About this file

This document is the final request for proposal for the NASA Sounding Rocket Operations Contract (NSROC) IV. The solicitation is issued by the National Aeronautics and Space Administration Goddard Space Center to procure services for sounding rocket operations, including launch services, payload integration, flight hardware processing, and post-flight data analysis. Proposals are due by April 30, 2021, with an anticipated award date of August 1, 2021. The single-award, indefinite-delivery/indefinite-quantity contract has a five-year base period of performance and five one-year options, for a total value of $150 million over ten years.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
NSROC III NNG16WA70C Attachment M - Contract Historical Data 19-20.pdf PDF
SRPO Technology Roadmap June 2021.pdf PDF
NSROC III List of Ongoing Work - October 2021.pdf PDF
SRPO Annual Report 2016.pdf PDF
Rocket_Report_4th_quarter_2019.pdf PDF
SR User Handbook Final_July 2015.pdf PDF
SRPO Annual Report 2019.pdf PDF
Doing Business with Wallops.pdf PDF
Sounding Rockets_NASA_fact_sheet.pdf PDF
NASA-STD-8719.12A Safety Standard for Explosives, Propellants, and Pyrotechnics.pdf PDF
803-GS-ESP-ES-F10-01 F-10 Explosive Site Plan.pdf PDF
803-PG-8730 1 WFF Met and Cal Lab Quality Manual.pdf PDF
GPR 8710.2.pdf PDF
NPR 8715.3.pdf PDF
NPR 4200.2.pdf PDF
GPD 7150.0.pdf PDF
GPR 1840.1.pdf PDF
GPR 8715.8.pdf PDF
GPR 8715.1.pdf PDF
GPR 8710.7.pdf PDF
GPR 7120.11.pdf PDF
200-PG-8812.1.1 Wallops Facilities Review Committee.pdf PDF
800-PG-8715.5.1A Range Safety Process for Programs and Projects.pdf PDF
GPR 8500.1.pdf PDF
NPR 1040.1 Updated.pdf PDF
NPD 8730.5.pdf PDF
GPR 1820.2.pdf PDF
GPR 1840.2.pdf PDF
GPR 1600.2.pdf PDF
GPR 8800.1.pdf PDF
GPR 8715.12.pdf PDF
GPR 4100.2.pdf PDF
NPD 8700.1 Updated.pdf PDF
800-PG-8715.0.4C_Certification Procedures for OSS at WFF.pdf PDF
NPD 2800.1.pdf PDF
NPR 6000.1.pdf PDF
NPD 2025.1.pdf PDF
800-PG-8710.0.2D Operations in Cold Weather Environments.pdf PDF
GPD 1800.0.pdf PDF
800-PG-7120.4.1 Risk Mgmt.pdf PDF
NPR 5200.1.pdf PDF
SR Risk Management Plan Official Release - 2010-04-15 signed and scanned.PDF PDF
NSROC III Selection Statement.pdf PDF
SRPO Annual Report 2018.pdf PDF
Wallops Range Users Handbook.pdf PDF
Rocket Report 3rd quarter 2020.pdf PDF
Rocket Report 2nd quarter 2020.pdf PDF
SRPO Annual Report 2020.pdf PDF
SRPO Missions Bluebook September 2021.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIVE NO. GPR 8621.4A APPROVED BY Signature: Original Signed By

EFFECTIVE DATE: September 24, 2019 NAME: Eric K. Isaac

EXPIRATION DATE: September 24, 2024 TITLE: Director, Safety and Mission Assurance

CHECK THE GSFC DIRECTIVES MANAGEMENT SYSTEM AT

http://gdms.gsfc.nasa.gov TO VERIFY THAT THIS IS THE CORRECT VERSION PRIOR TO USE.

08/16

Goddard Procedural Requirements (GPR)

COMPLIANCE IS MANDATORY

Responsible Office: 360/Safety Division

Title: GSFC Mishap/Close Call Preparation and Response

PREFACE

P.1 PURPOSE

This directive establishes procedures and requirements for reporting, processing, and investigating mishaps and close calls at the Goddard Space Flight Center (GSFC). This includes the establishment of investigation authorities and the development, implementation, and evaluation of corrective actions and lessons learned. The purpose of mishap and close call investigations is to identify root cause(s) in order to prevent recurrence and reduce the number and severity of future mishaps and close calls. This directive is the GSFC implementation of NPR 8621.1.

P.2 APPLICABILITY

a. This directive is applicable to all activities that could generate a NASA mishap or close call, as defined per NPR 8621.1. This includes NASA organizations conducting work onsite or at offsite facilities owned or controlled by GSFC. It is also applicable to offsite operations that are NASA-controlled or involve NASA-owned instruments or spacecraft. It is applicable to NASA GSFC contractors as specified in their contracts or grants, and other organizations as specified in written operating agreements. Mishaps or close call investigations involving local operations or remote deployments at or by WFF are managed by the Wallops Safety Office. This document does not address processing, reporting, or investigation of anomalies or non-conformances. This directive does not apply to investigations concerning civil, criminal, or administrative culpability or legal liability. The safety investigative process will not be used to direct or justify disciplinary action.

b. In this directive, all document citations are assumed to be the latest version unless otherwise noted.

c. In this directive, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.” The terms “may” or “can” denote discretionary privilege or permission; “should” denotes a good practice and is recommended but not required; “will” denotes expected outcome; and

“are/is” denotes descriptive material.

P.3 AUTHORITY

NPR 8621.1, NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and

Recordkeeping http://gdms.gsfc.nasa.gov/

DIRECTIVE NO. GPR 8621.4A Page 2 of 38

EFFECTIVE DATE: September 24, 2019

EXPIRATION DATE: September 24, 2024

P.4 APPLICABLE DOCUMENTS AND FORMS

a. NPR 3792.1, NASA Plan for a Drug-Free Workplace

b. NPR 7120.5, NASA Space Flight Program and Project Management Requirements

c. NPR 8715.2, NASA Emergency Management Program Procedure Requirements

d. GPR 8710.2, GSFC Emergency Management Program Plan

e. NTSB 6120, Pilot/Operator Aircraft Accident Report

f. NASA Shared Services Center Service Delivery Guide, NSSC-HR-SDG-0002

g. NFS 1852.223-70 NASA FAR Supplement

h. 803-PLAN-0003, Emergency Operations Plan for Wallops Flight Facility

i. GSFC Form 23-89, GSFC Mishap/Close Call Investigation Report

j. GSFC Form 23-96A, Witness Statement

P.5 CANCELLATION

GPR 8621.4-, GSFC Mishap Preparedness and Contingency Plan

P.6 SAFETY

N/A

P.7 TRAINING

Training will be in accordance with NPR 8621.1, Appendix D, Mishap Required Training.

P.8 RECORDS

Record Title Record Custodian Retention

NASA Mishap Information

System (NMIS) Report

Safety Division, Code 360 NRRS 8/103

Permanent - Cut off records at close of program/project or in 5-year blocks. Destroy/delete between 0 and

30 years after program/project cutoff.

Case file of all Type A, B, and

High Visibility records from an investigation, including

Closeout Letter and Report, hard copy files.

Safety Division, Code 360 *NRRS 1/122

Permanent – Retire to Federal

Records Center when 2 years old.

Transfer to National Archives when

20 years old.

SATERN/Records of Root

Cause & other mishap related training

NASA Shared Services

Center

*NRRS 3/33 C – Destroy or delete 5 years after separation of employee or when no longer needed, whichever comes first.

*NRRS 1441.1 – NASA Records Retention Schedules

DIRECTIVE NO. GPR 8621.4A Page 3 of 38

P.9 MEASUREMENT/VERIFICATION

The appropriate Safety Organization will gather metrics and lessons learned from mishap event, such as trends, numbers of events, etc.

Additional metrics will be identified and utilized as appropriate. These metrics will be reported to management and safety committees on a periodic basis or as requested.

PROCEDURES

INTRODUCTION

This document describes the mishap management program for the Goddard Space Flight Center and its component facilities.

This document provides requirements that specify expectations for the following:

a. preparing for the possibility of mishaps;

b. responding to events that occur;

c. reporting, investigating, and documenting mishaps or close calls;

d. determining and tracking resulting corrective actions;

e. promoting “lessons learned” through these activities.

The purpose of this activity is to reduce the risk of future work-related injury, property damage, or mission failure by determining causal factors and implementing corrective actions.

Mishap and close call type classifications are defined in NPR 8621.1, Paragraph 2.4, and in paragraph

4.1 of this document.

1. Roles and Responsibilities

All GSFC entities will follow the roles and responsibilities that are defined in NPR 8621.1 and NPR

3792.1. The following are in addition to the NPR requirements:

1.1 The GSFC Center Director shall:

a. Delegate the initial classification of the mishap to the appropriate safety organization;

b. Delegate the role of Appointing Official for investigation of Type C mishaps, Type D mishaps, close calls, as defined in NPR 8621.1.

1.2 Directors shall:

a. Support Interim Response Team (IRT) or investigating authority needs by providing subject matter experts, equipment, contractor support, and other needed resources; and

DIRECTIVE NO. GPR 8621.4A Page 4 of 38

b. Appoint investigating authority for Type C mishaps.

1.3 Managers shall:

Appoint investigating authority for Type D mishaps and close calls.

1.4 Appointing Official will:

a. Determine the type of investigating authority MIB, MIT, or MI that will investigate a mishap or close call or whether NASA will accept the investigation and subsequent mishap report of another competent authority that may have jurisdiction;

b. Determine the level of NASA involvement when a mishap resulted from the actions of an outside source that was not involved in NASA operations;

c. Appoint the mishap investigating authority in accordance with NPR 8621.1;

d. Ensure that the investigation is conducted in accordance with NPR 8621.1; and

e. Serve as an endorsing official for mishaps and close calls for investigation reports for which he/she is the appointing official.

1.5 Human Resources Office, Code 110, will:

a. Coordinate appropriate notifications to families of civil servants in the case of a fatality or serious injury; and

b. Notify the NASA Shared Services Center (NSSC) when drug testing services are required for mishaps and close calls.

1.6 Office of Communications, Code 130, will:

a. Prepare emergency information for the media, when necessary;

b. Handle inquiries from the media and the public; and

c. Coordinate and disseminate information to GSFC employees, as appropriate;

1.7 Facilities Management Division, Code 220, will:

a. Provide a skilled damage-assessment team who will assist in determining extent of damaged area if the mishap is facilities-related;

b. Evaluate the effect of damage on GSFC facilities and facilitate long-range recovery planning;

c. Determine recovery times of any affected utility systems; and

d. Assist in returning the facility to operational status, including but not limited to removing debris, restoring electrical and water service, and condemning unsafe structures.

1.8 In addition to emergency response, recovery and mitigation actions detailed in GPR 8710.2, the

Incident Commander (IC), Code 240, shall:

DIRECTIVE NO. GPR 8621.4A Page 5 of 38

a. Preserve the scene to the greatest extent possible so that mishap investigation activities can commence;

b. Notify appropriate safety organization through the emergency notification process

c. Support the appropriate Safety Organization with impounding data, records, equipment and facilities;

d. Relinquish site transfer command to the Interim Response Team after all incident management, including rescue and law enforcement activity efforts are completed and it has been determined that there is no evidence of any criminal activity. Note: if recovery/mitigation activities are required following response to a major emergency, a unified command may be established by the Incident

Commander to allow recovery/mitigation to occur simultaneously with IRT activities. If no recovery/mitigation required, IRT may take over;

e. Provide all evidence gathered at the scene or related to the incident to the IRT or investigating authority; and

During emergency events, the ultimate responsibility for the safe conduct of emergency operations rests with the IC and field supervisors at all levels of incident management, and if activated, the Emergency

Operations Center (EOC) Manager. For off-site operations, the IC role will be local emergency response. Not all mishap incidents will involve emergency response, but for those that do the Incident

Commander is completely in charge until such time that the scene is turned over to the IRT.

1.9 Information and Logistics Management Division, Code 270, will:

Provide urgent logistical (including, but not limited to photographic, administrative, stenographer, and/or graphics) support for the IRT and the investigating authority, when requested.

1.10 The Safety Division, Code 360, shall:

a. Provide for oversight and development of the GSFC mishap management program;

b. Serve as the GSFC NMIS administrator,

c. Coordinate with directorates in order to facilitate the availability of mishap-related training as needed to maintain a pool of employees for participating on a mishap-investigation authority.

d. Coordinate the establishment of GSFC IRT for GSFC mishaps and close calls at Greenbelt. For those projects that have an approved Program/Project Mishap Preparedness Contingency Plan

(MPCP) in place, the MPCP should be considered in support of this GPR during any mishap response at Greenbelt.

e. Assist the GSFC Director with determining the type of investigating authority that will investigate a mishap or close call and determine whether NASA will accept the investigation and report of another competent authority having jurisdiction;

f. Generate the board appointment memorandum for signature by the appointing official for Type A mishaps, Type B mishaps, and high-visibility mishaps and high-visibility close call investigations;

g. Notify GSFC Center Director of any mishap or close call, and make other notifications as detailed in paragraph 3.3 of this document;

DIRECTIVE NO. GPR 8621.4A Page 6 of 38

h. Coordinate with the appropriate directorate POCs who will initiate the investigative process if the event is other than a Type A or B mishap, high-visibility mishap or high visibility close call investigations;

i. Support Investigating Authority (IA) needs by serving as Center IRT, and providing subject matter experts, equipment, contract support and other needed resources;

j. Verify that NASA contractors and grantees conduct mishap investigations and provide mishap reports as specified in their contracts and in NFS 1852.223-70;

k. Assist the Investigating Authority in recommending what administrative, logistical, and information technology support may be needed for an IRT response;

l. Review preliminary mishap investigating authority reports for compliance with NPR 8621.1 requirements;

m. Ensure that Center-managed flight project-related mishaps and close calls are investigated per this document and NPR 8621.1; and

n. Disseminate “Lessons Learned” related to mishap and close call events.

1.11 Information Technology and Communications Directorate, Code 700, will :

Provide IT resources to the investigating authority, when requested.

1.12 The Wallops Safety Office, Code 803, shall:

a. Ensure that NMIS access requests are approved/disapproved appropriately;

b. Notify GSFC management of a mishap or close call, as detailed in paragraph 3.3 of this document;

c. Contact the appropriate appointing official who will initiate the investigative process if the event is other than a Type A or B mishap, high-visibility mishap or high visibility close call investigation;

d. Provide guidance to WFF mishap investigation authorities;

e. Coordinate board appointments, activities and logistics requirements with Code 360 for Type A or

B mishaps and high-visibility mishap or close call investigations;

f. Coordinate the establishment of IRTs for mishaps and close calls at WFF, and at remote sites for

WFF-managed activities;

g. Support IRT or Investigating Authority needs by providing subject matter experts, equipment, contract support and other needed resources;

h. Verify that NASA contractors and grantees conduct mishap investigations and provide mishap reports as specified in their contracts and in NFS 1852.223-70;

i. Assist the Investigating Authority in recommending what administrative, logistical, and information technology support may be needed to support the IRT response and investigation;

j. Provide initial capability and support for the IRT to function until an Investigating Authority is established; and

k. Notify the National Transportation Safety Board (NTSB) of mishaps and close calls involving aircraft. This notification will be made by the GSFC Chief of Aircraft Operations. In addition, NTSB Form 6120 should be completed in accordance with NPR 8621.1 and NTSB requirements.

l. Generate Lessons Learned as appropriate to share information in order to prevent recurrence of similar incidents

DIRECTIVE NO. GPR 8621.4A Page 7 of 38

1.13 Each Interim Response Team (IRT) will:

a. Maintain communication status with the incident commander to ensure the flow of critical information, the securing of the mishap site, and the avoidance of further damage or injuries;

b. Provide liaison and coordination with other entities;

c. Identify witnesses and collect witness statements. It is recommended that GSFC form 23-96A, Witness Statement, be used for this. Verbal statements should be promptly written down;

d. Support the Office of Communications, the appropriate safety organization, and the GSFC Director in the release of information regarding known hazards and their potential effects and provide instructions to mitigate risk and harm;

e. Preserve potential evidence, document the scene, retain and control witness statements, and collect debris; and

f. Relinquish control of the site command to the investigating authority or chairperson of the appropriate safety organization upon request.

1.14 Programs and Projects will:

a. Assist the appropriate safety organization with determining the classification of an incident;

b. Develop Program/Project MPCPs in accordance with NPR 8621.1and NPR 7120.5;

c. Establish a trained IRT to respond to an off-Center event, and provide support to any on-Center IRT response as requested

d. In the event of a mishap or close call involving their program or project, programs/projects will activate the MPCP for activities not located at a GSFC Facility. If the mishap or close call occurs at a GSFC-managed facility, the project MPCP will be supportive of a GSFC IRT response;

e. Halt operations/testing, as soon as possible after a mishap/close call, at a point where no additional hazard will be created. Notify their supervisor or individual within their management chain and the appropriate safety organization as soon as possible. If directly affecting project hardware, notification to project safety/management should be provided. Operations shall not resume until authorized by the appropriate safety organization, IRT, or investigating authority;

f. Provide funding and support for investigations within their program jurisdiction or involving their hardware and facilities;

g. Provide technical support (as necessary) to mishap or close call investigations;

h. Track Program/Project-owned corrective actions through implementation and closure; and

i. Generate Lessons Learned as appropriate to share information in order to prevent recurrence of similar incidents.

1.15 Contracting Officers will:

a. Coordinate with Contracting Officer’s Representative (COR) to initiate drug testing protocols after an event, if contractually required;

b. Ensure that the contract project manager is notified when their employees are involved in an incident;

DIRECTIVE NO. GPR 8621.4A Page 8 of 38

c. Ensure contractors report mishaps, close calls, emergencies, and unsafe or potentially unsafe conditions, in the workplace; and

d. Ensure contractors investigate all mishaps/close calls in accordance with the respective contract.

1.16 Supervisors will:

a. Require and encourage employees to report mishaps, close calls, emergencies, and unsafe or potentially unsafe conditions in the workplace;

b. Notify the appropriate safety organization of mishaps or close calls;

c. Notify the appropriate Facility Operations Manager if the mishap or close call is facility-related;

d. Ensure that mishaps and close calls are reported in NMIS;

e. Ensure employees involved in mishap investigations or IRTs are trained in accordance with NPR

8621.1 requirements and this document. It is recommended that CERTrak be utilized for maintaining training and OJT records; and

f. Appoint the Investigating Authority for Type D mishaps and close calls.

g. Share lessons learned with their employees for awareness and in order to prevent recurrence of similar incidents.

h. Coordinate with the Human Resources Office to obtain drug testing if necessary.

1.17 Employees will:

a. Immediately report emergencies at GSFC Greenbelt by calling 911 from any GSFC phone, or

(301)286-9111 from a cellular phone. At WFF, call 911 or x1333 from a land line. Consult local procedures for all other facilities.

b. Report unsafe or potentially unsafe conditions, mishaps and close calls to supervisor, Facility manager, NMIS database, or through any other valid channel.

c. Safe the scene and/or halt operations or testing if an unsafe condition arises (unless ceasing operations would create greater danger), and notify the supervisor. Operations shall not resume until authorized by the appropriate safety organization, IRT, or investigating authority;

d. Take action to limit further property damage or personnel injury if it can be done safely;

e. Remain on the scene in a safe location until all necessary information is provided to emergency responders and/or the investigating authority; and

f. Cooperate with IRT and/or investigating authority.

2.0 Pre-Mishap Planning

2.1 MPCPs

a. Project MPCPs

(1) Programs/Projects will develop MPCPs for any NASA-owned instrument or higher assembly that will be located off Center. At WFF MPCPs are required for onsite Range and Aircraft operations.

DIRECTIVE NO. GPR 8621.4A Page 9 of 38

(2) Projects will ensure that these plans definitively address notification, response, investigation, recording, and preparedness procedures for mishaps that occur offsite, as defined in NPR 8621.1 and in line with program/project expectations.

(3) Programs/Projects will provide a final copy of approved MPCP to 360 Mishap Program Manager or the WFF Mishap Program Manager (as applicable) no later than 30 days prior to shipment.

(4) Mishap Program Manager will forward a copy of approved Project MPCP to OSMA Mishap

Investigation Program Executive as soon as received.

(5) MPCPs are intended for open distribution, and will not contain data that require restrictions (i.e., proprietary, export-controlled, or SBU markings).

b. Center MPCP

(1) The MPCP for Greenbelt operations is Appendix C.

(2) The institutional plan for WFF is 803-GS-PLN-INST-01F Institutional Mishap Preparedness and

Contingency Plan.

2.1.1 MPCPs for programs/projects programs/projects formed and governed under the authority of

NPR 7120.5 or NPR 7120.8, and managed by GSFC, will:

a. Be utilized to provide additional program/project information, i.e., hazards, contact lists, agreements, etc. The plan should be stand alone for offsite mishaps and should include information regarding mishaps occurring at offsite contractor locations;

b. Be approved by the program/project manager as well as the project chief safety and mission assurance officer (CSO) or appropriate safety organization. Concurrence of the Program Executive is also required for all missions prior to shipment to the launch site;

c. Have initial draft readied by Preliminary Design Review, and be completed prior to the

Program/Project Critical Design Review (CDR) or other appropriate readiness review;

d. Be evaluated and updated as necessary prior to Pre-Ship Review (PSR) and Safety and Mission

Success Review (SMSR), when applicable; and

e. Be submitted to OSMA Mishap Program Manager once fully approved to be posted on the OSMA secure mishap website. The Mishap Program Manager will facilitate this submittal.

2.1.2 Programs, Projects and Instrument developers not required to have an MPCP by NPR 7120.5 or

NPR 7120.8 will follow the mishap response requirements of this document and NPR 8621.1.

2.1.3 The MPCP, including emergency response, will be practiced at regular intervals as well as during contingency simulations that occur prior to major test, launch, or activity for ongoing programs with repeated activities, the Program Mishap Preparedness and Contingency Plan will be exercised through a simulated response every 18 months or at a frequency established by the program/project

MPCP.

DIRECTIVE NO. GPR 8621.4A Page 10 of 38

The Program/Project Chief Safety and Mission Assurance Officer (CSO), Project Safety Manager

(PSM) or Project Safety Engineer (PSE) will coordinate with the Project Manager to schedule these simulations and tabletop reviews. The PSM will provide feasible scenarios to use for these simulations. The simulations and tabletop reviews should take place prior to key project events.

Mishap Program Manager will be available to support all tabletop exercises.

2.1.4 Prior to key project events the Program/Project Interim Response Team (IRT) will do the following:

a. Meet and discuss each person’s roles and responsibilities as a member of the IRT;

b. Evaluate need for ‘go kits,’ and arrange to have them ready in time to support project event. These kits should be assembled and maintained by the program/project. Suggestions for what to include in a ‘go kit’ are listed in Appendix C, but each project should evaluate specific needs.

Note: go-kits should not include items that require specialized training/expertise for use (such as respirators, gas detection devices, etc.) or that would be used for activities that are not the responsibility of the program/project (such as traffic control devices);

c. Obtain all forms (evidence log, evidence voucher, written witness statement);

d. Ensure that required training has been taken by IRT members;

e. Ensure Project creates and maintains a list of project personnel supervisor, contracting officers, and contractor drug testing agreements (for the purpose of potential drug testing); and

f. Report the outcome(s) of the discussion to Project Management, noting any deficiencies and the actions needed to correct them.

2.2 Interim Response Team (IRT) Appointment

2.2.1 The Safety Division (Code 360) and the WFF Safety Office (Code 803) shall appoint the Center

IRT for their respective locations. Programs/Projects follow the process defined in the Program MPCP for IRT appointment, and illustrated below in Figures 2.2-1 and 2.2-2:

Figure 2.2-1: Response for on-Center mishap

DIRECTIVE NO. GPR 8621.4A Page 11 of 38

Figure 2.2-2: Response for off-center mishap

2.2.2 All IRT members will take the IRT training as required by NPR 8621.1, Appendix D.

2.2.3 GSFC will maintain an IRT in accordance with Appendix C (Greenbelt), and 803-GS-PLN-

INST-01F Institutional Mishap Preparedness and Contingency Plan (WFF) , as well as any existing

Program/Projects MPCPs. IRT members will function in various roles following a mishap until the investigation is turned over to an investigation authority. The IRT will be formed based on the nature of the mishap and may consist of any of the following roles:

a. IRT Lead – Civil servant in charge of all IRT activities. Assumes control of mishap site from

Incident Commander and remains in control of scene and evidence. Maintains control of evidence/data;

b. Deputy IRT Lead – Civil servant in charge of IRT activity coordination in the absence of the IRT lead;

c. Mishap Scene Security Coordinator – Individual designated to ensure that the mishap scene is secured after the mishap occurs. This will usually be a member of the Protective Services Division;

d. Written Witness Statement Coordinator – Civil servant designated to coordinate the process of having identified persons fill out witness statements of the incident and/or events leading up to it;

e. Handling and Impoundment Coordinator (HIC) – Civil servant designated to coordinate all activities pertaining to hardware, documentation and debris impounding. The individual designated to be in charge of secure storage for impounded material;

f. Chain of Custody Custodian – Civil servant designated to coordinate the securing of sensitive and personal items of injured or ill victims of a mishap;

DIRECTIVE NO. GPR 8621.4A Page 12 of 38

g. Photographic Support – Individual designated to take official pictures of the scene and debris sites;

h. Office of Communications Advisor – Individual from the Office of Communications that will release mishap related information to the public. Responsible for responding to media/press releases or inquiries;

i. Office of Chief Counsel Advisor – Individual from the Office of Chief Counsel that will advise the

IRT on legal matters pertaining to the mishap;

j. Directorate Safety Representatives: Individuals from each directorate that will assist IRT; and

k. Project Safety Representatives: Individuals from any project involved in an on-Center mishap, who will provide project-specific information to the IRT.

2.4 Training Requirements

2.4.1 Minimum training will be in accordance with NPR 8621.1.

In addition to the NPR-required training, each Center activity, Program, or Project should customize personnel training to address exposure to hazards created by sources unique to local activities and conditions beyond general hazard awareness. Hazard awareness training may include, but is not limited to, blood-borne pathogens, confined space, etc.

3.0 Mishap Management

3.1 Actions Required as a Result of an Incident

The following actions should be carried out by employees in the event of an incident:

a. The initial response by personnel in the area when an incident occurs is very critical. The first priority is to take whatever immediate actions are necessary to minimize the risk of loss of life, injury, and property damage. This often may include the need to promptly get help. If an employee is involved in or witnesses a mishap that needs ambulance or fire department response, call 911 from an on-site phone. From an off-site or mobile phone: at Greenbelt dial (301) 286-9111; at Wallops dial (757) 824-1333. In the case of a fire, explosion, or other situations making evacuation of the building appropriate (e.g., release of flammable or toxic gasses), also activate the building fire alarm;

b. GPR 8710.2 shall be the authority document for onsite incidents when the emergency systems have been activated (i.e., 911 is called);

c. If imminent danger is not present, employees should perform emergency shutdown procedures, safe the area, notify the appropriate supervisor, and notify the appropriate safety organization;

d. Employees should remain on the scene in a safe location until all necessary information is provided to emergency responders and/or the investigating authority; and

e. If an injury has occurred and emergency care is not necessary, the injured employee should report to the Health Unit (civil servants or contractors). Once an area has been secured, employees should not enter that area until it is released by the incident commander.

DIRECTIVE NO. GPR 8621.4A Page 13 of 38

3.2 Securing the Mishap Site

a. The site shall be secured to the extent possible in order to preserve the mishap evidence for the investigation without hampering essential rescue operations. When an event does not require the need for an incident commander, the official in charge of the area will secure the site until the appropriate safety organization or interim response team takes control of the scene;

b. The incident commander, official in charge, or appropriate safety organization shall determine if there are any hazards (e.g., hazardous materials and chemicals, radiation, blood-borne pathogens, etc.) present and ensure needed precautions are taken to safe the scene;

c. The IRT or appropriate safety organization with other support (e.g., supervisor, safety, and security) shall impound appropriate records, equipment, and/or facilities involved in the mishap and hold until released to the Investigating Authority. The data to be impounded include, but is not limited to, the following: recorded photographic, video, and test data, records, work orders, design drawings, training records, and procedures;

d. The storage location of impounded items will be dependent on incident conditions, i.e., large items can be secured in place, while location of pertinent records is coordinated with the organization directly responsible for the facility or operation; and

e. The IRT or appropriate safety personnel will obtain, document, and secure witness statements. Only witness statements taken by civil servants on the IRT within the first 24 hours of the incident are considered privileged information. Contractors may obtain witness statements, but may not confer privilege.

3.3 Management Notification

a. The supervisor shall immediately notify the appropriate Safety Organization and their supervisor of the mishap or close call; and

b. The appropriate safety organization will ensure that all other notifications are made per the table in

NPR 8621.1, Appendix E. The Headquarters notification in NPR 8621.1 Appendix H will require the following information:

(1) the Center name;

(2) location of the incident;

(3) date and time of the incident;

(4) number of fatalities;

(5) number of hospitalized employees;

(6) type of injury;

(7) type of damage;

(8) contact person and phone number; and

(9) brief description of mishap.

c. For situations involving medical emergencies, the appropriate safety organization shall coordinate the notification protocols to the supervisor, organization head, Contracting Officer, or COR. Only the GSFC Medical Director is authorized to contact medical facilities to obtain medical information on a patient;

DIRECTIVE NO. GPR 8621.4A Page 14 of 38

d. The appropriate safety organization will ensure the Occupational Safety and Health Administration

(OSHA) area office is notified within 8 hours of any fatality or hospitalization of 3 or more civil service employees as a result of a mishap. OSHA must also be notified within 24 hours of an in-patient hospitalization, amputation or eye loss; and

e. Within 24 hours of the incident, the supervisor shall ensure that the incident is entered into the

NASA Mishap Information System (NMIS) at the following link: https://nmis.sma.nasa.gov.

Select “Report an Event” to report the details of the mishap or close call. A user name and password are not required to use NMIS for reporting a mishap or close call. NMIS will automatically notify the appropriate Safety Organization when a mishap or close call is reported.

3.4 Drug Testing

Drug testing shall be conducted in accordance with NPR 8621.1 and NPR 3792.1 when a mishap results in a fatality or personal injury requiring immediate hospitalization or in damage estimated to be equal to or greater than $10,000 to government or private property. It is recommended that testing be completed within 4 hours; however, attempts should be abandoned if not done within 32 hours. If the mishap meets the drug testing criteria, the civil service supervisor should call NSSC at 1-877-677-2123. The

NSSC-HR-SDG-0002, can be used as a reference. If the mishap meets the drug testing criteria and the contractor is involved, the supervisor/manager shall contact the Contracting Officer.

3.5 Impound Process

The impound process shall be strictly controlled. Impoundment procedures may only be performed by civil service employees.

3.5.1 Data and Equipment Impoundment

Ground support equipment, test equipment, flight hardware and pertinent data involved in a mishap or high visibility close call shall be secured and subject to impoundment, and tagged and cataloged prior to impoundment. Examples of data subject to impoundment include but are not limited to the items shown below:

a. check-out logs;

b. test and check-out record charts;

c. launch records;

d. weather information;

e. telemetry tapes;

f. audio and video tapes;

g. time cards;

h. training records;

i. inspection records;

j. problem reports;

k. notes;

https://nmis.sma.nasa.gov/

DIRECTIVE NO. GPR 8621.4A Page 15 of 38

l. e-mail messages;

m. automated log-keeping systems and procedures;

n. computer data and databases;

o. audio/video media that records the events;

p. maintenance records/work orders;

q. design drawings (e.g., facilities, equipment, spacecraft);

r. spacecraft and launch readiness data packages;

s. spacecraft team personnel records (training, time cards, certifications);

t. configuration-controlled presentations, documents, drawings, Work Order Authorizations, etc.;

u. photographic and video graphic records for the building, integration, and testing of the flight hardware (spacecraft and components);

v. science instrument design drawings (e.g., equipment, facilities);

w. science instrument team personnel records (training, time cards, certification);

x. assembly, integration and operational procedures that were used;

y. instrument and telemetry data; and

z. Mission Operations Control Center data.

3.5.2 Information Technology Support

The IRT shall obtain support from an information technology (IT) professional to support the collection, maintenance, and security of IT data that have been impounded and collected. No one except a trained

IT professional may remove data from servers and/or encrypted files. When the investigation is transitioned from the IRT to the Investigating Authority, the IT professional will continue his/her support as needed.

3.5.3 Impound Storage

Storage should be based on the mishap and location. The storage site of impounded equipment is dependent on the size and mobility of the equipment as well as the availability of an appropriate storage area (e.g., clean room, warehouse). The impounded data should be stored in a secured location or in a locked container such as a file cabinet or storage cabinet. Access to the location/container is to be controlled by the IRT. The key to the storage area and container(s) is to remain in the possession of the handling and impoundment coordinator until another person is designated as custodian or the items/ data are transferred to the investigating authority.

3.5.4 Chain of Custody Process

The chain of custody process will be used for all impounded articles, including but not limited to, personal effects and sensitive information related to injured or deceased individuals. The IRT Chain of

Custody Custodian shall be responsible for the tagging, securing and release of the impounded items.

DIRECTIVE NO. GPR 8621.4A Page 16 of 38

4.0 Mishap Investigation

4.1 Mishap classification:

Mishap classification shall be in accordance with NPR 8621.1

Figure 4.1-1: Decision tree for categorizing mishap or close call event

4.2 Appointing the Investigating Authority

4.2.1 The Appointing Official should appoint the Investigating Authority within 48 hours of the mishap or close call. The appointment notification will define duties and responsibilities and include the WBS charge number for the investigation. The mishap classification or level of investigation can be elevated by the Administrator, Assistant Administrator (AA), Mission Directorate Assistant Administrator

Damage or Injury?

NASA

owned hardware

NASA

personnel injured?

Fatality or injury resulting in permanent disability or hospitalization?

>$500K damage?

Lost workday or

$20K < $500K

Note: High visibility events would be declared by HQ OSMA

Not a NASA event:

Contractor investigation – reports per program requirements.

Type A/B mishap:

Notify 300/803 and project manager within 1 hr. Enter into NMIS.

Type C/D mishap:

Notify 300/803 and project manager within 24 hours.

A

A

B

C

B

C

Event occurs:

Injury Hardware damage

Y Y

Y

Y

N

Close Call:

Enter into NMIS

N

Y

Y

DIRECTIVE NO. GPR 8621.4A Page 17 of 38

(MDAA), GSFC Director, Chief/OSMA, or Chief Health and Medical Officer (CHMO) if the mishap is identified as High Visibility.

4.2.2 The GSFC Director delegates appointment authority for Type C and Type D mishaps and close calls that occur onsite at a Center, at offsite Center support contractor locations, or at Center-managed offsite contractor locations that are not part of an MDAA program or project activity to the responsible organization. The GSFC Director may require a higher-level Investigating Authority at their discretion.

At WFF the 803 Safety Office reserves the right to appoint the IA.

4.2.3 The Investigating Authority is responsible for investigating the mishap or close call and providing the report to the Appointing Official. The Investigating Authority may consist of:

a. Civil service employees as voting members;

b. Civil service advisor support (e.g., public affairs, import/export control), as determined by the mishap circumstances;

c. Contractor employees as nonvoting consultants, as determined necessary by the mishap circumstances; and

d. Civil service ex officio assigned to each GSFC mishap investigation (see Section 4.1.9. (c) for exception) to ensure the requirements of NPR 8621.1 and this GPR are followed.

All members will complete training as per section 2.4.1.

4.2.4 For Type A mishaps, Type B mishaps, high visibility mishaps, and high visibility close calls, the investigating authority will be a mishap investigation board (MIB), which is a NASA-sponsored board that:

a. Requires concurrence on membership from the NASA Chief/OSMA, Office of the Chief Engineer

(OCE), the OCHMO (Office of the Chief Health and Medical Officer), and AMD (Aircraft

Management Division) when warranted by the undesired outcome;

b. Consists of an odd number of Federal employees, who are independent from the mishap operation;

c. Requires 3-5 members for Type A-B, or high visibility mishaps or close calls; and

d. Provides a Safety officer and Human Factors Mishap Investigator, as voting members.

4.2.5 For Type C mishaps, Type D mishaps, and close calls, the investigating authority may be a mishap investigator (single individual) or a mishap investigation team, as specified by the appointing official. A mishap investigator or investigation team shall have:

a. Knowledge of NASA mishap investigations policy, requirements and processes;

b. Knowledge of witness interview techniques, data collection processes, human error analysis and root cause analysis techniques, and generation of recommendations; and

c. Training, in accordance with section 2.4.1.

DIRECTIVE NO. GPR 8621.4A Page 18 of 38

4.2.6 A contractor mishap board, team, or investigator will be determined by the contractor per the requirements of their contract; however, NASA can convene a NASA Investigating Authority if desired.

4.2.7 The Appointing Official, with the assistance of the appropriate security office, will ensure that the investigating authority members, chair, and ex officio have the requisite clearances to investigate a mishap.

4.2.8 The Safety Division (Code 360) will prepare a letter of appointment for the investigating authority for Type A mishaps, Type B mishaps, high-visibility mishaps and high-visibility close calls.

4.2.9 The Appointing Official shall document (by memorandum or official announcement) the members of the investigating authority, its charter, and a due date for the mishap report.

4.3 Investigation

The purposes of the mishap investigation are to determine proximate and root cause(s) of the mishap or close call and to develop recommendations to prevent recurrence. The investigation may also identify positive or negative observations, which highlight specific factors that may impact future mishap risk but that are not deemed causal to the event itself.

At the start of the investigation, the IRT will turn over all evidence to the Investigating Authority. At that time, the IRT’s responsibilities end.

4.3.1 Mishap investigations will be conducted in accordance with the requirements in NPR 8621.1 and other requirements defined in the appointment letter.

a. For Type A mishaps, Type B mishaps, and high-visibility mishaps/close calls, or other investigations delegated to the GSFC by NASA Headquarters, there may be additional instructions in the letter of delegation regarding the MIB, MIT or MI membership, activities, or other procedures to be followed.

b. These instructions take precedence over the corresponding processes established by this directive.

c. For less complicated Type C, D, or close call investigations, GSFC form 23-89 may be used in lieu of an investigation report at the discretion of the Appointing Official.

4.3.2 The investigating authority will be responsible for the release of the mishap site for post-investigation cleanup or activity as well as for the release of impounded data, records and equipment.

Upon release, facts pertaining to resuming operations (e.g., constraints, precautions, etc.) should be issued by the investigating authority. As the investigation progresses the information should be updated as needed.

4.3.3 The investigation is not completed until the Mishap Report is approved by the Appointing

Official.

DIRECTIVE NO. GPR 8621.4A Page 19 of 38

4.4 Mishap Investigation Reports

4.4.1 The investigating authority will prepare its report in accordance with the requirements of NPR

8621.1.

4.4.2 Extensions to the report deadline should be addressed by appointing official. Requests for extension may be sent via letter or email to the Appointing Official and Mishap Program Manager.

4.4.3 The mishap report will be reviewed within 14 working days of receipt by the appointing official.

The appointing official will initiate an endorsement review within 30 working days, if endorsements are required.

4.4.4 The investigating authority will take appropriate actions to disposition comments. For Type A and Type B mishaps, a presentation will be prepared by the investigating authority for briefing the appointing official and responsible organizations.

4.4.5 If there is a minority opinion or dissenting view held by investigating authority members or the ex officio, it will be attached to the report.

4.4.6 The investigating authority will present investigation findings to the appointing official in communication that includes the responsible organizations, appropriate safety organizations, and others previously identified. It is recommended that this be accomplished by an out brief meeting that summarizes the event as well as findings, observations, and recommendations.

4.4.7 If the report is rejected, a new investigating authority shall be appointed by the Appointing

Official within 48 hours, and will be provided with specific instructions as to the remaining duties and responsibilities with respect to concluding the investigation.

4.4.8 Approved investigation reports of Type A mishaps, Type B mishaps , and high-visibility mishaps/close calls will be sent to the appropriate-level NASA legal official, NASA import/export control official, NASA public affairs official, and any other NASA program or policy official(s) as required, for their review and reply within 10 work days.

4.5 Corrective Action Plan

The responsible organization will receive a copy of the mishap report as part of coordination activities.

The Corrective Action Plan (CAP) will be prepared by the responsible organization in accordance with

NPR 8621.1 and include the recommended corrective action(s), the action(s) to be implemented, and the projected completion date(s). The CAP is due to the Appointing Official within 15 working days unless otherwise specified in writing. The appointing official may provide the CAP to the investigating authority, applicable safety organization, and other selected offices as is deemed appropriate for review.

DIRECTIVE NO. GPR 8621.4A Page 20 of 38

Each item on Corrective Action Plans will be entered into NMIS as soon as the plans are completed and approved by the AO, including due dates and the name of the individual responsible for completing the action.

Responsible Organizations for each corrective action will update the NMIS record corrective action tracking details and provide regular tracking status to the AO, at a frequency determined by the AO, until all corrective actions are completed. The Mishap Program Manager will assist in NMIS data entry as requested. For Mishap Type A & B, and high visibility mishaps and close calls, regular tracking status will also be provided to the Mishap Program Manager. The Responsible Organization will continue to track all Corrective Action Plans until all items are implemented and closed.

NMIS record will not be closed until all listed corrective actions are either closed and verified, or transferred to another approved system (such as SHETrak) for tracking and closure.

When the owner of a NMIS record submits an item for closure, the Mishap Program Manager will review corrective actions and verify that the responsible organization has performed the following:

a. At least one corrective action is identified for every finding on the record, where practical;

b. That corrective action is demonstrated to be an adequate control for the finding; and

c. The responsible organization has closed each corrective action, and provided either verification that it has been implemented (and attached evidence to the record) or provided details of transfer of the item to alternate closed-loop tracking system. The Mishap Program Manager will independently gauge whether attached verification is sufficient to justify NMIS record closure.

Any NMIS record submitted for closure that does not meet these minimum requirements will be rejected by the Mishap Program Manager, and returned to “open” state.

Mishap Program Manager will report status of open corrective actions to the GSFC Safety committee, based on latest available data in NMIS, as requested.

A flow chart of the process is below:

DIRECTIVE NO. GPR 8621.4A Page 21 of 38

Figure 4.5-1: Process for closure of NMIS record

4.5.1 The appointing official will task the responsible organization to develop, finalize, and submit a

CAP and the lessons learned if warranted by the event. If a draft CAP is included with the report, it can be used as a starting point or as guidelines for forming a CAP.

4.5.2 A CAP will be developed for all mishaps and close calls by the responsible organization and submitted to the appointing official within 15 working days of receipt of the mishap investigation report.

The appointed official may extend this deadline upon written request from the responsible organization.

4.5.3 The CAP will address the recommendations in the mishap investigation report, including actions to correct the situation that caused the mishap or close call and prevent the same or similar mishap from reoccurring. The major objective is to address and correct the root causes for the mishap or close call.

4.5.4 The CAP will include:

a. A description of the corrective actions necessary to eliminate the causes, with direct connections made between corrective actions and the investigation findings they ameliorate;

b. Who is responsible for performing the action, or which NASA organization is responsible for ensuring the action is completed (if the action is to be performed for the responsible organization by a contractor or other NASA organization);

c. An estimated completion date for each action provided by the performing organization.

DIRECTIVE NO. GPR 8621.4A Page 22 of 38

4.5.5 If the responsible organization disagrees with the recommendation, the concern/issue should be addressed in the CAP and the appointing official will make the determination as to how to address the recommendation.

4.5.6 If the CAP is rejected, it will be returned with comments to the responsible organization for revision and re-submittal. The appointing official will determine the timeframe for re-submittal of the

CAP.

4.5.7 If the CAP is accepted, the appointing official will:

a. Direct the responsible organization(s) to implement the plan; and

b. Provide the plan to the appropriate safety organization for distribution. The final CAP will be completed and filed with the official approved report. Mishap lessons learned, if identified, should be submitted to the GSFC lessons learned system. Either the responsible organization or the appropriate safety organization can enter the approved corrective actions into NMIS for tracking.

4.6 Corrective Action Plan Implementation

4.6.1 Upon receipt of the CAP, organizations with assigned actions will implement the approved CAP as directed by the appointing official.

4.6.2 The responsible organization(s) will implement corrective actions as soon as possible and communicate completion to the appointing official and the appropriate safety organization.

4.6.3 The status of the CAP will be tracked monthly by the appropriate safety organization.

4.7 Mishap Follow-Up

a. All investigation reports will be…