General Decision VT080042 12-18-2009.pdf
PDF 11 KB Posted
- Solicitation number
- GS-01P-10-BZ-C-0014
About this file
General Wage Decision.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Q A - 5.pdf | ||
| Amendment 0006.pdf | ||
| Q A - 4.pdf | ||
| Q A - 3.pdf | ||
| Amendment 0005.pdf | ||
| Q A - 2.pdf | ||
| ST ALBANS SKA'S.PDF | ||
| A501 ---ST ALBANS.PDF | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Q A - 1.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Pre Bid Meeting Sign-in Sheet.pdf | ||
| Pre Bid Meeting Minutes.pdf | ||
| PRE BID LETTER.pdf | ||
| 1. The Agreement.pdf | ||
| 2. The Solicitation.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: VT080042 12/18/2009 VT42
Superseded General Decision Number: VT20070043
State: Vermont
Construction Type: Building
Counties: Franklin and Grand Isle Counties in Vermont.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 04/18/2008 2 05/30/2008 3 06/20/2008 4 08/08/2008 5 01/09/2009 6 04/17/2009 7 06/26/2009 8 09/04/2009 9 12/18/2009
* ELEC0300-001 06/01/2009
Rates Fringes
ELECTRICIAN
Electrical projects $250,000 < $750,000.........$ 20.70 20%+6.20 Electrical projects $750,000 and over...........$ 23.00 20%+6.20 Electrical projects < $250,000....................$ 19.55 20%+6.20
TELEDATA:
Cable splicer..............$ 19.67 20%+6.20 Technician.................$ 20.70 20%+6.20
* IRON0007-008 09/16/2009
Rates Fringes
Ironworker.....................$ 21.15 17.47
* PLAS0534-007 01/01/2009
Rates Fringes
1/29/2010mhtml:file://H:\Contracts\Construction\ARRA-Alterations to 1st Flr, St. Albans FB\Solicit...
Cement mason Projects of 50,000 sq. ft.
or less.....................$ 30.40 19.26 Projects over 50,000 sq.
ft..........................$ 30.50 20.44
Work on a suspended staging, not supported from the ground, and over 20 ft. above the ground: $.35 per hour additional.
PLUM0693-002 05/01/2008
Rates Fringes
Plumber/pipefitter (includes HVAC piping):
__All other work............$ 25.10 11.85 __Work on commercial buildings up to and including 3 stories, with no more than 10,000 sq. ft.; also, work on shopping centers of 50,000 sq.
ft. or less; also, work on motel or hotel properties of 30 units or less (does not apply to industrial or institutional work).....$ 17.57 11.85
SHEE0063-005 07/01/2009
Rates Fringes
Sheet metal worker (includes HVAC duct work)...............$ 21.50 12.06
SUVT2005-011 07/22/2005
Rates Fringes
Carpenter......................$ 16.15 5.16
Laborer, general _includes cement mason tender...................$ 11.63 1.56
Power equipment operators:
_Backhoe....................$ 18.25 3.73
1/29/2010mhtml:file://H:\Contracts\Construction\ARRA-Alterations to 1st Flr, St. Albans FB\Solicit...
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
1/29/2010mhtml:file://H:\Contracts\Construction\ARRA-Alterations to 1st Flr, St. Albans FB\Solicit...
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
1/29/2010mhtml:file://H:\Contracts\Construction\ARRA-Alterations to 1st Flr, St. Albans FB\Solicit...