Grafton #4 Refuse & Highwall Plans Sheets 31-61 - Rev. 5.0 - 8.19.16.pdf

PDF 18 MB Posted

Attached to
Addendum No 1 Grafton #4 Refuse and Highwall
Solicitation number
ARFQ 0313 DEP1700000030 2
Issued by
Ritchie County, West Virginia

About this file

This is a technical plan sheet document for the Grafton #4 Refuse & Highwall project, Revision 5.0, dated August 19, 2016. The document contains detailed surveyed control points and coordinate data for a mining or refuse management site, with multiple cross-sectional views and plan layouts. The file includes specifications for temporary erosion control infrastructure, specifically rock check dams with sumps, temporary culverts with trenches, and temporary pipe inlet check dams with sediment sumps. The coordinate system references indicate site locations with northing values ranging from approximately N273,076 to N275,500 and easting values from E1,793,500 to E1,800,500, with elevation data (Z values) ranging from approximately 1,176 to 1,287 feet. The plan sheets contain six detailed construction specifications organized by detail number, with profile views and sump pit configurations for managing stormwater and sediment during site operations.

This document serves as engineering design documentation for erosion control and stormwater management infrastructure required for the refuse and highwall management at the Grafton #4 facility. The detailed plans and specifications provided establish the technical requirements for construction and installation of temporary sediment control measures, including precise geometric layouts, elevation specifications, and structural details. No pricing, contractual terms, incumbent information, funding sources, or bidding procedures are contained within this technical plan document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

N:273076.93

E:1798717.71

Z:1280.74

N:273349.81

E:1798502.35

Z:1260.30

CONTROL POINT

CONTROL POINT

CONTROL POINT

N:273834.70

E:1798006.63

Z:1287.56

N:274293.42

E:1797829.39

Z:1281.42

CONTROL POINTCONTROL POINT

N:274234.62

E:1797375.27

Z:1176.43

E1,796,000 E1,798,500E1,798,000E1,797,500E1,797,000

E1,796,500

E1,799,000

N274,000

N274,500

N275,000

N275,500N275,500

N274,000

N274,500

N275,000

E1,798,500E1,798,000E1,797,500E1,797,000 E1,799,000

E1,798,500E1,798,000E1,797,500E1,797,000E1,796,500 E1,799,000

N274,000

N274,500

N275,000

N275,500N275,500

N274,000

N274,500

N275,000

E1,798,500E1,798,000E1,797,500E1,797,000 E1,799,000

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

E1,796,000

N274,500

N275,000

E1,795,500E1,795,000E1,794,500E1,794,000 E1,796,000

E1,793,500

N273,500

N275,000

N274,000

N274,500

N273,500

E1,795,500E1,795,000E1,794,500E1,794,000

E1,793,500

E1,796,000

N274,500

N275,000

E1,795,500E1,795,000E1,794,500E1,794,000 E1,796,000

E1,793,500

N273,500

N275,000

N274,000

N274,500

N273,500

E1,795,500E1,795,000E1,794,500E1,794,000E1,793,500 E1,796,000

X

X

X

X

X

E1,800,500

E1,800,000E1,799,500E1,799,000E1,798,500

E1,798,000

N271,000

N270,500

N271,500

N272,000N272,000

N271,000

N270,500

N271,500

E1,800,000E1,799,500E1,799,000E1,798,500

E1,798,000

E1,800,500E1,800,000E1,799,500E1,799,000E1,798,500E1,798,000

N271,000

N270,500

N271,500

N272,000N272,000

N271,000

N270,500

N271,500

E1,800,000E1,799,500E1,799,000E1,798,500

E1,798,000

DETAIL (2)

DETAIL (4)

DETAIL (5)

DETAIL (1)

DETAIL (6)

DETAIL (3)

ROCK CHECK DAM WITH SUMP

DETAIL (2)

DETAIL (1) - CONTINUED

TEMPORARY CULVERT TRENCH

DETAIL (1)

TEMPORARY PIPE INLET CHECK DAM WITH SEDIMENT SUMP

DETAIL (1) - CONTINUED

TEMPORARY CULVERT PROFILE

DETAIL (3)

SUMP PIT

File details come from the government source that posted it. Updated .