RFI_Questions_and_Responses.pdf
PDF 218 KB Posted
- Attached to
- FA2550-17-R-1012 Solicitation Federal contract opportunity
- Solicitation number
- GLEN_12_1036_FA2550_17_R_1012
About this file
RFI Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI__4_Questions_and_Responses.docx.pdf | ||
| RFI_Questions_and_Responses_5_July_2017.pdf | ||
| Building_805_Concrete_Pavement_Details.pdf | ||
| General_Decision_Number.pdf | ||
| GLEN_15-2020_Site_Layout_Plan_showing_concrete_slab_in_question.pdf | ||
| GLEN_12-1036_RFIs.pdf | ||
| 5_Design_Guide_Version_March_2016.pdf | ||
| 4_Schriever_B800_Sanitary_Sewer_Specifications.pdf | ||
| 3_Schriever_B800_Sanitary_Sewer_Drawings.pdf | ||
| 8_WD_CO20160012.pdf | ||
| 1_12-1036_1442.pdf | ||
| 6_01_57_20.04_SAFB_Overreaching_Environmental.pdf | ||
| 2_GLEN_12-1036_SOW.pdf | ||
| 7_GLEN_12-1036_Form_66_Repair_Sewer_Industrial_Area.xls | XLS spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GLEN 12-1036 Sanitary Sewer RFI #1
RFI Questions and Responses
1. The connection of the sanitary sewer to B‐805 on Sheet 6 appears to conflict with a new concrete vehicle pad currently being constructed (see project GLEN 15‐2020). The existing SS line exits the building and enters a MH 5’ to 10’ into this new slab. If the proposed connection happens before the concrete pad then there is not a problem but if it happens after then we would have to demolish and replace new concrete. Should we add costs to demo and replace part of the concrete pad?
a. Government Response: The new concrete slab at the northeast end of Building
805 may be complete by the time this contract is awarded. Please assume removal and replacement in kind of this concrete apron as needed to install the new sanitary sewer. For clarity, the site layout of the referenced project (GLEN 15-
2020) is attached.
2. Will the contractor have access to on-site water from a hydrant for compaction or would we need to bring in our own water?
a. Government Response: The Government will provide access, please refer to section 5(F)(i) of the Statement of Work.
3. Also, are there any planned pre-bid meetings?
a. Government Response: There is no pre-bid anticipated.