This is a 75-page Request for Quote (RFQ) solicitation document for grand jury and deposition court reporting services for the U.S. Attorney's Office, District of Columbia. The Executive Office for United States Attorneys (EOUSA) seeks to award an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with one base year and four option years, beginning July 1, 2025 through June 30, 2030.

The solicitation (15JA0525Q00000024) is a 100% small business set-aside under NAICS code 561492 with a size standard of $16.5M. The government plans to make 1-2 multiple awards on a best value basis. Key requirements include providing court reporters, transcriptionists, and related services for grand jury proceedings and depositions in Washington DC. At least one court reporter and one transcriptionist must obtain Top Secret clearance through a Tier 5 investigation, while other personnel require Tier 4 High Risk Public Trust Background investigations. Quotes are due by April 4, 2025 at 12:00 PM ET. The contract will be Time & Materials with task orders issued according to FAR 16.505. Technical capability and past performance are significantly more important than price in the evaluation criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15JA0525Q00000024 Page 1 of 75

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.

1. REQUISITION NUMBER PAGE 1 OF

5. SOLICITATION NUMBER

15JA0525Q00000024

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

03/05/2025

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Jonathan Mayfield Jonathan.Mayfield@usdoj.gov

b. TELEPHONE NUMBER (No collect calls) 8. OFFER DUE DATE / LOCAL

TIME

04/04/2025 12:00 ET

CODE 15JA05

Executive Office for United States Attorney

175 N Street NE

6th Floor

Washington, DC 20530-0021

9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR

X SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

561492

SIZE STANDARD:

16.5

10. THE ACQUISITION IS

SEE SCHEDULE

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

NET 30

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

X REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

CODE15. DELIVER TO

U.S. Attorneys Office District of Columbia Patrick Henry Building 601 D St NW Washington, DC 20530

USADC.acctspayable@usdoj.gov

CODE 15JA0516. ADMINISTERED BY

Executive Office for United States Attorney 175 N Street NE 6th Floor Washington, DC 20530-0021

Perla McKay perla.mckay@usdoj.gov

FACILITY

CODE

CODE

TELEPHONE NUMBER

17a. CONTRACTOR/

OFFEROR

15JA16CODE18a. PAYMENT WILL BE MADE BY

U.S. Attorneys Office District of Columbia Patrick Henry Building 601 D St NW Washington, DC 20530

USADC.acctspayable@usdoj.gov

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Grand Jury and Deposition Court Reporting Services for the U.S. Attorney's Office, District of Columbia

Locations: Washington D.C.

Period of Performance: 07/01/2025 - 06/30/2030

Time and Materials

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

ARE X ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print)

Jonathan T Mayfield

31c. DATE SIGNED

03/05/2024

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

15JA0525Q00000024 Page 2 of 75

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

15JA0525Q00000024 Page 3 of 75

Table of Contents

Section Description Page Number

1 Solicitation/Contract Form 2 Commodity or Services Schedule

EOUSA AI-10-1E Federal Grand Jury Court Reporter Security Requirements (December 2015) EOUSA AI-10-1F Security Requirements for Classified Contract (May 2016)

3 Contract Clauses DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023) DOJ-07 Prohibition On Access By Non-U.S. Citizens To DOJ IT Systems (MAR 2002) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.212-4 Contract Terms and Conditions-Commercial Products and Commercial Services (Nov 2023) 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (May 2024) 52.217-8 Option to Extend Services (Nov 1999) 52.224-1 Privacy Act Notification (Apr 1984) 52.224-2 Privacy Act (Apr 1984) 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021) 52.216-18 Ordering (Aug 2020) 52.216-19 Order Limitations (Oct 1995) 52.216-22 Indefinite Quantity (Oct 1995) DOJ-01 Whistleblower Information Distribution (Oct 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-03 Personnel Security Requirements For Contractor Employees (Nov 2021) DOJ-03 Alt I Personnel Security Requirements For Contractor Employees (Nov 2021); (Alt. I) -- Classified Information -- Cleared Contractors DOJ-08 Continuing Contract Performance During a Pandemic Influenza or other National Emergency (OCT 2007)

4 List of Attachments 5 Solicitation Provisions

52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (May 2024) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.216-27 Single or Multiple Awards (Oct 1995) 52.212-1 Instructions to Offerors-Commercial Products and Commercial Services (Sep 2023) 2852.233-70 Protests Filed Directly with the Department of Justice (NOV 2020) Addendum FAR 52.212-1 Instructions, Conditions and Notices to Offerors (Jul 2021) 52.212-2 Evaluation-Commercial Products and Commercial Services (Nov 2021) 52.217-5 Evaluation of Options (July 1990) Addendum FAR 52.212-2 Evaluation Criteria

15JA0525Q00000024 Page 4 of 75

Section 2 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0001 10 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

Delivery Schedule:

Quantity: 105,000.000000 FOB:

Place of Performance: U.S. Attorneys Office District of Columbia Patrick Henry Building 601 D St NW Washington, DC 20530 USADC.acctspayable@usdoj.gov

105,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0002 5 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

45,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0003 3 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

400 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0004 Next Business Day Transcript (Daily)

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

15JA0525Q00000024 Page 5 of 75

0005 Additional Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

2,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0006 Exhibit Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0007 Attendance Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

7,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0008 Cancellation Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

25 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0009 10 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0010 5 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

500 PG $________ $________$________$_________________

15JA0525Q00000024 Page 6 of 75

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0011 3 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

200 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0012 Next Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0013 Videographer Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

20 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0014 Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

300 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0015 Cancellation Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

10 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0016 Transcription of English provided media:

(3) business days

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

20,000 HR $________ $________$________$_________________

15JA0525Q00000024 Page 7 of 75

Base Period

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0017 Transcription of English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0018 Transcription of English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0019 Transcription of Non-English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

0020 Transcription of Non-English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2025 - 06/30/2026

Base Period

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1001 10 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

105,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1002 5 Business Day Transcript

Grand Jury

PSC: R606

45,000 PG $________ $________$________$_________________

15JA0525Q00000024 Page 8 of 75

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1003 3 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

400 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1004 Next Business Day Transcript (Daily)

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1005 Additional Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

2,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1006 Exhibit Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1007 Attendance Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

7,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1008 Cancellation Fee

Grand Jury

25 EA $________ $________$________$_________________

15JA0525Q00000024 Page 9 of 75

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1009 10 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1010 5 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

500 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1011 3 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

200 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1012 Next Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1013 Videographer Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

20 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

15JA0525Q00000024 Page 10 of 75

1014 Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

300 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1015 Cancellation Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

10 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1016 Transcription of English provided media:

(3) business days

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1017 Transcription of English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1018 Transcription of English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

1019 Transcription of Non-English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

15JA0525Q00000024 Page 11 of 75

COSTS

TRAVEL

COSTS

AMOUNT

1020 Transcription of Non-English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2026 - 06/30/2027

Unexercised Option 1

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2001 10 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

105,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2002 5 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

45,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2003 3 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

400 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2004 Next Business Day Transcript (Daily)

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2005 Additional Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

2,000 PG $________ $________$________$_________________

15JA0525Q00000024 Page 12 of 75

Unexercised Option 2

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2006 Exhibit Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2007 Attendance Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

7,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2008 Cancellation Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

25 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2009 10 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2010 5 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

500 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2011 3 Business Day Transcript

Deposition

200 PG $________ $________$________$_________________

15JA0525Q00000024 Page 13 of 75

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2012 Next Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2013 Videographer Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

20 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2014 Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

300 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2015 Cancellation Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

10 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2016 Transcription of English provided media:

(3) business days

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2017 Transcription of English provided media:

(5) business days

15JA0525Q00000024 Page 14 of 75

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2018 Transcription of English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2019 Transcription of Non-English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

2020 Transcription of Non-English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2027 - 06/30/2028

Unexercised Option 2

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3001 10 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

105,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3002 5 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

45,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

15JA0525Q00000024 Page 15 of 75

3003 3 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

400 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3004 Next Business Day Transcript (Daily)

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3005 Additional Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

2,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3006 Exhibit Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3007 Attendance Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

7,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3008 Cancellation Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

25 EA $________ $________$________$_________________

15JA0525Q00000024 Page 16 of 75

COSTS

TRAVEL

COSTS

AMOUNT

3009 10 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3010 5 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

500 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3011 3 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

200 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3012 Next Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3013 Videographer Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

20 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3014 Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

300 HR $________ $________$________$_________________

15JA0525Q00000024 Page 17 of 75

Unexercised Option 3

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3015 Cancellation Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

10 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3016 Transcription of English provided media:

(3) business days

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3017 Transcription of English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3018 Transcription of English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3019 Transcription of Non-English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

3020 Transcription of Non-English provided media:

(10) business days

15JA0525Q00000024 Page 18 of 75

Line Period of Performance: 07/01/2028 - 06/30/2029

Unexercised Option 3

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4001 10 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

105,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4002 5 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

45,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4003 3 Business Day Transcript

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

400 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4004 Next Business Day Transcript (Daily)

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4005 Additional Copies

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

2,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4006 Exhibit Copies

Grand Jury

100 PG $________ $________$________$_________________

15JA0525Q00000024 Page 19 of 75

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4007 Attendance Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

7,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4008 Cancellation Fee

Grand Jury

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

25 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4009 10 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

7,000 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4010 5 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

500 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4011 3 Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

200 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

15JA0525Q00000024 Page 20 of 75

4012 Next Business Day Transcript

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

100 PG $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4013 Videographer Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

20 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4014 Attendance Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

300 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4015 Cancellation Fee

Deposition

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

10 EA $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4016 Transcription of English provided media:

(3) business days

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4017 Transcription of English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

15JA0525Q00000024 Page 21 of 75

COSTS

TRAVEL

COSTS

AMOUNT

4018 Transcription of English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4019 Transcription of Non-English provided media:

(5) business days

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

20,000 HR $________ $________$________$_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE MATERIAL

COSTS

TRAVEL

COSTS

AMOUNT

4020 Transcription of Non-English provided media:

(10) business days

PSC: R606

Line Period of Performance: 07/01/2029 - 06/30/2030

Unexercised Option 4

20,000 HR $________ $________$________$_________________

Questions due to the Contracting Officer Jonathan Mayfield by Friday March 14, 2025 NLT 12:00 p.m. EST on Jonathan.Mayfield@usdoj.gov

EOUSA AI-10-1E Federal Grand Jury Court Reporter Security Requirements (December 2015)

Federal Grand Jury Court Reporter Security Requirements (December 2015)

1. Grand Jury (GJ) Security.

The work to be performed under this contract will involve access to sensitive information subject to the rules of 6(e) of the Federal Rules of Criminal Procedures. The adequate and continual protection of the information (hereafter referred to as GJ information which includes GJ testimony, discussions, exhibits, etc.) and how it is used, shared, and stored, is extremely important. The secrecy and ultimate security of the GJ information and proceedings is vital to the performance of the U.S. Attorney’s Office (USAO) and the Court. A failure to protect GJ information by anyone involved may be considered a breach of contract, breach of agreement, a violation of standards, and perhaps, an unlawful act. Disclosures of matters appearing before the GJ other than its deliberations, including the vote of any juror may be made available to the attorneys for the Government to use in the performance of their duties. Otherwise, a juror, attorney, interpreter, stenographer, or operator of recorded testimony may disclose matters appearing before the GJ only when so directed by the Court.

a. Violations of the Terms and Conditions. Unauthorized use of GJ information or material could subject the disclosing individual to contempt of court penalties and other applicable penalties. Sensitive information may include, but is not limited to: data found within GJ information, informant and witness information, investigative material, tax information, medical information, computer systems information, Privacy Act (as amended) information, Department of Justice proprietary information, or Federal information that is not releasable to the general public and/or under the guidelines of the Freedom of Information Act (FOIA). Unauthorized duplication or disclosure of the data and other information to which the Contractor may have access as a result of this contract is prohibited by Public Law and is subject to criminal penalties.

15JA0525Q00000024 Page 22 of 75

b. Court Reporter Security Training. The Contractor is responsible for ensuring all employees approved to work with and have access to GJ information and materials are familiar with - and required to follow - continuing responsibilities and the security requirements as outlined in the contract.

c. Failure to Meet Security Requirements. Should the Government determine that the Contractor has failed to comply with the security requirements of the contract, the Contractor may be held responsible, as a minimum, for all reasonable and necessary costs incurred by the Government to: (a) provide coverage (performance) through assignment of individuals employed by the Government or third parties in cases where absence of contract personnel would cause a delay in the proceedings, a security threat, and/or disrupt a DOJ program, and (b) conduct security investigations in excess of those which would otherwise be required. Nothing in this clause shall require the Contractor to bear costs involved in the conduct of security investigations for the replacement of an employee who becomes incapacitated, severely ill, or deceased. Any violation of this requirement subjects the Contractor, subcontractor, employees, etc., to certain penalties including, but not limited to termination of the contract, issuance of a cure notice for less serious violations, and being held in Contempt of Court for failing to safeguard federal GJ information.

d. List of Contractor’s Employees. The Contractor shall submit to the USAO a list of the names of all principals, staff members, and regular employees requiring access to the work performed under the contract. This includes personnel of the principal Contractor and any subcontractor(s).

e. Sub-Contractors. The Contractor must ensure that any sub-contractor furnishing supplies and services which will involve access to GJ materials complies with the security requirement of the contract and has been approved by the Government.

2. Personnel Security.

The USAO will process the background investigations for GJ court reporter(s) identified by the Contractor to the USAO to perform work under this contract. However, this background investigation does not replace or supersede the employer’s responsibility to sufficiently screen and eliminate unsuitable applicants and to take all necessary steps to ensure only qualified persons perform services.

a. Residency Requirement. All Contractor employees assigned to this contract and working within the United States shall meet the DOJ Residency Requirement. The Residency Requirement states that, for 3 of the 5 years immediately prior to applying for a position, the individual must have: (1) resided in the United States; (2) worked for the United States overseas in a Federal or military capacity; or (3) be a dependent of a Federal or military employee serving overseas.

b. Sufficient Personnel. The Contractor must maintain a sufficient number of approved personnel to execute the contract. The Contractor is not to assign GJ court reporting duties unless, and not until, the COR or representative of the USAO provides notification in writing that the employee has been granted the necessary security approval to perform GJ court reporting duties as outlined under this contract.

c. Suspension or Revocation of Access Approval. Access to GJ information can be suspended or revoked for cause at any time by the Contractor and/or the COR.

d. Required Suitability Approval and Background Investigation. Contractor employees must receive a security approval based upon: (1) A Government conducted Moderate Background Investigation (MBI) or higher background investigation, and (2) Favorable adjudication. A security waiver may be requested by the contractor prior to completion of a background investigation when necessary and as outlined by the Government. The Contractor will ensure the required security background investigation forms are completed and submitted. The intent and purpose of the investigation is to preclude the assignment of any individual who poses a threat to the Government or successful contract completion due to past unlawful or inappropriate behavior.

e. Background Investigation Process and Forms. The USAO will initiate the Electronic Questionnaires for Investigations Processing (e-QIP) upon receipt of the Contractor’s or Contractor employee applicant’s name and other information. The applicant will complete sign and submit e-QIP forms to the USAO/POC on the same day the signature pages are signed. The USAO will have 5 days to forward the forms to SEMS/PERSEC. Waiver package will include the following: e-QIP package, and the following forms; Certification, General Release, Medical Release, and Fair Credit pages, DOJ-555 Disclosure & Authorization Pertaining to Consumer Reports, Standards of Conduct Form, OF-306 Declaration for Federal Employment, Foreign Nat’l Relatives or Associates Form (if applicable), employment vouchers (2 if most recent employment is less than 2 years; 1 if most recent

15JA0525Q00000024 Page 23 of 75 employment is more than 2 years), and fingerprints cards (form FD 258) or results. The forms shall be submitted to the SEMS/PERSEC upon completion of e-QIP. The Government may request additional security forms, or additional information, if the contract employee's security forms contain information which requires clarification (i.e.

information concerning criminal history, financial problems, citizenship of family members, etc.)

3. Protecting the GJ Information.

a. Contractor’s GJ Information Processing Site. The location selected by the Contractor and approved by the Government (USAO) for the processing, storage, and preparation of GJ information must be determined in advance of commencement of work. The location for processing is not to be changed or modified without the prior consent of the USAO unless extenuating circumstances or emergencies demand relocation. In such cases, the Contractor must coordinate with the CO or COR. The means and methods for transfer or relocation of any GJ material will also be coordinated and approved by the USAO in advance.

b. Contractor Physical Security Requirements. The physical security standards are extremely important to the Government. The Contractor has a duty and legal obligation to ensure that all physical security measures, practices, and policies are strictly followed and any deviation must be coordinated and approved by the CO. If the Contractor and the CO mutually agree to only using USAO provided space in lieu of the Contractor’s own space, then the physical security requirements of subparagraphs 3d, 3e, and 3f contained in this Annex do not apply.

c. Designated Room or Space. The Contractor will have and use a designated room or space to process, proofread, and store GJ material. When a dedicated room is not feasible or practical, the Contractor must ensure that the room or space used meets or exceeds the required physical security controls, protection standard, and has been pre-approved by the USAO. The requirement is to prevent unauthorized access to the GJ material. The GJ material must be protected against unauthorized disclosure and viewing by other tenants, co-business employees, and unauthorized persons (family, friends, customers, etc.)

d. Door and Locking Hardware. The designated room or space must have an operational door and lock which prevents unauthorized entry into the room or space. Doors must be closed and locked when the room is not in use and when the room is vacated for short periods of time. (The alarm is also to be set if the user is not expected to return within 5 minutes.) The Contractor must have total key control and accountability. Only persons who have been approved to access the GJ information are to possess a key to the pre-approved room or space. The Contractor must ensure that no one is allowed unsupervised and/or unrestricted access to the space where the GJ material is stored unless approved by the government.

e. Windows and Emergency Exits. Windows are allowed provided they are locked and the pre-approved room or space is alarmed and monitored. Emergency exits are allowed and if present, must be alarmed.

f. Intrusion Alarm and Monitoring Service. The designated room or workspace where the material is stored must be equipped with an Intrusion Detection System (IDS) that is connected to a central monitoring station.

The Contractor will provide the USAO a copy of the call or notification list and responder protocols on alarm annunciation. The Contractor must notify the USAO within 2 business days of any alarm activation. The notification must include the time and date of the alarm activation, an explanation of cause if known, incident details including the identification of any missing GJ material (devices, storage media, paper, etc.), and a copy of the activity log from the monitoring station. The Contractor must provide the USAO with a copy of the IDS monitoring history log quarterly (every 90 days) and as requested by the USAO. Knowledge of the code number used to program, arm and/or disarm the system must be limited to those who have Government approved access to the GJ material. Remote monitoring services are not allowed to have the code number. The alarm must be set to “armed” whenever the room is not in use. Short absences of less than 5 minutes in duration do not require the alarm to be set to “armed.” The alarm system is to be tested at least once per year to ensure it is functioning properly and the desired response occurs.

g. Contractor’s GJ Information Storage. The GJ material must be stored only in USAO approved storage container(s). The container must be either equipped with an approved lock or locking mechanism. The combination of a lock shall be restricted to those who have a need-to-know the information and have a security approval. An entry/closure log shall be maintained to record each time a security container is opened and closed and by whom. Any combination will be changed when a person with knowledge of the combination no longer needs or is approved for access, or upon compromise of the combination. End of day security checks shall be performed within the contract facility to ensure that precautions are taken to protect GJ material. The Contractor or an approved contractor’s employee is to make periodic checks to ensure all GJ material has been properly stored.

The periodic security checks shall be annotated in a log or journal. The storage container must be locked when not in use. A storage container that can be easily moved or illegally removed should be mounted or anchored to the floor or wall. It is recommended that the Contractor use a GSA-approved container whenever possible. A Class 3, 4, 5, or 6 is sufficient.

15JA0525Q00000024 Page 24 of 75

h. Use and/or Sale of Grand Jury Information and Transcripts. Grand Jury transcripts may not be sold or made available to anyone other than the Government at any time under any circumstances.

i. Personal Identity Verification (PIV) of Contractor Personnel. The Contractor shall comply with agency personal identity verification procedures that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) Guidance M-05-24, and Federal Information Processing Standards Publication (FIPS Pub) Number 201. The Contractor’s employees who require physical access to the USAO or to USAO controlled information technology or device may be required to be issued and use a PIV Card issued in accordance with HSPD-12. The Contractor must comply with access procedures, policies, and security requirements if and/or when physical and/or virtual access is required to a federally-controlled facility or information system(s).

4. Information Technology (IT) Equipment.

The Contractor must ensure that all devices used to process, store, record, and duplicate GJ information meet the requirements of the USAO and have been approved by the USAO for use. (IT equipment refers to computers, recording devices, scanners, printers, laptops, copiers, and all other devices used to process and/or store GJ information.) When processing GJ Information the computer/laptop must be used as standalone with internet connectivity disabled. The computer/laptop can only be the internet enabled during the timeframe of transmitting files when using file exchange software. Administrative controls over all approved IT devices and settings used for this contract are to be restricted and approved by the Government.

a. Approval and Marking Approved Devices. The Contractor will provide to the USAO the serial numbers of all IT devices used in the performance of this contract over the term of the contract in advance of their use. The approved devices will be clearly marked and labeled as containing federal GJ information or FGI. The devices will also be marked as containing controlled unclassified information (CUI).

b. IT Processing, Transmitting, and Storing GJ. The GJ information processed and stored on a Contractor owned or provided device, must be used solely for the purpose of processing and/or storage of GJ information. Data must be encrypted, including additional peripherals or devices such as a flash drive, thumb drive, and/or external storage. In addition to encryption, any temporary file(s) created by the operating system or user must be deleted after each use. Any and all portable devices or removable media used for GJ must be stored in the approved security container(s) when not in use. The contractor is required to establish an internal process for backing-up GJ information. The USAO can provide physical storage of backed-up GJ information for the Contractor upon request or necessity. The GJ information may not be processed or backed-up on a commercial mainframe, data server, cloud, or with a data warehousing service.

c. Modification and/or Changes to Approved IT. Any modification, repair, or replacement of any IT device used to process and/or store GJ information must be approved by the USAO. Only individuals approved by the USAO are authorized to repair or modify any previously approved device or equipment used for the processing and storage of GJ information.

d. Damaged or Defective Storage Devices. The Contractor will turn over any and all damaged or defective storage media used for processing and/or storing GJ information to the USAO throughout the term of the contract.

e. Access to IT. Access to IT used for, and any products created from or containing, GJ information must be restricted to individuals approved, by name, by the USAO or the Court.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .