George Wyth State Park Site Location Map.html

HTML file 208 KB Posted

Attached to
Office/Shop Buildings for George Wyth State Park and Upper Iowa Wildlife Management Area
Solicitation number
25CRDLWBGANTO-0014
Issued by
Black Hawk County, Iowa

About this file

This is a site location map file for George Wyth State Park, related to an architectural and engineering services request from the Iowa Department of Natural Resources. The RFP (Number 25CRDLWBGANTO-0014) seeks design and construction services for office/shop buildings at two locations: George Wyth State Park in Black Hawk County and Upper Iowa Wildlife Management Area in Winneshiek County. The scope includes architectural design, engineering systems design, construction plans, technical specifications, cost estimates, and construction administration. A non-mandatory virtual pre-proposal conference is scheduled for March 4, 2025, with separate sessions for each location, and proposals are due March 19, 2025, at 4:00 PM. The contract term is 26 months with key milestones including 35% plans by July 2025, 60% plans by August 2025, and 100% construction documents by February 2026. Project deliverables encompass building design, site grading, parking areas, on-site wastewater treatment, liquid propane connections, and utility services for both facilities.

Evaluation criteria allocate 20 points for cost, 40 points for professional experience and performance record, and 40 points for work plan, with a minimum score of 25 points required for consideration. Required insurance includes $2 million general aggregate liability and $1 million per occurrence. Payment terms are Net 60 days with options for electronic funds transfer, state warrant, or purchasing card. The RFP does not specify set-aside designations for disadvantaged enterprises. No incumbent vendors are identified, though reference materials from similar projects at Kellerton and Wapello State Parks are provided for context. A specific project budget is not disclosed; vendors must submit detailed hourly rates and total hours for each task, with pricing to include travel, expenses, and freight costs. The project appears funded through state infrastructure sources, with the total contract value anticipated to be substantial given the comprehensive services required across two separate locations.

Text of this file

When you have eliminated the JavaScript, whatever remains must be an empty page.

Enable JavaScript to see Google Maps.

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .