GFI_Fire Suppression System Tested Components.pdf

PDF 64 KB Posted

Attached to
Government Publishing Office -- Annual Fire Preventative Maintenance
Solicitation number
040ADV-26-R-0021
Issued by

About this file

This document contains testing results for fire suppression systems across four buildings (A, B, C, and D), presenting pass/fail data for individual components and assemblies.

Building A tested 261 total items with 161 passing and 100 failing. Notable failures include Gauges (15 failures), Hose Valves (52 failures), Inspector's Tests (14 failures), Check Valves (3 failures), and Dry Pipe Valves (2 failures). Building B tested 110 total items with 65 passing and 45 failing, with significant failures in Hose Valves (26 failures), Gauges (5 failures), and Inspector's Tests (9 failures). Building C tested 354 total items with 244 passing and 110 failing, exhibiting the highest failure rate in Hose Valves (61 failures) and Gauges (17 failures), along with substantial failures in Check Valves (4 failures) and Control Valves (11 failures). Building D tested 141 total items with 96 passing and 45 failing, with notable failures in Hose Valves (23 failures), Gauges (11 failures), and Check Valves (3 failures). Across all buildings, Hose Valves and Gauges demonstrated the most consistent failure patterns, while components such as Air Maintenance Devices, Tamper Switches, and Drain systems generally achieved high pass rates. The combined testing encompassed a total of 866 items across the four buildings, with 566 passing and 300 failing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING A FIRE SUPPRESSION SYSTEM TESTED ITEMS

Passed Failed Air Compressor 1 0

Air Maintenance Device 3 0 Alternate Power 1 0

Backflow Prevention 1 0 Casing Relief Valve 0 1

Check Valve 0 3 Control Valve 40 1

Controller 1 0 Drain 5 0

Dry Pipe Valve 0 2 Electrical Driver 1 0 Fire Pump Off 1 0

Fire Pump Running 1 0 Gauge 0 15

Hose Valve 44 52 Inspector's Test 5 14

Jockey Controller 1 0 Jockey Pump 1 0

Nitrogen System 1 0 Piping 0 1

Preaction Valve 1 0 Pressure Switch 2 0

Pump 1 0 Quick Opening Device 1 0

Sprinkler Box 0 3 Sprinkler Box Spares 3 0

Tamper Switch 30 4 Waterflow Switch 16 4

Total 161 100 Grand Total 261

BUILDING B FIRE SUPPRESSION SYSTEM TESTED ITEMS

Air Compressor 2 0

Air Maintenance Device 2 0 Control Valve 14 1

Drain 2 0 Dry Pipe Valve 1 1

Gauge 0 5 Hose Valve 20 26

Inspector's Test 0 9 Quick Opening Device 2 0

Standard Response 0 1 Tamper Switch 15 0

Waterflow Switch 7 2 Total 65 45 Grand Total 110

BUILDING C FIRE SUPPRESSION SYSTEM TESTED ITEMS

Air Maintenance Device 3 0

Alternate Power 1 0 Backflow Prevention 0 1 Casing Relief Valve 0 1

Check Valve 0 4 Control Valve 73 11

Controller 1 0 Drain 33 1

Dry Pipe Valve 4 0 Electrical Driver 1 0 Fire Pump Off 1 0

Fire Pump Running 1 0 Gauge 0 17

Hose Valve 28 61 Jockey Controller 1 0

Jockey Pump 1 0 Piping 0 1

Pressure Relief 0 1 Pressure Switch 1 0

Pump 1 0 Quick Opening Device 2 2

Standard Response 1 2 Tamper Switch 67 8

Test Gauge 1 0 Waterflow Switch 23 0

Total 244 110 Grand Total 354

BUILDING D FIRE SUPPRESSION SYSTEM TESTED ITEMS

Air Maintenance Device 3 0

Alternate Power 1 0 Backflow Prevention 2 0 Casing Relief Valve 0 1

Check Valve 0 3 Control Valve 29 1

Controller 1 0 Drain 14 0

Dry Pipe Valve 3 0 Electrical Driver 1 0 Fire Pump Off 1 0

Fire Pump Running 1 0 Gauge 2 11

Hose Valve 1 23 Jockey Controller 0 1

Jockey Pump 1 0 Piping 0 1

Pressure Switch 2 2 Pump 1 0

Quick Opening Device 3 0 Tamper Switch 22 0

Test Gauge 1 0 Waterflow Switch 7 2

Total 96 45 Grand Total 141