This directive establishes the requirements for implementing Electrostatic Discharge (ESD) control for NASA's Goddard Space Flight Center (GSFC) projects and internal operations. It adopts the American National Standards Institute (ANSI)/ESD S20.20 standard as the baseline for ESD control and requires GSFC's Safety and Mission Assurance Directorate to develop a GSFC ESD Control Plan defining ESD control plan requirements for applicable work performed in GSFC facilities. The directive applies to all GSFC projects and organizations processing ESD Sensitive flight hardware. It requires monthly ESD workstation certification testing and summary reporting to verify compliance. Training requirements are defined in the GSFC ESD Control Plan. Records of the monthly certification summaries must be retained for three years after completion of the final production order for the related hardware component.
The related federal contract opportunity notice announces a final Request for Proposal for the NASA Sounding Rocket Operations Contract (NSROC) IV, with the National Aeronautics and Space Administration Goddard Space Center as the contracting agency. The attached documentation constitutes the eLibrary containing proposal submission instructions and requirements.
View the file
Other files for this federal contract opportunity
Show all 50
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTIVE NO. GPR 8730.6C APPROVED BY Signature: Original Signed By
EFFECTIVE DATE: October 6, 2020 NAME: Eric K. Isaac
EXPIRATION DATE: October 6, 2025 TITLE: Director, Safety and Mission Assurance
CHECK THE GSFC DIRECTIVES MANAGEMENT SYSTEM AT
http://gdms.gsfc.nasa.govTO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.
08/16
Goddard Procedural Requirements (GPR)
COMPLIANCE IS MANDATORY
Responsible Office: 300/Safety and Mission Assurance Directorate
Title: Electrostatic Discharge (ESD) Control
PREFACE
P.1 PURPOSE
This document establishes the requirements for implementing Electrostatic Discharge (ESD) control for
Goddard Space Flight Center (GSFC) projects and internal operations, which comply with the requirements of NPD 8730.5, NASA Quality Assurance Program Policy. This directive establishes
American National Standards Institute (ANSI)/ESD S20.20, Standard for the Development of an
Electrostatic Discharge Control Program for – Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices), as the requirements baseline for
ESD control. Code 300 will develop a GSFC ESD Control Plan, which defines the ESD control plan requirements for applicable work performed in GSFC facilities at the Wallops Flight Facility (WFF) and the Greenbelt Campus. Organizational responsibilities relative to this directive are defined herein.
P.2 APPLICABILITY
a. This GPR applies to all GSFC projects and to all organizations within Greenbelt and WFF that process ESD Sensitive (ESDS) flight hardware. The ESD sensitivity levels considered to be in scope for this directive are defined in the GSFC ESD Plan. For all other applications where ESD sensitive items are handled, including outdoor field operations, these requirements are recommended, as applicable and practical.
b. In this document citations are assumed to be the latest version unless otherwise noted.
c. In this document, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.” The terms “may” or “can” denote discretionary privilege or permission; “should” denotes a good practice and is recommended but not required; “will” denotes expected outcome; and “are/is” denotes descriptive material.
P.3 AUTHORITY
NPD 8730.5, NASA Quality Assurance Program Policy
DIRECTIVE NO. GPR 8730.6C Page 2 of 8
EFFECTIVE DATE: October 6, 2020
EXPIRATION DATE: October 6, 2025
P.4 APPLICABLE DOCUMENTS AND FORMS
a. ANSI/ESD S20.20, Standard for the development of an ESD Control Program for the Protection of
Electrical and Electronic Parts, Assemblies, and Equipment (Excluding Electrically Initiated
Explosive Devices).
b. NPR 1441.1, NASA Records Management Program
c. GPR 1410.1, Directives Management
d. GPR 1420.1, Forms Management
e. GPR 1700.7, Electrical Safety
f. GPR 8730.1, Metrology: Control of Measuring and Test Equipment
g. 300-PG-8730.6.1, GSFC Electrostatic Discharge (ESD) Control Plan
P.5 CANCELLATION
a. GPR 8730.6B, Electrostatic Discharge (ESD) Control
P.6 SAFETY
The requirements prescribed herein are designed for the protection of hardware from damaging
ESD events and are not intended to guarantee the safety of the Operator from all possible electrical hazards. This is particularly true when employing conductive work surfaces or floors while operating at 50 V and above. Additional human safety precautions may be required in accordance with GPR 1700.7, Electrical Safety. Properly maintained and calibrated equipment is essential for the effective and safe processing of flight hardware and ground support systems and the safe and effective performance of our flight projects (See GPR 8730.1). The safety of all hardware processed and handled in ESD controlled areas is also dependent on the proper grounding of the facility and of the common ground points, the proper maintenance and operation of all safety equipment such as Ground Fault Circuit Interrupters (GFCIs) when employing conductive work surfaces, and compliance with resistance requirements for all dissipative surfaces.
P.7 TRAINING
In accordance with ANSI/ESD S20.20, the training plan associated with ESD controls with GSFC facilities are established in the GSFC ESD Control Plan.
DIRECTIVE NO. GPR 8730.6C Page 3 of 8
P.8 RECORDS
Record Title Record Custodian Retention Monthly ESD Workstation
Certification Summary
Code 300 ESD Program
Lead
NRRS 5/35A.1*- Destroy 3 years after completion of final production order for the related component.
*NRRS – NASA Records Retention Schedules (NRRS 1441.1)
P.9 MEASUREMENT/VERIFICATION
The manager of the ESD Control Program in Code 300 will collect results of the Monthly ESD
Workstation Certifications and provide summary data for presentation to the Code 373 Branch Head monthly including, as a minimum, the following:
a. number of workstations inspected by the certification process
b. number of workstations certified
c. number of workstations failing the certification process
d. any test parameters which failed during the certification process http://nodis3.gsfc.nasa.gov/library/lib_docs.cfm?range=1___
DIRECTIVE NO. GPR 8730.6C Page 4 of 8
PROCEDURES
1. The Safety and Mission Assurance (SMA) Directorate shall have the responsibility for establishing
Technical Authority* for the ESD Control Program.
2. For operations at the Greenbelt and Wallops Flight Facilities, both civil servants and contractors operating at facilities that are considered property of GSFC shall meet the requirements within the
GSFC ESD Control Plan*. The GSFC ESD Control Plan* is traceable to ANSI/ESD S20.20 which is required by NPR 8730.5 for all Programs and Projects.
3. The SMA Directorate shall develop and maintain the GSFC ESD Control Plan* in accordance with the requirements of GPR 1410.1 Directives Management and GPR 1420.1 Forms Management.
4. All Directorates shall impose the GSFC ESD Control Plan* on services contracts whose statements of work includes processing of applicable ESDS equipment in the GSFC Greenbelt and Wallops
Flight Facilities. (Reference paragraph P.2 above for definitions of applicability).
5. Flight projects shall require all suppliers who are external to NASA GSFC, and who process applicable hardware in facilities not owned or operated by GSFC, to meet the requirements of
ANSI/ESD S20.20. The GSFC ESD Control Plan* is not for use outside of GSFC owned and operated facilities.
*NOTE: Further information on the ESD Technical Authority and the ESD Control Program can be found in the GSFC Electrostatic Discharge (ESD) Control Plan, 300-PG-8730.6.1.
DIRECTIVE NO. GPR 8730.6C Page 5 of 8
Appendix A – Definitions
The following definitions below apply to terms used in this GPR. See the GSFC Electrostatic Discharge
Control Plan, 300-PG-8730.6.1, for further definitions related to ESD Control.
A.1 Certification: Third party confirmation or guarantee that personnel or ESD protected areas (EPAs) meets the applicable requirements herein.
A.2 Dissipative: The resistive range between conductive and insulative; 5x105 Ω to 1x109 Ω. The low end of this resistance range is derived from the assumption that 110 V discharged through a 5x105 Ω resistor is not life-threatening.
A.3 Electrostatic Discharge (ESD): A rapid transfer of electrostatic charge between bodies at different electrostatic potentials caused by direct contact.
A.4 ESD Sensitive (ESDS) Items: Electrical and electronic parts, assemblies and equipment that are sensitive to electrostatic discharges of specific energy levels.
A.5 Ground: A mass such as earth, a ship, or a vehicle hull, capable of supplying or accepting a large electrical charge without a net change in potential.
A.6 Mission Hardware: Hardware used during execution of the mission as either the launch vehicle, the payload (spacecraft or observatory), or the subsystem (instrument, or other).
A.7 Operator: An individual who is trained and certified to process ESDS mission hardware in the EPA.
A.8 Verification: The act of performing the tests and/or inspections to periodically confirm performance.
DIRECTIVE NO. GPR 8730.6C Page 6 of 8
Appendix B – Acronyms
ANSI American National Standards Institution
CM Configuration Management
ESD Electrostatic Discharge
ESDS Electrostatic Discharge Sensitive
GSFC Goddard Space Flight Center
GFCI Ground Fault Circuit Interrupter
GPR Goddard Procedural Requirement
NASA National Aeronautics and Space Administration
NPD NASA Policy Directive
NPR NASA Procedural Requirement
NRRS NASA Records Retention Schedule
SMA Safety and Mission Assurance
WFF Wallops Flight Facility
WM Workmanship Manual
DIRECTIVE NO. GPR 8730.6C Page 7 of 8
CHANGE HISTORY LOG
Revision Effective Date Description of Changes
Baseline 01/05/2006 Initial Release
A
06/07/2010 Added requirements to:
1. Establish the parent requirements for ANSI/ESD
S20.20, this GPR and GSFC-WM-001
2. Establish GSFC-WM-001 as the ANSI/ESD S20.20 implementation plan for NASA GSFC.
3. Require compliance with GSFC-WM-001 by all projects (flight and developmental) processing hardware in GSFC facilities
4. Clarify that GSFC-WM-001 applies internally to GSFC only.
5. Clarify applicability of GSFC-WM-001 for visiting principle investigators (PIs) and for field operations.
6. Added, https://ossmacm.gsfc.nasa.gov/index.cfm,
7. Provide a point of contact for workspace certification and garment services.
B 01/30/2014 Added/removed requirements to:
1. Establish 300-PG-8730.6.1 as the ANSI/ESD S20.20 implementation plan for NASA GSFC differentiating the former for in-house operations and the latter for operations in non-GSFC facilities.
2. Replace mention of GSFC-WM-001 within for 300-
PG-8730.6.1.
3. Add applicable document and removed one that was not mentioned in the text.
4. Update the “Note” in P.7 concerning legacy contractual requirements.
5. Reformat Training section and added language clarifying requirements.
6. Reformat Records section.
7. Clarify the language in Section 2 of Procedures concerning facilities 300-PG-8730.6.1 is applicable to.
B 01/19/2019 Administratively extending for 6 months from current expiration date.
B 07/24/2019 Administratively extended for 6 months
C 10/06/2020 Added/removed requirements to:
1. References updated appropriately.
2. Appendix A definitions expanded on.
https://ossmacm.gsfc.nasa.gov/index.cfm
DIRECTIVE NO. GPR 8730.6C Page 8 of 8
08/16
3. Reduced Records section since some records are defined within the GSFC Electrostatic Discharge
Control Plan.
4. Expanded the Measurement/Verification section to better capture metrics.
5. Removed redundant statements within the Training section that are already within the GSFC Electrostatic
Discharge Control Plan requirements and training section.
6. Clarified language in the Safety section with regards to personnel safety.
File details come from the government source that posted it. Updated .