This document contains testing results for fire suppression systems across four buildings (A, B, C, and D), presenting pass/fail data for individual components and assemblies.
Building A tested 261 total items with 161 passing and 100 failing. Notable failures include Gauges (15 failures), Hose Valves (52 failures), Inspector's Tests (14 failures), Check Valves (3 failures), and Dry Pipe Valves (2 failures). Building B tested 110 total items with 65 passing and 45 failing, with significant failures in Hose Valves (26 failures), Gauges (5 failures), and Inspector's Tests (9 failures). Building C tested 354 total items with 244 passing and 110 failing, exhibiting the highest failure rate in Hose Valves (61 failures) and Gauges (17 failures), along with substantial failures in Check Valves (4 failures) and Control Valves (11 failures). Building D tested 141 total items with 96 passing and 45 failing, with notable failures in Hose Valves (23 failures), Gauges (11 failures), and Check Valves (3 failures). Across all buildings, Hose Valves and Gauges demonstrated the most consistent failure patterns, while components such as Air Maintenance Devices, Tamper Switches, and Drain systems generally achieved high pass rates. The combined testing encompassed a total of 866 items across the four buildings, with 566 passing and 300 failing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING A FIRE SUPPRESSION SYSTEM TESTED ITEMS
Passed Failed Air Compressor 1 0
Air Maintenance Device 3 0 Alternate Power 1 0
Backflow Prevention 1 0 Casing Relief Valve 0 1
Check Valve 0 3 Control Valve 40 1
Controller 1 0 Drain 5 0
Dry Pipe Valve 0 2 Electrical Driver 1 0 Fire Pump Off 1 0
Fire Pump Running 1 0 Gauge 0 15
Hose Valve 44 52 Inspector's Test 5 14
Jockey Controller 1 0 Jockey Pump 1 0
Nitrogen System 1 0 Piping 0 1
Preaction Valve 1 0 Pressure Switch 2 0
Pump 1 0 Quick Opening Device 1 0
Sprinkler Box 0 3 Sprinkler Box Spares 3 0
Tamper Switch 30 4 Waterflow Switch 16 4
Total 161 100 Grand Total 261
BUILDING B FIRE SUPPRESSION SYSTEM TESTED ITEMS
Air Compressor 2 0
Air Maintenance Device 2 0 Control Valve 14 1
Drain 2 0 Dry Pipe Valve 1 1
Gauge 0 5 Hose Valve 20 26
Inspector's Test 0 9 Quick Opening Device 2 0
Standard Response 0 1 Tamper Switch 15 0
Waterflow Switch 7 2 Total 65 45 Grand Total 110
BUILDING C FIRE SUPPRESSION SYSTEM TESTED ITEMS
Air Maintenance Device 3 0
Alternate Power 1 0 Backflow Prevention 0 1 Casing Relief Valve 0 1
Check Valve 0 4 Control Valve 73 11
Controller 1 0 Drain 33 1
Dry Pipe Valve 4 0 Electrical Driver 1 0 Fire Pump Off 1 0
Fire Pump Running 1 0 Gauge 0 17
Hose Valve 28 61 Jockey Controller 1 0
Jockey Pump 1 0 Piping 0 1
Pressure Relief 0 1 Pressure Switch 1 0
Pump 1 0 Quick Opening Device 2 2
Standard Response 1 2 Tamper Switch 67 8
Test Gauge 1 0 Waterflow Switch 23 0
Total 244 110 Grand Total 354
BUILDING D FIRE SUPPRESSION SYSTEM TESTED ITEMS
Air Maintenance Device 3 0
Alternate Power 1 0 Backflow Prevention 2 0 Casing Relief Valve 0 1
Check Valve 0 3 Control Valve 29 1
Controller 1 0 Drain 14 0
Dry Pipe Valve 3 0 Electrical Driver 1 0 Fire Pump Off 1 0
Fire Pump Running 1 0 Gauge 2 11
Hose Valve 1 23 Jockey Controller 0 1
Jockey Pump 1 0 Piping 0 1
Pressure Switch 2 2 Pump 1 0
Quick Opening Device 3 0 Tamper Switch 22 0
Test Gauge 1 0 Waterflow Switch 7 2
Total 96 45 Grand Total 141