GENERATOR Sign-Off Sheet 17_5.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Generator Maintenance and Inspection
Solicitation number
ARFQ-0506-HOP1700000005-2
Issued by
Preston County, West Virginia

About this file

This document appears to be a Generator Maintenance and Inspection contract opportunity issued by the West Virginia Department of Health and Human Resources (WVDHHR) for Hopemont Hospital in Preston County, West Virginia. The contract requires the successful vendor to provide generator maintenance and inspection services, including checks of various generator components and systems such as water hoses, batteries, radiator, alternator, wiring, fuel system, and transfer switch. The contract term is not specified.

The document provides a detailed checklist of the maintenance and inspection procedures to be performed. Pricing terms, set asides, funding requirements, and other salient commercial details are not included in this document. The key focus is on the technical requirements and scope of work for the generator maintenance and inspection services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SystemOKSVCCheck/ProcedureSystemOKSVCCheck/Procedure
32Water HosesElectricalBatteries (Level, Condition)
Radiator/Heat ExchangerAlternator Voltage:Voltage Drop (VDC):
Drive BeltsConnections (Clean,Tight)
Fan ConditionCharger Operation (VDC):
Block Heater OperationEngine Wiring
Coolant Level
Coolant ProectionTest Safeties
DCA Strength
Water Pump
Change Filter (At Service)
Intake/ ExhaustVisual Check of Piping
Crankcase BreatherGenerator/ ControlsVolts:
Ambient Temp:Turbo OperationHertz:
Inspect Air CleanerWiring (Controls, Eng)
Check Rain CapVisual Check: Windings, Diodes
Fuel SystemCheck for LeaksMeters: Working, Accurate
Level:Fuel Transfer PumpGeneral ConditionRoom-Clean and Ventilated
Govenor OperationSwitch:
Day Tank-Leaks & OperationHour Meter Operation
Rupture Basin AlarmUnit Cleanliness, Paint
Drain Water SeperatorsFire PumpCheck Packing
Change Filter (At Service)Engine RPM
LubeCheck Oil LevelCheck Raw Water Cooling
Oil Press:Check for LeaksCheck for leaks
Oil Cap:Check Hydraulic GovenorTest Sytem
Oil Type:Take Oil sample (at service)Misc.Breakers
Change Filter (At Service)
Transfer SwitchVisual Inspection
Test No Load
Load Test with Customer OK

Suggested Repairs/ Comments

Date:
Name:
Signature:

ARFQ HOP17*5 &"-,Bold"&12Generator Maintenance/Inspection WVDHHR/BHHF/Hopemont Hospital

Overspeed Overcrank Low OP High Eng Temp Lo Eng Tmp Low Coolant Lvl.

Lo Fuel Digital Control Auto

OFF

Sheet2

Sheet3

File details come from the government source that posted it. Updated .