GLOMAS DRFP 09.04.pdf
PDF 1 MB Posted
- Attached to
- Global Modeling & Assimilation Support (GLOMAS) Draft Request For Proposal (DRFP) Federal contract opportunity
- Solicitation number
- 80GSFC24R0036
About this file
This document is a Draft Request for Proposal (DRFP) for the Global Modeling & Assimilation Support (GLOMAS) contract from the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC).
The principal purpose of this requirement is to provide maintenance and development of the GMAO's Goddard Earth Observing System (GEOS) model and its application to data assimilation, weather and climate prediction, and scientific studies. The work will include supporting the development and validation of GEOS model components, maintaining the GEOS Climate Diagnostics Package, developing and integrating external components such as sea- and land-ice models, and supporting the use of the GEOS modeling and assimilation system for various applications. This will be a small business set-aside, resulting in an Indefinite Delivery Indefinite Quantity (IDIQ) contract with Cost Plus Fixed Fee (CPFF) task orders. The contract will have an effective ordering period of 5 years.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment C - Financial Rep. Req..pdf | ||
| Attachment I.1 - DEIA Plan.pdf | ||
| Enclosure CC - GPM.pdf | ||
| Enclosure DD -QASP.pdf | ||
| Attachment F - IT DRD.pdf | ||
| Attachment G -Req Statements List.pdf | ||
| Enclosure BB - Contract Historical Data.pdf | ||
| GLOMAS DRFP Cover Letter_signed.pdf | ||
| GLOMAS SF33.pdf | ||
| Attachment B -Rate Matrix.pdf | ||
| Attachment D - Contract Historical Data.pdf | ||
| Attachment H - List of IAGP.pdf | ||
| Attachment J.1 - OCI DRD.pdf | ||
| Exhibits 1A-1B All IDIQ Std by CY MAR 2016.pdf | ||
| Exhibits 2-11 All IDIQ by CY JUL 2016.pdf | ||
| Exhibits 12 - PastPerfQues.pdf | ||
| Attachment A -SOW.pdf | ||
| Attachment E - Safety and Health Plan.pdf | ||
| Attachment I.2 - DEIA Plan DRD.pdf | ||
| Attachment J.2 - OCI Plan.pdf | ||
| Enclosure AA - Sample SH Plan.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Global Modeling and Assimilation Support (GLOMAS)
DRAFT RFP 80GSFC24R0036
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
B-1
SECTION B - SUPPLIES OR SERVICES AND COSTS
B.1 1852.216-74 ESTIMATED COST AND FIXED FEE (DEC 1991)
The estimated cost of this contract is TBP exclusive of the fixed fee of TBP. The total estimated cost and fixed fee is TBP.
(End of clause)
B.2 1852.232-81 CONTRACT FUNDING (JUN 1990)
(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $TBD. This allotment is for Clause B.3 Supplies and/or Services to be Provided related to the IDIQ Task Orders and covers the following estimated period of performance: TBD.
(b) An additional amount of $ TBD is obligated under this contract for payment of fee.
(End of clause)
B.3 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED (APR 2023)
The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with the Statement of Work (SOW), incorporated as Attachment A, and Task Orders issued hereunder.
Item Description Reference Schedule Delivery
Method/Addresses
1 Services and Deliverables in accordance with Task Orders Issued and the
SOW
As Defined in Individual Task Orders Issued
As Specified in Individual Task Orders Issued
As Specified in Individual Task Orders Issued
2 Task Plans Section B
GSFC
52.216-91
As Required in Clause NFS 1852.216-80
NASA Task Order Management System
(TOMS)
B-2
Section I
NFS
1852.216-80
3 Reports of Work Section C
GSFC
52.235-90
Section H
NFS
1852.235-73
As Required in Clause GSFC 52.235-
As specified in Clause
4 Contract Historical Data
Section C
GSFC
52.211-91 Attachment D
30 Days after Contracting Officer Request
Electronic Format/CO
5 NASA Financial Management Reports
Section G
GSFC
52.242-90
Section G
NFS
1852.242-73
Attachment C
Monthly and Quarterly in accordance with Attachment C
Electronic Format/
Contracting Officer (CO), Contracting Officer’s Representative (COR), Resource Analyst (RA) & Regional Finance Office
6 Foreign Travel Requests and Foreign Travel Reports
Section G
NFS
1852.242-71
Foreign Travel Requests–30 days in Advance of Travel
Foreign Travel Reports–Due within 10 business days of the completion of travel.
As specified in CO’s travel approval
B-3
7 Requests for Government Property
Section G
NFS
1852.245-70
30 Days Prior to Acquire Date
Electronic Format/CO
8 Financial Report of NASA Property in the Custody of Contractors (NF 1018)
Section G
NFS
1852.245-73
Annual Report by October 15th and Final Report
NF 1018 Electronic Submission System
(NESS)
9 Supplemental Financial Report of NASA Property in the Custody of Contractors
Section G
GSFC
52.245-99
Monthly By the 21st of each Month and Final Report
Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov
10 Physical Inventory of Capital Personal Property Reporting
Section G
NFS
1852.245-78
Within 10 Days of Annual Physical Inventory
Property Administrator
11 Contractor Acquired Government Property Reporting
Section G
GSFC
52.245-93
Quarterly by Jan 30, Apr 30, July 30, and Oct 30
Electronic and Hard Copy Format/CO and SEMO, Code 273
12 Reporting of Inventions
Section G
NFS
1852.227-72
Section I
FAR
52.227-11
Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion
Electronic or Hard Copy Format/New Technology Representative or Patent Representative
13 Safety & Health Plan
Section H 30 Days After Contract Award
Electronic Format/CO
B-4
FAR
52.236-13-- Alternate I
14 Safety & Health Reporting
Section H
NFS
1852.223-70
Section H
NFS
1852.223-75
Section H
GSFC
52.223-91
Monthly/Quarterly Reports and As Required
NASA Mishap Information System
(NMIS)
15 Equal Opportunity Reports
Section I
FAR
52.222-26
As Specified by FAR 52.222-26
Electronic Format/CO & Code 120
16 Certificate of Insurance
Section I
FAR
52.228-7
NFS
1852.228-75
As Specified by
FAR 52.228-7
Electronic Format/CO
17 Subcontract Notification
Section I
FAR
52.244-2
30 Days Prior to Subcontract Award Date
Electronic or Hard Copy Format/CO
18 Service Contract Reporting
Section I
FAR
52.204-15
Annually by October 31 and Revisions, if needed, by November https://www.sam.gov
19 Diversity, Equity, Inclusion, and Accessibility (DEIA) Plan
Section J
Attachment I.1 & I.2
Within 30 days after contract award
B-5
20 Affirmative Procurement of Biobased Products
Section I
FAR
52.223-2
Annually by October 31 and Final Report https://www.sam.gov and copy to the CO
21 Personal Identity Verification
(PIV)
Documentation and Reporting
Section H
GSFC
52.204-99
10th Day of the Month and As Required
Electronic Format and Hard Copy/COR & Code 240
22 Organizational Conflicts of Interest (OCI) Avoidance Plan
Section I
NFS
1852.237-72
Section J
Attachment J.1 & J.2
To Be Submitted With Proposal
NOTE: Unless otherwise specified, “day” means “calendar day”.
NOTE: Transportation Classification: Transportation Classifications designations, in accordance with Clause D.1, for deliverables under Item 1 will be specified in each individual task order at the time of task order issuance. Deliverables under Items 2-24, unless specified (electronic format, etc.), are considered Class IV and shall be shipped via the most advantageous commercial transportation means considered to be in the best interest of the Government.
(End of clause)
B.4 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR SERVICES
(COST REIMBURSEMENT) (MAR 2022)
(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $2,000,000.00. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $85M. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.
(b) The minimum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount stated in paragraph (a).
B-6
(c) The maximum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals the maximum amount stated in paragraph (a).
(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the Changes clause.
(End of clause)
B.5 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES (COST
REIMBURSEMENT) (APR 2022)
(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment B, to calculate the proposed estimated costs for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.
(c) The Government and Contractor agree that the fixed fee percentage specified in Attachment B shall be used to calculate the fixed fee dollars on all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.
(End of clause)
B.6 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)
(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.
B-7
(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.
(c)(1) The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:
Incurred costs to date
Projected cost to completion
Total cost at completion
Current negotiated estimated cost
Requested increase in estimated cost
(2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:
(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.
(ii) Supporting explanation for the increases and projections, sufficient for the Government to understand the reasons for the increased estimated cost.
[END OF SECTION B]
GLOMAS DRFP
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1
C.1 GSFC 52.211-91 SCOPE OF WORK (FEB 2016)
The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this contract in accordance with the Statement of Work, Attachment A; Contract Historical Data, Attachment D; Safety and Health Plan, Attachment E; and task orders issued hereunder.
(End of clause)
C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER
SOFTWARE (MAR 2008)
In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following: NONE
(End of clause)
C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ/BPA) (MAR 2022)
(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance.
Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.
(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including recommendations and conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photographs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task Order.
GLOMAS DRFP
C-2
(c) Submission. The Contractor shall submit the reports required by this clause as follows:
Copies Report Type Addressee Mail Code
1 M, F Contracting Officer (CO) 178
1 M, F Contracting Officer's Representative (COR) 610
1 M, F Task Monitor See Task Order
[M=Monthly Report, F=Final Report]
(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order
[END OF SECTION C]
GLOMASATMOSDRFP
SECTION D - PACKAGING AND MARKING
D-1
D.1 CLAUSES INCORPORATED BY REFERENCE
1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)
(End of by reference clauses)
D.2 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011)
(a) The Contractor shall identify all equipment to be delivered to the Government using NASA Technical Handbook (NASA-HDBK) 6003, Application of Data Matrix Identification Symbols to Aerospace Parts Using Direct Part Marking Methods/Techniques, and NASA Standard (NASA-STD) 6002, Applying Data Matrix Identification Symbols on Aerospace Parts or through the use of commercial marking techniques that: (1) are sufficiently durable to remain intact through the typical lifespan of the property: and, (2) contain the data and data format required by the standards. This requirement includes deliverable equipment listed in the schedule and other equipment when no longer required for contract performance and NASA directs physical transfer to NASA or a third party. The Contractor shall identify property in both machine and human readable form unless the use of a machine readable-only format is approved by the NASA Industrial Property Officer.
(b) Equipment shall be marked in a location that will be human readable, without disassembly or movement of the equipment, when the items are placed in service unless such placement would have a deleterious effect on safety or on the item's operation.
(c) Concurrent with equipment delivery or transfer, the Contractor shall provide the following data in an electronic spreadsheet format:
(1) Item Description.
(2) Unique Identification Number (License Tag).
(3) Unit Price.
(4) An explanation of the data used to make the unique identification number.
(d) For equipment no longer needed for contract performance and physically transferred under paragraph (a) of this clause, the following additional data is required:
(1) Date originally placed in service.
(2) Item condition.
D-2
(e) The data required in paragraphs (c) and (d) of this clause shall be delivered to the NASA center receiving activity listed below:
Goddard Space Flight Center Building 35, Code 279 Greenbelt, MD 20771
(f) The contractor shall include the substance of this clause, including this paragraph (f), in all subcontracts that require delivery of equipment.
[END OF SECTION D]
SECTION E - INSPECTION AND ACCEPTANCE
E-1
SECTION E - INSPECTION AND ACCEPTANCE
E.1 CLAUSES INCORPORATED BY REFERENCE
52.246-5 INSPECTION OF SERVICES - COST-REIMBURSEMENT (APR 1984)
(End of by reference clauses)
E.2 GSFC 52.246-92 ACCEPTANCE -- SERVICES (APR 2022)
The Contracting Officer or authorized representative will accomplish acceptance at the Goddard Space Flight Center as specified in individual task orders issued. For the purpose of this clause, the Contracting Officer's Representative delegated on this contract is the authorized representative. The Contracting Officer reserves the right to unilaterally designate a different Government agent as the authorized representative. The Contractor will be notified by a written notice or by a copy of the delegation of authority if different representative is designated.
(End of clause)
E.3 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)
The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.
[END OF SECTION E]
SECTION F - DELIVERIES OR PERFORMANCE
F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 CLAUSES INCORPORATED BY REFERENCE-
52.242-15 STOP-WORK ORDER. (AUG 1989) ALTERNATE I (APR 1984)
(End of by reference clauses)
F.2 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)
The effective ordering period of this contract shall be for a period of 5 years from the contract effective date of TBD.
(End of clause)
F.3 GSFC 52.237-92 PLACE OF PERFORMANCE - SERVICES (NOV 2013)
The services to be performed under this contact shall be performed at the following location(s):
GSFC and Contractor’s facility. Alternate places of performance may be specified in individual task orders issued.
(End of clause)
F.4 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING (FEB 2016)
Shipments of the items required under this contract shall be to:
Receiving Officer
NASA Goddard Space Flight Center Building 35, Code 279 Greenbelt, MD 20771
Marked for:
Technical Officer: Eric C. Hackert, Code 610.1 Building: 33 Room: C225 Contract No.: TBD Item(s) No.: TBD
Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.
SECTION F - DELIVERIES OR PERFORMANCE
F-2
[END OF SECTION F]
SECTION G - CONTRACT ADMINISTRATION DATA
G-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 CLAUSES INCORPORATED BY REFERENCE
1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)
1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE
AND PATENT REPRESENTATIVE (APR 2015)
1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT REPORTING
(NOV 2004)
1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED
PROPERTY (AUG 2015)
1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)
1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY
(AUG 2015)
(End of by reference clauses)
G.2 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (APR 2018)
(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.
(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:
https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.
(c) Payment requests.
(1) The payment periods are stipulated in the payment clause(s) contained in this contract.
(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:
(i) Vouchers.
G-2
(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.
(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.
(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.
(D) Progress reports, as required.
(ii) Invoices.
(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.
(B) Progress reports, as required.
(C) Date goods and services were performed.
(iii) Fee vouchers.
(A) Listing of all provisionally-billed fee by period or date earned since contract award.
(B) A reconciliation of all billed and earned fee.
(C) A clear explanation of the fee calculations.
(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:
(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.
(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.
(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
G-3
(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.
(End of clause)
G.3 1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)
(a) The Contracting Officer must authorize in advance and in writing travel to locations outside of the United States by Contractor employees that is to be charged as a cost to this contract. This approval may be granted when the travel is necessary to the efforts required under the contract and it is otherwise in the best interest of NASA.
(b) The Contractor shall submit requests to the Contracting Officer at least 30 days in advance of the start of the travel.
(c) The Contractor shall submit a travel report at the conclusion of the travel. The Contracting Officer's approval of the travel will specify the required contents and distribution of the travel report.
G.4 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT PROPERTY (JUN
2018)
(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:
NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;
NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;
NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;
Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.
G-4
The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.
(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:
(i) The Contractor's purchase order shall require the vendor to deliver the property to the installation central receiving area.
(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.
(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.
(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.
(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph
(a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.
(c) The following property and services are provided if checked:
X (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.
G-5
X (2) Office furniture.
X (3) Property listed in Attachment H IAGP
(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.
(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.
(4) Supplies from stores stock.
(5) Publications and blank forms stocked by the installation.
(6) Safety and fire protection for Contractor personnel and facilities.
(7) Installation service facilities: [Insert the name of the facilities or “none”].
(8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.
(9) Cafeteria privileges for Contractor employees during normal operating hours.
(10) Building maintenance for facilities occupied by Contractor personnel.
(11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.
(End of clause)
G.5 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE CUSTODY
OF CONTRACTORS (JAN 2017)
(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by
NASA.
(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.
G-6
(2) The Contractor shall mail the original signed NF 1018 directly to the cognizant NASA Center Industrial Property Officer and a copy to the cognizant NASA Center Deputy Chief Financial Officer, Finance, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address:
Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt, MD 20771, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.
(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st.
The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.
(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors' procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention.
Contractors shall validate the reasonableness of the estimates and associated methodology by comparing them to the actual activity once that data is available, and adjust them accordingly. In addition, differences between the estimated cost and actual cost must be adjusted during the next reporting period. Contractors shall have formal policies and procedures, which address the validation of NF 1018 data, including data from subcontractors, and the identification and timely reporting of errors. The objective of this validation is to ensure that information reported is accurate and in compliance with the NASA FAR Supplement. If errors are discovered on NF 1018 after submission, the contractor shall contact the cognizant NASA Center Industrial Property Officer (IPO) within 30 days after discovery of the error to discuss corrective action.
(3) In addition to an annual report, if at any time during performance of the contract, NASA-owned property in the custody of the contractor has a value of $10 million or more, the contractor shall also submit a report no later than the 21st of each month in accordance with the requirements of paragraph (c)(2) of this clause.
(4) The Contracting Officer may, in NASA's interest, withhold payment until a reserve not exceeding $25,000 or 5 percent of the amount of the contract, whichever is less, has been set aside, if the Contractor fails to submit annual NF 1018 reports in accordance with NFS subpart 1845.71, any monthly report in accordance with (c)(3) of this clause, and any supplemental instructions for the current reporting period issued by NASA. Such reserve shall be withheld
G-7 until the Contracting Officer has determined that NASA has received the required reports. The withholding of any amount or the subsequent payment thereof shall not be construed as a waiver of any Government right.
(d) A final report shall be submitted within 30 days after disposition of all property subject to reporting when the contract performance period is complete in accordance with paragraph (b)(1) through (3) of this clause.
(End of clause)
G.6 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT TO
FAR 52.245–1. (JAN 2011)
For performance of work under this contract, the Government will make available Government property identified below or in Attachment H of this contract on a no charge-for-use basis pursuant to the clause at FAR 52.245–1, Government Property, as incorporated in this contract.
The Contractor shall use this property in the performance of this contract at the Contractor’s facilities and at other location(s) as may be approved by the Contracting Officer. Under FAR 52.245–1, the Contractor is accountable for the identified property.
(End of clause)
G.7 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)
(a) In addition to the requirements of the clause at FAR 52.245-1, Government Property, as included in this contract, the Contractor shall comply with the following in performance of work in and around Government real property:
(1) NPD 8800.14, Policy for Real Estate Management.
(2) NPD 8831.2, Facilities Maintenance and Operations Management.
(b) The Contractor shall obtain the written approval of the Contracting Officer before installing or removing Contractor-owned property onto or into any Government real property or when movement of Contractor-owned property may damage or destroy Government-owned property. The Contractor shall restore damaged property to its original condition at the Contractor's expense.
(c) The Contractor shall not acquire, construct or install any fixed improvement or structural alterations in Government buildings or other real property without the advance, written approval of the Contracting Officer. Fixed improvement or structural alterations, as used herein, means any alteration or improvement in the nature of the building or other real property that, after completion, cannot be removed without substantial loss of value or damage to the premises. Title to such property shall vest in the Government.
G-8
(d) The Contractor shall report any real property or any portion thereof when it is no longer required for performance under the contract, as directed by the Contracting Officer.
(End of clause)
G.8 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS (MAR 2022)
The following personnel are authorized to issue orders under this contract. All designated personnel are employed by the GSFC unless otherwise indicated:
Contracting Officer, Code 178
(End of clause)
G.9 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING (JUN 2014)
(a) Requirements. This clause provides the supplemental instructions referred to in NASA FAR Supplement (NFS) clause 1852.242-73. The NFS clause and NASA Procedural Requirements (NPR) 9501.2E, “NASA Contractor Financial Management Reporting”, establish report due dates and other financial management reporting requirements. NPR 9501.2E permits withholding of payment for noncompliance.
(b) Supplemental instructions. (1) Monthly (NF 533M) reports are required. Quarterly (NF 533Q) reports are also required. The reporting structure shall be in accordance with Attachment C of Section J of this contract.
(2) As stated in NPR 9501.2E, NASA strongly encourages electronic contractor cost reporting.
The preferred formats are Excel and Adobe. Contact the Contracting Officer for any E-Mail addresses that are not provided or which become noncurrent.
Distribution shall be as follows:
Contracting Officer, Code 178
E-Mail: michelle.r.padfield@nasa.gov
Contracting Officer’s Representative, Code 610.1
E-Mail: eric.c.hackert@nasa.gov
Resources Analyst, Code 157.1
E-Mail: joann.m.carter@nasa.gov
Regional Finance Office Cost Team, Code 155.2
E-Mail: GSFC-rfocateam@lists.nasa.gov
G-9
Administrative Contracting Officer (if delegated)
(c) Web site. NPR 9501.2E, “NASA Contractor Financial Management Reporting”:
http://nodis3.gsfc.nasa.gov/displayDir.cfm?t=NPR&c=9501&s=2E
(End of clause)
G.10 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY - ON-SITE AND OFF-
SITE (APR 2016)
(a) Performance of this contract requires that Contractor personnel and any furnished and/or acquired Government property be located at both Government controlled and managed premises (onsite) and at Contractor controlled and managed premises (offsite). The requirements for control and accountability of Government property differ depending upon the location of the property. The applicability of the clauses in this contract to on-site and to off-site locations is indicated below.
(b) Clauses, if included in the contract, are applicable to both onsite and offsite locations.
FAR clause 52.245-1, “Government Property”
FAR clause 52.245-9, “Use and Charges”
NASA FAR Supplement clause 1852.245-70, “Contractor Requests for Government-Provided Property”
NASA FAR Supplement clause 1852.245-72, “Liability for Government Property Furnished for Repair or Other Services”
NASA FAR Supplement clause 1852.245-73, “Financial Reporting of NASA Property in the Custody of Contractors"
NASA FAR Supplement clause 1852.245-74, “Identification and Marking of Government Equipment”
NASA FAR Supplement clause1852.245-75, “Property Management Changes”
NASA FAR Supplement clause 1852.245-78, “Physical Inventory of Capital Personal Property”
NASA FAR Supplement clause 1852.245-79, “Records and Disposition Reports for Government Property with Potential Historic or Significant Real Value”
NASA FAR Supplement clause 1852.245-83, “Real Property Management Requirements”
GSFC clause 52.245-99, “Supplemental Financial Reporting of NASA Property in the Custody of Contractors”
G-10
(c) Clauses, if included in the contract, are applicable to offsite locations only.
NASA FAR Supplement clause 1852.245-76, “List of Government Property Furnished Pursuant to FAR 52.245-1”
(d) Clauses, if included in the contract, are applicable to onsite locations only.
FAR clause 52.245-2, “Government Property Installation Operation Services”
NASA FAR Supplement clause 1852.245-71, “Installation-Accountable Government Property"
NASA FAR Supplement clause 1852.245-77, “List of Government Property Furnished Pursuant to FAR 52.245-2”
NASA FAR Supplement clause 1852.245-82, “Occupancy Management Requirements”
GSFC clause 52.245-93, “Reports of Contractor Acquired Government Property”
(End of clause)
G.11 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA
PROPERTY IN THE CUSTODY OF CONTRACTORS (JUN 2019)
(a) In addition to the annual 1018 reporting required under clause NFS 1852.245-73 of this contract, the Contractor shall submit monthly property financial reports as described below if, at either award or any time during contract performance, the cumulative amount of NASA property is $10 million or more.
(1) Monthly property financial reports shall be submitted including item-level supporting data for all items acquired/fabricated/modified where the total acquisition cost of the item is $500,000 or more, in the contractor’s or its subcontractors’ possession. This data shall be submitted for all items in the property classifications of real property, equipment, special test equipment, special tooling, and agency peculiar property.
(2) Monthly data shall also be submitted for items of any acquisition cost in the classifications of materials and contract work-in-process (WIP). Specifically, itemized monthly data is required for materials and WIP line items when the estimated total acquisition cost of any item at completion will be $500,000 or more.
(b) The monthly reports shall be electronically submitted using the Contractor-Held Asset Tracking System (CHATS) at https://chats.nasa.gov using the format described in the CHATS user’s manual.
I Acquisition costs shall be developed using actual costs to the greatest extent possible, especially costs directly related to fabrication such as labor and materials. Supporting
G-11 documentation shall be maintained and available for all amounts reported, including any amounts developed using estimating techniques.
(d) All adjustments shall be thoroughly explained and directly related to a specific Government Fiscal Year (GFY). If the GFY cannot be determined, the default shall be the previous GFI(e) Work Breakdown Structures (WBS) shall be provided for all Contractor acquired property (CAP), WIP, and any new materials acquired. The format shall be a five digit numerical level.
(i.e., 803-10). If the WBS is not identifiable, contact the NASA GSFC Property Office for further guidance, as provided in paragraph (f)(4) below.
(f)(1) The data required for the monthly submission is due the 21st day after the close of the month.
e.g., August 21 for the month ending July 31
September 21 for the month ending August 31
October 21 for the month ending September 30
(2) The monthly property financial reports required by this clause are separate from, and in addition to the annual NF 1018 reports.
(3) Both the NF 1018 report data and the September monthly report data are as of September 30.
Corrections in monthly report data shall be handled as adjustments in the next monthly report after discovery of the error. (e.g., Errors in the September monthly report shall be reported as adjustments in the October monthly report. The NF 1018 shall reflect the corrected numbers and the contractor shall provide a note regarding the corrected monthly report error under Comments in the NF 1018.) Errors in the NF1018 found after the November 30 submission shall be reported as adjustments in the NF 1018 for the next reporting year, unless immediate correction and resubmission are directed by NASA.
(4) Questions may be directed to the following individuals of the NASA GSFC Property Office:
Angela King, (301) 286-3543, email angela.c.king@nasa.gov
Timothy Kelly (301) 286-8819, email: timothy.e.kelly@nasa.gov
[END OF SECTION G]
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 CLAUSES INCORPORATED BY REFERENCE
1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING (NOV 2004)
1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING
(DEC 2015)
1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)
1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS (DEC 2006) –
ALT II (DEC 2005)
1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)
1852.244-70 GEOGRAPHIC PARTICIPATION IN THE AEROSPACE
PROGRAM (APR 1985)
(End of by reference clauses)
H.2 1852.225-70 EXPORT LICENSES (FEB 2000)
(a) The Contractor shall comply with all U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR), 22 CFR parts 120-130, and the Export Administration Regulations (EAR), 15 CFR parts 730-799, in the performance of this contract.
In the absence of available license exemptions/exceptions, the Contractor shall be responsible for obtaining the appropriate licenses or other approvals, if required, for exports of hardware, technical data, and software, or for the provision of technical assistance.
(b) The Contractor shall be responsible for obtaining export licenses, if required, before utilizing foreign persons in the performance of this contract, including instances where the work is to be performed on-site at GSFC, where the foreign person will have access to export-controlled technical data or software.
(c) The Contractor shall be responsible for all regulatory record keeping requirements associated with the use of licenses and license exemptions/exceptions.
(d) The Contractor shall be responsible for ensuring that the provisions of this clause apply to its subcontractors.
H-2
H.3 GSFC 52.204-99 CONTRACTOR PERSONNEL-IDENTIFICATION, ONSITE
REPORTING, AND CHECKOUT PROCEDURES (NOV 2021)
(a) In accordance with FAR 52.204-9, Personal Identity Verification of Contractor Personnel, the Contractor shall follow the procedures in NASA Procedural Requirements (NPR) 1600.4, for each contract employee (prime and subcontractor) who will have physical access to a NASA-controlled facility (also referred to as “onsite”). The Contractor must apply for permanent NASA/GSFC PIV cards for those contract employees who will be employed by the Contractor onsite for at least six months. GSFC Protective Services will consider permanent PIV cards for other employees of the Contractor on a case-by-case basis, such as employees that are not resident onsite, but must frequently visit. In the future, upon written notice from the Contracting Officer, the Contractor shall follow the steps outlined in NPR 1600.4 for each offsite contract employee (prime and subcontractor) who require remote access to a NASA information system for contract performance.
(b) The Contractor shall notify GSFC Protective Services, Code 240, Attention: Badging Supervisor, and the Contracting Officer’s Representative (COR) of the contractor’s designated PIV Requester within 15 calendar days after award of this contract. The NASA maintained PIV system (Identify and Access Management – IdMAX) contains work and home location and contact information for personnel that have permanent NASA PIV cards. The Contractor may contact the Badging Supervisor, Tel 301-286-2306 for assistance regarding IdMAX.
(c) Each contract employee shall provide to the Contractor’s designated PIV Requester the basic identifying information required for a PIV Request to be initiated in IdMAX. The PIV Request must be approved by the PIV Sponsor (COR or the Contracting Officer). The COR will resolve any housing or access issues and review the request for accuracy and completeness. Requests that are approved by the PIV Sponsor will be forwarded to GSFC Protective Services, Code 240, PIV Authorization, Badge enrollment, and Badge issuance.
(d) The Contractor shall submit an annotated PIV Report each month. The GSFC Badging Supervisor will furnish a PIV print-out to the Contractor no later than the end of each month. The Contractor shall annotate this provided report monthly to correct and update the information as follows:
(1) Draw a line through the names of employees who are no longer employed by the contractor or that no longer work onsite under the contract; and
(2) Make handwritten changes to any other incorrect data.
The annotated PIV Report shall be separately submitted to GSFC Protective Services, Code 240, Attention: Badging Supervisor, and to the COR by the 10th calendar day of the month.
For the final PIV Report under the contract, the GSFC Badging Supervisor will furnish a PIV print-out to the Contractor no later than two weeks prior to the end of the contract. The
H-3
Contractor shall submit its annotated final PIV Report no later than three (3) days prior to the end of the contract.
If this is a follow-on contract, at the end of the phase-in period (if any)/start of the basic contract period, GSFC Protective Services will provide the Contractor a copy of the final PIV Report from the previous contract. The Contractor shall review the list and redline it as necessary to reflect its employees requiring PIV cards. The redlined list shall be provided GSFC Protective Services within 30 days after the start of the contract.
(e) The Contractor shall ensure that all personnel who have NASA/GSFC issued PIV cards, keys or other property who leave its employment or that no longer work onsite, process out through GSFC Protective Services, Code 240 and complete the GSFC form 17-26A, which shall be signed off and maintained by the contract Program Manager once completed. Employees must return all GSFC issued identification and any Government property no later than the last day of their employment or the last day they work onsite under this contract. The Contractor shall establish appropriate procedures and controls to ensure this is accomplished. In addition, it is the responsibility of the contractor to notify the government of any termination/removal that occurs when the PIV has not been turned in to or received by the government. Failure to comply may result in the exercise of Government rights to limit and control access to Government premises, including denial of access and invalidation of NASA issued PIV cards and identification.
(End of clause)
H.4 GSFC 52.211-95 GOVERNMENT PREMISES—PHYSICAL ACCESS AND
COMPLIANCE WITH PROCEDURES (APR 2022)
(a)(1) The Contractor must apply for permanent NASA/GSFC Personal Identity Verification (PIV) cards (badges) for those employees that will be employed by the Contractor and subcontractors and that will be resident for at least six months at GSFC or at locations controlled by GSFC, such as GSFC leased space. Other personnel may be issued a temporary badge. All personnel must conspicuously display the GSFC PIV card at, or above, the waistline. Refer to GSFC clause 52.204-99, “Contractor Personnel – Identification, Onsite Reporting, and Checkout Procedures” for permanent PIV card issuance procedures.
(2) Visits by foreign nationals are restricted and must be necessary for the performance of the contract and concurred with by the Contracting Officer or by the Contracting Officer’s Representative. Approval of such visits must be approved in advance in accordance with Goddard Procedural Requirement (GPR) 1600.1.
(3) Access to the GSFC may be changed or adjusted in response to threat conditions or special situations.
(b) While on Government premises, the Contractor shall comply with all requirements governing the conduct of personnel and the operation of the facility. These requirements are set forth in
H-4
NASA Procedural Requirements (NPR), NASA Policy Directives (NPD), GPRs, GSFC Policy Directives (GPD), handbooks and announcements. The following cover many of the requirements:
(1) Harassment and Discrimination Announcements: https://eeo.gsfc.nasa.gov/article/anti-harassment
(2) GSFC Workplace Violence Announcement: https://ohcm.gsfc.nasa.gov/content/gsfc-workplace-domestic-violence
(3) GPR 1600.1, GSFC Security Requirements
(4) NPD 1600.3, Policy on Prevention of and Response to Workplace Violence
(5) GPR 1700.1, Occupational Safety Program at GSFC
(6) GPR 1700.2, Chemical Hygiene Program
(7) GPR 1700.5, Control of Hazardous Energy (Lockout/Tagout)
(8) GPR 1700.6, Confined Space Program at GSFC
(9) GPR 1700.7, Electrical Safety
(10) GPR 1700.8, GSFC Hazard Communication Program
(11) GPR 1800.1, GSFC Smoking and Other Tobacco Use Requirements
(12) GPR 1800.6, Occupational Health, Medicine and Employee Assistance Programs
(13) GPR 1840.2, Industrial Hygiene Program
(14) GPR 1860.1, Ionizing Radiation Protection
(15) GPR 1860.2, Laser Radiation Protection
(16) GPR 1860.3, Radio Frequency Radiation Protection
(17) GPR 1860.4, Ultraviolet and High Intensity Light Radiation Protection
(18) NPD 2540.1, Personal Use of Government Office Equipment Including Information Technology
(19) GPR 2570.1,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .