About this file

This is a Contract Data Requirements List (CDRL) form DD 1423-1 that outlines three required deliverables for the WPAFB Commercial Internet and CATV Services contract. The CDRLs specify detailed submission requirements for: 1) Monthly Status Reports due on the 5th day of each month, with distribution to specified Air Force personnel, 2) Monthly Funds Expenditure Reports due within the first week of each month, and 3) Voluntary Protection Program documentation including a Safety and Health Plan due 10 days after contract award and annual TCIR/DART rates due January 15th.

Each CDRL contains specific delivery instructions, distribution requirements limited to US Government agencies only (Distribution Statement B), and electronic submission requirements to designated Air Force personnel. The forms are prepared by Christopher Lipps and dated December 19, 2024. All deliverables must be submitted electronically to five designated Air Force personnel at the 88CS/SCXC office.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001 - 0021

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER X

D. SYSTEM/ITEM

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

STATUS REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS 6.1

6. REQUIRING OFFICE

88CS/SCXC

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

EOM

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16 Draft

Final

Reg Repro

16. REMARKS

Contractor format is acceptable, and submittal shall consist of electronic copy.

BLOCK 9: B distribution authorized to US Government agencies only.

BLOCKS 12 AND 13: The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support (Example: Contract start date 01 January, first status report due 05 February). Subsequent monthly status reports shall be delivered on the 5th day of each month (PWS 6.1.).

BLOCK 14:

Distribution via email to the following personnel:

christopher.lipps.3@us.af.mil michael.tolliver.2@us.af.mil jackie.boles.1@us.af.mil shannon.scott.4@us.af.mil jennifer.blackford@us.af.mil

88CS/SCXC 1

15. TOTAL 0 1 0

G. PREPARED BY

LIPPS.CHRISTOPHER.JAMES.12

68305676

Digitally signed by

LIPPS.CHRISTOPHER.JAMES.1268305676

Date: 2024.12.19 08:32:06 -05'00'

H. DATE

19DEC2024

I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

0001 - 0021

B. EXHIBIT

A

C. CATEGORY:

X

TDP TM OTHER

D. SYSTEM/ITEM

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

This page is not used.

Reset DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort

(production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001 - 0021

B. EXHIBIT

A

TDP TM OTHER X

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

FUNDS EXPENDITURE REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS 6.2.

6. REQUIRING OFFICE

88CS/SCXC

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

See Blk 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

EOM

13. DATE OF SUBSEQUENT

SUBMISSION

Draft Final

Reg Repro

16. REMARKS

Contractor format is acceptable, and submittal shall consist of electronic copy.

BLOCK 9: B distribution authorized to US Government agencies only.

BLOCKS 12 AND 13: The Contractor shall deliver the initial monthly expenditure report within ten (10) work days after the end of first full month of support. Subsequent monthly expenditure reports shall be delivered no later than the first week of each month (PWS 6.2.).

BLOCK 14:

Distribution via email to the following personnel:

christopher.lipps.3@us.af.mil michael.tolliver.2@us.af.mil jackie.boles.1@us.af.mil shannon.scott.4@us.af.mil jennifer.blackford@us.af.mil

88CS/SCXC 1

15. TOTAL 0 1 0

G. PREPARED BY

LIPPS.CHRISTOPHER.JAMES.12

68305676

Digitally signed by

LIPPS.CHRISTOPHER.JAMES.1268305676

Date: 2024.12.19 08:33:02 -05'00'

H. DATE

A. CONTRACT LINE ITEM NO.

0001 - 0021

B. EXHIBIT

A

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001-0021

B. EXHIBIT

A

TDP TM OTHER X

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

VOLUNTARY PROTECTION PROGRAM

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS 1.13 – 1.13.4, 6.3

6. REQUIRING OFFICE

88CS/SCXC

7. DD 250 REQ

NO

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

See Blk 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

Draft Final

Reg Repro

16. REMARKS: Contractor format is acceptable, and submittal shall consist of electronic copy.

BLOCK 9: B distribution authorized to US Government agencies only.

BLOCK 11: January 15th of each year (PWS 1.13.2., 6.3.).

BLOCK 12: The Contractor shall submit the Safety and Health Plan and corresponding site safety checklist to the CO not later than (10) calendar days after contract award (PWS 1.13.1. – 1.13.1.12.).

BLOCK 13: The Contractor shall submit a Total Case Incidence Rate (TCIR) and Days Away, Restricted, and or Transfer Case Incident Rate (DART) rates and OSHA Form 300A to the CO by January 15th of each year (PWS 1.13.2.).

BLOCK 14:

Distribution via email to the following personnel:

christopher.lipps.3@us.af.mil michael.tolliver.2@us.af.mil jackie.boles.1@us.af.mil shannon.scott.4@us.af.mil jennifer.blackford@us.af.mil

88CS/SCXC 1

15. TOTAL 0 1 0

G. PREPARED BY

LIPPS.CHRISTOPHER.JAMES.12

68305676

Digitally signed by

LIPPS.CHRISTOPHER.JAMES.1268305676

Date: 2024.12.19 08:34:01 -05'00'

H. DATE

19DEC2024

A. CONTRACT LINE ITEM NO.

0001-0021

B. EXHIBIT

A

WPAFB Commercial Internet and CATV Services

E. CONTRACT/PR NO. F. CONTRACTOR

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM

- Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be

2 TITLE OF DATA ITEM STATUS REPORT:
5 CONTRACT REFERENCE PWS 61:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_2:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_2:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_2:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_2:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_3:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_3:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_3:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_3:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_4:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_4:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_4:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_4:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_5:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_5:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_5:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_5:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_6:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_6:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_6:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_6:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_7:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_7:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_7:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_7:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_8:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_8:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_8:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_8:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_9:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_9:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_9:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_9:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_10:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_10:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_10:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_10:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_11:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_11:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_11:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_11:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_12:
Draft16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_12:
116 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_12:
Repro16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_12:
88CSSCXC16 REMARKS Contractor format is acceptable and submittal shall consist of electronic copy BLOCK 9 B distribution authorized to US Government agencies only BLOCKS 12 AND 13 The Contractor shall deliver the initial status report on the 5th day of the month after first full month of support Example Contract start date 01 January first status report due 05 February Subsequent monthly status reports shall be delivered on the 5th day of each month PWS 61 BLOCK 14 Distribution via email to the following personnel christopherlipps3usafmil michaeltolliver2usafmil jackieboles1usafmil shannonscott4usafmil jenniferblackfordusafmil 1_13:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .