Additional Standard Notes G-002 21JUN24.pdf
PDF 165 KB Posted
- Attached to
- Replace Water Distribution System
- Solicitation number
- 6100061255
- Issued by
- Lebanon County, Pennsylvania
About this file
This document contains the Additional Standard Notes for a contract opportunity to replace the water distribution system at Fort Indiantown Gap in Pennsylvania. The project involves the installation of approximately 11,283 linear feet of new 10-inch and 6-inch water mains, fire hydrants, valves, and tie-ins. A mandatory pre-bid conference will be held on June 6, 2024, and bids are due on June 26, 2024. The contract is a standard low-bid project, and the estimated range for the general construction work is $1,500,001 to $2,000,000. Liquidated damages of $500 per day will be assessed for late completion. The document also includes detailed technical specifications and requirements related to utility coordination, field testing, disinfection, and pipe restraints.
The contract opportunity is being managed by the state of Pennsylvania and is located in Lebanon County. Contractors will need to obtain a day pass to access the Fort Indiantown Gap military installation for the pre-bid site visit. No additional information is provided regarding pricing terms, set-asides, incumbents, funding sources, or other salient details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 42110341_Replace Water DistroSystem-FIG_SPECS.pdf | ||
| Attachment_03_FTIG_Traffic_Route.pdf | ||
| Wage Rates.pdf | ||
| Addendum #2.docx | DOCX document | |
| Addendum #5.docx | DOCX document | |
| C-306-(A) - 6-20-24.pdf | ||
| GP Permit SIte Plan-Vesle Run.pdf | ||
| Bid docs to be returned.pdf | ||
| General Conditions to the Construction Contract DMVA 2023 v5.docx | DOCX document | |
| Notice to Bidders.docx | DOCX document | |
| 42110341 FTIG Water Distribution Replacement_RFI_Log 21JUN24.pdf | ||
| 42110341 FTIG Water Distribution Replacement_RFI_Log as of 03JUL24.pdf | ||
| Addendum #3.docx | DOCX document | |
| FTIG Map 2017.pdf | ||
| Pages from 42110341_Replace Water DistroSystem-FIG_DWGS_Descoped Work as of 03JUL24.pdf | ||
| Pre-bid sign in.pdf | ||
| 42110341_Replace Water DistroSystem-FIG_DWGS.pdf | ||
| Administrative Procedures 2023 DMVA.docx | DOCX document | |
| Instructions to Bidders 2023 DMVA.doc | DOC document | |
| Addendum #1.docx | DOCX document | |
| Addendum #4.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addi�onal Standard Notes G-002:
16. Contractor shall contact the PA One-Call number at 1-800-242-1776 three working days prior to the start of work to have all u�li�es marked in the work area.
17. The contractor shall no�fy all appropriate u�li�es of work schedule prior to the start of construc�on.
The contractor shall have each u�lity owner verify and mark the loca�ons of their respec�ve main and service lines in the field before the start of work.
18. Contractor shall be responsible to repair, at their own expense, any damage caused by construc�on.
19. In the event of damage to any opera�ng facili�es the contractor shall immediately no�fy the Using
Agency and/or Professional and be prepared to work over�me, if deemed necessary, to complete restora�on to the sa�sfac�on of the using Agency and with no addi�onal costs to the Using Agency.
20. The contractor shall maintain the structural integrity of all trench excava�ons, at all �mes.
21. When the depth of trench exceeds 5 FT, a trench box or shoring shall be required. If maximum trench depth exceeds 20 FT, a shoring design as per O.S.H.A. regula�ons shall be used.
22. The contractor shall, at their own expense, adequately support all u�lity poles in the area of the trench excava�on prior to excava�on.
23. The contractor shall be responsible for all fees associated with the barricading and/or closing and re-opening of any and all excava�ons during “down-�me” as required by the on-site inspectors (PADEP, Professional, Using Agency, etc…).
24. The contractor shall, at their own expense, remove and replace exis�ng guide rail, lawns, signs, sidewalks, curbs, bollards, pavement, pavement markings, etc… as needed for the comple�on of the work.
25. No addi�onal compensa�on will be made for exploratory work and/or test pits.
26. The contractor shall verify all exis�ng field condi�ons (eleva�ons, loca�on, etc…) before commencing work. The Professional shall be no�fied immediately if a conflict exists.
27. The contractor shall sawcut to full depth, all exis�ng concrete and bituminous paved areas prior to excava�on and/or removal.
28. All items coming into contact with the water being treated must be ANSI/NSF Standard 60/61 for potable water use.
29. All new waterlines crossing exis�ng sewer mains must maintain a 18” ver�cal separa�on or the sewer main shall be concrete encased, a minimum of 5 feet on both sides of the sewer main being crossed, when the water main is above the sewer line.
30. Properly grounded, tracer wire shall be installed (following manufacturers recommenda�ons) to allow for future loca�ng of waterlines.
31. All new fire hydrants throughout this project, shall be Muller Centurion Type, with integral 5" Stortz connec�on.
32. All service connec�ons to any buildings throughout this project shall be installed up to and including replacing the exis�ng curb stop with a new curb stop.
Water System Specific Notes:
1. Field Tes�ng:
• Contractor shall test completed sec�ons in conformance with AWWA standard C600. Furnish equipment and supplies and make all necessary connec�ons for the tests. The test pressure shall not be less than 150 PSI. Loss of water pressure during the test shall not exceed 5 PSI in a 2 hour period. If pressure loss exceeds 5 PSI, then the volume of water to refill the line to obtain the star�ng pressure shall be measured (This is the allowable leakage). Allowable leakage cannot exceed the standard as outlined in AWWA C600.
2. Disinfec�on and Dechlorina�on:
• Disinfec�on contractor shall disinfect pipelines in sec�ons not more than 2,000 FT long.
Disinfec�on according to AWWA C651. Use of any of the three methods described in Sec�on 5.
At least two consecu�ve samples, obtained twenty-four hours apart, from each sec�on disinfected must be cer�fied bacteriologically sa�sfactory by an independent 3rd party cer�fied water tes�ng laboratory before pipe can be placed in service. These results shall be provided to FTIG’s Environmental Office for review/approval prior to pipes being placed in service as well.
Take samples at regular intervals, not exceeding 2,000feet, throughout the length of pipeline, flush the sterilized line immediately a�er confirma�on of acceptable test results.
• Contractor shall u�lize a dechlorina�on device to assure less than 1 PPM chlorine is being discharged from system a�er tes�ng. The Arden Bazooka hydrant connec�ng dechlorina�on device or approved equal device or method is preferred.
3. Swab pipe and fi�ngs that will not be pressure tested or chlorinated with chlorine solu�on during installa�on and use extra precau�on to prevent soil and debris from entering pipe. Incorporate untested pipe into the flushing rou�ne when possible. When connec�ng new pipe to the exis�ng water system, use opera�ng pressure to visually inspect for leaks. When feasible preform inspec�on prior to backfilling. Comply with all standards and requirements of PADEP/AWWA.
4. Contractor shall install supplemental joint restraints in lieu of thrust block for all pipe deflec�on for crossings, etc.
• Based on 150 PSI pressure and 20-foot pipe lengths the following number of upstream and downstream joints require restraints:
Bends 11 ¼ and 22 ½ degree – none required.
45 degree – 1 required.
90 degree – 2 required.
• Pipe step reduc�on (Step 1 (8x6) Step 2 (8x4) Step 3 (8x3)).
Step 1 – 1 required.
Step 2 – 2 required.
Step 3 – 3 required.
• Standard tee fi�ng – requires minimum 1 on branch side direc�on.
• All ver�cal offsets beyond allowable deflec�on. All joints must be restrained between offsets and 1 joint immediately prior and a�er.
5. The contractor must provide thrust restraints in accordance with detail provided. The contractor must furnish and install mechanical joint thrust restraint glands at all fi�ngs and mechanical joints.
6. Water main and fi�ngs loca�ons shown on the drawings for the new water mains and appurtenances may be changed due to field condi�ons.
7. Fi�ngs and their loca�ons indicated on the drawings are tenta�ve. The contractor must complete the installa�on with the necessary fi�ngs dictated by field condi�ons. No addi�onal payment will be made for devia�ons from the indicated fi�ngs.
U�lity Coordina�on Notes:
1. Contractor shall enter a PA One Call complex project one call no�fica�on �cket and schedule a u�lity coordina�on mee�ng with all u�lity owners prior to the start of any construc�on work on-site.
2. Most facili�es on FTIG are services by natural gas and therefore have services to buildings and mains that will be encountered and crossed throughout the project area.