This Statement of Work details a database conversion project between Milsoft Utility Solutions and the City of Gallup's Utilities Department, with the primary objective of converting the customer's existing ESRI GIS data into a format compatible with Milsoft's Engineering and Operations (E&O) Model. The scope encompasses converting existing GIS data into a Milsoft WindMil model, migrating work orders from ESRI into WindMil, confirming electrical phasing from the existing model, ensuring optimal model conditions for system analysis, establishing frameworks for ongoing maintenance using WindMil Map and Milsoft FieldSyte Staking, and enforcing best practices to maintain data integrity and model reliability. Work will be performed at Milsoft locations in Abilene, Texas; Pensacola, Florida; Bowling Green, Missouri; or at the customer's site or employee's remote location. The conversion process is interdependent and iterative, requiring the customer to provide prompt reviews and detailed feedback typically within two business days.
The customer is responsible for providing all required data sources, establishing cut-off dates for posting changes, and making corrections to source data within two business days when errors or inconsistencies surface during joint reviews. Milsoft will deliver a completed E&O Model and attribute data in Milsoft Internal Tables (MS SQL), contingent upon timely customer participation and prompt responses. Installation will follow final conversion approval. The customer will receive both Milsoft Standardized Tables and "External Tables" containing legacy data; external tables will be left off upon delivery to optimize system performance. Database acceptance occurs when the customer has reviewed the conversion and found no significant errors within Milsoft's scope of work. The project requires detailed customer data including coordinate systems, location data, parent and child element relationships, equipment databases, and comprehensive specifications for overhead lines, underground lines, regulators, transformers, switches, sources, generators, motors, devices, capacitors, consumers, and map points with specific attributes for each element type outlined in Attachment A.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DATABASE CONVERSION
Prepared for Milsoft customer:
City of Gallup Attn: Riley Crain
Utilities Department
230 S. Second St.
Gallup, NM 87301
TABLE OF CONTENTS
Introduction/Background
Scope of Work
Place of Performance
Data Sources
Data Destination
Conversion Process
Customer Deliverables
Milsoft Deliverables
Installation
Post Installation Customer data review and clean-up
Database Acceptance Criteria
Change Orders
Attachment A: Customer data required to complete Milsoft E&O Model
Introduction/Background
Gallup Joint Utilities Department, City of Gallup (hereafter referred to as “Customer”) has engaged Milsoft Utility Solutions (hereafter referred to as “Milsoft”) to convert data from [ESRI to a format that is compatible with the Milsoft’s Engineering and Operations (E&O) Model. The database conversion process is interdependent between Customer and Milsoft and will require several review iterations.
Scope of Work
The scope of work is limited to electrical circuit elements and map points recognized by Milsoft’s
E&O software. Corrections or modification to the source data will be the responsibility of
Customer and will not be included in Milsoft’s scope of work.
-Convert your existing GIS data into a Milsoft WindMil model.
-Migrate the work orders currently in ESRI into WindMil.
-Confirm phasing reflected from the existing model.
-Ensure the model is in the best possible condition for system analysis in WindMil.
-Establish the framework for ongoing maintenance using WindMil Map and Milsoft FieldSyte
Staking.
-Enforce best practices moving forward to maintain data integrity and model reliability.
Place of Performance
Milsoft will perform work at one or more of the following places:
• Abilene, Texas
• Pensacola, Florida
• Bowling Green, Missouri
• Customer’s site, or Employee’s Remote
Data Sources
• Customer-supplied data sets correlated to Attachment A
• Supplemental data outside Customer data set in compliance with Attachment A
Data Destination
• Milsoft E&O Model (FairCom)
• Milsoft Data Set/Internal Tables (MS SQL)
Conversion Process
During the conversion process, Milsoft will expect Customer to provide prompt (typically within two business days) and detailed reviews of mapped and converted data. Milsoft cannot provide any missing data or independently identify/fix latent data errors. Engineering assumptions (e.g.
snapping transformers and lines to poles based on proximity) will be used to create data.
However, assumptions are not guaranteed to be engineering-accurate.
1. Milsoft will provide connection details to a secure FTP site to be used in the exchange of
Customer data files. Connection details for the FTP will be communicated to Customer prior to the kick-off call.
2. Milsoft will initiate and conduct a database conversion project kick-off call with Customer team to discuss and identify:
a. Required Interfaces (e.g. Billing, AMI, Staking …)
b. Grid Requirements
c. Coordinate System
d. Workflow
e. Data Sources and Request Data
f. Project Contacts
3. If Customer wishes to use grid-based naming within the Milsoft E&O Model, a schema must be provided by Customer supplying unique element names which can be programmatically defined within the Milsoft E&O Model. The grid-based naming may be used for all electrical elements within the Milsoft E&O Model. Customer is responsible for all renaming of elements within Customer’s model and database.
4. Customer will be provided an evaluation of Customer’s electric model including overall accuracy (Gap Analysis). Missing or inaccurate information will be detailed so Customer can update the source data.
5. Database conversion will be limited to data from Customer’s data sources selected by Milsoft. Milsoft will create data mappings based on Customer’s data and
Milsoft’s standardized file structure. In the event that the element data required for a connectivity model is not provided, Milsoft will insert the elements without electrical connectivity. Customer is responsible for data cleanup not provided in source data.
6. The transmission portion of the electric model, if contracted by Customer, can be included in the conversion; however, transmission will be isolated/disconnected from the distribution network model to optimize outage predictions.
7. Milsoft supports Center Tap transformer modeling; however, not all 3rd party software systems recognize Xn phasing. If Customer requires Center Tap transformer modeling in
WindMil/EA and standard phasing for Outage Management or Staking, Milsoft recommends the model be delivered in standard phasing (A/B/C). Altering existing single-phase transformers to Center Tap is relatively easy using WindMil tools prior to running analysis. Typically, two and three phase Power & Light transformer banks require engineering assumptions because the source data doesn’t identify which transformer is center tapped. The Customer has the ability to store Center Tap information in the transformer unit table (external SQL table) even when only standard phasing is selected.
8. After initial conversion, Milsoft will conduct an evaluation of Customer’s electric model and provide a report assessing the overall accuracy. The report will detail missing or inaccurate information. It is Customer’s responsibility to update source data.
Milsoft will provide Customer with ongoing analysis of the data quality throughout the conversion process, and will work with Customer to address any issues.
CUSTOMER DELIVERABLES
1. Customer will provide a defined detailed list of data requested by Milsoft, and linking information for Internal Tables in their database by:
a. Collectively determining how equipment not presently modeled by Milsoft will be handled to include underground switchgear, feed-thru cabinets, pad-mounted transformers, and open-points.
b. Defining:
i. Naming conventions
ii. Unique identifiers required to link devices in the Milsoft E&O Model to Internal data
iii. Attributes to use for the Milsoft E&O Model’s equipment device definitions (EQDB)
2. Customer will provide the current data source to be used for the conversion and attribute data associated with the model elements to be used with Milsoft Internal
Tables prior to the start of the conversion project.
3. Customer must establish a cut-off date for posting changes to the source data prior to the final conversion and the transition to the Milsoft E&O Model.
Customer will make corrections to the source data requested by Milsoft as errors and/or inconsistencies surface during the joint reviews of the Milsoft E&O Model generated by the database conversion. Corrections will be completed and returned to Milsoft within two (2) business days to prevent software installation delays for Customer. Customer may elect to forego some corrections at their discretion if the corrections cannot be made in a timely manner prior to the cut-off date.
MILSOFT DELIVERABLES
1. Milsoft will deliver a completed Milsoft E&O Model and attribute data associated with the model elements in the form of Milsoft Internal Tables (MS SQL). This delivery is contingent upon the timely participation and prompt responses of Customer throughout the data conversion work.
2. Upon request, a virtual machine will be hosted for Customer to facilitate the review of their converted data using Milsoft’s WindMil software. If Customer is not familiar with WindMil, basic training can be obtained by contacting Milsoft.
3. Milsoft will convert Customer data using proprietary coding and conducting detailed quality assurance reviews of the Milsoft E&O Model and data provided from the data conversion.
4. Milsoft will initiate joint reviews of the Milsoft E&O Model throughout the conversion process.
a. Programmatic changes to correct issues discovered during joint reviews will be completed by Milsoft.
b. Customer and Milsoft will evaluate progress toward a final conversion and cut-off date after the second data review.
c. All third-party updates must be posted prior to the cut-off date.
INSTALLATION
Milsoft will install the Milsoft E&O Model on Customer’s system following the review of the final conversion.
POST INSTALLATION CUSTOMER DATA REVIEW AND CLEAN-UP
Customer will receive Milsoft Standardized Tables and “External Tables” (MS SQL) with the completed data conversion. Only source tables relevant to the conversion will be stored in the
Milsoft Standardized Tables. The “External Tables” typically contain fields that have a great deal of redundant and legacy data that could unnecessarily inhibit the performance of the software;
therefore, Milsoft will leave “external tables” turned off upon delivery, to optimize performance of the system while retaining the legacy data Customer might need for other purposes.
If Customer wishes to link the “external tables,” Customer is advised to use SQL Server to review the database and delete data fields that are redundant or no longer required. Depending on the amount of extraneous data contained within the original database, this can be a significant task, but failure to review and delete legacy “external tables” SQL data fields can cause sluggish performance of Milsoft products.
Wholesale deletion of the “external tables” database is an option, as it is provided as an archive of the data Milsoft received. Such deletion is only recommended once Customer is certain they have no need for this archived data.
Database Acceptance Criteria
Acceptance of the database conversion will occur when Customer has reviewed the conversion and found no significant errors within Milsoft’s scope of work.
Change Orders
Any modification to this Statement of Work must be requested by one party’s Project Manager
(PM) to the other party’s PM, reviewed, and agreed to by both parties. Any proposed Change
Order will be drafed by Milsoft and submitted for Customer review and approval. Such changes may result in required adjustment of the project deadlines or additional fees; any change that requires an increase in cost should be coordinated through the RAM and Customer. Once signed by Milsoft’s CEO of Business Operations and Customer’s authorized representative, the Change
Order will become effective.
Statement of Work Acceptance/Authorization
MILSOFT UTILITY SOLUTIONS, INC. GALLUP JOINT UTILITIES,
CITY OF GALLUP
By: __________________________ By: __________________________ Signature Signature
Adam Turner __________________ _____________________________
Printed Name Printed Name
CEO of Business Operations ______ _____________________________
Title Title
Date Date
Project Acceptance by Customer upon Completion
By: __________________________ Signature of Customer Representative
Printed Name & Title
Date
Attachment A:
Customer data required to complete Milsoft E&O Model.
Customers Coordinate System and Projection (WGS-84) to be used
Customers Location Data for each element
The Parent and Child data (Up-line & Down-line) information for all model elements
Equipment Database (eqdb) (if current WindMil customer)
Elements
Each data element must be identified. Elements are required to have a unique name, type and include attribute data listed in this attachment.
1. Overhead
a. Unique Name (ID) include preferred prefixes to distinguish OHP, OHS
b. Phase Data
c. Conductor Definitions (both phase and neutral conductors)
d. Impedance Length
2. Underground
a. Unique Name (ID) include preferred prefixes to distinguish UGP, UGS
b. Phase Data
c. Conductor Definitions (phase conductor, if neutral is concentric, or tape shield)
d. Impedance Length
3. Regulator
a. Unique Name (ID) include preferred prefix
b. Phase Data (phase of the bank, include the controlling phase where applicable)
c. Regulator Size (in kva or amps/designate equipment definition)
d. Voltage Level
e. LD Comp R&X (preferred)
f. First House High & Low (preferred)
4. Transformer
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. Winding Connections
d. Transformer Equipment/Impedance Definition
e. Rated L-L Input Voltage
f. Rated L-L Output Voltage
g. Nominal of Output System
h. Overhead, Step, or Pad Mounted? – Transclosures will be typed as Pad-Mounted. If identified in the data, they can be given unit tables in the External Data Tables
i. kva data
j. input/output voltage data (preferably line-to-line)
5. Switch
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. Switch Status (open/closed/looped)
d. Switch ID (optional)
e. Open Points can be modeled as switches, or nodes, if data supports this. This will require a unique prefix (OP)
6. Source
a. Unique Name (ID)
b. Phase Order (?) Data (position of lines leaving substation)
c. Impedance Code Minimum (often this is the substation number and name)
d. Impedance Code Maximum(often this is the substation number and name)
e. Sub Number (optional)
f. Bus Voltage
g. Overhead Ground Ohms
h. Underground Ground Ohms
i. Nominal L-G
j. Nominal L-L
k. Connection (wye/delta)
l. Regulation (yes or no)
7. Generator
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. Generator Model
d. Total Generator kVA
e. PU Volts
f. Output (kW)
g. Maximum Leading Output (kvar)
h. Maximum Lagging Output (kvar)
i. Connection (wye/delta)
8. Motor
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. Motor Mode (example: horse power)
d. Total Motor HP
e. Rated LG Volts
f. Rated LL Volts
g. Load in kW
h. Load in kVAR
i. Motor Status (off/on)
j. Locked Rotor
k. Soft Start (if applicable)
9. Device
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. Device Code (example: 3-phase operation)
d. Device Status (phase open/closed)
e. If Feeder Device (require feeder number/feeder alias)
f. Device Equipment Definitions
g. Current and Link Ratings, Device Type data
10. Capacitor
a. Unique Name (ID) include preferred prefix
b. Phase Data
c. How Capacitor Bank Connected (series/shunt)
d. Capacitor Connection (same as parent/wye/delta)
e. Capacitor kVAR Rating (total/phase)
11. Consumer
a. Unique Name (ID) unique tie between model and CIS
b. Phase Data
c. Active (yes/no)
d. Consumer Type (example: residential/small commercial/traffic light)
e. Meter Number
12. Map Points and Assemblies (requires all domain values and codes necessary for identifying the proper categories noted below)
a. Assembly Label/Code
b. Parent Type
i. Pole
ii. Junction Box
iii. Tower
iv. Pad
v. Pedestal
vi. Enclosure
vii. Vault
viii. Pull Box
ix. Marker
x. Light
xi. Surface Structure
xii. Foreign Structure
xiii. Storage Location
xiv. Non-Utility Facility
c. Quantity
13. The foregoing list contains data elements and attributes Milsoft typically requires to build an E&O Model. If the data supplied does not contain all information needed, Milsoft will request missing data from Customer. If Customer does not have all data required, Milsoft will work with Customer to establish default values where possible. Milsoft reserves the right to define what data is needed to create the Milsoft E&O Model and External Tables.
Potential Data Sources
The list of potential data sources is will be tailored to each Customer. This list is typical of
ESRI based GIS users:
1. ESRI Personal Geodatabase (.mdb) without class extensions
2. Billing Export, (.csv) format is preferred, with column headers
3. If using ArcSDE please provide a SQL back up file (.bak)
4. ESRI Domains and Coded Values
5. Any substation 1-line drawings that show substation regulators/transformers/reclosers, etc
6. Copy of the Engineer's WindMil model and corresponding equipment database
(eqdb) (if available)
7. Shape Files of Landbase (roads, water ways, board districts, etc...)
8. Shape File of Grid used for Grid-based naming, along with the format of the Grid naming
9. List of switchgear, including Manufacturer, Type (Box/Retangular) and
Configuration (Example: S&C PME-9)
10. Percent Impedance, X/R, and NL Losses values for transformers (typically from the Engineer)
11. Substation impedance information (positive/negative/zero sequence values)
12. Line Reclosers and Sectionalizers information (Manufacturer/Current
Rating/Type) if not contained within the GIS database
14. Export of CIS Transformer database in (.csv) format with column headers
15. Any additional notes, data, etc. that are pertinent to the final converted model, but not contained within the GIS database.