This is a bid sheet for a rebid contract opportunity (GLRR 2015-109M14) dated February 5, 2016, for tunnel excavation and support work. The project encompasses two main components: the Everett Tunnel and a Cross Passageway Tunnel (add/alternate). The Everett Tunnel scope includes 15 line items covering mobilization, furnishing and installing 10 steel sets, installing 75 spiles, applying shotcrete across 200 square feet, drilling and injecting pre- and post-excavation grout (chemical and cement), excavating and hauling 20 cubic yards of rubble material, providing 100 hours of QC inspection services, and installing permanent lighting. The Cross Passageway Tunnel component (items 16-29) involves excavating an 8-foot by 8-foot tunnel for 250 linear feet, furnishing and installing 4 steel sets, 8 rock bolts, welded wire fabric, mine straps, and split sets, along with shotcrete application, blasting zone management, and permanent lighting installation.
The bid sheet establishes unit price line items for all work components, with variations in quantities permitted for certain items including steel sets, spiles, grout holes, grout, wood lagging, wood cladding, and rubble excavation, which may vary up to plus or minus 50 percent at the contractor's unit price. The sheet specifies that "furnish only" quantities will be paid in full regardless of installation, while "install only" quantities will be compensated only for work actually completed. The extent of the rubble pile is noted as estimated, acknowledging that actual quantities may differ from the bid sheet projections. This structure allows for cost flexibility while maintaining a defined pricing framework for competitive bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GLRR Answers to Questions for RFP 2016-142 2.16.2016.docx | DOCX document | |
| sbp-LABOR & MATERIAL BOND-6221docx.docx | DOCX document | |
| 2015-109M14 REBID SCHEDULE 2.1.2016.pdf | ||
| sbp-PERFORMANCE BOND-622.docx | DOCX document | |
| 2015-109M14 Stamped Drawings add TN2 2.1.2016.pdf | ||
| sbp-BID BOND-614.docx | DOCX document | |
| GLXX 2015-109M14 Everett REBID Addendum 2.5.2016.pdf | ||
| 2015-109M14 SITE LOCATION 2.1.2016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Description Unit
Estimated
Quantity Unit Price Total Price
Everett Tunnel
1 Mobilization ‐ Everett Tunnel only LS 1
2 Furnish Steel Sets EA 10
3 Install Steel Sets EA 10
4 Furnish Spiles EA 75
5 Install Spiles EA 75
6 Furnish and Install Shotcrete (~4" Thick) SF 200
7 Drill Pre‐Excavation Chemical Grout Holes LF 60
8 Inject Pre‐Excavation Chemical Grout Gal 40
9 Drill Post‐Excavation Chemical Grout Holes LF 140
10 Inject Post‐Excavation Chemical Grout Gal 45
11 Drill Post‐Excavation Cement Grout Holes LF 40
12 Inject Post‐Excavation Cement Grout 94# bags 35
13 Excavate, Haul, and dispose of Rubble Material CY 20
14 QC Inspector HR 100
15 Furnish and Install Permanent Lighting LS 1
Cross Passageway Tunnel (Add\Alternate)
16 Mobilization ‐ Cross Passageway Tunnel only LS 1
17 Excavate 8'x8' Tunnel LF 250
18 Furnish Steel Sets EA 4
19 Install Steel Sets EA 4
20 Furnish Rock Bolts (#8, 6' Long, with End Hardware) EA 8
21 Install Rock Bolts (#8, 6' Long, with End Hardware) EA 8
22 Furnish WWF 6x6‐W2.9xW2.9 with Pins SF 64
23 Install WWF 6x6‐W2.9xW2.9 with Pins SF 64
24 Furnish Mine Straps EA 3
25 Install Mine Straps EA 3
26 Furnish and Install Shotcrete (~4" Thick) SF 40
27 Furnish and Install Split Sets, 4' long EA 36
28 Restricted Blasting Zone at Everett End (as needed) LS 1
29 Furnish and Install Permanent Lighting LS 1
Variation in Quantities
"Furnish" only quantities will be paid for the full amount. "Install" only quantities will be paid for only what is installed. The extent of the rubble pile is estimated. The installed quantities for steel sets, spiles, grout holes, grout, wood lagging, wood cladding, and rubble excavation muck and hauling may vary +/‐ 50% at the contractors unit price.
Total
Total