GP Permit SIte Plan-Vesle Run.pdf
PDF 706 KB Posted
- Attached to
- Replace Water Distribution System
- Solicitation number
- 6100061255
- Issued by
- Lebanon County, Pennsylvania
About this file
This document is a set of plans and specifications for a stream crossing at the Vesle Run on the Fort Indiantown Gap facility in Lebanon County, Pennsylvania. The work includes the installation of 10-inch ductile iron water pipe, with associated appurtenances such as fire hydrants and valves, over a total distance of 11,283 linear feet. A mandatory pre-bid conference will be held on June 6, 2024, and bids are due by 2:00 PM on June 26, 2024. Bids must be submitted electronically through the Pennsylvania Supplier Portal.
The estimated range for the general construction work is $1,500,001.00 to $2,000,000.00, with liquidated damages of $500.00 per day. The contract will be awarded through a standard low-bid process, and all potential bidders must attend the pre-bid conference to be eligible to submit a bid. Questions related to the project are due by 4:30 PM EST on June 14, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 42110341_Replace Water DistroSystem-FIG_SPECS.pdf | ||
| Attachment_03_FTIG_Traffic_Route.pdf | ||
| Wage Rates.pdf | ||
| Addendum #2.docx | DOCX document | |
| Addendum #5.docx | DOCX document | |
| C-306-(A) - 6-20-24.pdf | ||
| FTIG Map 2017.pdf | ||
| Pages from 42110341_Replace Water DistroSystem-FIG_DWGS_Descoped Work as of 03JUL24.pdf | ||
| Pre-bid sign in.pdf | ||
| 42110341_Replace Water DistroSystem-FIG_DWGS.pdf | ||
| Administrative Procedures 2023 DMVA.docx | DOCX document | |
| Instructions to Bidders 2023 DMVA.doc | DOC document | |
| Addendum #1.docx | DOCX document | |
| Addendum #4.docx | DOCX document | |
| Bid docs to be returned.pdf | ||
| General Conditions to the Construction Contract DMVA 2023 v5.docx | DOCX document | |
| Notice to Bidders.docx | DOCX document | |
| 42110341 FTIG Water Distribution Replacement_RFI_Log 21JUN24.pdf | ||
| 42110341 FTIG Water Distribution Replacement_RFI_Log as of 03JUL24.pdf | ||
| Addendum #3.docx | DOCX document | |
| Additional Standard Notes G-002 21JUN24.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EDGE OF WOODS
EDGE OF WOODS
440 441
435436437438439
440441442
EDGE OF ASPHALT
EDGE OF ASPHALT
EDGE OF ASPHALT
0+00 0+200+10 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30
SCALECHECKED BY
DRAWING NO.DRAWN BY DATE
REVISIONS
DESCRIPTION DATENO.
Professional's Signature Date
DESIGN PROFESSIONALS:
OFFICE OF FACILITIES AND ENGINEERING
BUREAU OF DESIGN AND PROJECT MANAGEMENT
BUILDING 0-10, CHAPEL ROAD FORT INDIANTOWN GAP
ANNVILLE, LEBANON COUNTY, PENNSYLVANIA
COMMONWEALTH OF PENNSYLVANIA
DEPT. OF MILITARY & VETERANS' AFFAIRS
ANNVILLE, PENNSYLVANIA 17003
PROJECT NO. 42110341
VESLE RUN
STREAM CROSSING
FORT INDIANTOWN GAP
LEBANON COUNTY, PENNSYLVANIA
STREAM CROSSING DETAIL
7/2/24
AS NOTED
C.1.0
CONTRACTOR SHALL FIELD VERIFY
ALL DIMENSIONS.
VARIANCE FROM CONTRACT
DOCUMENTS NOT PERMITTED
WITHOUT BUREAU OF ENGINEERING
AND ARCHITECTURE APPROVAL.
VERIFY SCALE
IF BAR IS NOT ONE (1) INCH LONG,
ADJUST SCALE ACCORDINGLY
BAR IS ONE (1) INCH LONG
ON ORIGINAL DRAWING:
0 1
STANDARD CONSTRUCTION DETAIL #13-2
TYPICAL UTILITY LINE STREAM CROSSING
WITH PUMP BYPASS
STANDARD CONSTRUCTION DETAIL #3-16
PUMPED WATER FILTER BAG
STANDARD CONSTRUCTION DETAIL #3-15
SANDBAG DIVERSION DAM OR COFFERDAM
STANDARD CONSTRUCTION DETAIL #4-1
COMPOST FILTER SOCK
THE AREA OF DISTURBANCE = 7,202 SF, 0.1653 AC
ALL DISTURBED AREAS ARE TO BE COVERED WITH
EROSION MATTING S75BN.
NOT TO SCALE
EROSION BLANKET DETAIL
AutoCAD SHX Text
CLAY PLUG TYP.
AutoCAD SHX Text
SANDBAG DAM
AutoCAD SHX Text
ENERGY DISSPATOR
AutoCAD SHX Text
SANDBAG DAM
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
INTAKE
AutoCAD SHX Text
DISCHARGE
AutoCAD SHX Text
VESLE RUN
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
%%UVESLE RUN STREAM CROSSING
AutoCAD SHX Text
SCALE: HORIZ.: 1" = 10'
AutoCAD SHX Text
VERT.: 1" = 5'
AutoCAD SHX Text EX. Stream Bed
AutoCAD SHX Text
PROP. WATERLINE
AutoCAD SHX Text 10"D.I.P.
AutoCAD SHX Text
MIN 3'
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTES: GRUBBING SHALL NOT TAKE PLACE WITHIN 50 FEET OF TOP-OF-BANK UNTIL ALL MATERIALS REQUIRED TO COMPLETE CROSSING ARE ON SITE AND PIPE IS READY FOR INSTALLATION. BYPASS PUMP INTAKE SHALL BE MAINTAINED A SUFFICIENT DISTANCE FROM THE BOTTOM TO PREVENT PUMPING OF CHANNEL BOTTOM MATERIALS. TRENCH PLUGS SHALL BE INSTALLED WITHIN THE TRENCH ON BOTH SIDES OF THE STREAM CHANNEL (STANDARD CONSTRUCTION DETAIL #13-4). WATER ACCUMULATING WITHIN THE WORK AREA SHALL BE PUMPED TO A PUMPED WATER FILTER BAG OR SEDIMENT TRAP PRIOR TO DISCHARGING INTO ANY SURFACE WATER. HAZARDOUS OR POLLUTANT MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM THE TOP OF STREAMBANK. ALL EXCESS EXCAVATED MATERIAL SHALL BE IMMEDIATELY REMOVED FROM THE STREAM CROSSING AREA. ALL DISTURBED AREAS WITHIN 50 FEET OF TOP-OF-BANK SHALL BE BLANKETED OR MATTED WITHIN 24 HOURS OF INITIAL DISTURBANCE FOR MINOR STREAMS OR 48 HOURS OF INITIAL DISTURBANCE FOR MAJOR STREAMS UNLESS OTHERWISE AUTHORIZED. APPROPRIATE STREAMBANK PROTECTION SHALL BE PROVIDED WITHIN THE CHANNEL.
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
SPOIL
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
SPOIL
AutoCAD SHX Text
STREAM TOP OF BANK
AutoCAD SHX Text
STREAM TOP OF BANK
AutoCAD SHX Text
SEDIMENT BARRIER (TYP.)
AutoCAD SHX Text
TRENCH PLUGS
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILTER BAG
AutoCAD SHX Text
WELL VEGETATED, GRASSY AREA
AutoCAD SHX Text
WELL VEGETATED, GRASSY AREA
AutoCAD SHX Text
FILTER BAG
AutoCAD SHX Text
INTAKE HOSE
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
DISCHARGE HOSE
AutoCAD SHX Text
CLAMPS
AutoCAD SHX Text
CLAMPS
AutoCAD SHX Text
DISCHARGE HOSE
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
INTAKE HOSE
AutoCAD SHX Text
HEAVY DUTY LIFTING STRAPS (RECOMMENDED)
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
ELEVATION VIEW
AutoCAD SHX Text NOTES: LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
AutoCAD SHX Text A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
AutoCAD SHX Text
PROPERTY
AutoCAD SHX Text
TEST METHOD
AutoCAD SHX Text
MINIMUM STANDARD
AutoCAD SHX Text
AVG. WIDE WIDTH STRENGTH
AutoCAD SHX Text
ASTM D-4884
AutoCAD SHX Text
60 LB/IN
AutoCAD SHX Text
GRAB TENSILE
AutoCAD SHX Text
ASTM D-4632
AutoCAD SHX Text
205 LB
AutoCAD SHX Text
PUNCTURE
AutoCAD SHX Text
ASTM D-4833
AutoCAD SHX Text
110 LB
AutoCAD SHX Text
MULLEN BURST
AutoCAD SHX Text
ASTM D-3786
AutoCAD SHX Text
350 PSI
AutoCAD SHX Text
UV RESISTANCE
AutoCAD SHX Text
ASTM D-4355
AutoCAD SHX Text 70%
AutoCAD SHX Text
AOS % RETAINED
AutoCAD SHX Text
ASTM D-4751
AutoCAD SHX Text
80 SIEVE
AutoCAD SHX Text 18" DIA. FILTER SOCK SURROUNDING THE BAG. NO LESS THAN 4' BETWEEN THE BAG AND SOCK
AutoCAD SHX Text 4'
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
SANDBAGS
AutoCAD SHX Text
IMPERVIOUS MEMBRANE
AutoCAD SHX Text
2 BAG MIN. HEIGHT ABOVE NORMAL BASE FLOW
AutoCAD SHX Text
WORK AREA
AutoCAD SHX Text
SANDBAG TO HOLD IMPERVIOUS LINER IN PLACE
AutoCAD SHX Text
IMPERVIOUS LINER EXTENDED TO STREAM BOTTOM AND SECURED WITH SANDBAGS
AutoCAD SHX Text
OPTIONAL SANDBAG PLATFORM
AutoCAD SHX Text
SANDBAG (TYP.)
AutoCAD SHX Text
JERSEY BARRIER
AutoCAD SHX Text
NORMAL STREAM FLOW
AutoCAD SHX Text
STACKED SANDBAGS OPTION
AutoCAD SHX Text
JERSEY BARRIER OPTION
AutoCAD SHX Text
SANDBAG DAM
AutoCAD SHX Text
ENERGY DISSPATOR
AutoCAD SHX Text
SANDBAG DAM
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
INTAKE
AutoCAD SHX Text
DISCHARGE
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
%%USECTION
AutoCAD SHX Text
%%UPLAN VIEW
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text 2 IN. x 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER
AutoCAD SHX Text 2 IN. x 2 IN. WOODEN STAKES PLACED 10 FT ON CENTER
AutoCAD SHX Text
COMPOST FILTER SOCK
AutoCAD SHX Text
BLOWN/PLACED FILTER MEDIA
AutoCAD SHX Text
DISTURBED AREA
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text NOTES: SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA. TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN. COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER’S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION. BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER’S S RECOMMENDATIONS. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NOTES: SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET. PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE. SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS. BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET. THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS SHALL BE RESTORED OR REPLACED WITHIN 4 CALENDAR DAYS.
AutoCAD SHX Text
BLANKET EDGES STAPLED AND OVERLAPPED (4 IN. MIN.)
AutoCAD SHX Text INSTALL BEGINNING OF ROLL IN 6 IN. x 6 IN. ANCHOR TRENCH, STAPLE, BACKFILL AND COMPACT SOIL
AutoCAD SHX Text
STARTING AT TOP OF SLOPE, ROLL BLANKETS IN DIRECTION OF WATER FLOW
AutoCAD SHX Text PREPARE SEED BED (INCLUDING APPLICATION OF LIME, FERTILIZER AND SEED) PRIOR TO BLANKET INSTALLATION
AutoCAD SHX Text REFER TO MANUF. RECOMMENDED STAPLING PATTERN FOR STEEPNESS AND LENGTH OF SLOPE BEING BLANKETED
AutoCAD SHX Text
THE BLANKET SHOULD NOT BE STRETCHED; IT MUST MAINTAIN GOOD SOIL CONTACT
AutoCAD SHX Text OVERLAP BLANKET ENDS 6 IN. MIN. WITH THE UPSLOPE BLANKED OVERLYING THE DOWNSLOPE BLANKET (SHINGLE STYLE). STAPLE SECURELY.
| Sheets and Views |
| Vesle Run |
File details come from the government source that posted it. Updated .