Amendment 0003.pdf

PDF 347 KB Posted

Attached to
RECOVERY: St. Albans Federal Building, First Floor Space Alterations, St. Albans, VT
Solicitation number
GS-01P-10-BZ-C-0014
Issued by

About this file

Amendment 0003.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Q A - 5.pdf PDF
Amendment 0006.pdf PDF
Q A - 4.pdf PDF
Q A - 3.pdf PDF
Amendment 0005.pdf PDF
Q A - 2.pdf PDF
ST ALBANS SKA'S.PDF PDF
A501 ---ST ALBANS.PDF PDF
Amendment 0004.pdf PDF
Q A - 1.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Pre Bid Meeting Sign-in Sheet.pdf PDF
Pre Bid Meeting Minutes.pdf PDF
General Decision VT080042 12-18-2009.pdf PDF
PRE BID LETTER.pdf PDF
1. The Agreement.pdf PDF
2. The Solicitation.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATiON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED

(SEE

ITEM

11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1. REPLACE ATTACHMENT A, WAGE DETERMINATION:

a. DELETE Attachment A, "General Decision Number: VT080042 dated 12/18/2010" from Amendment 0001 and REPLACE with Attachment A of Amendment 0003, "General Decision Number: VT080042 01/22/2010."

2. CHANGE TO SECTION III.A.12 INSURANCE REQUIREMENTS. On page 13 of 30 of Volume 1: The Agreement, make the changes to the rates as follows:

a. DELETE Sub-Section III.A.12(a)(i) in its entirety and REPLACE with "III.A.12(a)(i) Workers' compensation insurance in the amount required by the jurisdiction in which the Contract is performed. The Contractor shall obtain Employers' liability coverage of at least $100,000. If occupational diseases are not covered by workers' compensation insurance, Employers' liability coverage shall include occupational diseases."

b. DELETE Sub-Section III.A.12(a)(ii) in its entirety and REPLACE with "III.A.12(a)(ii) Broad form comprehensive commercial general liability insurance in the amount of at least $500,000 per occurrence. Such insurance shall include, but not be limited to, contractual liability, bodily injury and property damage."

c. DELETE Sub-Section III.A.12(a)(iii) in its entirety and REPLACE with "III.A.12(a)(iii) Comprehensive automobile liability covering the operation of all automobiles used in connection with performing the Contract in the amount of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage."

GS-01P-10-BZ-C-0014 Page 2 of 2 Amendment 0002

General Decision Number: VT080042 01/22/2010 VT42

Superseded General Decision Number: VT20070043

State: Vermont

Construction Type: Building

Counties: Franklin and Grand Isle Counties in Vermont.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 02/08/2008 1 04/18/2008 2 05/30/2008 3 06/20/2008 4 08/08/2008 5 01/09/2009 6 04/17/2009 7 06/26/2009 8 09/04/2009 9 12/18/2009 10 01/22/2010

ELEC0300-001 06/01/2009

Rates Fringes

ELECTRICIAN

Electrical projects $250,000 < $750,000.........$ 20.70 20%+6.20 Electrical projects $750,000 and over...........$ 23.00 20%+6.20 Electrical projects < $250,000....................$ 19.55 20%+6.20

TELEDATA:

Cable splicer..............$ 19.67 20%+6.20 Technician.................$ 20.70 20%+6.20

* IRON0007-008 09/16/2009

Rates Fringes

IRONWORKER (Structural)..........$ 21.15 17.47

PLAS0534-007 01/01/2009

2/16/2010http://www.wdol.gov/wdol/scafiles/davisbacon/VT42.dvb robertdbudlong TextBox Attachment A of Amendment 0003

Rates Fringes

Cement mason Projects of 50,000 sq. ft.

or less.....................$ 30.40 19.26 Projects over 50,000 sq.

ft..........................$ 30.50 20.44

Work on a suspended staging, not supported from the ground, and over 20 ft. above the ground: $.35 per hour additional.

* PLUM0693-002 05/01/2008

Rates Fringes

Plumber/pipefitter (includes HVAC piping):

(1) Work on commericial buildings up to 3 stories and 10,000 sq ft, shopping centers up to 50,000 sq ft, and hotels/motels of 30 units or less. Does not include industrial or institutional work..........$ 17.57 11.85

(2) All other work..........$ 25.10 11.85

SHEE0063-005 07/01/2009

Rates Fringes

Sheet metal worker (includes HVAC duct work)...............$ 21.50 12.06

SUVT2005-011 07/22/2005

Rates Fringes

Carpenter......................$ 16.15 5.16

Laborer, general _includes cement mason tender...................$ 11.63 1.56

Power equipment operators:

_Backhoe....................$ 18.25 3.73

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

2/16/2010http://www.wdol.gov/wdol/scafiles/davisbacon/VT42.dvb robertdbudlong TextBox

Amentdment 0003

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

2/16/2010http://www.wdol.gov/wdol/scafiles/davisbacon/VT42.dvb robertdbudlong TextBox

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

2/16/2010http://www.wdol.gov/wdol/scafiles/davisbacon/VT42.dvb robertdbudlong TextBox

IDCode:
EffDate: FEB 17, 2010
ReqNo: 1PCS-10-0046
ProjNo:
IssuedBy: GSA/PBS SERVICE CENTERS DIVISION

NORTH SERVICE CENTER BRANCH

TP O'NEILL FOB, 10 CAUSEWAY ST., 11TH FLOOR

BOSTON MA 02222-1077

AdminBy: See Block 6
NoCopies:
Amended: Yes
ChgeOrder:
Modify: Off
SuppAuth:
OthrSpec:
Require: Off
Copies:
Descript: Solicitation GS-01P-10-BZ-C-0014, St. Albans Federal Building First Floor Space Alterations, St. Albans, Vermont is hereby amended as follows:

This Amendment must be acknowledged by one of the methods in Block 11 above.

Continued on page 2.

SignName:
SignTitl:
ContDate:
CODate:
OffrExt: Off
OffrNoEx: No
ChgeOrd: Off
SuppAgre: Off
ModOthr: Off
NoReq: Off
ContractorCode:
FacCode:
ContractorPOC:
AwdChg: Off
SolChg: Yes
SolNo: GS-01P-10-BZ-C-0014
SolDate: JAN 29, 2010
AwdNo:
IssuedByCode: 1PSK
AdminByCode:
ContrOfficerInfo:
DocNo: 0003
AwdDate:
text1: 10B. DATED (SEE ITEM 13)
block 14: 14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
pageblock: PAGE OF PAGES
block13: 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Contractor:
ContratorInfo:
ModAmount:
block12: 12. ACCOUNTING AND APPROPIATION DATA (If required)
ApprData: See Schedule
Pages: 2
Page: 1

File details come from the government source that posted it. Updated .