Green Village Drawings.pdf
PDF 18 MB Posted
- Attached to
- Green Village Cottages Amendment Four
- Solicitation number
- 33330221RF0010024
- Issued by
-
Smithsonian Institution
About this file
This Request for Proposal issued by the Smithsonian Institution seeks a Design-Build contractor to provide design and construction services for two to six cottages and site infrastructure improvements at the Smithsonian Environmental Research Center in Edgewater, Maryland. The scope of work includes designing and constructing the cottages as well as constructing previously designed site infrastructure. The contract will be a firm fixed-price contract selected through Source Selection procedures in accordance with FAR Subpart 15, with proposals evaluated using criteria stated in the solicitation. Upon selection of a successful offeror, the Smithsonian Institution will execute a design/build construction contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
SCALE: 1"=2000'
PROJECT AREA
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Copyright © 2020 by EWINGCOLE
SCALE: 1"=300'
MATHIAS
LAB
SERC
ADMINISTRATION
BUILDING
JA
V
A F
A R
M R
O A
D
C O
N T E
E S
W H
A R
F R
O A
D
SCHMIDT
BUILDING
PROPOSED
GREEN
VILLAGE
PROJECT
EX. SWM POND
approved by email approved by email approved by email approved by email approved by email
HayDav Typewriter approved by email
E
W
M
W
M
T
C
O
S D
S D
CONC.
EXISTING BUILDING (TRAILER)
F.F.=53.91'
B.F.=43.42'
OVERHANG
CONC.
CoB (B)
DnB (D
UxB (C)
UxB (C
CoB (B)
CoB (B
DnB (D
12" TREE
18" TREE
20" TREE
18" TREE
18" TREE
24" OAK
12" TREE
TWIN
40" TREE
E D
G E
O F
P A
V E
M
E N
T
GATE
EX. HC SIGNS
E
X
R
W
GATE
CONC. PORCH
E X
W
C
O
N
C
S
W
W A
L L
EXISTING
SHED
EX.
BLDG
F.F.=53.92'
EXISTING BUILDING
OVERHANG
EXISTING BUILDING
F.F.=52.66'
18" TREE
12" TREE
TWIN
12" TREE
18" TREE
15" TREE
24" TREE
18" TREE
20" TREE
12" TREE
18" TREE
20" TREE
TWIN
18" TREE
18" TREE
I N
V E
R
T
SIGN
SECURITY
D
I
T
C
H
SIGN
RESEARCH
PARKING
E X
W
E
X
R
W
E
X
R
E X
R
W
E
X
R
W
M
E D
G
O
F
U
N P
A V
D
CONC.
E D
P
A V
E M
E N
T
E
W
M
W
M
W
M
WALL
S D
S D
E
D
U
N
P
A
V
E D
U
N P
A V
T
TMH TOP
EL=47.19'
RIP RAP
AC
H
E
D
C m
A (C
D nB
(D
15" TREE
APPROX. LOCATION OF EX.
EMERGENCY CALL BOX
EX. WOODLAND PARKING
(ASPHALT)
E
M
A
B
A
N
D
E
L
E
E
APPROX. LOCATION OF EX.
EMERGENCY CALL BOX
EXISTING BUILDING TR
EXISTING BUILDING TR
EX. GRAVEL DRAIN TBRM
E X
P
A V
E R
S
T
B R
M
E X
P
A V
E R
S T
B R
M
PAVEMENT TBRM
AND REPLACED
EX. LIGHT POLE
TBRL SEE SITE PLAN
& UTILITY PLAN
EXISTING UTILITY YARD TR
E D
U
N P
A V
T
R
E D
U
N P
A V
T
R
EXISTING CLEAN OUT
EXISTING SIGN
EXISTING ELECTRIC HAND HOLE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
125 MAGNETIC NAIL SET
445402.449 1440298.949
43.45'
PT. #
NORTHING EASTING
ELEV.
DESCRIPTION
TRAVERSE TABLE
445323.038
1439760.943 39.03'
MAGNETIC NAIL SET
502 MAGNETIC NAIL SET
445778.484 1439817.529
101.10'
503 MAGNETIC NAIL SET
445709.883 1440130.529
63.50'
MAGNETIC NAIL SET445592.779 1440306.266
58.60'
507 MAGNETIC NAIL SET445283.267
1439958.233
35.66'
501 MAGNETIC NAIL SET
445575.858 1439614.323
72.79'
500 MAGNETIC NAIL SET
445454.500 1439620.460
53.08'
GENERAL NOTES:
1. THE SURVEY INFORMATION SHOWN HEREON HAS BEEN COLLECTED IN ACCORDANCE
WITH THE MARYLAND MINIMUM STANDARDS OF PRACTICE, ADOPTED BY THE BOARD FOR
PROFESSIONAL LAND SURVEYORS (COMAR 09.13.06.04) AND SUPPLEMENTED WITH GIS
INFORMATION PROVIDED BY OTHERS.
2. ALL MEASUREMENTS SHOWN HEREON REPRESENT GROUND MEASUREMENTS.
3. BEARINGS, DISTANCES AND COORDINATES SHOWN HEREON ARE BASED UPON THE
NORTH AMERICAN DATUM OF 1983.
4. ELEVATIONS SHOWN HEREON ARE BASED UPON THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD 88). BENCHMARKS ARE AS FOLLOWS:
5. WETLAND DELINEATION WAS PREPARED BY ECO-SCIENCE PROFESSIONALS,INC IN
AUGUST 2018.
6. FIELD SURVEY WAS COMPLETED BY DEWBERRY ON JANUARY 20, 2017 & SUPPLEMENTED
ON JUNE 25, 2019
7. TOTAL DISTURBED AREA = 1.38 AC.
8. THERE ARE EXISTING WETLANDS PRESENT ON THE EAST SIDE OF THE SITE.
9. THE SITE IS NOT WITHIN THE 100-YEAR FLOODPLAIN, PER FEMA FIRM #24003CO243F
10. THE SITE IS NOT WITHIN THE CHESAPEAKE BAY CRITICAL AREA.
11. THERE ARE NO KNOWN HISTORIC RESOURCES OR CEMETERIES WITHIN THE LIMITS OF
DISTURBANCE
COORDINATE
DEMOLITION WITH BGE
EX. CONDUIT TBRM OR
ABANDONED
NOTE: THIS PLAN IS FOR DEMOLITION ONLY
EX. CONDITION/DEMOLITION NOTES:
1. VISIBLE ABOVE GROUND UTILITIES HAVE BEEN SHOWN. SUBSURFACE UTILITIES, WHERE SHOWN, FOLLOW ASCE 38-02 QUALITY LEVELS A-D. A: VISUALLY VERIFIED VIA TEST HOLES; B: DESIGNATED
AND SURVEYED; C: RECORD INFORMATION CORRELATED WITH SURVEYED SURFACE FEATURES; D:
RECORD INFORMATION ONLY. WHERE SUBSURFACE UTILITIES HAVE BEEN APPARENTLY DESIGNATED
BY OTHERS ON SITE, THOSE LOCATIONS WILL BE SHOWN AS QUALITY LEVEL C. UTILITIES MAY EXIST
THAT ARE NOT SHOWN. UNLESS OTHERWISE LABELED AS ABOVE, THIS SURVEY REPRESENTS
QUALITY LEVEL C.
2. FOR DISPOSITION OF EXTERIOR MECHANICAL/ELECTRICAL EQUIPMENT, REFER TO ELECTRICAL
PLANS.
3. THIS PLAN IS FOR IDENTIFIED SITE FEATURES ONLY AND DOES NOT ADDRESS VEGETATION BEYOND
GENERAL CLEARING.
4. CONTRACTOR TO ABANDON UTILITIES IN PLACE AS NOTED ON THIS PLAN. IF EXISTING UTILITIES ARE
IN CONFLICT WITH PROPOSED DESIGN, THEY MAY BE REMOVED AND TRENCHES BACKFILLED TO
GRADE.
5. CONTRACTOR SHALL COORDINATE RELOCATION OR REMOVAL/DISPOSAL OF EXISTING BUILDINGS
SHOWN "TO BE REMOVED" OR "TO BE RELOCATED" WITH COTR. ONCE EXISTING BUILDINGS HAVE
BEEN REMOVED OR RELOCATED, CONTRACTOR SHALL REMOVE ASSOCIATED CONCRETE SLABS. IF
CONCRETE SLAB REMAINS FROM THE SHED NEXT TO THE EX. TRAILER, CONTRACTOR SHALL BE
RESPONSIBLE FOR ITS REMOVAL.
6. WHEN LODGE IS CONSTRUCTED IN THE FUTURE, THERE WILL BE A PARKING REDUCTION OF 5
SPACES DUE TO LODGE ACCESS, DROP OFF, AND HANDICAP SPACE ACCOMMODATIONS. FOR THE
INFRASTRUCTURE PACKAGE (THIS CONTRACT), PARKING TO BE RE-STRIPED TO ACCOMMODATE
FUTURE PARKING LAYOUT. SEE SITE PLAN, SHEET C-1-2.
7. REMOVE AND REPLACE EX. PAVEMENT AS SHOWN.
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
T
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
1 7
G U
R
M
E
I
NG
H
U
N
I A
E X
. P A
R K
IN
G
ABBREVIATIONS:
TBRL - TO BE RELOCATED
TBRM - TO BE REMOVED
TR - TO REMAIN
SHED TBRL. SEE EX.
COND/DEMO NOTE 5,
THIS SHT.
C-5-4
EXISTING TREELINE
EXISTING TOPOGRAPHY
EXISTING ASPHALT
EXISTING GRAVEL ROAD
EXISTING BUILDING
EXISTING STORM DRAIN
EXISTING RECLAIMED WATER
LEGEND
EXISTING POTABLE WATER
EXISTING SEWER
EXISTING TELECOMM
EXISTING COMMUNICATION LINE
EXISTING UNDERGROUND POWER
EXISTING UTILITY TO BE ABANDONED
IN PLACE OR REMOVED
EXISTING PAVEMENT TO BE REMOVED
EXISTING SLOPES, 15-25%
EXISTING SLOPES, > 25%
EXISTING PAVEMENT TO BE REMOVED
& REPLACED
REMOVE AND STORE EX. WHEEL
STOPS (TYP. 9) DURING
CONSTRUCTION. REPLACE UPON
COMPLETION OF TRENCHING
AND PAVEMENT RESTORATION.
EX. LIGHT POLE TR
TBRL (SEE
SITE PLAN)
RIPRAP TO BE REMOVED
FOR POND FOREBAY.
RIPRAP TO REMAIN. ADJUST
RIPRAP TO MATCH
PROPOSED GRADES ON
SHEETS C-1-3 & C-1-5.
FUTURE
COTTAGE #2
R
R
R
F U
T U
R
E
C
O
T T
A
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
R
R
R
R
167°
167°
R
T
CONC.
EXISTING BUILDING (TRAILER)
F.F.=53.91'
B.F.=43.42'
OVERHANG
GATE
EX. HC SIGNS
GATE
C
O
N
W
W A
L L
EXISTING
SHED
EX.
BLDG
F.F.=53.92'
EXISTING BUILDING
OVERHANG
EXISTING BUILDING
F.F.=52.66'
I N
V E
R
T
SIGN
SECURITY
D
I
T
C
H
SIGN
RESEARCH
PARKING
CONC.
WALL
RIP RAP
AC
EX. WOODLAND PARKING
E
B
A
N
D
E
E
E
0+00
0+50
L
L2
L
L
C
C
20'
P
LINE TABLE
NUMBER
L1
L2
L3
L4
BEARING
N04°37'19"W
N82°53'24"E
N62°47'36"E
N77°27'44"E
LENGTH (FT)
95.74
49.02
24.72
109.12
START POINT
N445,351.51, E1,439,631.50
N445,438.97, E1,439,566.41
N445,450.18, E1,439,631.73
N445,465.83, E1,439,665.72
END POINT
N445,446.93, E1,439,623.78
N445,445.04, E1,439,615.06
N445,461.49, E1,439,653.72
N445,489.52, E1,439,772.24
CURVE TABLE
NUMBER
C1
C2
RADIUS (FT)
LENGTH (FT)
17.54
12.80
TANGENT (FT)
8.86
6.44
DELTA
020°05'48"
014°40'08"
CHORD
LENGTH (FT)
17.45
12.77
CHORD BEARING
N72°50'30"E
N70°07'40"E
EXISTING TREELINE
EXISTING TOPOGRAPHY
EXISTING ASPHALT
EXISTING GRAVEL ROAD
EXISTING BUILDING
EXISTING STORM DRAIN
EXISTING RECLAIMED WATER
LEGEND
EXISTING POTABLE WATER
EXISTING SEWER
EXISTING CLEAN OUT
EXISTING SIGN
EXISTING ELECTRIC HAND HOLE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
EXISTING TELECOMM
EXISTING COMMUNICATION LINE
EXISTING UNDERGROUND POWER
PROPOSED LIMIT OF
DISTURBANCE
FUTURE RETAINING WALL
PROPOSED SIDEWALK
FUTURE RAILING
FUTURE BUILDING
PROPOSED DRIVE
PROPOSED TREELINE
FUTURE SIDEWALK
2 PARKING SPACE COUNT
C-5-4
DETAIL NUMBER
SHEET NUMBER
(SCHMIDT CENTER)
(DORMITORY)
PROPOSED DRIVEWAY
FULL DEPTH ASPHALT PAVEMENT
CONCRETE LEAD
WALK, LANDING,
STEPS
FUTURE RAMP
& HANDRAIL
PATIO
RET. WALL
HT. = 3' ±
TREE
PIT
E X
. W O
O D
L A
N D
P A
R K
IN
G
T O
J A
V A
F A
R M
R O
A D
EX. UTILITY YARD
PROPOSED WALKWAY
FULL DEPTH ASPHALT
PAVEMENT
RET. WALL
HT. = 5' ±
RET. WALL
HT. = 3' ±
NOTE: THIS PLAN IS FOR SITE IMPROVEMENTS ONLY
SITE PLAN NOTES:
1. HANDICAP PARKING SYMBOLS SHALL BE WHITE WITH BLUE BACKGROUND.
2. THESE PLANS WERE PREPARED WITH THE BENEFIT OF A SITE SPECIFIC
GEOTECHNICAL REPORT BUT WITHOUT CERTAIN DESIGN ELEMENT
RECOMMENDATIONS INCLUDING ASPHALT AND CONCRETE PAVING SECTIONS.
THESE DESIGN ELEMENTS ARE SUBJECT TO CHANGE.
PATIO
TREE
PIT
P
A
T
I
O
T
R
E
E
P
I
T
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
C-5-4
PROPOSED LIGHT POLES (2) PROVIDED
BY SERC (REMOVE EX. AND REPLACE
WITH SERC STANDARD)
C-5-4
PROPOSED LIGHT POLE
(CONTRACTOR TO
PROCURE)
C-5-4
PROPOSED LIGHT
POLE (CONTRACTOR
TO PROCURE)
PROPOSED LIGHT
POLE (CONTRACTOR
TO PROCURE)
C-5-4
CONNECT TO EX S/W
AT GRADE (SEE
NOTE 1 THS SHT)
E X
G
R A
V E
L
R
O A
D
E X
. G R
E E
N S
P A
C E
13 2
SERC DRIVE
P R
O P
P A
R K
IN
G
C-5-4
EX. LIGHT POLE TO
BE RELOCATED AS
SHOWN
PROP. FIRE LANE SIGN
PROP. FIRE
LANE SIGN
C-5-4
PROP. FIRE
LANE SIGN
C-5-4
RELOCATED
HC SIGN
PROP. VAN
ACCESSIBLE
HC SIGN
PROP. HC SIGNS,
1 RELOCATED,
1 NEW
PARKING SUMMARY:
WOODLAND PARKING
SPACES PROVIDED: 86
ADA REQUIRED: 4
ADA VAN REQUIRED: 1
ADA PROVIDED: 4
ADA VAN PROVIDED: 1
F
IR
E L
A N
E
- N
O P
A R
K
IN
G
PROPOSED
DRIVEWAY
FULL DEPTH
ASPHALT
PAVEMENT
PROP. 6" YELLOW
FIRE LANE STRIPING
WITH 'NO PARKING'
STENCIL
PROP. 6" YELLOW
FIRE LANE
STRIPING WITH 'NO
PARKING' STENCIL
F
IR
E L
A N
E
N O
P A
R K
IN
G
F I R
E
L A
O
P
A R
K I N
G
F I R
E
L A
O
P
A R
K I N
G
C-5-4
C-5-4
C-5-4
TRV # 501
ELEV = 72.79'
E
T
CONC.
EXISTING BUILDING (TRAILER)
F.F.=53.91'
B.F.=43.42'
OVERHANG
CONC.
12" TREE
18" TREE
20" TREE
18" TREE
18" TREE
24" OAK
12" TREE
TWIN
40" TREE
E D
G E
O F
P A
V E
M
E N
T
GATE
EX. HC SIGNS
GATE
CONC. PORCH
C
O
N
W
W A
L L
EXISTING
SHED
EX.
BLDG
F.F.=53.92'
EXISTING BUILDING
OVERHANG
EXISTING BUILDING
F.F.=52.66'
18" TREE
12" TREE
TWIN
12" TREE
18" TREE
15" TREE
24" TREE
18" TREE
20" TREE
12" TREE
18" TREE
20" TREE
TWIN
18" TREE
18" TREE
I N
V E
R
T
SIGN
SECURITY
D
I
T
C
H
SIGN
RESEARCH
PARKING
E D
U
N P
A V
CONC.
E D
P
A V
E M
E N
T
WALL
P
E
D
P
A
V
E D
U
N P
A V
TRENCH DRAIN
INV EL=50.68'
TOP EL=52.18'
TOP EL=43.37'
E
D
6" PVC
6" PVC
P V
C
8" PVC
15" TREE
EX. WOODLAND PARKING
E
E
B
A
N
D
E
E
C
E
FUTURE
COTTAGE #2
F U
T U
R
E
C
O
T T
A
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
ES
MH
MH
I
I
I
I
I
ES
I
ROOF
DRAIN
S
S
I
P
E
H
D
P
E
P
E
H
D P
E
H
D
P
E
H
D P
E
H
D P
E
P
E
H
D P
E
ROOF
DRAIN
(TD
-2)
T R
E N
C H
D R
A
IN
(T D
-1
P
E
TR
EN
C H
D R
AIN
T R
E N
C H
D R
A
IN
T
D -3
0 55
FUTURE RETAINING WALL
FUTURE RAILING
FUTURE BUILDING
PROPOSED DRIVE
EXISTING TREELINE
EXISTING TOPOGRAPHY
EXISTING ASPHALT
EXISTING GRAVEL ROAD
EXISTING BUILDING
EXISTING STORM DRAIN
EXISTING RECLAIMED WATER
LEGEND
EXISTING POTABLE WATER
EXISTING SEWER
EXISTING CLEAN OUT
EXISTING SIGN
EXISTING ELECTRIC HAND HOLE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
EXISTING TELECOMM
EXISTING COMMUNICATION LINE
EXISTING UNDERGROUND POWER
PROPOSED SIDEWALK
PROPOSED TOPOGRAPHY
PROPOSED LIMIT OF
DISTURBANCE
PROPOSED SPOT ELEVATION
PROPOSED STORM DRAIN
PROPOSED TREELINE
FUTURE SIDEWALK
NOTE: THIS PLAN IS FOR INTERIM GRADING ONLY
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
NOTE: GRADING IS SUBJECT TO CHANGE THROUGHOUT FINAL
ENGINEERING DESIGN.
CONNECT TO EX.
S/W AT GRADE
CONNECT TO EX.
S/W AT GRADE
CONNECT TO EX.
S/W AT GRADE
EXISTING ENHANCED EXTENDED
DETENTION POND
TREE PIT FOR
PROPOSED FILTERRA
UNIT OR SIMILAR SWM
FEATURE (TYP. 3)
GRADING NOTES:
1. CLASS II FILL TO BE PLACED BELOW ALL PAVED AREAS INCLUDING PARKING LOTS, DRIVES AND
SIDEWALKS.
2. CLASS III TO BE PLACED IN AREAS TO REMAIN "GREEN."
3. MAXIMUM SLOPE IN GRASSED AREAS IS 3:1, MINIMUM SLOPE IS 2.5%, UNLESS OTHERWISE NOTED ON
THE PLANS.
4. MAXIMUM PAVEMENT SLOPE IS 12.5%, MINIMUM SLOPE IS 1.0%, UNLESS OTHERWISE NOTED ON THE
PLANS.
5. MAXIMUM SLOPE IN PARKING AREAS IS 7%, MINIMUM SLOPE IS 1%.
6. SLOPE IN HANDICAP PARKING AREAS SHALL BE NO MORE THAN 2% IN ALL DIRECTIONS.
7. CONTRACTOR SHALL COORDINATE WITH COTR TO MAINTAIN ACCESS TO SERC WATER TOWER AND
SEWER DRAIN FIELDS.
X
M
A
X
CONNECT TO EX.
ASPH. DRIVE AT
GRADE
E X
. S T
E P
P O
O L S
Y S
T E
M
D O
N O
T D
IS
T
U R
B
BEST MANAGEMENT PRACTICES FOR WORKING IN NONTIDAL WETLANDS, WETLAND BUFFERS,
WATERWAYS, AND 100-YEAR FLOODPLAINS
(APPLIES TO EAST SIDE OF LOD, IN AND IMMEDIATELY ADJACENT TO EXISTING WETLAND BUFFER)
1) NO EXCESS FILL, CONSTRUCTION MATERIAL, OR DEBRIS SHALL BE STOCKPILED OR STORED IN
NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR
FLOODPLAIN.
2) PLACE MATERIALS IN A LOCATION AND MANNER WHICH DOES NOT ADVERSELY IMPACT SURFACE
OR SUBSURFACE WATER FLOW INTO OR OUT OF NONTIDAL WETLANDS, NONTIDAL WETLAND
BUFFERS, WATERWAYS, OR THE 100-YEAR FLOODPLAIN.
3) DO NOT USE THE EXCAVATED MATERIAL AS BACKFILL IF IT CONTAINS WASTE METAL PRODUCTS, UNSIGHTLY DEBRIS, TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE. IF ADDITIONAL
BACKFILL IS REQUIRED, USE CLEAN MATERIAL FREE OF WASTE METAL PRODUCTS, UNSIGHTLY
DEBRIS, TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE
4) PLACE HEAVY EQUIPMENT ON MATS OR SUITABLY OPERATE THE EQUIPMENT TO PREVENT
DAMAGE TO NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE
100-YEAR FLOODPLAIN.
5) REPAIR AND MAINTAIN ANY SERVICEABLE STRUCTURE OR FILL SO THERE IS NO PERMANENT
LOSS OF NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, OR WATERWAYS, OR
PERMANENT MODIFICATION OF THE 100-YEAR FLOODPLAIN IN EXCESS OF THAT LOST UNDER
THE ORIGINALLY AUTHORIZED STRUCTURE OR FILL.
6) RECTIFY ANY NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR 100-YEAR
FLOODPLAIN TEMPORARILY IMPACTED BY ANY CONSTRUCTION.
7) ALL STABILIZATION IN THE NONTIDAL WETLAND AND NONTIDAL WETLAND BUFFER SHALL
CONSIST OF THE FOLLOWING SPECIES: ANNUAL RYEGRASS (LOLIUM MULTIFLORUM), MILLET
(SETARIA ITALICA), BARLEY (HORDEUM SP.), OATS (UNIOLA SP.), AND/OR RYE (SECALE CEREALE).
THESE SPECIES WILL ALLOW FOR THE STABILIZATION OF THE SITE WHILE ALSO ALLOWING FOR
THE VOLUNTARY REVEGETATION OF NATURAL WETLAND SPECIES. OTHER NON-PERSISTENT
VEGETATION MAY BE ACCEPTABLE, BUT MUST BE APPROVED BY THE NONTIDAL WETLANDS AND
WATERWAYS DIVISION. KENTUCKY 31 FESCUE SHALL NOT BE UTILIZED IN WETLAND OR BUFFER
AREAS. THE AREA SHOULD BE SEEDED AND MULCHED TO REDUCE EROSION AFTER
CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED.
8) AFTER INSTALLATION HAS BEEN COMPLETED, MAKE POST-CONSTRUCTION GRADES AND
ELEVATIONS THE SAME AS THE ORIGINAL GRADES AND ELEVATIONS IN TEMPORARILY IMPACTED
AREAS.
9) TO PROTECT AQUATIC SPECIES, IN-STREAM WORK IS PROHIBITED AS DETERMINED BY THE
CLASSIFICATION OF THE STREAM:
USE I WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD MARCH 1
THROUGH JUNE 15, INCLUSIVE, DURING ANY YEAR.
USE III WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD
OCTOBER 1 THROUGH APRIL 30, INCLUSIVE, DURING ANY YEAR.
USE IV WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD MARCH
1 THROUGH MAY 31, INCLUSIVE, DURING ANY YEAR.
10) STORMWATER RUNOFF FROM IMPERVIOUS SURFACES SHALL BE CONTROLLED TO PREVENT THE
WASHING OF DEBRIS INTO THE WATERWAY.
11) CULVERTS SHALL BE CONSTRUCTED AND ANY RIPRAP PLACED SO AS NOT TO OBSTRUCT THE
MOVEMENT OF AQUATIC SPECIES, UNLESS THE PURPOSE OF THE ACTIVITY IS TO IMPOUND
WATER.
V
E L E
TRV # 500
ELEV = 53.08'
TRV # 501
ELEV = 72.79'
TRV # 103
ELEV = 39.03'
EX. SMH 2A
INVERT
8" PVC (E) = 39.22'
8" PVC (W) = 39.18'
8" PVC (S) = 39.14'
EX. SMH-3
INVERT
8" PVC (W) = 40.59'
8" PVC (NE) = 40.73'
8" PVC (S) = 40.28'
E
W
M
W
M
T
CONC.
EXISTING BUILDING (TRAILER)
F.F.=53.91'
B.F.=43.42'
OVERHANG
CONC.
EMH TOP
EL=54.31'
12" TREE
18" TREE
20" TREE
18" TREE
18" TREE
24" OAK
12" TREE
TWIN
40" TREE
E D
G E
O F
P A
V E
M
E N
T
GATE
EX. HC SIGNS
E
X
R
W
E
X
S
GATE
E
X
S
CONC. PORCH
E X
W
E
X
O
N
W
W A
L L
EXISTING
SHED
EX.
BLDG
F.F.=53.92'
EXISTING BUILDING
OVERHANG
EXISTING BUILDING
F.F.=52.66'
12" TREE
TWIN
12" TREE
18" TREE
15" TREE
24" TREE
12" TREE
18" TREE
20" TREE
TWIN
18" TREE
LIGHT
POLE
SIGN
SECURITY
D
I
T
C
H
SIGN
RESEARCH
PARKING
LIGHT
POLE
TRV # 102
ELEV = 48.63'
E X
W
E
X
R
W
E
E X
R
W
M
LIGHT POLE
LIGHT POLE
E D
U
N P
A V
CONC.
E D
P
A V
E M
E N
T
E
W
M
W
M
W
WALL
P
E
D
P
A
V
E D
U
N P
A V
T
TRENCH DRAIN
INV EL=50.68'
TOP EL=52.18'
TMH TOP
EL=47.19'
TOP EL=43.37'
E
D
6" PVC
6" PVC
P V
C
8" PVC
APPROX. LOCATION OF EX.
EMERGENCY CALL BOX
EX. WOODLAND PARKING
E
B
A
N
D
E
E
C
EX. SMH 2
INVERT
8" PVC (E) = 38.65'
E
FUTURE
COTTAGE #2
F U
T U
R
E
C
O
T T
A
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
ES
MH
MH
I
I
I
I
I
ES
I
ROOF
DRAIN
S
S
I
P
E
H
D
P
E
P
E
H
D P
E
H
D
P
E
H
D P
E
H
D P
E
P
E
H
D P
E
ROOF
DRAIN
(TD
-2)
T R
E N
C H
D R
A
IN
(T D
-1
P
E
TR
EN
C H
D R
AIN
T R
E N
C H
D R
A
IN
T
D -3
EXISTING TREELINE
EXISTING TOPOGRAPHY
EXISTING ASPHALT
EXISTING GRAVEL ROAD
EXISTING BUILDING
EXISTING STORM DRAIN
EXISTING RECLAIMED WATER
LEGEND
EXISTING POTABLE WATER
EXISTING SEWER
EXISTING CLEAN OUT
EXISTING SIGN
EXISTING ELECTRIC HAND HOLE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
EXISTING TELECOMM
EXISTING COMMUNICATION LINE
EXISTING UNDERGROUND POWER
PROPOSED DRIVE
PROPOSED STORM DRAIN
PROPOSED UNDERGROUND ELEC
PROPOSED COMMUNICATIONS,
FIBER, SECURITY LINES
PROPOSED SEWER CONNECTION WITH CLEANOUT
PROPOSED WATER CONNECTION
PROPOSED RECLAIMED WATER
PROPOSED DRY PIPE FOR FDC
PROPOSED FIRE HYDRANT
FUTURE RETAINING WALL
FUTURE RAILING
FUTURE BUILDING
FUTURE SIDEWALK
PROPOSED DOMESTIC WATER
PROPOSED SANITARY SEWER
NOTES
1. PLAN REPRESENTS INFRASTRUCTURE PHASE ONLY, ALL BUILDINGS SHOWN ARE FUTURE, FOR
INFORMATION ONLY.
2. COTTAGES 1, 3 AND 5 ARE MIRRORED.
3. UTILITY SERVICES TO SCHMIDT BUILDING AND DORMITORY SHALL BE MAINTAINED. COORDINATE
ANY OUTAGES WITH COTR.
4. COMMUNICATIONS SERVICE CONNECTIONS FOR COTTAGE 2, 4 AND 6 ARE INTERNAL TO THE
BUILDINGS- REFER TO ELECTRICAL DRAWINGS.
5. DOMESTIC WATER HOUSE CONNECTIONS SHALL BE 1" COPPER.
6. SANITARY SEWER HOUSE CONNECTIONS SHALL BE 4" PVC WITH CLEANOUT.
7. FDC SERVICE CONNECTIONS SHALL BE 4" DIP.
8. RW (FIRE PROTECTION) SERVICE CONNECTIONS SHALL BE 4" DIP.
9. REFER TO INTERIM GRADING AND DRAINAGE PLAN FOR STORM DRAIN INFORMATION (SHEET C-1-3).
10. CONTRACTOR SHALL PROVIDE GPS COORDINATES FOR ALL UTILITIES CAPPED BELOW GRADE.
11. ALL FIRE HYDRANTS WILL BE SET WITH STREAM OUTLET OF FIRE HYDRANT FACING THE EDGE OF
THE PAVEMENT
12. ALL BENDS AND FITTINGS ON POTABLE WATER (W) AND RECLAIMED WATER (RW) TO BE RESTRAINED
OR BLOCKED.
13. MINIMUM COVER OVER RECLAIMED WATER, FDC AND POTABLE WATER SHALL BE 4 FT. SEE STORM
DRAIN PROFILES ON SHEET C-2-1 FOR CROSSING ELEVATIONS.
NOTE: THIS PLAN IS FOR UTILITY CONSTRUCTION ONLY
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
ABBREVIATIONS
BGE - BALTIMORE GAS & ELECTRIC
DIP - DUCTILE IRON PIPE
EMH - ELECTRIC MANHOLE
EX. - EXISTING
FDC - FIRE DEPARTMENT CONNECTION
FH - FIRE HYDRANT
PROP. - PROPOSED
PVC - POLYVINYL CHLORIDE PIPE
RW - RECLAIMED WATER
SHC - SEWER HOUSE CONNECTION
SMH - SEWER MANHOLE
TYP. - TYPICAL
WHC - WATER HOUSE CONNECTION
E X
. W
O O
D L A
N D
P A
R K
IN
G
J
A
D
EX. UTILITY YARD
2x6" PVC CONDUIT
COORDINATE WITH BGE
PROP. 6" DIP DRY FDC
PIPING
PROP. FDC
PROP. 4.5' FH
8" X 6" TEE & 6" VALVE.
SEE NOTE 11
ELEC. CONDUITS: 1
TO EACH COTTAGE
AND 2 SPARE. SEE
ELEC. PLANS
PROP. 4.5' FH,
8" X 6" TEE &
6" VALVE.
SEE NOTE 11
PROP. 1" PVC ELEC.
PROP. ELEC. SEE ELEC. PLANS
PROP. LIGHT
POLE, TYP. 3
PROP. 4"
DOMESTIC
WATER
PROP. 4" CAP (SEE NOTE 10)
SMH
PROP. 4" FDC
CONNECTION (TYP. 7)
PROP. 4" SPRINKLER LINE (TYP. 7)
PROP. 4" SHC (TYP. 7)
PROP. 1" WHC. (TYP. 7)
PROP. FDC
PROP. ELEC.
HANDHOLE
(TYP. 5)
PROP. ELEC. HANDHOLE
PROP. EMH
COORD.
WITH BGE.
PROP. STORM
MANHOLE (TYP. 3)
(SCHMIDT CENTER)
(DORMITORY)
PROP. 8"
DIP RW
APPROX. LOCATION
OF EX. TELECOM
PEDESTAL
CONTRACTOR SHALL FIELD
VERIFY LOCATION OF EX. FH
TEE PRIOR TO CONSTRUCTION.
INSTALL PROP. 8"X8" TEE AT
LEAST 5FT FROM EXISTING
FITTINGS
PROP. 4"
DOMESTIC
WATER
CONTRACTOR
MAY ADJUST EX.
UGE AS NEEDED
CONDUIT TO EACH LIGHT,
SEE ELECTRICAL PLANS
PVC CONDUITS. SEE
ELEC. PLANS.
CAP BELOW GRADE
FOR FUTURE LODGE
CONNECTION
PROP. 8" CAP (SEE NOTE 10)
SERC DRIVE
PROP. 6" CAP, TYP. 2 (SEE NOTE 10)
CAP PROP. 6" DIP
BELOW GRADE.
SEE NOTE 10
CAP BELOW GRADE
(TYP. ALL COMM HOUSE
CONNECTIONS) SEE NOTE 10
CAP BELOW GRADE
(TYP. ALL ELEC. HOUSE
CONNECTIONS)
SEE NOTE 10
CAP BELOW GRADE
(TYP. ALL DW, RW & FDC
HOUSE CONNECTIONS)
SEE NOTE 10
TEMPORARY ELEC.
CONNECTION TO
TRAILER. SEE ELEC.
PLANS.
EX. LIGHT POLE TO
BE RELOCATED AS
SHOWN
SMH
SCO
SCO
SCO
SCO
SCO
S
CONNECT PROP.
4" W TO EX. 4" W
CONNECT PROP. 8" DIP RW
TO EX. 8" DIP RW
SCO
CONNECT PROP. 8" RW
TO EX. 8" RW WITH 8"X8"
TAPPING SLEEVE & VALVE
PROP. 8" CAP
8"
HB
8"
HB
8"
HB
8"
HB
8"
HB
6"
HB
6"
HB
6"
HB
8"
HB
4"
HB
4"
HB
8"
HB
(2) 4"
HB
8"
HB
ROCK OUTLET PROTECTION II:
CLASS I RIPRAP
W = 15 FT
L a
= 13 FT
T = 19 IN
H = 12 IN
D
= 9.5 IN
ROCK OUTLET PROTECTION I:
CLASS I RIPRAP
W = 11.5 FT
L a
= 10 FT
T = 19 IN
H = 9 IN
D
= 9.5 IN.
8"
HB
STUB OUT 2" PVC AND CAP
BELOW GRADE FOR FUTURE
LODGE FORCE MAIN CONNECTION
CAP DOMESTIC AND
RECLAIMED WATER
BELOW GRADE FOR
FUTURE LODGE
CONNECTION
CONTRACTOR SHALL BE
RESPONSIBLE FOR INSTALLATION OF
3" ORIFICE STEEL PLATE IN EX. SWM
POND RISER STRUCTURE. SEE SHEET
C-5-4 FOR ADDITIONAL INFORMATION
C-5-4
C-5-4
C-5-4
E
L
TRV # 500
ELEV = 53.08'
TRV # 501
ELEV = 72.79'
TRV # 103
ELEV = 39.03'
E
W
M
W
M
T
CONC.
EXISTING BUILDING (TRAILER)
F.F.=53.91'
B.F.=43.42'
OVERHANG
CONC.
12" TREE
18" TREE
20" TREE
18" TREE
18" TREE
24" OAK
12" TREE
TWIN
40" TREE
GATE
EX. HC SIGNS
GATE
CONC. PORCH
C
O
N
W
W A
L L
EXISTING
SHED
EX.
BLDG
F.F.=53.92'
EXISTING BUILDING
OVERHANG
EXISTING BUILDING
F.F.=52.66'
18" TREE
12" TREE
TWIN
12" TREE
18" TREE
15" TREE
24" TREE
18" TREE
20" TREE
12" TREE
18" TREE
20" TREE
TWIN
18" TREE
18" TREE
I N
V E
R
T
SIGN
SECURITY
D
I
T
C
H
SIGN
RESEARCH
PARKING
TRV # 102
ELEV = 48.63'
E
X
R
W
E
E X
R
W
M
CONC.
E
W
M
W
M
W
M
WALL
T
RIP RAP
AC
15" TREE
APPROX. LOCATION OF EX.
EMERGENCY CALL BOX
EX. WOODLAND PARKING
E
B
A
N
D
E
E
C
E
FUTURE
COTTAGE #2
F U
T U
R
E
C
O
T T
A
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
F
U
T
U
R
E
C
O
T
T
A
F U
T U
R E
C O
T T
A G
E
ES
MH
MH
I
I
I
I
I
ES
I
ROOF
DRAIN
S
S
I
P
E
H
D
P
E
P
E
H
D P
E
H
D
P
E
H
D P
E
H
D P
E
P
E
H
D P
E
ROOF
DRAIN
(TD
-2)
T R
E N
C H
D R
A
IN
(T D
-1
P
E
TR
EN
C H
D R
AIN
T R
E N
C H
D R
A
IN
T
D -3
P S
D
- 1
S C
E
STAGING/STORAGE
0 55
TGOS
EXISTING TREELINE
EXISTING TOPOGRAPHY
EXISTING ASPHALT
EXISTING GRAVEL ROAD
EXISTING BUILDING
EXISTING STORM DRAIN
EXISTING RECLAIMED WATER
LEGEND
EXISTING POTABLE WATER
EXISTING SEWER
EXISTING CLEAN OUT
EXISTING SIGN
EXISTING ELECTRIC HAND HOLE
EXISTING POWER POLE
EXISTING LIGHT POLE
EXISTING TREE
EXISTING TELECOMM
EXISTING COMMUNICATION LINE
EXISTING UNDERGROUND POWER
PROPOSED DRIVE
PROPOSED TOPOGRAPHY
PROPOSED LIMIT OF
DISTURBANCE
PROPOSED SPOT ELEVATION
PROPOSED STORM DRAIN
PROPOSED TREELINE
PSD
EARTH DIKE
SILT FENCE
PIPE SLOPE DRAIN
SUPER SILT FENCE
STABILIZED CONSTRUCTION ENTRANCESCE
TEMPORARY GABION OUTLET STRUCTURE
FUTURE RETAINING WALL
PROPOSED SIDEWALK
FUTURE RAILING
FUTURE BUILDING
FUTURE SIDEWALK
SEQUENCE OF CONSTRUCTION
1. CONTRACTOR SHALL ARRANGE A PRE-CONSTRUCTION MEETING WITH MDE A MINIMUM OF 5 DAYS PRIOR TO THE
BEGINNING OF CONSTRUCTION ACTIVITIES.
2. CLEAR AND GRUB AS NECESSARY TO INSTALL PERIMETER SEDIMENT CONTROLS. INSTALL PERIMETER
CONTROLS PRIOR TO ANY DEMOLITION.
NOTE: ALL FOREST AND WETLAND OUTSIDE THE LIMITS OF DISTURBANCE SHALL BE MARKED IN THE FIELD PRIOR
TO ANY LAND DISTURBING ACTIVITY.
3. REMOVE EXISTING BUILDINGS AND UTILITIES. SEE EXISTING CONDITIONS AND DEMOLITION PLAN C-1-1, SHEET 2.
CLEAR AND GRUB AS NECESSARY WITHIN INSTALLED PERIMETER CONTROLS.
4. INSTALL ALL 100 SERIES STORM DRAINS. DURING A NOAA THREE (3) DAY DRY FORECAST, REMOVE EX. RIPRAP
AT ES-101 AND GRADE THE FOREBAY AREA. STABILIZE WITH GEOTEXTILE MATTING IMMEDIATELY AFTER
GRADING. FOR INSTALLATION OF STORM DRAINS, SAME DAY STABILIZATION IS REQUIRED. INSTALL INLET
PROTECTION ON CONSTRUCTED INLETS. SEE UTILITY CONSTRUCTION NOTE 22 ON SHEET 9 (C-5-2).
5. INSTALL ALL OTHER SEDIMENT CONTROLS INCLUDING STABILIZED CONSTRUCTION ENTRANCE, EARTH DIKES, TEMPORARY SWALE, TEMPORARY GABION OUTLET STRUCTURE, AND PIPE SLOPE DRAIN AS SHOWN ON PLANS.
6. INSTALL ALL 200 SERIES STORM DRAINS. INSTALL INLET PROTECTION ON THE CONSTRUCTED INLETS.
7. GRADE THE SITE. STABILIZE ALL DISTURBED AREAS. LIMITS OF DISTURBANCE TO BE STRICTLY MAINTAINED TO
ENSURE PROTECTION OF NATURAL AREAS. CONSTRUCTION EQUIPMENT AND VEHICLES MUST REMAIN INSIDE
THE APPROVED LIMITS OF DISTURBANCE. SEE STABILIZATION NOTE ON THIS SHEET FOR STABILIZATION
TIMEFRAME.
8. GRADE PROPOSED ROAD. DURING GRADING, THE SIZE OF THE TEMPORARY GABION OUTLET STRUCTURE CAN
BE REDUCED AS NEEDED. ONCE ROAD AND BERMS ARE GRADED TO DIRECT WATER TO PROPOSED INLETS, TGOS AND PIPE SLOPE DRAIN CAN BE REMOVED WITH APPROVAL OF THE INSPECTOR. SEE SHEET C-1-5A FOR
PROPOSED GRADING AFTER TGOS REMOVAL. INSTALL SUPER SILT FENCE AS SHOWN ON SHEET C-1-5A.
9. INSTALL TRENCH DRAINS AND TEMPORARILY BLOCK THE OUTFLOW UNTIL THE BASE COURSE OF PAVEMENT HAS
BEEN LAID.
10. INSTALL ALL OTHER UTILITIES.
NOTE: ANY SEDIMENT CONTROL DEVICE LOCATED OVER PROPOSED WATER, SEWER, OR STORM DRAINS MAY BE
DISTURBED TEMPORARILY TO ALLOW FOR CONSTRUCTION OF THE LINES. THE DISTURBED SECTION OF SEDIMENT
CONTROL SHOULD BE REPLACED THE SAME DAY. SUCH WORK SHOULD BE DONE ON A DRY DAY ONLY.
11. CONSTRUCT PROPOSED PAVEMENT TO THE BASE COURSE.
12. CONSTRUCT TOP COURSE OF PAVEMENT ON EXISTING AND PROPOSED PAVEMENT AREAS.
13. WITH THE APPROVAL OF THE INSPECTOR, REMOVE ALL SEDIMENT CONTROL MEASURES AND INSTALL
PERMANENT STABILIZATION TO ALL DISTURBED AREAS. UNBLOCK TRENCH DRAIN OUTFALLS.
NOTE: CONTRACTOR SHALL MAINTAIN ACCESS AT THE LOCATIONS NOTED ON THE PLAN.
NOTE: REFER TO SHEETS C-5-1 THROUGH C-5-3 (SHEETS 9-11) FOR EROSION AND SEDIMENT CONTROL STANDARD
DETAILS AND SPECIFICATIONS.
MAINTAIN CLEAR
PATH FOR INGRESS
AND EGRESS
MAINTAIN CLEAR
PATH FOR INGRESS
AND EGRESS
MAINTAIN 10' MIN.
CLEAR PATH FOR
INGRESS AND EGRESS
MAINTAIN CLEAR
PATH FOR INGRESS
AND EGRESS
MAINTAIN CLEAR
PATH FOR INGRESS
AND EGRESS
STABILIZATION NOTE
FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE,
PERMANENT OR TEMPORARY STABILIZATION MUST BE
COMPLETED WTIHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL
PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES,
AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1
VERTICAL (3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED
OR GRADED AREAS ON THE PROJECT SITE NOT UNDER
ACTIVE GRADING.
NOTE: THIS PLAN IS FOR EROSION AND SEDIMENT CONTROLS ONLY
EXISTING MATURE
VEGETATION COVER
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
TGOS #1
DA = 0.77 AC
VOLUME REQUIRED:
0.77 AC * 1,800 CF/AC = 1,386 CF
VOLUME PROVIDED: 1,408 CF
WEIR CREST ELEV. = 49.25'
ED #2
TYPE: A-2
DA = 0.16 AC
SLOPE: 8.2%
ED #1
TYPE: A-1
DA = 0.61 AC
SLOPE: 1.9%
SIP-A
DA = 0.08 AC
SIP-A
DA = 0.03 AC
SIP-A
DA = 0.03 AC
SIP-A
DA = 0.08 AC
SIP-A
DA = 0.02 AC
SIP-A
DA = 0.02 AC
AGIP
DA = 0.40 AC
SUPER SILT FENCE:
PLACE ON LOD (FENCE OFFSET FOR
GRAPHIC PURPOSES)
CONSTRUCTION OF ALL
UTILITIES OUTSIDE OF
DESIGNED CONTROLS
PER NOTE 22 OF
STANDARD EROSION &
SEDIMENT CONTROL
NOTES ON C-5-2 (SHEET 9)
MAINTAIN POSITIVE
DRAINAGE ALONG
EARTH DIKE
STRUCTURE S-108 &
TRENCH DRAIN
(TYP. 3) TO REMAIN
BLOCKED UNTIL
UPSTREAM AREA IS
STABILIZED)
SIP-B
DA = 0.56 AC
ROP I
CLASS I
W = 11.5 FT
La = 10 FT
T = 19 IN
H = 9 IN
ROP II
CLASS I
W = 15 FT
La = 13 FT
T = 19 IN
H = 12 IN
(CONTRACTOR MAY USE OR
MODIFY EX. RIPRAP TO MEET
REQUIREMENTS ABOVE)
ALL 3:1 SLOPES SHALL
BE STABILIZED WITH
MATTING IMMEDIATELY
AFTER GRADING (TYP.)
NORTH
SD OUTFALL
Q10 = 1.25 CFS
V10 = 0.71 FPS
(MAX.Q & V OCCUR IN
INTERIM CONDITION)
SD OUTFALL
Q10 = 5.32 CFS
V10 = 1.69 FPS
(MAX. Q & V OCCUR IN
FINAL CONDITION)
FOREBAY TO BE GRADED DURING A NOAA
THREE (3) DAY DRY FORECAST AND
STABILIZED WITH GEOTEXTILE MATTING
IMMEDIATELY AFTER GRADING. SEE
SEQUENCE ITEM 4, THIS SHEET.
SEE DETAIL ON C-5-2 FOR SUPER SILT
FENCE ADJUSTMENTS DURING FOREBAY
AND PIPE OUTFALL CONSTRUCTION
USE EX. RIPRAP TO LINE CHANNEL FROM
FOREBAY TO EX. POND. RIPRAP TO
REMAIN SHALL BE ADJUSTED TO MEET
PROPOSED GRADES.
EX. 4" W
INV=50.37
EX. 8" RW
INV=49.24
I
I
MH
MH
ES
PROP. 6" FH LEAD
INV=32.62
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL D-11
AA CO.
TYPE A-1 MH
DETAIL D-11
AA CO.
TYPE A-1 MH
SEE SHT. C-5-5
24" END SEC.
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
P
R
O
P
P
R
O
P
PROP. 15" HDPE
@ 5.00%
P
R
O
P
P
PR
O
P. 24" H D
PE
0.50%
EXISTING
GROUND
PROPOSED
GRADE
18" HDPE
FROM I-109
INV=35.26
PROP. 6" FDC
INV=32.88
EX. UGE (TBR)
INV=35.37
EX. UGE (TBR)
INV=36.51
PROP. 1" UGE
INV=37.50
EX. 2" COMM
INV=37.64
8" HDPE
FROM TD-1
INV=41.81
15" HDPE
FROM S-107
INV=45.89
EX. 2" COMM
INV=48.59
EX. UGE
INV=49.98
EX. 8" S
INV=38.88
(3) PROP.
4" UGE
INV=50.53
FUTURE
GRADE
PAVED
DRIVE
ROP II
CLASS I
W = 15 FT
La = 13 FT
T = 19 IN
H = 12 IN
(2) 6" HDPE
FROM TD-2 &
ROOF DRAIN
INV=48.50
PROP.
8" RW
INV=42.32
EX. 4" W
INV=49.92
PROP.
6" FDC
INV=50.35
EX. 8" S
INV=40.00
I
I
MH
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL D-11
AA CO.
TYPE A-1 MH
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
P
R
O
P
P
P
R
O
P
EXISTING
GROUND
PROPOSED
GRADE
PROP.
8" RW
INV=33.82
24" HDPE
TO ES-101
INV=34.76
18" HDPE
FROM MH-103
INV=35.26
PROP.
4" UGE
INV=40.37
PROP.
4" COMM
INV=42.40
PROP.
2" & 4" COMM
INV=51.06
PROP. 1" UGE
INV=49.83
PROP.
2" & 4" COMM
INV=43.72
EX. 8" RW
INV=49.41
8" HDPE
FROM ROOF
DRAIN
INV=46.17
FUTURE
GRADE
℄TRENCH DRAIN & PAVEMENT
(2) PROP. 2" UGE
INV=51.30
(3) PROP. 4" UGE
INV=48.67
(8) PROP. 2" UGE
INV=41.70
I
ES
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
DETAIL 374.04
MD SHA
STD. WR INLET
SEE SHT. C-5-5
18" END SEC.
PROP. 8" S
INV=46.17
PROP. 15" HDPE
@ 2.00%
P
R
O
P
P
EXISTING
GROUND
PROPOSED
GRADE
I N
V
O
U T
I N
V
I N
I N
V
O
U T
I N
V
I N
I
PROP.
2" & 4" COMM
INV=50.60
PROP. 4" W
INV=49.42
PROP. 8" RW
INV=49.06
PROP.
6" FDC
INV=49.01
FUTURE
GRADE
ROP I
CLASS I
W = 11.5 FT
La = 10 FT
T = 19 IN
H = 9 IN
PROP. 1" UGE
INV=49.92
(2) 2" UGE
INV=50.63
S
I
DRAIN BASIN
NYLOPLAST
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
P
R
O
P
I N
V
O
U T
I N
V
I N
I N
V
I N
I N
V
O
U T
EXISTING
GROUND
PROPOSED
& FUTURE
GRADE
PROP. TRENCH DRAIN
(TD-3)
EX. 8" S
INV=39.62
EX. 8" S
INV=39.29
15" HDPE
TO I-104
INV=43.52
EX. 2" COMM
INV=49.58
PROP. 2" UGE
INV=50.12
EX. 8" S
INV=39.14
EX. 8" S
INV=39.14
EX. UGE
INV=50.53
PROP. 8" HDPE
@ 5.00%
S
EX. 2" COMM
INV=50.48
15" HDPE
FROM I-106
INV=43.62
(2) 6" HDPE
FROM TD-2 &
ROOF DRAIN
INV=47.50
E X
S
V
V
EXISTING
GROUND
PROPOSED
GRADE
EX.
SMH-2
SMH
SEE SHEET C-5-6
48" DROP MH
AA CO.
DETAIL S-11
STANDARD PRECAST MH
SCO
PROP. 8" S (PVC)
@ 2.00%
P
R
O
P
V
C
SMH
EX.
SMH-2A
EX.
SMH-3
E X
S
V
V
V
V
V
V
V
V
P R
O P
S
D
I N
V
P R
O P
S
D
I N
V
I N
V
P R
O P
U
G T
I N
V
P R
O P
U
G E
I N
V
P R
O P
R
W
I N
V
P R
O P
W
I N
V
P R
O P
W
I N
V
P R
O P
R
W
I N
V
P R
O P
U
G T
I N
V
P
R O
P
U
G E
I N
V
P R
O P
W
I N
V
P R
O P
W
I N
V
P R
O P
U
G E
I N
V
P R
O P
R
W
I N
V
P R
O P
W
I N
V
P R
O P
U
G E
I N
V
P R
O P
U
G T
P R
O P
S
D
I N
V
P R
O P
S
D
I N
V
E X
U
G E
I N
V
U N
K
I N
V
P
R O
P
U
G E
E X
U
G T
I N
V
U N
K
E X
U
G E
I N
V
U N
K
I N
V
P R
O P
W
E X
W
I N
V
U N
K
E X
R
W
I N
V
U N
K
I N
V
P R
O P
W
PROP.
TRENCH
DRAIN
I N
V
P R
O P
U
G T
I N
V
P R
O P
U
G E
E X
U
G E
I N
V
U N
K
I N
V
P R
O P
R
W
E X
R
W
T
B R
I N
V
U N
K
I N
V
P R
O P
U
G T
I N
V
P R
O P
U
G E
I N
V
P R
O P
W
I N
V
P R
O P
W
V
V
PROP. 4" S (PVC)
@ 5.00%
FUTURE
GRADE
STUB FOR
FUTURE
EJECTOR PUMP
CONNECTION
FROM LODGE
INV = 41.81
P
R
O
V
C
PROP. TRENCH
DRAIN (TD-1)
MH
PROP. 8" HDPE
@ 3.00%
I N
V
O
U T
I N
V
I N
15" HDPE
FROM I-104
INV=38.44
18" HDPE
TO MH-102
INV=38.19
DETAIL D-11
AA CO.
TYPE A-1 MH
PROP. 6" HDPE
@ 8.33%
PROP. TRENCH
DRAIN (TD-2)
EX. ROOF DRAIN
TO BE BURIED
AND CONNECTED
TO I-105
I
PROP. 6" HDPE
@ 7.14%
I N
V
I N
I N
V
O
U T
I N
V
I N
I N
V
O
U T
15" HDPE
FROM S-107
INV=45.89
15" HDPE
FROM I-106
INV=43.62
15" HDPE
TO I-104
INV=43.52
DETAIL 381.02
MD SHA
PRECAST
YARD INLET
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
B-4-1 STANDARDS AND SPECIFICATIONS
FOR
INCREMENTAL STABILIZATION
DEFINITION
ESTABLISHMENT OF VEGETATIVE COVER ON CUT AND FILL SLOPES.
PURPOSE
TO PROVIDE TIMELY VEGETATIVE COVER ON CUT AND FILL SLOPES AS WORK PROGRESSES.
CONDITIONS WHERE PRACTICE APPLIES
ANY CUT OR FILL SLOPE GREATER THAN 15 FEET IN HEIGHT. THIS PRACTICE ALSO APPLIES TO STOCKPILES.
CRITERIA
A. INCREMENTAL STABILIZATION - CUT SLOPES
1. EXCAVATE AND STABILIZE CUT SLOPES IN INCREMENTS NOT TO EXCEED 15 FEET IN HEIGHT. PREPARE SEEDBED
AND APPLY SEED AND MULCH ON ALL CUT SLOPES AS THE WORK PROGRESSES.
2. CONSTRUCTION SEQUENCE EXAMPLE (REFER TO FIGURE B.1):
A. CONSTRUCT AND STABILIZE ALL TEMPORARY SWALES OR DIKES THAT WILL BE USED TO CONVEY RUNOFF AROUND THE
EXCAVATION.
B. PERFORM PHASE 1 EXCAVATION, PREPARE SEEDBED, AND STABILIZE.
C. PERFORM PHASE 2 EXCAVATION, PREPARE SEEDBED, AND STABILIZE.OVERSEED PHASE 1 AREAS AS NECESSARY.
D. PERFORM FINAL PHASE EXCAVATION, PREPARE SEEDBED, AND STABILIZE. OVERSEED PREVIOUSLY SEEDED AREAS AS
NECESSARY.
NOTE: ONCE EXCAVATION HAS BEGUN THE OPERATION SHOULD BE CONTINUOUS FROM GRUBBING THROUGH THE
COMPLETION OF GRADING AND PLACEMENT OF TOPSOIL (IF REQUIRED) AND PERMANENT SEED AND MULCH. ANY
INTERRUPTIONS IN THE OPERATION OR COMPLETING THE OPERATION OUT OF THE SEEDING SEASON WILL NECESSITATE
THE APPLICATION OF TEMPORARY STABILIZATION.
FIGURE B.1: INCREMENTAL STABILIZATION - CUT
B. INCREMENTAL STABILIZATION - FILL SLOPES
1. CONSTRUCT AND STABILIZE FILL SLOPES IN INCREMENTS NOT TO EXCEED 15 FEET IN HEIGHT. PREPARE SEEDBED
AND APPLY SEED AND MULCH ON ALL SLOPES AS THE WORK PROGRESSES.
2. STABILIZE SLOPES IMMEDIATELY WHEN THE VERTICAL HEIGHT OF A LIFT REACHES 15 FEET, OR WHEN THE
GRADING OPERATION CEASES AS PRESCRIBED IN THE PLANS.
3. AT THE END OF EACH DAY, INSTALL TEMPORARY WATER CONVEYANCE PRACTICE(S), AS NECESSARY, TO
INTERCEPT SURFACE RUNOFF AND CONVEY IT DOWN THE SLOPE IN A NON-EROSIVE MANNER.
4. CONSTRUCTION SEQUENCE EXAMPLE (REFER TO FIGURE B.2):
A. CONSTRUCT AND STABILIZE ALL TEMPORARY SWALES OR DIKES THAT WILL BE USED TO DIVERT RUNOFF AROUND THE
FILL. CONSTRUCT SILT FENCE ON LOW SIDE OF FILL UNLESS OTHER METHODS SHOWN ON THE PLANS ADDRESS THIS
AREA.
B. AT THE END OF EACH DAY, INSTALL TEMPORARY WATER CONVEYANCE PRACTICE(S), AS NECESSARY, TO INTERCEPT
SURFACE RUNOFF AND CONVEY IT DOWN THE SLOPE IN A NON-EROSIVE MANNER.
C. PLACE PHASE 1 FILL, PREPARE SEEDBED, AND STABILIZE.
D. PLACE PHASE 2 FILL, PREPARE SEEDBED, AND STABILIZE.
E. PLACE FINAL PHASE FILL, PREPARE SEEDBED, AND STABILIZE. OVERSEED PREVIOUSLY SEEDED AREAS AS NECESSARY.
NOTE: ONCE THE PLACEMENT OF FILL HAS BEGUN THE OPERATION SHOULD BE CONTINUOUS FROM GRUBBING
THROUGH THE COMPLETION OF GRADING AND PLACEMENT OF TOPSOIL (IF REQUIRED) AND PERMANENT SEED AND
MULCH. ANY INTERRUPTIONS IN THE OPERATION OR COMPLETING THE OPERATION OUT OF THE SEEDING SEASON WILL
NECESSITATE THE APPLICATION OF TEMPORARY STABILIZATION.
FIGURE B.2: INCREMENTAL STABILIZATION - FILL
B-3 STANDARDS AND SPECIFICATIONS
FOR
LAND GRADING
DEFINITION
RESHAPING THE EXISTING LAND SURFACE TO PROVIDE SUITABLE TOPOGRAPHY FOR BUILDING FACILITIES AND
OTHER SITE IMPROVEMENTS.
PURPOSE
TO PROVIDE EROSION CONTROL AND VEGETATIVE ESTABLISHMENT FOR EXTREME CHANGES IN GRADE.
CONDITIONS WHERE PRACTICE APPLIES
EARTH DISTURBANCES OR EXTREME GRADE MODIFICATIONS ON STEEP OR LONG SLOPES.
DESIGN CRITERIA
THE GRADING PLAN SHOULD BE BASED ON THE INCORPORATION OF BUILDING DESIGNS AND STREET LAYOUTS
THAT FIT AND UTILIZE EXISTING TOPOGRAPHY AND DESIRABLE NATURAL SURROUNDINGS TO AVOID EXTREME
GRADE MODIFICATIONS. INFORMATION SUBMITTED MUST PROVIDE SUFFICIENT TOPOGRAPHIC SURVEYS AND
SOIL INVESTIGATIONS TO DETERMINE LIMITATIONS THAT MUST BE IMPOSED ON THE GRADING OPERATION
RELATED TO SLOPE STABILITY, ADJACENT PROPERTIES, DRAINAGE PATTERNS, MEASURES FOR WATER REMOVAL, AND VEGETATIVE TREATMENT, ETC.
MANY JURISDICTIONS HAVE REGULATIONS AND DESIGN PROCEDURES ALREADY ESTABLISHED FOR LAND
GRADING THAT MUST BE FOLLOWED. THE PLAN MUST SHOW EXISTING AND PROPOSED CONTOURS FOR THE
AREA(S) TO BE GRADED INCLUDING PRACTICES FOR EROSION CONTROL, SLOPE STABILIZATION, AND SAFE
CONVEYANCE OF RUNOFF (E.G., WATERWAYS, LINED CHANNELS, REVERSE BENCHES, GRADE STABILIZATION
STRUCTURES). THE GRADING/CONSTRUCTION PLANS ARE TO INCLUDE THE PHASING OF THESE PRACTICES AND
CONSIDERATION OF THE FOLLOWING:
1. PROVISIONS TO SAFELY CONVEY SURFACE RUNOFF TO STORM DRAINS, PROTECTED OUTLETS OR
STABLE WATER COURSES TO ENSURE THAT SURFACE RUNOFF WILL NOT DAMAGE SLOPES OR OTHER
GRADED AREAS.
2. CUT AND FILL SLOPES, STABILIZED WITH GRASSES, NO STEEPER THAN 2:L. (WHERE THE SLOPE IS TO BE
MOWED, THE SLOPE SHOULD BE NO STEEPER THAN 3:L, BUT 4:L IS PREFERRED BECAUSE OF SAFETY
FACTORS RELATED TO MOWING STEEP SLOPES.) SLOPES STEEPER THAN 2:L REQUIRE SPECIAL DESIGN
AND STABILIZATION CONSIDERATIONS TO BE SHOWN ON THE PLANS.
3. BENCHING PER DETAIL B-3-1 WHENEVER THE VERTICAL INTERVAL (HEIGHT) OF ANY 2:L SLOPE EXCEEDS
20 FEET; FOR 3:L SLOPES, WHEN IT EXCEEDS 30 FEET; AND FOR 4:L SLOPES, WHEN IT EXCEEDS 40 FEET.
LOCATE BENCHES TO DIVIDE THE SLOPE FACE AS EQUALLY AS POSSIBLE AND TO CONVEY THE WATER
TO A STABLE OUTLET. SOILS, SEEPS, ROCK OUTCROPS, ETC. ARE TO BE TAKEN INTO CONSIDERATION
WHEN DESIGNING BENCHES.
A. PROVIDE BENCHES WITH A MINIMUM WIDTH OF SIX FEET FOR EASE OF MAINTENANCE.
B. DESIGN BENCHES WITH A REVERSE SLOPE OF 6:L OR FLATTER TO THE TOE OF THE UPPER SLOPE
AND WITH A MINIMUM OF ONE FOOT IN DEPTH. GRADE THE LONGITUDINAL SLOPE OF THE BENCH
BETWEEN 2 PERCENT AND 3 PERCENT, UNLESS ACCOMPANIED BY APPROPRIATE DESIGN AND
COMPUTATIONS.
C. THE MAXIMUM ALLOWABLE FLOW LENGTH WITHIN A BENCH IS 800 FEET UNLESS ACCOMPANIED BY
APPROPRIATE DESIGN AND COMPUTATIONS.
4. DIVERSION OF SURFACE WATER FROM THE FACE OF ALL CUT AND FILL SLOPES USING EARTH DIKES OR
SWALES. CONVEY SURFACE WATER DOWN SLOPE USING A DESIGNED STRUCTURE, AND:
A. PROTECT THE FACE OF ALL GRADED SLOPES FROM SURFACE RUNOFF UNTIL THEY ARE
STABILIZED.
B. DO NOT SUBJECT THE SLOPE’S FACE TO ANY CONCENTRATED FLOW OF SURFACE WATER SUCH
AS FROM NATURAL DRAINAGE WAYS, GRADED SWALES, DOWNSPOUTS, ETC.
C. PROTECT THE FACE OF THE SLOPE BY SPECIAL EROSION CONTROL MATERIALS TO INCLUDE, BUT
NOT BE LIMITED TO, APPROVED VEGETATIVE STABILIZATION PRACTICES, RIPRAP OR OTHER
APPROVED STABILIZATION METHODS.
5. SERRATED SLOPE AS SHOWN IN DETAIL B-3-2. THE STEEPEST ALLOWABLE SLOPE FOR RIPABLE ROCK IS
1.5:1. FOR NON ROCK SURFACES, THE SLOPES ARE TO BE 2:1 OR FLATTER. THESE STEPS WILL
WEATHER AND ACT TO HOLD MOISTURE, LIME, FERTILIZER AND SEED THUS PRODUCING A MUCH
QUICKER AND LONGER LIVED VEGETATIVE COVER AND BETTER SLOPE STABILIZATION.
6. SUBSURFACE DRAINAGE PROVISIONS. PROVIDE SUBSURFACE DRAINAGE WHERE NECESSARY TO
INTERCEPT SEEPAGE THAT WOULD OTHERWISE ADVERSELY AFFECT SLOPE STABILITY OR CREATE
EXCESSIVELY WET SITE CONDITIONS.
7. PROXIMITY TO ADJACENT PROPERTY. SLOPES MUST NOT BE CREATED CLOSE TO PROPERTY LINES
WITHOUT ADEQUATE PROTECTION AGAINST SEDIMENTATION, EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE, OR OTHER RELATED DAMAGES.
8. QUALITY OF FILL MATERIAL. FILL MATERIAL MUST BE FREE OF BRUSH, RUBBISH, LOGS, STUMPS, BUILDING DEBRIS, AND OTHER OBJECTIONABLE MATERIAL. DO NOT PLACE FROZEN MATERIALS IN THE
FILL NOR PLACE THE FILL MATERIAL ON A FROZEN FOUNDATION.
9. STABILIZATION. STABILIZE ALL DISTURBED AREAS STRUCTURALLY OR VEGETATIVELY IN COMPLIANCE
WITH SECTION B-4 STANDARDS AND SPECIFICATIONS FOR STABILIZATION PRACTICES.
MAINTENANCE
THE LINE, GRADE, AND CROSS SECTION OF BENCHING AND SERRATED SLOPES MUST BE MAINTAINED. BENCHES
AND SERRATED SLOPES MUST CONTINUOUSLY MEET THE REQUIREMENTS FOR ADEQUATE VEGETATIVE
ESTABLISHMENT IN ACCORDANCE WITH
SECTION B-4 VEGETATIVE STABILIZATION.
B-4 STANDARDS AND SPECIFICATIONS
FOR
VEGETATIVE STABILIZATION
DEFINITION
USING VEGETATION AS COVER TO PROTECT EXPOSED SOIL FROM EROSION.
PURPOSE
TO PROMOTE THE ESTABLISHMENT OF VEGETATION ON EXPOSED SOIL.
CONDITIONS WHERE PRACTICE APPLIES
ON ALL DISTURBED AREAS NOT STABILIZED BY OTHER METHODS. THIS SPECIFICATION IS DIVIDED INTO
SECTIONS ON INCREMENTAL STABILIZATION; SOIL PREPARATION, SOIL AMENDMENTS AND TOPSOILING;
SEEDING AND MULCHING; TEMPORARY STABILIZATION; AND PERMANENT STABILIZATION.
EFFECTS ON WATER QUALITY AND QUANTITY
STABILIZATION PRACTICES ARE USED TO PROMOTE THE ESTABLISHMENT OF VEGETATION ON EXPOSED SOIL.
WHEN SOIL IS STABILIZED WITH VEGETATION, THE SOIL IS LESS LIKELY TO ERODE AND MORE LIKELY TO ALLOW
INFILTRATION OF RAINFALL, THEREBY REDUCING SEDIMENT LOADS AND RUNOFF TO DOWNSTREAM AREAS.
PLANTING VEGETATION IN DISTURBED AREAS WILL HAVE AN EFFECT ON THE WATER BUDGET, ESPECIALLY ON
VOLUMES AND RATES OF RUNOFF, INFILTRATION, EVAPORATION, TRANSPIRATION, PERCOLATION, AND
GROUNDWATER RECHARGE. OVER TIME, VEGETATION WILL INCREASE ORGANIC MATTER CONTENT AND
IMPROVE THE WATER HOLDING CAPACITY OF THE SOIL AND SUBSEQUENT PLANT GROWTH.
VEGETATION WILL HELP REDUCE THE MOVEMENT OF SEDIMENT, NUTRIENTS, AND OTHER CHEMICALS CARRIED
BY RUNOFF TO RECEIVING WATERS. PLANTS WILL ALSO HELP PROTECT GROUNDWATER SUPPLIES BY
ASSIMILATING THOSE SUBSTANCES PRESENT WITHIN THE ROOT ZONE.
SEDIMENT CONTROL PRACTICES MUST REMAIN IN PLACE DURING GRADING, SEEDBED PREPARATION, SEEDING, MULCHING, AND VEGETATIVE ESTABLISHMENT.
ADEQUATE VEGETATIVE ESTABLISHMENT
INSPECT SEEDED AREAS FOR VEGETATIVE ESTABLISHMENT AND MAKE NECESSARY REPAIRS, REPLACEMENTS, AND RESEEDINGS WITHIN THE PLANTING SEASON.
1. ADEQUATE VEGETATIVE STABILIZATION REQUIRES 95 PERCENT GROUNDCOVER.
2. IF AN AREA HAS LESS THAN 40 PERCENT GROUNDCOVER, RESTABILIZE FOLLOWING THE ORIGINAL
RECOMMENDATIONS FOR LIME, FERTILIZER, SEEDBED PREPARATION, AND SEEDING.
3. IF AN AREA HAS BETWEEN 40 AND 94 PERCENT GROUNDCOVER, OVER-SEED AND FERTILIZE USING HALF
OF THE RATES ORIGINALLY SPECIFIED.
4. MAINTENANCE FERTILIZER RATES FOR PERMANENT SEEDING ARE SHOWN IN TABLE B.6.
B-4-2 STANDARDS AND SPECIFICATIONS
FOR
SOIL PREPARATION, TOPSOILING, AND SOIL AMENDMENTS
B-4-3 STANDARDS AND SPECIFICATIONS
FOR
SEEDING AND MULCHING
EMBANKMENT
EMBANKMENT
EMBANKMENT
REFER TO LANDSCAPE PLANS, DETAILS, AND SPECIFICATION 329113 "SOIL PREPARATION".
REFER TO LANDSCAPE PLANS, DETAILS, AND SPECIFICATION 329200 "TURF AND GRASSES".
Smithsonian Institution
Washington, DC 20024-2520 600 Maryland Avenue S.W. Suite 5001
Smithsonian Facilities
Dewberry Engineers Inc.
10461 MILL RUN CIRCLE
SUITE 300
OWINGS MILLS, MD 21117
(P) 410.265.9500
WWW.DEWBERRY.COM
Federal Reserve Bank Building
100 North 6th Street
Philadelphia, PA 19106-1590
Tel: 215-923-2020 Fax: 215-574-0952
PROFESSIONAL
CERTIFICATION:
S
T
A
MA
R
Y
L
A
N
D
P
R
O
F
E
S
S
I
O
N
G
I
N
E
E
R
N
G U
R
M
E
H
U
N
I A
B-4-5 STANDARDS AND SPECIFICATIONS
FOR
PERMANENT STABILIZATION
B-4-4 STANDARDS AND SPECIFICATIONS
FOR
TEMPORARY STABILIZATION
DEFINITION:
TO STABILIZE DISTURBED SOILS WITH VEGETATION FOR UP TO 6 MONTHS.
PURPOSE:
TO USE FAST GROWING VEGETATION THAT PROVIDES COVER ON DISTURBED SOILS.
CONDITIONS WHERE PRACTICE APPLIES:
EXPOSED SOILS WHERE GROUND COVER IS NEEDED FOR A PERIOD OF 6 MONTHS OF LESS. FOR LONGER DURATION OF
TIME, PERMANENT STABILIZATION PRACTICES ARE REQUIRED.
CRITERIA:
1. SELECT ONE OR MORE OF THE SPECIES OR SEED MIXTURES LISTED IN TABLE B.1 FOR THE APPROPRIATE PLANT
HARDINESS ZONE (FIGURE B.3) AND ENTER THEM IN THE TEMPORARY SEEDING SUMMARY (BELOW) ALONG WITH
APPLICATION RATES, SEEDING DATES AND SEEDING DEPTHS.
2. FOR SITES HAVING SOIL TESTS PERFORMED, USE AND SHOW THE RECOMMENDED RATES BY THE TESTING
AGENCY (SEE TEMPORARY SEEDING SUMMARY THIS SHEET). SOIL TESTS ARE NOT REQUIRED FOR TEMPORARY
SEEDING.
3. WHEN STABILIZATION IS REQUIRED OUTSIDE OF A SEEDING SEASON, APPLY SEED AND MULCH OR STRAW MULCH
ALONE AS PRESCRIBED IN SECTION B-4-3.A.1.B AND MAINTAIN UNTIL THE NEXT SEEDING SEASON.
B-4-8 STANDARDS AND SPECIFICATIONS
FOR
STOCKPILE AREA
DEFINITION
A MOUND OR PILE OF SOIL PROTECTED BY APPROPRIATELY DESIGNED EROSION AND SEDIMENT CONTROL
MEASURES
PURPOSE
TO PROVIDE A DESIGNATED LOCATION FOR THE TEMPORARY STORAGE OF SOIL THAT CONTROLS THE POTENTIAL
FOR EROSION, SEDIMENTATION, AND CHANGES TO DRAINAGE PATTERNS.
CONDITIONS WHERE PRACTICE APPLIES
STOCKPILE AREAS ARE UTILIZED WHEN IT IS NECESSARY TO SALVAGE AND STORE SOIL
FOR LATER USE.
CRITERIA
1. THE STOCKPILE LOCATION AND ALL RELATED SEDIMENT CONTROL PRACTICES MUST BE CLEARLY
INDICATED ON THE EROSION AND SEDIMENT CONTROL PLAN.
2. THE FOOTPRINT OF THE STOCKPILE MUST BE SIZED TO ACCOMMODATE THE ANTICIPATED VOLUME OF
MATERIAL AND BASED ON A SIDE SLOPE RATIO NO STEEPER THAN 2:1. BENCHING MUST BE PROVIDED IN
ACCORDANCE WITH SECTION B-3 LAND GRADING.
3. RUNOFF FROM THE STOCKPILE AREA MUST DRAIN TO A SUITABLE SEDIMENT CONTROL PRACTICE.
4. ACCESS THE STOCKPILE AREA FROM THE UPGRADE SIDE.
5. CLEAR WATER RUNOFF INTO THE STOCKPILE AREA MUST BE MINIMIZED BY USE OF A DIVERSION DEVICE
SUCH AS AN EARTH DIKE, TEMPORARY SWALE OR DIVERSION FENCE. PROVISIONS MUST BE MADE FOR
DISCHARGING CONCENTRATED FLOW IN A NON-EROSIVE MANNER.
6. WHERE RUNOFF CONCENTRATES ALONG THE TOE OF THE STOCKPILE FILL, AN APPROPRIATE
EROSION/SEDIMENT CONTROL PRACTICE MUST BE USED TO INTERCEPT THE DISCHARGE.
7. STOCKPILES MUST BE STABILIZED IN ACCORDANCE WITH THE 3/7 DAY STABILIZATION REQUIREMENT AS
WELL AS STANDARD B-4-1 INCREMENTAL STABILIZATION AND STANDARD B-4-4 TEMPORARY STABILIZATION.
8. 8. IF THE STOCKPILE IS LOCATED ON AN IMPERVIOUS SURFACE, A LINER SHOULD BE PROVIDED BELOW
THE STOCKPILE TO FACILITATE CLEANUP. STOCKPILES CONTAINING CONTAMINATED MATERIAL MUST BE
COVERED WITH IMPERMEABLE SHEETING.
B-4-6 STANDARDS AND SPECIFICATIONS
FOR
SOIL STABILIZATION MATTING
DEFINITION
MATERIAL USED TO TEMPORARILY OR PERMANENTLY STABILIZE CHANNELS OR STEEP SLOPES UNTIL GROUNDCOVER IS
ESTABLISHED.
PURPOSE
TO PROTECT THE SOILS UNTIL VEGETATION IS ESTABLISHED.
CONDITIONS WHERE PRACTICE APPLIES
ON NEWLY SEEDED SURFACES TO PREVENT THE APPLIED SEED FROM WASHING OUT; IN CHANNELS AND ON STEEP
SLOPES WHERE THE FLOW HAS EROSIVE VELOCITIES OR CONVEYS CLEAR WATER; ON TEMPORARY SWALES, EARTH
DIKES, AND PERIMETER DIKE SWALES AS REQUIRED BY THE RESPECTIVE DESIGN STANDARD; AND, ON STREAM BANKS
WHERE MOVING WATER IS LIKELY TO WASH OUT NEW VEGETATIVE PLANTINGS.
DESIGN CRITERIA
1. THE SOIL STABILIZATION MATTING THAT IS USED MUST WITHSTAND THE FLOW VELOCITIES AND SHEAR STRESSES
DETERMINED FOR THE AREA, BASED ON THE 2-YEAR, 24-HOUR FREQUENCY STORM FOR TEMPORARY
APPLICATIONS AND THE 10-YEAR, 24-HOUR FREQUENCY STORM FOR PERMANENT APPLICATIONS. DESIGNATE ON
THE PLAN THE TYPE OF SOIL STABILIZATION MATTING USING THE STANDARD SYMBOL AND INCLUDE THE
CALCULATED SHEAR STRESS FOR THE RESPECTIVE TREATMENT AREA.
2. MATTING IS REQUIRED ON PERMANENT CHANNELS WHERE THE RUNOFF VELOCITY EXCEEDS TWO AND HALF FEET
PER SECOND (2.5 FPS) OR THE SHEAR STRESS EXCEEDS TWO POUNDS PER SQUARE FOOT (2 LBS/FT2). ON
TEMPORARY CHANNELS DISCHARGING TO A SEDIMENT TRAPPING PRACTICE, PROVIDE MATTING WHERE THE
RUNOFF VELOCITY EXCEEDS FOUR FEET PER SECOND (4 FPS).
3. TEMPORARY SOIL STABILIZATION MATTING IS MADE WITH DEGRADABLE (LASTS 6 MONTHS MINIMUM), NATURAL, OR MANMADE FIBERS OF UNIFORM THICKNESS AND DISTRIBUTION OF FIBERS THROUGHOUT AND IS SMOLDER
RESISTANT. THE MAXIMUM PERMISSIBLE VELOCITY FOR TEMPORARY MATTING IS 6 FEET PER SECOND.
MAINTENANCE
THE STOCKPILE AREA MUST CONTINUOUSLY MEET THE REQUIREMENTS FOR ADEQUATE VEGETATIVE
ESTABLISHMENT IN ACCORDANCE WITH SECTION B-4 VEGETATIVE STABILIZATION. SIDE SLOPES MUST BE
MAINTAINED AT NO STEEPER THAN A 2:1 RATIO. THE STOCKPILE AREA MUST BE KEPT FREE OF EROSION. IF THE
VERTICAL HEIGHT OF A STOCKPILE EXCEEDS 20 FEET FOR 2:1 SLOPES, 30 FEET FOR 3:1 SLOPES, OR 40 FEET FOR
4:1 SLOPES, BENCHING MUST BE PROVIDED IN ACCORDANCE WITH SECTION B-3 LAND GRADING.
TABLE H.1: GEOTEXTILE FABRICS
PROPERTY TEST METHOD MD CD MD CD MD CD
MINIMUM AVERAGE ROLL VALUE*
WOVEN SILT
FILM
GEOTEXTILE
WOVEN
MONOFILAMENT
GEOTEXTILE
NONWOVEN
GEOTEXTILE
GRAB TENSILE STRENGTH
GRAB TENSILE ELONGATION
TRAPEZOIDAL TEAR STRENGTH
PUNCTURE STRENGTH
APPARENT OPENING
SIZE**
PERMITTIVITY
ULTRAVIOLET RESISTANCE
RETAINED AT 500 HOURS
ASTM D-4362
ASTM D-4362
ASTM D-4533
ASTM D-6241
ASTM D-4751
ASTM D-4491
ASTM D-4355
200LB
15%
75LB
200LB
10%
75LB
370LB
15%
100LB
250LB
15%
60LB
200LB
15%
80LB
200LB
50%
80LB
450LB 900LB
U.S. SIEVE 30
(0.59MM)
0.05 SEC⁻¹
450LB
U.S. SIEVE 70
(0.21MM)
U.S. SIEVE 70
(0.21MM)
0.28 SEC⁻¹ 1.1 SEC⁻¹
70% STRENGTH 70% STRENGTH 70% STRENGTH
* ALL NUMERIC VALUES EXCEPT APPARENT OPENING SIZE (AOS) REPRESENT
MINIMUM AVERAGE ROLL VALUES (MARV). MARV IS CALCULATED AS THE
TYPICAL MINUS TWO STANDARD DEVIATIONS. MD IS MACHINE DIRECTION; CD
IS CROSS DIRECTION.
** VALUES FOR AOS REPRESENT THE AVERAGE MAXIMUM OPENING.
4. PERMANENT SOIL STABILIZATION MATTING IS AN OPEN WEAVE, SYNTHETIC MATERIAL CONSISTING OF NON-
DEGRADABLE FIBERS OR ELEMENTS OF UNIFORM THICKNESS AND DISTRIBUTION OF WEAVE THROUGHOUT. THE
MAXIMUM PERMISSIBLE VELOCITY FOR PERMANENT MATTING IS 8.5 FEET PER SECOND.
5. CALCULATE CHANNEL VELOCITY AND SHEAR STRESS USING THE FOLLOWING PROCEDURE:
SHEAR STRESS (Τ) IS A MEASURE OF THE FORCE OF MOVING WATER AGAINST THE SUBSTRATE AND IS
CALCULATED AS:
Τ = Γ ⋅ R ⋅SW
WHERE:
Τ = SHEAR STRESS (LB/FT2)
Γ = WEIGHT DENSITY OF WATER (62.4 LB/FT3)
R = AVERAGE WATER DEPTH (HYDRAULIC RADIUS) (FT)
SW = WATER SURFACE SLOPE (FT/FT)
VELOCITY (V) MEASURES THE RATE OF FLOW THROUGH A DEFINED AREA AND IS CALCULATED AS:
V=1.486R S
N
WHERE:
V = VELOCITY (FT/SEC)
N = MANNING’S ROUGHNESS COEFFICIENT
R = HYDRAULIC RADIUS (FT)
S = CHANNEL SLOPE (FT/FT)
6. USE TABLE B.7 TO ASSIST IN SELECTING THE APPROPRIATE SOIL STABILIZATION MATTING FOR SLOPE APPLICATIONS
BASED ON THE SLOPE, THE SLOPE LENGTH, AND THE SOIL-ERODIBILITY K FACTOR.
* SLOPE LENGTH INCLUDES CONTRIBUTING FLOW LENGTH.
** SLOPES STEEPER THAN 2:1 MUST BE ENGINEERED.
*** SOIL HAVING A K VALUE LESS THAN OR EQUAL TO 0.35 CAN BE STABILIZED EFFECTIVELY WITH STRAW MULCH OR
WOOD CELLULOSE FIBER WHEN LOCATED ON SLOPES STEEPER THAN 5%. SOIL STABILIZATION MATTING IS
REQUIRED ON ALL SLOPES STEEPER THAN 5% THAT HAVE SOIL WITH A K FACTOR GREATER THAN 0.35. K FACTOR
RATINGS ARE PUBLISHED IN THE NRCS SOIL SURVEY HTTP:// WEBSOILSURVEY.NRCS.USDA.GOV/APP. DURING
CONSTRUCTION OR RECLAMATION, THE SOIL- ERODIBILITY K VALUE SHOULD REPRESENT THE UPPER 6 INCHES OF
THE FINAL FILL MATERIAL RE-SPREAD AS THE LAST LIFT. ONLY THE EFFECTS OF ROCK FRAGMENTS WITHIN THE
SOIL PROFILE ARE CONSIDERED IN THE ESTIMATION OF THE K VALUE. DO NOT ADJUST K VALUES TO ACCOUNT FOR
ROCKS ON THE SOIL SURFACE OR INCREASES IN SOIL ORGANIC MATTER…
This is the start of the file's text. The full file is on GovTribe.