This is a Work Write-Up document prepared by the City of Jackson Community Development Department for a housing rehabilitation project located at 115 W Euclid Avenue, Jackson, Michigan 49203, for homeowner Rickey Parris. The project encompasses two primary work scopes: roof stripping and replacement (R05) and gutterwork installation (G08). The roofing work requires removal of existing shingles and felt, repair of roof framing as needed, installation of 7/16" oriented-strand board sheathing, ice shield at lower roof edges extending 24" inside the interior surface, 15% asphalt saturated felt, and new architectural-style roofing material with metal drip and rake edging. The project includes approximately 22 roofing squares across all elevations, including a carport, with an estimated 100 square feet of decking repair. The gutterwork scope calls for furnishing and installing gutter and downspout systems using baked pre-enameled aluminum 5-inch K-type in standard colors, with a minimum thickness of .027 inches, hangers spaced no more than 30 inches on center, and all downspouts to be commercial size. The work write-up was prepared on November 25, 2025, and requires a building permit for the roofing work. Final measurements and quantities for linear footage of gutter and downspout remain to be determined by the contractor.
The document specifies that the scope of work is contingent upon the owner's acceptance and the contractor's agreement to perform all work in accordance with their submitted bid. Pricing and cost information are not included in this work write-up document; however, the document provides a framework for contractors to reference specific materials, finishes, and installation standards required for completion. All work must conform to the Michigan Building Code and referenced specifications (G.S. 1 for roofing and G.S. 4a for gutterwork). The project is part of the City of Jackson's sealed, competitive bid process for its Community Development Department housing rehabilitation program, which serves qualified homeowners in the city.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 115_W_Euclid_-_Strip_and_Replace_Roof_and_Gutterwork.pdf | ||
| All_Services_Sample_Contract_.docx | DOCX document | |
| Maintenance_and_Guarantee_Bond.pdf | ||
| Performance_Bond.pdf | ||
| Labor_and_Material_Payment_Bond.pdf | ||
| CDBG_Additional_Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Write-Up
G08 - GUTTERWORK
* EXHIBIT 1 *
Dated: 11/25/2025
CUSTOMER INFORMATION
PARRIS, RICKEY
115 W EUCLID AVE, Jackson, MI 49203
PREPARED BY
sharrison@cityofjackson.org
* NOTE *
THE CUSTOMER AND CONTRACTOR MUST SIGN THE BOTTOM OF EACH PAGE ONLY IF
1) THIS WORK WRITE-UP BECOMES PART OF A CONSTRUCTION CONTRACT
2) THE UNDERSIGNED CUSTOMER AND CONTRACTOR HAVE REVIEWED, APPROVED AND AGREED TO THE WORK AND PRICES DESCRIBED IN THIS WORK WRITE-UP
Location: Unassigned
| General Requirements |
| Quantity |
| Units |
| Total |
1 - R05 - ROOF - STRIP AND INSTALL
(Specification ID:1.05000 )
Sq
* PERMIT REQUIRED *
Strip existing roof, removing all shingles and felt. Make repairs to the existing roof framing where required to provide adequate strength and a true and level surface. Install 7/16” oriented-strand board sheathing to cover all areas of roof deck. Just before proceeding, sweep roof thoroughly to remove all debris. Install ice shield at all lower roof edges. Ice shield shall extend at least 24" inside the interior surface of the exterior wall line of the building, in accordance with the Michigan Building Code. Install new 15% asphalt saturated felt according to manufacturer's directions. Furnish and install new roofing material of a color as selected by owner, must be architectural style. Installation shall include metal drip and rake edge, two layers of 90# roll valley or metal valley in all valleys. Reflash chimney, plumbing vents, and vertical walls with appropriate neoprene boots and metal step flashing where possible. Install ventilation units sufficient to vent all areas of attic. Ridge venting when used shall cover the full length of the roof ridge. Installation of all materials shall follow manufacturer's printed instructions and G.S. 1.
Contractor is responsible for final measurement.
Currently there is a tarp on the rear lower roof, plan on approximately 100 sq ft of decking repair prior to sheathing the roof.
Approximately22 SQ squares on all elevations. To include the car port New roofing material type shall be architectural shingles.
Manufacturer: __________ Color Name/Number: __________ Contractor's Initials: ____________________ Owner's Initials: __________ Rehab Initials: ________________
2 - G08 - GUTTERWORK
(Specification ID:1.08000 )
LF
Furnish and install gutter and downspout. Replacements shall match existing as to materials, finish, shape and size. Do not mix galvanized with copper or aluminum. Where replacements are of a complete system or side of a system having no cross connections with sections not to be replaced, used baked pre-enameled aluminum, 5-inch K-type in standard colors. Minimum thickness of aluminum shall be .027 inches for troughs and fittings. Use one or a combination of strap hangers, spike and ferrules or fascia hangers. Space hangers and slip joint connectors per manufacturer's instructions. Maximum spacing of hangers shall be 48 inches OC for galvanized and 30 inches for aluminum. Use only recommended gutter seal and rivets or screws at all joints. All work, whether a complete new system or a partial replacement, shall have the system with a pitch of not less than 1 inch in 16 feet. Divert the water away from the foundation using appropriate extensions and/or concrete splash blocks. All work to conform to code and G.S. 4a.
Contractor responsible for final measurements.
All Downspouts shall be commercial size.
Approximately __________ linear feet of gutter on all elevation(s).
Approximately ___________ linear feet of downspout on all elevation(s).
Subtotal for General Requirements
Total
Customer:__________________________________ Contractor:__________________________________
Prepared By: sharrison@cityofjackson.org on 11/25/2025
OWNER ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and received a copy. I fully understand the repairs to be made to my property.
| x_________________________ | __________ | |
| Owner: | Date |
CONTRACTOR ACCEPTS SCOPE OF WORK
I have read the contents of this work write up and agree to perform all work called for in accordance with the bid submitted on __________.
| x_________________________ | __________ | |
| Contractor | Date |
| x____________________________ | __________ | |
| Construction Specialist | Date |
| Prepared By: sharrison@cityofjackson.org on 11/25/2025 |
| 4 of 4 |