawings." Under "Option No. 2: DOS-Diplomatic Security Shell and Tennant Improvement (TI)" subsection A, delete "Section 01036" and replace with "General Definition Notes of sheet A002 of the drawings." Under "Option No. 3: GSA Shell and Tenant Improvements (TI) subsection A, delete "Section 01036 and replace with "General Definition Notes of sheet A002 of the drawings."
5. All other terms and conditions remain the same. The bid due date and time are NOT extended.
GS-01P-10-BZ-C-0014 Page 2 of 9 Amendment 0001
General Decision Number: VT080042 12/18/2009 VT42
Superseded General Decision Number: VT20070043
State: Vermont
Construction Type: Building
Counties: Franklin and Grand Isle Counties in Vermont.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 04/18/2008 2 05/30/2008 3 06/20/2008 4 08/08/2008 5 01/09/2009 6 04/17/2009 7 06/26/2009 8 09/04/2009 9 12/18/2009
* ELEC0300-001 06/01/2009
Rates Fringes
ELECTRICIAN
Electrical projects $250,000 < $750,000.........$ 20.70 20%+6.20 Electrical projects $750,000 and over...........$ 23.00 20%+6.20 Electrical projects < $250,000....................$ 19.55 20%+6.20
TELEDATA:
Cable splicer..............$ 19.67 20%+6.20 Technician.................$ 20.70 20%+6.20
* IRON0007-008 09/16/2009
Rates Fringes
Ironworker.....................$ 21.15 17.47
* PLAS0534-007 01/01/2009
Rates Fringes
Cement mason Projects of 50,000 sq. ft.
or less.....................$ 30.40 19.26 Projects over 50,000 sq.
ft..........................$ 30.50 20.44
GS-01P-10-BZ-C-0014 Page 3 of 9
Attachment A
Work on a suspended staging, not supported from the ground, and over 20 ft. above the ground: $.35 per hour additional.
PLUM0693-002 05/01/2008
Rates Fringes
Plumber/pipefitter (includes HVAC piping):
__All other work............$ 25.10 11.85 __Work on commercial buildings up to and including 3 stories, with no more than 10,000 sq. ft.; also, work on shopping centers of 50,000 sq.
ft. or less; also, work on motel or hotel properties of 30 units or less (does not apply to industrial or institutional work).....$ 17.57 11.85
SHEE0063-005 07/01/2009
Rates Fringes
Sheet metal worker (includes HVAC duct work)...............$ 21.50 12.06
SUVT2005-011 07/22/2005
Rates Fringes
Carpenter......................$ 16.15 5.16
Laborer, general _includes cement mason tender...................$ 11.63 1.56
Power equipment operators:
_Backhoe....................$ 18.25 3.73
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a)(1)(ii)).
In the listing above, the "SU" designation means that rates
GS-01P-10-BZ-C-0014 Page 4 of 9 listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor
GS-01P-10-BZ-C-0014 Page 5 of 9
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GS-01P-10-BZ-C-0014 Page 6 of 9
P A
R
TS
LIS
T
TO
TA
L PC
S
Q
TY
TA
G
8'-
0'' 4'-
0'' W ire M esh P anel
S
A
0'- 1 1/2''
9'- 10 1/2''
S lotted A ngle
N O
N
-STO
C K
ITEM
S ns3
3'- 0''
0'- 10 1/2''
W ire M esh P anel ns6
4'- 10''
4'- 0''
W ire M esh P anel ns5
2'- 11 3/16''
6'- 11 3/4''
H inge D oor ns1
0'- 2''
8'- 2''
C orner P ost ns2 0'-
2'' 8'-
2'' D oor P ost ns4
0'- 2''
8'- 2''
D oor P ost ns7
4'- 0''
1'- 2''
B ench w
/H andcuff R ail
W
ID
TH
H
EIG
H
T D
ESC
R
IPTIO
N robertdbudlong TextBox Attachment B
Alterations to 1st Floor St. Albans, Vermont
AMENDMENT ITEMS – SECURITY UPGRADES.
SECURITY:
1. Furnish and install the following Intrusion Detection System and Access Control Equipment. Exact Locations of equipment to be coordinated with COTR.
1. Expander Board: One (1) Bosch D8128D Octopopit (Eight point Expansion Module) for a Bosch
D7412GV2.
2. Keypad: One (1) Bosch D1255 Command Center Keypad. To be located in Room 169.
3. Door Contacts: Recessed or Surface Mount Sentrol PBM1 or GE Security/Sentrol, Inc. 2505A-L .
Two (2) door contacts at the following doors: 102A, 102B, 104A and 104B. These are double doors so two contacts are required at each door. One (1) Door contact at the following doors: Doors 145B, and existing overhead door in corridor 166.
4. Glass Breaks: Sentrol 5885 Motion Sensitive Acoustic Glass-break Sensor. One (1) Glass-break sensors in the following rooms. 102, 104, 106, 107, 108, 109, 111, 112, 133, 134, 135, 136, 137, 140, 145, 155 and 158. Two (2) Glass-break sensors in the following rooms. 103
5. Request to Exit: REX Bosch DS150I. One (1) REX device at the following doors: 102A, 104A.
6. Door 103E. Prep door frame and furnish and install electric strike, fail secure. The contractor will be responsible to install a government furnished Westinghouse keycard reader to enter at this door which will be wired to the existing access control system. Keycard reader installation to include coaxial cable run back to panel. Additionally, the electric strike will also be wired to a keyed door release button which will be run to the main lobby area where the screening station will be located. The key will be used to activate the button. If the guards are not at the post, the button would be de-activated with the key.
7. Door 148B. Prep new door frame and furnish and install electric strike, fail secure. Furnish and install door contact on door wired back to basement panel on a dedicated point. Installation to include electric strike, door closer, hinges and Von Duprin Rim Panic Device, 99EOF with integrated REX device for exiting the building to shunt out the door contact upon exiting. The panic device REX will be wired to the door contact to be installed as part of the security equipment to shunt out the alarm when someone exits the building. The door contact will also need to be shunted out with a valid read from the card reader when entering the building. Additionally, the contractor will need to install a government furnished Westinghouse keycard reader to enter at this door which will be wired to the existing access control system. Keycard reader installation to include coaxial cable run back to the panel.
CCTV:
1. Fixed Camera: Pelco IS90B-DWV9 or equivalent Wide Dynamic Range, Day/Night, High Resolution camera will be used in a fixed camera location with an enclosure and wall/corner mounting hardware.
The lens option, depending on the field of view needed will be a varifocal lense. Camera will be wired to Central Power Supply located in the Security Offce. CAT6 Cable run from Security Office to camera end.
18/2 shielded cable form Security Office to camera end. Two locations are required for this camera set
up. One is at the Southwest corner of the building facing east focused up to the stairwell. The second location is in the area identified as vestibule 100. Exact locations to be determined.
2. PTZ Camera: Pelco SD418PGE1 Spectra IV Series or equivalent Environmental Dome Camera with wall/corner mounting hardware. This camera is a high-resolution day/night camera that switches from color to Black & White depending on the light level. This camera has an 18X maximum focal length CAT6 Cable run from Security Office to camera end. 120 Volt Power from Security Office to Camera end. 120 Volt will be in conduit and will in a weatherproof box within 12" of the mounting site. Conduit
GS-01P-10-BZ-C-0014 Page 8 of 9
Attachment C supplied by General Contractor. Include a CM400 Corner Mount adapter or equivalent. Two locations are required for this camera set up. One is at the Northwest corner of the building facing east focused on the gate and interior of approaching vehicles at the side entrance. The second location is in the Northeast corner of the building facing west and south to focus on the gate and rear of approaching vehicles at the side entrance. Exact locations to be determined.
3. DVR: Intellex 600DVS032 DVR with 16 Channel 320 GB DVR to provide up to 900 hours real-time recording will be secured in two EMI SLB2 DVR lock boxes. A RDVUSB232 USB Adapter allows use with Pelco Equipment.
4. Monitor: Pelco PMCL419 Flat Screen Premium Monitor or equivalent.
These guidelines include the furnishing of all labor, supervision, programming training, materials, and miscellaneous equipment necessary for the performance of the installation of any Access Control, CCTV and Intrusion Detection System in a Federal Office Building or leased space. Any deviation from these guidelines must be pre-approved by the GSA COTR. Conduit is required when wiring is exposed to public view, ie., exterior cameras. Conduit is not required when wiring is run above ceilings. Work in Lobby 103 should not use any form of exposed wire-mold and/or conduit due to the Historic Nature of the Lobby.
The contractor shall furnish all incidental materials such as conduit, wire mold, wiring, mounting hardware, etc, that are necessary to complete the installation of equipment and electronic security system components.
All materials and workmanship provided by the contractor will be in a neat and workman-like manner.
The contractor will perform in the best practice of the trade, using the most recent state-of- the- art methods, and shall meet all Underwriters Laboratories (UL) Standards for safety including National Fire Protection Association (NAPA) requirements, National Electrical Code (NEC) and all applicable state and local codes.
Installation will be laid out in advance to prevent unnecessary damage to existing walls, ceilings, doors, door frames, etc. In the event there is damage as such, the contractor is responsible and will be required to repair, refinish and/or repaint affected areas.
MISCELLANEOUS:
1. Furnish and install Aiphone at entrance gate card reader to allow for communication between the entrance and the guards stationed at the Basement Guard Lobby. Installation to include new metal fabricated post and associated wiring to station. Reuse existing conduit for card reader to get wiring into the building.
2. Furnish and install new release button for gate arm located at rear entrance of the building. Button to be key activated so that it can be shut off if the guards leave their post.
GS-01P-10-BZ-C-0014 Page 9 of 9
Attachment C
| IDCode: |
| EffDate: FEB 04, 2010 |
| ReqNo: 1PCS-10-0046 |
| ProjNo: |
| IssuedBy: GSA/PBS SERVICE CENTERS DIVISION |
NORTH SERVICE CENTER BRANCH
TP O'NEILL FOB, 10 CAUSEWAY ST., 11TH FLOOR
BOSTON MA 02222-1077
| AdminBy: See Block 6 |
| NoCopies: 1 |
| Amended: Yes |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: Solicitation GS-01P-10-BZ-C-0014, St. Albans Federal Building First Floor Space Alterations, St. Albans, Vermont is hereby amended as follows: |
1. CHANGE: On page 5 of 30 of The Agreement, Change Davis Bacon Wage Determination VT080042, dated 12/18/2009 to Wage Decision VT080042, dated 1/22/2010. See attachment A and attachment B.
This Amendment must be acknowledged by one of the methods in Block 11 above.
Continued on page 2.
| SignName: |
| SignTitl: |
| ContDate: |
| CODate: |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| ContractorCode: |
| FacCode: |
| ContractorPOC: |
| AwdChg: Off |
| SolChg: Yes |
| SolNo: GS-01P-10-BZ-C-0014 |
| SolDate: JAN 29, 2010 |
| AwdNo: |
| IssuedByCode: 1PSK |
| AdminByCode: |
| ContrOfficerInfo: |
| DocNo: 0001 |
| AwdDate: |
| text1: 10B. DATED (SEE ITEM 13) |
| block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) |
| pageblock: PAGE OF PAGES |
| block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. |
| Contractor: |
| ContratorInfo: |
| ModAmount: |
| block12: 12. ACCOUNTING AND APPROPIATION DATA (If required) |
| ApprData: See Schedule |
| Pages: 9 |
| Page: 1 |
File details come from the government source that posted it. Updated .