This is a Final Construction Plans document for the City of Gallup, New Mexico, prepared by H.W. Lochner, Inc., detailing the installation of a new FAA-certified Automated Weather Observing System (AWOS III P/T) at Gallup Municipal Airport under NMDOT Project No. GUP-24-03. The project encompasses the complete installation, integration, testing, and commissioning of the AWOS system, including removal and decommissioning of the existing ASOS system. The construction scope includes installation of a 30-foot tilt tower with foundation, multiple sensor pads (present weather and visibility, ceilometer, and lighting sensor), electrical infrastructure with underground conduit and cable runs, gravel site preparation, and related site work. The new AWOS tower will be located approximately 50 feet south of the existing ASOS installation to allow the current system to remain operational during new system installation and commissioning. Construction is scheduled for a single phase of 30 calendar days or less, with the airport remaining open to general operations throughout the project. The contractor must coordinate with the AWOS manufacturer for proper siting, commissioning, and system validation to ensure a fully functional and commissioned system meeting FAA specifications.
The plans establish detailed requirements for contractor safety and phasing management, including specified haul routes, staging areas, construction limits with low-profile barricading, and continuous monitoring of Common Traffic Advisory Frequency (CTAF) 122.95. Contractors must maintain communications with airport personnel and the Resident Project Representative, utilize the designated access gate, and complete all ground restoration, seeding, and site cleanup upon project completion. The plans include comprehensive grounding and electrical specifications, including a 3/4-inch by 10-foot copper-clad ground rod at the tower, #4/0 copper ground cable, and equipment pad layouts with specific spacing and drainage requirements. All contractor staging areas, haul routes, and equipment operations are limited to areas outside active aircraft operations and runway safety zones. The contractor assumes responsibility for utility locating through New Mexico One Call, pavement protection during operations, restoration of any damage to airport or public roads caused by construction activities, and provision of temporary facilities including water access and sanitary portable toilets.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D ra w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
TI
TL
E .d w g
Fe b
,2
- 9 :1
7a m
0.0
TITLE SHEET
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
NMDOT PROJECT NO. GUP-24-03
VICINITY MAP
NO SCALE
GENERAL DESCRIPTION OF PROJECT:
CITY OF GALLUP, NEW MEXICO
GALLUP MUNICIPAL AIRPORT (GUP)
INDEX OF SHEETS
SHEET NUMBER SHEET TITLE
0.0 TITLE SHEET
0.1 GENERAL AIRPORT LAYOUT PLAN AND GENERAL NOTES
1.1 CONSTRUCTION SAFETY AND PHASING PLAN DETAILS
JANUARY 2026
INSTALL AWOS III P/T
COMMON TRAFFIC ADVISORY FREQUENCY (CTAF) 122.95
GALLUP, NM
GALLUP MUNICIPAL
AIRPORT (GUP)
2.0 AWOS DEMOLITION PLAN
3.0 AWOS SITE PLAN
4.0 - 4.2 AWOS DETAILS
1.0 CONSTRUCTION SAFETY AND PHASING PLAN
erivera
DRAFT
X
XX
X
X
X
XXXX
X X X
X X
X X X X X
X
X
X
X
X
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R -O
FZ
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
R -O
FA
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
R -O
FA
R -O
FZ
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
X
X
XX
X
X
X
XXXX
X X X
X X
X X X X X
X
X
X
X
X
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R -O
FZ
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
R -O
FA
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
R -O
FA
R -O
FZ
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
EM
U.S. RTE 66
MENDOZA RD
APRON
PARALLEL TAXIWAY A
TAXIWAY A5
TAXIWAY A4 TAXIWAY A3 TAXIWAY A2
TAXIWAY A1
RUNWAY 6-24 (7,315' X 100')
TERMINAL
BUILDING
CONTRACTOR SHALL UTILIZE ACCESS
GATE AT THE LOCATION SHOWN FOR
PROJECT INGRESS/EGRESS. GATE SHALL
BE CLOSED AND LOCKED WHEN NOT IN USE.
FUEL FARM
INSTALL NEW
AWOS III P/T
ELECTRICAL
VAULT
EXISTING
CHAINLINK FENCE
HANGAR
(TYP.)
ROTATING BEACON
CP-2
CP-1
CP-3
CP-170
CP-171
GRAVEL ROAD
EXISTING ASOS
EXISTING ASOS ELECTRICAL
METER AND SHUTOFF
Scale in Feet
0 600300300
D ra w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- G E
N L
A Y
.d w g Fe b
,2
- 1
0:
am
0.1
GENERAL LAYOUT
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
lc or te z
/0 1/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
RUNWAY 6-24 SAFETY DIMENSIONS
RUNWAY SAFETY AREA (RSA): 7,915.66' X 150'
RUNWAY OBJECT FREE AREA (R-OFA): 7,915.66' X 500'
RUNWAY OBSTACLE FREE ZONE
(R-OFZ): 7,715.66' X 400'
TAXIWAY SAFETY DIMENSIONS
TAXIWAY SAFETY AREA (TSA): 79' WIDE
TAXIWAY OBJECT FREE AREA (T-OFA): 124' WIDE
GENERAL NOTES:
1. THE EXISTING FEATURES SHOWN ON THESE PLANS ARE THOSE NOTED IN THE
FIELD AND THOSE TAKEN FROM RECORD DRAWINGS. THIS DOES NOT GUARANTEE
THAT ALL FEATURES ARE SHOWN ON THE PLANS. THERE WILL BE NO ADDITIONAL
PAYMENT TO THE CONTRACTOR DUE TO VARIATIONS IN SIZE, QUANTITY, OR
LOCATION OF EXISTING FEATURES.
2. EXTREME CAUTION SHALL BE USED WHEN WORKING NEAR EXISTING LIGHT
FIXTURES, UNDERGROUND ELECTRICAL DUCTS, UNDERGROUND ELECTRICAL
CABLE AND ANY OTHER AIRPORT FIXTURES. SHOULD DAMAGE OCCUR TO ANY OF
THESE ITEMS, THEY WILL BE REPLACED IMMEDIATELY AT THE CONTRACTOR'S
EXPENSE TO THE SATISFACTION OF THE ENGINEER.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ANY UNDERGROUND
UTILITIES PRIOR TO BEGINNING CONSTRUCTION. CONTACT NEW MEXICO ONE
CALL AT 1-800-321-2537/ OR 811 A MINIMUM OF 48 HOURS PRIOR TO ANY
CONSTRUCTION ACTIVITIES TO ALLOW ONE CALL SUFFICIENT TIME TO LOCATE
AND MARK ANY EXISTING UTILITIES WHICH MIGHT BE AFFECTED BY THIS PROJECT.
CONTRACTOR SHALL PROVIDE THE ONE CALL REPORT/CASE INFORMATION TO
THE ENGINEER AND AIRPORT PERSONNEL PRIOR TO BEGINNING EXCAVATION.
SHOULD DAMAGE OCCUR TO ANY OF THESE ITEMS, THEY WILL BE REPLACED
IMMEDIATELY AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE
ENGINEER. AIRPORT UTILITIES NOT LOCATED BY ONE CALL SHALL BE LOCATED BY
THE CONTRACTOR AT NO COST TO THE OWNER.
4. ONLY RUBBER-TIRED VEHICLES UNDER 60,000 LBS GVWR WILL BE ALLOWED ON
AIRPORT PAVEMENT SURFACES WITHOUT PRIOR ENGINEER APPROVAL.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RESTORATION AND SEEDING
OF THE CONTRACTOR'S STAGING AREA, ACCESS, AND HAUL ROADS IF DAMAGE
HAS OCCURRED DUE TO CONSTRUCTION ACTIVITIES. NO DIRECT PAYMENT WILL
BE MADE FOR THESE ITEMS. RETURNING THE AREA TO ORIGINAL OR BETTER
CONDITION. ALL OF THE CONTRACTOR'S EQUIPMENT AND MATERIALS SHALL BE
REMOVED FROM THE AIR OPERATIONS AREA (AOA) PRIOR TO REOPENING THE
AIRFIELD PAVEMENT. THE AIRPORT MAINTENANCE PERSONNEL SHALL BE
RESPONSIBLE FOR MOWING THE AIRFIELD OUTSIDE THE WORK LIMITS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AND MOWING THE
GRASS WITHIN THE WORK LIMITS.
6. WASTE MATERIALS RESULTING FROM THIS PROJECT SHALL BE DISPOSE OF OFF
AIRPORT PROPERTY UNLESS SHOWN OTHERWISE ON THESE PLANS. EXCESS
UNCLASSIFIED EXCAVATION SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND BE DISPOSED OF OFF AIRPORT PROPERTY.
7. THE CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) DRAWINGS DEPICT HAUL
ROUTES FOR ACCESS FROM SURROUNDING PUBLIC ROADWAYS AND HAUL ROUTE
THROUGH THE AIRPORT PERIMETER FENCE. CONTRACTOR ACCESS AND HAULING
OPERATIONS ARE STRICTLY LIMITED TO THE HAUL ROUTES SHOWN. ANY TIME AN
EXISTING AIRFIELD PAVEMENT IS TRAVERSED OR CROSSED, THE CONTRACTOR
SHALL PROVIDE PROTECTION TO THE PAVEMENT EDGES. THE CONTRACTOR IS
REQUIRED TO SWEEP AND MAINTAIN THE PAVEMENT AS DIRECTED BY THE
RESIDENT PROJECT REPRESENTATIVE (RPR).
8. THE CONTRACTOR WILL BE REQUIRED TO REPAIR ANY DAMAGE TO PUBLIC AND
AIRPORT ROADS AND AIRFIELD PAVEMENTS CAUSED BY THE CONTRACTOR'S
TRUCKS AND EQUIPMENT DURING THE CONSTRUCTION OF THE PROJECT.
REPAIRS SHALL BE ADEQUATE TO RETURN THE PAVEMENTS TO A CONDITION
EQUAL TO OR BETTER THAN THE CONDITION PRIOR TO DAMAGE. ALL REPAIR
WORK SHALL BE AT THE CONTRACTOR'S EXPENSE. THE AIRPORT ENTRANCE
ROAD AND HAUL ROUTES SHALL BE VIDEOED AND PHOTOGRAPHED BY THE
CONTRACTOR IN THE PRESENCE OF THE ENGINEER OR THE RPR PRIOR TO
CONSTRUCTION IN ORDER TO DOCUMENT THEIR EXISTING CONDITION.
9. THE CONTRACTOR SHALL MONITOR COMMON TRAFFIC ADVISORY FREQUENCY
(CTAF) 122.95 AT ALL TIMES DURING CONSTRUCTION AND SHALL RESPOND TO ANY
INSTRUCTIONS FOR AIRPORT PERSONNEL AND/OR THE RPR IMMEDIATELY. THE
CONTRACTOR SHALL PROVIDE THEIR OWN RADIOS CAPABLE OF TRANSMITTING
AND RECEIVING. THE CONTRACTOR MAY UTILIZE TWO-WAY CONSTRUCTION
RADIOS ON THE PROJECT PROVIDED THEY DO NOT INTERFERE WITH EXISTING
AIRPORT AND FAA COMMUNICATION EQUIPMENT AND FREQUENCIES.
10. NO CHANGES TO THE APPROVED SAFETY AND PHASING PLAN WILL BE ALLOWED
WITHOUT PRIOR APPROVAL AND CONCURRENCE FROM THE RPR, AIRPORT, AND
FAA.
11. THE CONTRACTOR SHALL PROVIDE THE AIRPORT WITH THE CONTACT
INFORMATION OF THE SUPERVISOR ON SITE. THE CONTRACTOR'S PROJECT
SUPERINTENDENT OR SHIFT LEADERS MUST BE ON SITE DURING ALL WORK
ACTIVITIES. THE CONTRACTOR'S PROJECT SUPERINTENDENT IS THE DESIGNATED
RESPONSIBLE CONTRACTOR REPRESENTATIVE AND MUST BE AVAILABLE IN CASE
OF EMERGENCIES ON A 24-HOUR BASIS.
12. THE CONTRACTOR HAS THE OPTION OF INSTALLING TEMPORARY DRAINAGE
STRUCTURES FOR CONSTRUCTION OF TEMPORARY ACCESS DRIVES DURING
CONSTRUCTION. ONCE CONSTRUCTION IS COMPLETE, THE DRIVES AND DRAINAGE
STRUCTURES SHALL BE REMOVED AND THE AREA RESTORED TO ITS ORIGINAL
CONDITION. THIS WORK SHALL BE CONSIDERED SUBSIDIARY TO OTHER BID ITEMS
IN THE CONTRACT.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING WATER, AS REQUIRED
FOR COMPLETION OF THE PROJECT, AND SHALL COORDINATE WITH THE LOCAL
WATER PROVIDER FOR PRICING, OBTAINING A WATER METER, AND DETERMINING
A LOCATION FOR WATER ACCESS. THE COST OF THIS WORK SHALL BE
CONSIDERED SUBSIDIARY TO OTHER ITEMS BID.
14. CONTRACTOR SHALL PROVIDE SANITARY PORTABLE TOILET(S) FOR USE ON THE
JOBSITE, WHICH SHALL BE SECURED TO PREVENT MOVEMENT, FOR TOILET
QUANTITY, SEE OSHA 1915.88(D)(2). CONTRACTOR SHALL COORDINATE
MAINTENANCE OF PORTABLE TOILET(S) AND SHALL ESCORT THE MAINTENANCE
VEHICLES TO THE TOILET(S) LOCATION(S).
Topographic survey performed by:
SURVEYOR INFO
1. This is not a boundary survey or a Right-of-Way survey. Apparent property corners, Right-of-Way lines, or property lines as shown are derived from record survey plats, Right-of-Way maps, or deeds referenced hereon and are not guaranteed or to be relied on for the establishment of property lines.
2. Field survey performed November 2025.
PROJECT CONTROL
COORDINATES SHOWN ARE NAD83 NEW MEXICO STATE PLANE, WEST ZONE, US SURVEY FOOT.
VERTICAL ELEVATION SHOWN ARE NAVD88, GEOID18.
COMBINED GRID-TO-GROUND FACTOR = 1.0002980288
SCALED TO GROUND AROUND: NGS GALLUPAIR AZ MK (1643803.840, 2440633.210)
PROJECT BENCHMARK
BENCHMARK USED IS A FLANGE-ENCASED STEEL ROD W/O SLEEVE STAMPED "GALLUPAIR AZ 1987"
UNDERNEATH AN ALUMINUM LOGO CAP STAMPED "GALLUPAIR AZ MK 1987".
ELEVATION=6466.200
THE PRIMARY CONTROL POINTS:
1,N:1643803.840,E:2440633.210,ELEV:6466.200,NGS STAMPED "GALLUPAIR AZ MK 1987"
2,N:1642037.324,E:2436935.418,ELEV:6460.700,NGS STAMPED "GUP G 1996"
3,N:1642640.303,E:2440917.345,ELEV:6497.000,NGS STAMPED "GUP F 1981"
THE SECONDARY CONTROL POINTS SET FOR SURVEY:
170,N:1641698.946,E:2437461.552,ELEV:6462.898,ALUM CAP WCI & REBAR
171,N:1641945.719,E:2437482.235,ELEV:6462.018,ALUM CAP WCI & REBAR
4401 MASTHEAD ST. NE, SUITE 150
ALBUQUERQUE, NEW MEXICO 87109
OFFICE: 505-348-4000
FAX: 505-348-4155
www.wilsonco.com
SURVEY INFO.
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X X X
X X
X X X X X
X
X
X
X
X
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R -O
FZ
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
R -O
FA
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
R -O
FA
R -O
FZ
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X X X
X X
X X X X X
X
X
X
X
X
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R -O
FZ
R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ R-OFZ
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
R -O
FA
R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA R-OFA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
R -O
FA
R -O
FZ
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA T-OFA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
TS
A
TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA TSA
EM
MENDOZA RD
APRON
PARALLEL TAXIWAY A
TAXIWAY A5
TAXIWAY A4 TAXIWAY A3 TAXIWAY A2
RUNWAY 6-24 (7,315' X 100')
TERMINAL
BUILDING
CONTRACTOR SHALL UTILIZE THE ACCESS
GATE AT THE LOCATION SHOWN FOR
PROJECT INGRESS/EGRESS. THE CONTRACTOR
SHALL COORDINATE WITH THE AIRPORT
MANAGER DURING THE PRE-CONSTRUCTION
MEETING FOR GATE CODE/KEY. GATE SHALL BE
CLOSED AND LOCKED WHEN NOT IN USE.
FUEL FARM
ELECTRICAL
VAULT
EXISTING
CHAINLINK FENCE
HANGAR
(TYP.)
ROTATING BEACON
GRAVEL ROAD
CONTRACTOR HAUL ROUTE
ALONG MENDOZA ROAD.
PROPOSED AWOS
CONTRACTOR'S
STAGING AREA
CONSTRUCTION LIMITS
TAXIWAY A1
U.S. RTE 66
LOW PROFILE BARRICADES
SEE CSPP DETAIL SHEETEXISTING ASOS
CONTRACTOR SHALL UTILIZE THE ACCESS
GATE AT THE LOCATION SHOWN FOR
ELECTRICAL VAULT INGRESS/EGRESS.
Scale in Feet
0 600300300
D ra w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- C S
P P
.d w g Fe b
,2
- 9
:1 8a m
1.0
CONSTRUCTION SAFETY
AND PHASING PLAN
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 1/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
LEGEND
CONTRACTOR HAUL ROUTE
CONTRACTOR STAGING AREA
CONSTRUCTION LIMITS
LOW PROFILE BARRICADES
(SYMBOL DOES NOT
DENOTE THE NUMBER OF
BARRICADES REQUIRED)
GENERAL PHASING NOTES:
1. CONSTRUCTION PERSONNEL AND EQUIPMENT WILL NOT BE ALLOWED
WITHIN AREAS OPEN TO AIRCRAFT OPERATIONS OR THE AIRPORT
OPERATIONS AREA (AOA) UNTIL THE AREA HAS BEEN CLOSED TO AIRCRAFT
AND NOTAMS HAVE BEEN ISSUED. CONTRACTOR MUST CONFIRM A NOTAM
IS IN PLACE PRIOR TO ENTERING AOA.
2. THE CONTRACTOR SHALL SUPPLY PORTABLE HAND-HELD RADIOS TO EACH
SUPERVISOR. THE CONTRACTOR SHALL MONITOR CTAF/UNICOM
FREQUENCY 122.95 AT ALL TIMES DURING CONSTRUCTION AND SHALL
RESPOND TO ANY INSTRUCTIONS FROM THE ENGINEER, AIRPORT
PERSONNEL AND/OR EMERGENCY PERSONNEL IMMEDIATELY.
3. CONTRACTOR SHALL ROUTE ALL VEHICLES OFF THE EDGES OF EXISTING
PAVEMENT DURING DRY CONDITIONS TO LIMIT WEAR OF EXISTING
PAVEMENTS.
4. TEMPORARY EROSION CONTROL DEVICES SHALL BE INSTALLED IN THE
AREA OF CONSTRUCTION PRIOR TO SOIL DISTURBING ACTIVITIES IN THAT
PHASE. TEMPORARY EROSION CONTROL DEVICES SHALL BE REMOVED AS
DIRECTED BY THE ENGINEER.
5. ANY RUTTING OR DAMAGE TO PAVEMENTS TO REMAIN CAUSED BY
CONTRACTOR'S VEHICLE OR EQUIPMENT OPERATIONS SHALL BE
CORRECTED BY THE END OF THE PROJECT BY THE CONTRACTOR AT THEIR
OWN EXPENSE.
6. CONTRACTOR SHALL INSTALL SURVEY LATH, AT A MINIMUM, AT EACH
CORNER OF THE CONSTRUCTION LIMITS. IF CONTRACTOR'S EMPLOYEES,
SUBCONTRACTORS, OR SUPPLIERS ARE NOTED TO CROSS INTO ACTIVE
PAVEMENT, ADDITIONAL LATH WILL BE REQUIRED TO BE INSTALLED.
RUNWAY 6-24 SAFETY DIMENSIONS
RUNWAY SAFETY AREA (RSA): 7,915.66' X 150'
RUNWAY OBJECT FREE AREA (R-OFA): 7,915.66' X 500'
RUNWAY OBSTACLE FREE ZONE (R-OFZ): 7,715.66' X 400'
TAXIWAY SAFETY DIMENSIONS
TAXIWAY SAFETY AREA (TSA): 79' WIDE
TAXIWAY OBJECT FREE AREA (T-OFA): 124' WIDE
PHASE 1 CONSTRUCTION LIMITS
POINT
NUMBER LATITUDE LONGITUDE SITE ELEVATION
(FT.)
OBSTRUCTION
HEIGHT (FT.)
OBSTRUCTION
ELEVATION (FT.) DESCRIPTION
1 N35°30' 31.78" W108°47' 36.52" 6470 40 6510 CONSTRUCTION LIMITS
2 N35°30' 31.80" W108°47' 34.10" 6471 40 6511 CONSTRUCTION LIMITS
3 N35°30' 29.32" W108°47' 34.07" 6471 40 6511 CONSTRUCTION LIMITS
4 N35°30' 29.31" W108°47' 36.49" 6471 40 6511 CONSTRUCTION LIMITS
5 N35°30' 30.60" W108°47' 34.09" 6470 25 6495 CONTRACTOR'S
STAGING AREA
6 N35°30' 30.60" W108°47' 29.49" 6470 25 6495 CONTRACTOR'S
STAGING AREA
7 N35°30' 28.49" W108°47' 29.48" 6470 25 6495 CONTRACTOR'S
STAGING AREA
8 N35°30' 28.47" W108°47' 34.10" 6470 25 6495 CONTRACTOR'S
STAGING AREA
NOTE: SITE ELEVATIONS FOR POINT 1 - 8 ARE FROM GOOGLE EARTH.
PHASE 1 CONSTRUCTION SCHEDULE (30 CALENDAR DAYS OR LESS)
1. THE GALLUP MUNICIPAL AIRPORT WILL BE OPEN FOR THE DURATION OF THE
PROJECT.
2. RUNWAY 6-24, TAXIWAY A, TAXIWAY A1, TAXIWAY A2, TAXIWAY A3, TAXIWAY A4,
TAXIWAY A5, AND TERMINAL APRON WILL REMAIN OPEN FOR THE DURATION OF
THIS PHASE.
3. THE FOLLOWING WORK SHALL BE COMPLETED WITHIN THE CONSTRUCTION LIMITS:
3.1. INSTALL NEW AWOS-III P/T SYSTEM.
3.2. REMOVE EXISTING ASOS SYSTEM.
4. AT THE COMPLETION OF THE ITEMS ABOVE, COORDINATE WITH AIRPORT MANAGER,
ENGINEER AND RPR TO OPEN THE WORK AREAS AS DESCRIBED IN THE STEPS
BELOW:
4.1. CLEAN ALL AIRPORT SURFACES.
4.2. REMOVE ALL EQUIPMENT, MATERIALS, AND PERSONNEL FROM THE WORK
AREA.
erivera Strikethrough 150' 500' 400' E E w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- C S
P P
D
TL
S .d w g
Fe b
,2
- 9 :1
8a m
1.1
CONSTRUCTION SAFETY
AND PHASING PLAN
DETAILS
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 1/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
4'
NOTES:
1. BARRIER SHALL BE SHERWIN INDUSTRIES, 10" X 96" LOW PROFILE AIRPORT BARRIER,
AS SHOWN, OR APPROVED EQUAL.
2. THE ENTIRE AREA OF ORANGE AND WHITE STRIPES SHALL BE REFLECTORIZED WITH
SMOOTH SURFACE TYPE REFLECTIVE SHEETING.
3. LIGHTS MUST BE MOUNTED ON BARRIERS AND SPACED AT NO MORE THAN 10 FT.
4. BARRICADES SHALL BE SPACED NO GREATER THAN 12' ON CENTER OR 4' END TO END
5. THE BARRIERS SHALL BE WEIGHTED AGAINST PROPWASH AND CAPABLE OF
WITHSTANDING UP TO 100 M.P.H. WIND FORCES.
6. FLASHING RED CAUTION LIGHTS SHALL BE BATTERY OPERATED AND SHALL MAINTAIN
SUCH INTENSITY SO AS TO BE READILY IDENTIFIED FROM DISTANCES OF AT LEAST 200
FEET DURING DARKNESS.
7. THE CONTRACTOR SHALL CHECK ALL BARRIERS AND LIGHTS EACH DAY BEFORE
LEAVING THE AIRPORT TO ENSURE LIGHTS ARE WORKING PROPERLY AND MAY NOT
LEAVE WITHOUT ALL BARRIERS AND LIGHTS BEING IN PROPER WORKING ORDER.
8. NO ADDITIONAL PAYMENT SHALL BE MADE FOR THIS ITEM. IT SHALL BE CONSIDERED
SUBSIDIARY TO OTHER BID ITEMS.
8'
" M
A X
BATTEN TO KEEP
FLAG EXTENDED
20" MIN. X 20" MIN. FLAGS
ALTERNATING ORANGE AND WHITE,
ONE FLAG PER BARRIER. SUPPORTS
SHALL BE VERTICAL AND FRANGIBLE.
FLASHING RED
CAUTION
LIGHTS
REFLECTIVE ORANGE
(BOTH SIDES)REFLECTIVE WHITE
(BOTH SIDES)
LOW PROFILE BARRICADE DETAIL
NO SCALE
NOTES:
1. FLAG MUST HAVE A CHECKERED PATTERN OF
INTERNATIONAL ORANGE AND WHITE SQUARES.
COLORS SHALL BE IN ACCORDANCE WITH THE
CURRENT VERSION OF AC 150/5210-5.
2. FLAG AND FLASHING BEACON REQUIRED PER
CONSTRUCTION SAFETY AND PHASING PLAN (CSPP).
36"
12" 12" 12"
FLAG DETAIL
NO SCALE
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X X X X X X
X
X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X X X X X X
X
X X
X
X
G A
S
EM
MENDOZA RD
APRON
PARALLEL TAXIWAY A
TAXIWAY A3
RUNWAY 6-24 (7,315' X 100')
TERMINAL
BUILDING
FUEL FARM
ELECTRICAL
VAULT
HANGAR
(TYP.)
ROTATING BEACON
CAUTION: DO NOT DISTURB
EXISTING ELECTRICAL
JUNCTION BOX AND POLE.
U.S. RTE 66
GRAVEL ROAD
TAXIWAY A2
REMOVE EXISTING ASOS
SYSTEM AFTER NEW AWOS
IS INSTALLED AND
OPERATIONAL
DO NOT DISTURB EXISTING
ASOS METER AND SHUTOFF
EXISTING ASOS CABLE
TO BE ABANDONED
Scale in Feet
0 400200200
D ra w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- D E
M O
P
LA
N .d w g
Fe b
,2
- 9 :1
8a m
2.0
AWOS DEMOLITION PLAN
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
EXISTING ASOS SYSTEM
ASOS REMOVAL NOTES:
1. ALL EQUIPMENT AND PARTS OF THE EXISTING ASOS SYSTEM SHALL BE
REMOVED AND DECOMMISSIONED AFTER THE NEW AWOS SYSTEM HAS
BEEN INSTALLED AND IS OPERATIONAL. ALL SENSORS AND EQUIPMENT
TO BE SALVAGED TO THE AIRPORT AT THE AIRPORT'S DISCRETION. IF
THE AIRPORT CHOOSES NOT TO RETAIN THE SENSORS AND EQUIPMENT,
THEY SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
REMOVED FROM THE PROPERTY.
2. EXISTING ASOS CABLES AND CONDUIT SHALL BE CUT TO 2 FEET BELOW
EXISTING GRADE AT THE ASOS SITE AND AT THE POWER POLE.
3. EXISTING CONCRETE SLAB SHALL BE REMOVED OFF AIRPORT PROPERTY.
EXISTING ASOS TOWER FOUNDATION SHALL BE REMOVED AND THE VOID
FILLED TO GRADE TO ALLOW POSITIVE DRAINAGE.
4. AFTER REMOVAL OF EQUIPMENT AND FOUNDATIONS, GRADE THE AREA
TO MATCH THE SURROUNDING GRADE. SEED ALL DISTURBED GROUND
PER FAA SPECIFICATIONS T-901.
5. ALL WORK SHALL BE INCLUDE IN THE BID ITEM "REMOVE EXISTING ASOS
SYSTEM". THIS SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT,
TOOLS, AND INCIDENTALS NECESSARY TO COMPLETE THIS ITEM.
ELECTRICAL DEMOLITION PLAN NOTES:
1. THE CONTRACTOR SHALL USE CAUTION WHEN WORKING WITHIN THE
VICINITY OF EXISTING UNDERGROUND ELECTRIC LINES, BURIED WATER
LINES, BURIED TELEPHONE LINES, BURIED AIRPORT ELECTRICAL LINES
THAT ARE TO REMAIN, AND EXISTING DRAINAGE PIPE AND
STRUCTURES. ANY DAMAGE CAUSED BY THE CONTRACTOR TO THE
EXISTING BURIED UTILITIES, PIPES, AND STRUCTURES SHALL BE FIXED
TO THE SATISFACTION OF THE ENGINEER AT NO ADDITIONAL COST TO
THE OWNER.
2. CONTRACTOR SHALL PROVIDE TEMPORARY CABLE AND CONNECTIONS
AS NECESSARY TO KEEP ALL LIGHTING AND EQUIPMENT IN SERVICE ON
OPEN PAVEMENT IF NECESSARY.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X X X X X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X X X X X X
X
X X
X
X
G A
S
EM
MENDOZA RD
APRON
PARALLEL TAXIWAY A
TAXIWAY A3
RUNWAY 6-24 (7,315' X 100')
TERMINAL
BUILDING
FUEL FARM
ELECTRICAL
VAULT
HANGAR
(TYP.)
ROTATING BEACON
U.S. RTE 66
JB
AW
O
S
GRAVEL ROAD
AWOS TOWER LOCATION
N: 1641754.5418 E: 2437436.2935 Lat: N35° 30' 30.33" Long: W108° 47' 35.31"
TAXIWAY A2
AWOS
1,000' RADIUS
CRITICAL AREA
AWOS
500' RADIUS
CRITICAL AREA
AWOS
100' RADIUS
CRITICAL AREA
INSTALL 3 - #1/0 THWN CU CABLE,
1 - #6 GROUND CABLE,
1 - #6 COUNTERPOISE
ABOVE NEW 2" PVC.
POWER SUPPLY
EXISTING METER AND SHUTOFF
INSTALL NEW AWOS III P/T SYSTEM
CAUTION: DO NOT DISTURB
EXISTING ASOS CIRCUIT
(ABANDON IN PLACE)
PROVIDE SURVEY MONUMENT FOR NORTH ALIGNMENT CALIBRATION
PER MANUFACTURE REQUIREMENTS. SURVEY MONUMENT SHALL
BE PLACED BY A REGISTERED LAND SURVEYOR IN THE STATE OF
NEW MEXICO. INSTALLATION AND COST OF MONUMENT SHALL BE
INCIDENTAL AND INCLUDED WITH AWOS INSTALLATION.
TOWER SHALL TILT
TOWARD THE
PERIMETER FENCE
Scale in Feet
0 400200200
D ra w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- A W
O S
S
IT
E P
LA
N
.d w g Fe b
,2
- 9
:1 8a m
3.0
AWOS SITE PLAN
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
NOTES:
1. AWOS SYSTEM SHALL BE INSTALLED APPROXIMATELY 50 FT.
SOUTH TO EXISTING ASOS. THE EXISTING ASOS SHALL BE
OPERATIONAL UNTIL THE NEW AWOS IS OPERATIONAL AND
POWER CAN BE SWITCHED OVER TO THE AWOS FROM THE
EXISTING METER AND SHUTOFF.
2. CONTRACTOR SHALL COORDINATE WITH LOCAL POWER UTILITY
FOR MAKING CONNECTION TO POWER NEW AWOS. ALL WORK
REQUIRED TO BRING POWER TO AWOS SHALL BE CONSIDERED
SUBSIDIARY TO AWOS.
3. CONTRACTOR TO COORDINATE WITH AWOS MANUFACTURER
FOR SITING, COMMISSIONING, AND ALL WORK REQUIRED FOR
PROVIDING FULLY FUNCTIONAL AND COMMISIONED AWOS
SYSTEM AS INDICATED IN THE CONTRACT DOCUMENTS AND TO
THE SATISFACTION OF THE RPR.
4. FURNISH AND INSTALL 2" SURVEYOR'S BRASS CAP EMBOSSED
WITH AWOS TOWER FOUNDATION ELEVATION (MSL). LOCATE
ADJACENT TOWER.
w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- D E
TA
IL
S .d w g
Fe b
,2
- 9 :1
8a m
4.0
AWOS DETAILS
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
GROUND LEVEL GROUND LEVEL
#4/0 GROUND CABLE
BARE COPPER WIRE
CAD WELD OR ATTACH
TO GROUND ROD AT
TOWER PER LOCAL CODES
3/4''Ø X 10'
LONG COPPER
CLAD GROUND
ROD
AT TOWER
24''Ø READY-FORM
TUBE 5' LONG
4-#4 VERTICAL
RE-BAR
4' 6'' LONG
#4 TIES @ 12'' ON
CENTER
FINE SAND OR GRAVEL
1" S
LO
P
E F
O R
D R
A
IN
A G
E
3' -6
INSTALL OWNER PROVIDED VISIBILITY
SENSOR TOWER PER MANUFACTURER
REQUIREMENTS
4000 PSI
CONCRETE
NOTES:
1. THE NEW AWOS (MODEL 8522 30 FT. TILT TOWER) WILL BE
APPROXIMATELY 50 FT. SOUTH OF THE EXISTING ASOS, SO THE ASOS
SHALL REMAIN OPERATIONAL UNTIL NEW AWOS HAS BEEN INSTALLED
AND IS OPERATIONAL.
2. TOLERANCE FOR LEVEL/PLUMB IS ± 2°.
3. FOUNDATION SIZE SHALL BE ALTERED IF RECOMMENDED OR
REQUIRED BY MANUFACTURER
4. AWOS TOWER, CONTROL AND SENSOR EQUIPMENT SHALL BE
SUPPLIED BY THE OWNER.
5. CONTRACTOR SHALL SUPPLY ULTRASONIC WIND SENSOR CERTIFIED
BY THE FAA TO BE INSTALLED IN PLACED OF THE OWNER PROVIDED
MECHANICAL SENSOR.
VISIBILITY SENSOR FOUNDATION
NO SCALE
17"
BOLT C-C
75"
B O
LT
C
-C
THE CONCRETE MUST HAVE 4,000
PSI MINIMUM 28-DAY COMPRESSIVE
STRENGTH. THE FOUNDATION SHALL
BE DESIGNED BY THE INSTALLER
FOR 2,000 LB/SQ FT SOIL BEARING
CAPACITY. IT MAY BE NECESSARY
TO SECURE THE SERVICES OF A
GEOTECHNICAL ENGINEER TO VERIFY
SOIL CAPACITY AT THE INSTALLATION
SITE, AND IF NECESSARY, TO
RECOMMEND ALTERATION WHEN SOIL
CONDITIONS ARE QUESTIONABLE.
PREVIOUS GEOTECHNICAL REPORTS
AT THE AIRPORT ARE PROVIDED IN THE
PROJECT MANUAL TO ASSIST IN THE
FOUNDATION DESIGN.
CROWN THE TOP OF THE CONCRETE
SLIGHTLY TO PREVENT WATER
ACCUMULATION.
8" MIN ALL 4 SIDES
4"
2"
1" M
A X
A B
O V
E G
R O
U N
D
LE
V E
L
2.
4"
4X, FOUNDATION BOLT
M24-430
2X, WWF 4 X 4 -6/6
DEFORMED WIRE
MESH
70" X 70"
GROUND LEVEL
TILT
SQUARE FOUNDATION
FOR FRANGIBLE TOWER
NO SCALE
w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- D E
TA
IL
S .d w g
Fe b
,2
- 9 :1
8a m
4.1
AWOS DETAILS
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
GROUND LEVEL GROUND LEVEL
#4/0 GROUND CABLE
BARE COPPER WIRE
CAD WELD OR ATTACH
TO GROUND ROD AT
TOWER PER LOCAL CODES
3/4''Ø X 10'
LONG COPPER
CLAD GROUND
ROD
AT TOWER
1" S
LO
P
E F
O R
D R
A
IN
A G
E
3' -6
GROUND LEVEL GROUND LEVEL
#4/0 GROUND CABLE
BARE COPPER WIRE
CAD WELD OR ATTACH
TO GROUND ROD AT
TOWER PER LOCAL CODES
3/4''Ø X 10'
LONG COPPER
CLAD GROUND
ROD
AT TOWER
1" S
LO
P
E F
O R
D R
A
IN
A G
E
3' -6
INSTALL OWNER PROVIDED CEILOMETER
TOWER PER MANUFACTURER
REQUIREMENTS
INSTALL OWNER PROVIDED LIGHTING
SENSOR TOWER PER MANUFACTURER
REQUIREMENTS
24''Ø READY-FORM
TUBE 5' LONG
4-#4 VERTICAL
RE-BAR
4' 6'' LONG
#4 TIES @ 12'' ON
CENTER
FINE SAND OR GRAVEL
4000 PSI
CONCRETE
24''Ø READY-FORM
TUBE 5' LONG
4-#4 VERTICAL
RE-BAR
4' 6'' LONG
#4 TIES @ 12'' ON
CENTER
FINE SAND OR GRAVEL
4000 PSI
CONCRETE
NOTE:
3. FOUNDATION SIZE SHALL BE ALTERED IF RECOMMENDED OR
REQUIRED BY MANUFACTURER
CEILOMETER FOUNDATION
NO SCALE
LIGHTING SENSOR FOUNDATION
NO SCALE
CABLE TRENCH DETAILS
NO SCALE
6"
.5
" T Y
P
8"
1 CONDUIT
4" TY
P
TOP SOIL, SEED
AND MULCH TYP.
ELECTRICAL WARNING TAPE 6"
ABOVE COUNTERPOISE
COUNTERPOISE
EQUIPOTENTIAL METHOD
SAND OR EARTH BACKFILL, 100%
PASSING 1/4" SIEVE (TYP).
2" PVC CONDUIT.8"
-1
2"
TY
P
TYPICAL L-867 JUNCTION BOX
NO SCALE
CENTER OF
CONDUIT 24
16"
.5
2.
5"
3/4" DIA. WEEP HOLE
2" PVC CONDUIT
AS REQUIRED. 8" AGGREGATE BACKFILL 1/2" - 3/4" CLEAN
AGGREGATE (APPROX. 8" DEEP)
GROUND ROD.
SEE DETAIL.
L-867 BASE
(METALLIC) CLASS
1A, SIZE D (16"X24")
SOLID STEEL
COVER
BACKFILL MATERIAL
#6 AWG BARE SOLID
COPPER GROUND WIRE.
GROUND LUG
1" M
A w in g N am e:
C :\p w _w or ki ng \lo ch ne r-pw
-0 1\ d0
\2
T
O
- D E
TA
IL
S .d w g
Fe b
,2
- 9 :1
8a m
4.2
AWOS DETAILS
NOL
TA
LFC
12-12-2025
11-26-2025
12-03-2025
P lo t S ty le : a e.
ct b La st S av ed
B y:
n lo vo s
/0 2/
PROJECT NO.
DRAWN BY
CHECKED BY
REVISIONS
DATE
DATE
DATE
DESIGNED BY DATE
N M
D O
T P
R O
JE
C
T N
O . G
U P
-2 4-
25683 - TO01
2201 BUENA VISTA DRIVE
SOUTHEAST STE 204
ALBUQUERQUE, NM 87106
P 505.508.2192
WWW.HWLOCHNER.COM
G A
LL
U
P M
U N
IC
IP
A L
A
IR
P O
R T
(G U
P
G A
LL
U
P , N
E W
M E
X
IC
O
NOTES:
1. DO NOT BEND GROUNDING CABLE TO LESS
THAN 8" RADIUS.
2. LAYOUT, SENSOR ORDER, AND SPACING
SHALL BE PER MANUFACTURER
REQUIREMENTS IF DIFFERENT THAN SHOWN.
AWOS SITE LAYOUT DETAIL
NO SCALE
NOTE:
PROPOSED ROAD ROUTE SHALL BE CLEARED,
GRUBBED, AND GRADED TO A DRIVABLE
SURFACE PRIOR TO SUBGRADE COMPACTION
GRAVEL SITE PAD
TYPICAL SECTION DETAIL
NO SCALE
5' TYP VARIES
2% MIN2% MIN
PRESENT WEATHER AND
VISIBILITY SENSOR PAD
10' 10' 10'
TOWER PAD
LIGHTNING SENSOR PAD CEILOMETER PAD
TY
P
TY
P
6" COMPACTED SUBGRADE
4" NMDOT 303, TYPE I AGGREGATE BASE COURSE (S-30)
3/4" SCH 40 PVC
CONDUITS IN
TRENCH
#4/0 COPPER GROUND WIRE
3/4" X 10' GROUND ROD
JUNCTION
BOXES,
BREAKER BOX,
DISCONNECT,
ETC.
JUNCTION BOXES
TRENCH
JUNCTION BOXESJUNCTION BOXES
GRAVEL
SITE PAD
| Sheets and Views |
| 0.0 TITLE SHEET |
| 0.1 GENERAL LAYOUT |
| 1.0 CONSTRUCTION SAFETY AND PHASING PLAN |
| 1.1 CONSTRUCTION SAFETY AND PHASING PLAN DETAILS |
| 2.0 AWOS DEMOLITION PLAN |
| 3.0 AWOS SITE PLAN |
| 4.0 AWOS DETAILS |
| 4.1 AWOS DETAILS |
| 4.2 AWOS DETAILS |
File details come from the government source that posted it. Updated .