FY26 PWS Chem Water Treatment 17 Oct 2025.pdf
PDF 498 KB Posted
- Attached to
- HVAC Chemical Water Treatment
- Solicitation number
- FA488726Q0024
About this file
This is a Performance Work Statement (PWS) for chemical water treatment services at Luke Air Force Base, Arizona, effective FY-26 and dated October 17, 2025.
The contractor must provide full-service HVAC chemical water treatment for open and closed loop cooling/condenser water systems, open and closed loop chilled water systems, and closed-loop hot water systems across approximately 70 boilers and 40+ cooling towers. Key objectives include: (1) conducting initial plant surveys within 45 days of award detailing chemistry, equipment, and automation; (2) performing chemical cleaning and flushing of all closed loop systems within 90 days of award; (3) maintaining treatment programs to reduce fuel and electrical consumption by minimizing scale, corrosion, fouling, and microbiological growth; (4) testing critical systems daily for inhibitor levels and conductivity, with non-critical systems tested minimum three times weekly; (5) maintaining minimum 10% inventory levels in all chemical drums; and (6) submitting monthly reports by the 10th of each month containing raw data, laboratory results, performance metrics, and Legionnaires disease assessments. The contractor must have minimum 10 years' experience treating industrial cooling water systems, and all service representatives must possess Chemical Water Treatment Certification and 5 years' industry experience, or alternatively 10 years' experience. Work is performed during normal duty hours (7:00 AM to 4:30 PM, Monday-Friday) unless approved otherwise. The government furnishes conductivity controllers, pumps, chemical container barrels, contamination pallets, electricity, water, sewage, refuse collection, and police/fire protection. Replacement parts are reimbursed at invoice cost with supporting documentation from three independent sources; repairs at or below $2,500 require three price quotes prior to invoicing, while repairs exceeding $2,500 require three quotes and approval before work commences. Extensive environmental, hazardous materials, and security requirements apply, including compliance with Luke AFB Environmental Guide, HAZMAT tracking, Security Forces procedures, and National Agency Check processing for personnel requiring base access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Log.pdf | ||
| Ombudsman.docx | DOCX document | |
| Luke AFB Environmental Guide for Contractors October 2024.pdf | ||
| Solicitation - FA488726Q0024.pdf | ||
| Contractor Access to Department of the Air Force Installations.docx | DOCX document | |
| Wage Determinatin 2015-5469 dated 30 Mar 2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PERFORMANCE WORK STATEMENT
(PWS) FOR
CHEMICAL WATER TREATMENT OF HYDRONIC HEATING
AND COOLING SYSTEMS
FY-26
DATED: 17 OCT 2025
LUKE AIR FORCE BASE, ARIZONA
1.0 GENERAL
1.1. The contractor shall provide a full-service HVAC chemical water treatment program, including ancillary equipment cleaning service, and all management, labor, material, parts, equipment, transportation, and tools necessary to maintain, service, calibrate, and repair equipment identified herein and in accordance with the most recent publication of ASHRAE Standards. The systems to be treated, serviced, and cleaned consist of open and closed loop cooling/condenser water systems, open and closed loop chilled water systems, and closed-loop hot water systems. A listing of these systems and locations can be found in Attachments A, B, C, and G.
1.2. INITIAL SURVEY OF EQUIPMENT
1.2.1. The contractor will provide plant surveys of each system that detail the chemistry, equipment and automation that will be used. The contractor will evaluate all equipment and suggest the need for improvements or upgrades. If the contractor fails to provide this report within 45 days after award of this contract, it will be assumed that the contractor has accepted all equipment in satisfactory condition.
1.2.2. Upon notification from the government, the contractor will have sixty (60) calendar days to perform upgrades or improvements identified in the initial plant survey and as specified by the government. All necessary work identified during the initial survey must be completed during the basic contract year.
1.2.3. Hot and cold closed loop systems: Within the first 90 days after award of the contract, the contractor will chemically clean and flush all closed loop systems with pot feeders listed in this contract prior to chemical water treatment. Contractor will schedule chemical closed loop cleaning with Luke AFB 48 hours in advance. A Luke AFB representative must be present during this chemical cleaning unless otherwise approved by HVAC Supervision.
1.3. WATER TREATMENT AND MAINTENANCE PROGRAM
1.3.1. The contractor's main goal is to reduce fuel and electrical consumption through improved heat transfer efficiency. This is accomplished by minimizing scale, corrosion, fouling, and microbiological growth, which create deposits on heat transfer surfaces. The vendor shall try to maximize cycles of concentration in both boilers and cooling towers including distribution loops to minimize water, energy and chemical consumption.
1.3.2. The contractor is responsible for maintaining the cleanliness of cooling towers, condenser bundles, heat exchangers and closed loops. Towers and all internal and external strainers (Filters) will be cleaned at least once per year and more if needed.
Tube bundles and closed loops will be cleaned as determined by the contractor and Luke Air Force Base personnel.
1.3.3. All critical systems (identified in Attachment B) will be checked for proper inhibitor levels and conductivity daily. Non-critical systems (identified in Attachment A) will be tested a minimum of three times each week. Some testing can be reduced if it is being performed by new technology. The basic testing requirements are detailed below. See Attachment D - G for control ranges.
. Conductivity of tower water vs Make Up (Cycles)
. Scale inhibitor levels
. Calcium Balance
. Biocide levels (weekly)
. Alkalinity Balance
1.3.4. The contractor is responsible for maintaining a minimum of 10% inventory levels in all chemical drums to ensure system does not run empty. The contractor will use the safest technology available to limit exposure of hazardous chemicals. Inventories will be recorded weekly for each system.
1.3.5. The effectiveness of the treatment program shall be reviewed periodically based on the timeliness and accuracy of reports, adherence to proper addition and maintenance of chemical levels in all systems, the service personnel's ability and attitude, professional performance and dedication to maintaining the Luke Air Force Base facility, and the ability to correctly analyze problems and apply corrective actions.
If any question arises as to the accuracy of the tests results Luke AFB will utilize the services of another water treatment company to take samples and provide a laboratory analysis of the results at the cost of the water treatment supplier.
1.3.6. The 500,000 gallon cold water thermal storage tank will need to be tested annually and treated as required. Testing to be performed within the first 90 days after contract award. Testing results are to be submitted to 56 CES/CEOIH, COR and CO as soon as available. SEE ATTACMENT J for Water sampling and treatment access located at Bldg. 547.
1.4. REPORTS
1.4.1. The contractor shall electronically submit to the Contracting Officer Representative (COR) and HVAC Supervision monthly reports as specified herein. The reports are due no later than the 10th of the following month and shall include:
1.4.2. List all current issues and recommendations for improved operation. It is the contractor’s responsibility to alert the COR and HVAC Supervision by email any immediate actions that need to be taken.
1.4.2.1. All the collected data from the month in the original, raw format and data compilation reports.
1.4.2.2. The results from any laboratory testing.
1.4.2.3. Identified metrics on treatment performance.
1.4.2.4. Annual Legionnaires Decease
1.5. PARTS
1.5.1. Replacement Parts. The contractor will be reimbursed at invoice cost for parts required to replace defective items on equipment identified in this statement of work.
Only new parts or parts of equal quality that are specified by the equipment identified in Attachment H, Government Furnished Equipment will be used in effecting repairs.
Parts replaced will become the property of the government. The contractor will return all replaced defective parts to the COR, unless the replaced parts are used for trade-in as authorized by the CO or his designated representative.
1.5.2. Parts reimbursement is only for direct costs.
1.5.3. The burden of justification for the dollar value of the replacement parts falls on the Contractor, who must provide documentation from three independent sources of the actual installed cost of the item. The following documentation shall be provided to the CO or his designated representative:
1.5.4. A minimum of three (3) independent written price quotes which shall include material(s) description with unit price and installation cost. The price quotes must be submitted on the contractor’s letterhead and be signed by the owner or authorized representative of the company.
1.5.5. For any repair with a dollar value at or below $2,500 (parts and labor included) the Contractor must provide three price quotes to the CO or his designated representative prior to submitting an invoice into WAWF for reimbursement.
1.5.6. For any repair with a dollar value over $2,500 (parts and labor included) the Contractor must provide three price quotes to the CO or his designated representative for approval prior to commencement of work.
2.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES
2.1. See Attachment H.
3.0 HOURS OF OPERATION
3.1. The contractor shall establish a work schedule which requires work to be performed during normal duty hours 7:00 AM to 4:30 PM, Monday through Friday.
These hours are concurrent with the local Base Civil Engineer maintenance shops. The Contractor shall notify the CO in writing three (3) days in advance of his intention to work during non-normal hours, except for emergency calls.
4.0 SECURITY REQUIREMENTS
4.1. Contractor employees shall comply with Luke AFB security requirements imposed by the Installation Commander at all times while on Luke AFB premises. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services at Luke AFB. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment for the Contractor. The Contractor shall comply with all Luke AFB policies regarding entry to the installation, rules of the road, contingency operations compliance, and photography prohibitions.
Contractor employees are authorized to the installation for the purpose of work under this contract only, and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, understand, read, and write English.
4.1.1. The Contractor must be aware that entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through the FBI for base access.
4.2. Current security access restrictions at Luke AFB require all contractor vehicles to enter through the South Gate only. Contractor vehicles may be subject to search prior to gaining base entry. The Contractor should plan and allow for delays as a result of increased and ever-changing security procedures.
4.3. The Contractor shall brief all employees that they shall immediately leave any area upon notification by the CO, COR, constituted authority, Security Forces, or when directed as occasional operational requirements, real world activities, or emergencies dictate.
4.4. Contractor performance within restricted/controlled areas shall require Contractor compliance with various levels of security and established personnel security entry control procedures. The Contractor shall ensure all contractor employees performing services in secured areas are processed for a controlled area, limited access, or visitor badge by the Entry Controller of the restricted/controlled area.
4.4.1. The facility manager/user/occupant/requester will be responsible for providing access, escorts, or temporary visitor access badges for contractor personnel while performing custodial service duties. The Contractor shall be responsible for scheduling access/escorts/badges by contacting the facility manager/requester at the Entry Control Point of the restricted/controlled area.
4.4.2. At all times while in restricted/controlled areas, contractor employees shall be under direct surveillance of a person from that facility who is cleared to wear a controlled area badge and perform escort duties. Visitor badges shall be returned to the Entry Controller each time the employee completes the duties and leaves the area. This requirement is waived for contractor personnel who have unescorted access privileges and display a controlled area badge for the restricted/controlled areas.
4.5. All Contractor employees who do not have a current security investigation acceptable to the Security Forces, and who require a National Agency Check (NAC) for the performance of their duties, shall complete an Electronic Personnel Security Questionnaire (EPSQ), SF 85P, Questionnaire for Public Trust Positions, in three copies (original and two photocopies); and an AF Form 2583, Request for Personnel Security Action. For all employees requiring local area network (LAN) access (if applicable), the Contractor shall submit the following information: full name, date and place of birth, social security account number, affirmation of United States citizenship, and any current security investigation data. Information shall be in writing, on company letterhead, and submitted to Security Forces through the CES Security Manager.
4.6. The CES Security Manager is the source for the necessary forms and will provide instructions for receiving, preparing, and processing these forms. The Contractor shall coordinate with all required facilities to process all necessary paperwork. After forms have been properly completed, the CES Security Manager will make an appointment for contractor employee(s) to go to the Security Forces for submittal of paperwork and fingerprinting. Appointments will be scheduled within two weeks of request.
4.6.1. A minimum of 180 days is required to process contractor employee NACs.
Additional time will be required if the NAC is unfavorable and may result in denial of entry to restricted/controlled areas or denial of base LAN access. The CES Security Manager will notify the Contractor of any NAC results. After completion of a favorable NAC, each eligible employee shall report to the CES Security Manager for processing of AF Form 2586, Unescorted Entry Authorization Certificate. The CES Security Manager will schedule appointments for issuance of badges.
4.7. The Luke AFB Installation Commander reserves the right to deny restricted area entry to any contractor employee whose NAC is unfavorable, and the right to terminate the entry of any employee upon disclosure of information indicating the individual’s continued entry to a secure area is not in the best interest of national security.
4.8. Controlled area badges will be valid only for the actual period of employment or the term of the contract, whichever occurs first. Contractor employees must display the controlled area badge on their outer garment above waist level, and must, upon request, surrender the badge to any DoD member for identification verification.
Violations or deviations from established security procedures by contractor employees may result in confiscation of controlled area badges and denial of future entry to restricted areas.
4.9. The Contractor shall not employ persons for work on this contract who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
Contractor personnel shall be easily recognized as contractor employees by wearing an identification tag that includes the company’s name/logo and employee’s name.
5.0 SPECIAL QUALIFICATIONS
5.1. Contractor shall have a minimum of ten (10) years’ experience in the treatment of industrial cooling water systems as identified in this PWS.
5.2. All service representatives shall possess a Chemical Water Treatment Certification and (5) years’ experience in the Water Treatment Industry. Service representatives that do not possess such a certification shall have no less than 10 years’ experience in the water treatment industry (include diploma / degree and or experience resume for each service representative that will service facilities identified by this PWS).
5.3. The contractor may be asked to remove persons who pose a threat to the health, safety, or security of the installation. Contractor personnel while on duty shall be easily recognized as contractor employees.
6.0 ENVIRONMENTAL REQUIREMENTS
6.1. The contractor shall comply with all environmental requirements as set forth in the Luke AFB Environmental Guide for Contractors. The contractor shall be knowledgeable of and comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change the term of this contract, the contractor shall comply with such law/regulation as changed. If there is an increase or decrease in cost as a result of the change, the contractor shall immediately inform the CO for possible modification of the contract.
6.2. Contractors shall use the least hazardous materials available to the maximum extent possible. Contractor shall use chemicals that meet or exceed all Arizona State and Federal EPA laws and guidelines. Contractor shall dispose of all unused chemicals off base in accordance with all Federal, State and local regulations.
6.3. A Safety Data Sheet (SDS) shall be provided for each cleaning and restroom supply item and employees will be trained, by the contractor, in the proper use and disposal of each item. SDSs are required as specified in the Hazard Communication Standard, 29 CFR (including revisions adopted during the term of the contract) for any other material designated by a government technical representative as potentially hazardous and requiring safety controls. SDSs must be submitted by the contractor upon contract award. Failure to provide SDSs or certificates when requested could result in the contractor being considered non-responsive and result in termination of the contract.
6.4. Luke AFB’s Hazardous Materials Management Office (HAZMAT) will review all chemicals that the contractor brings on base. Any products that meet the criteria of hazardous material or that will become a hazardous waste must be tracked until permanently removed from government property. The Contractor will submit an inventory of all materials to the HAZMAT Office prior to commencement of work.
Criteria for identifying hazardous waste is contained in Subparts A through D of 40 CFR, Part 261. The Contractor is responsible for properly storing hazardous materials and for properly disposing of any hazardous waste off-base according to all applicable Federal, State and local regulations.
6.5. The contractor must follow spill response procedures as outlined in Luke AFB’s Environmental Guide for Contractors. Contractors must report spills to the Base Fire Department (dial 911) when: the spill is greater than two feet; or the spill is greater than one gallon; or the spill is an unknown substance; or the spill is on soil or cracked pavement; or the spill may create a threat to fire/explosion; or the spill may be a risk to personnel. Contractors must report small spills (spills less than two feet in area) to the Luke Environmental Office (623) 856-3832. The contractor is responsible for reporting and promptly cleaning all spills in a manner consistent with current environmental regulations. If it is necessary to utilize government material, equipment, or personnel to clean up a contractor that caused spill, the contractor shall be required to reimburse the government for all associated costs.
6.6. The contractor shall have approval from HAZMAT, Bio-Environmental (BEE) and Safety sections prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require SDSs. The contractor shall identify these materials and products on The Contractor Hazardous Material Questionnaire and the monthly Contractor Environmental Reporting Form (ATTACHMENT I). The contractor shall provide one copy of the SDSs for each item to the HAZMAT Office for review prior to any chemicals being brought onto Luke AFB. The contractor shall maintain one copy of the SDSs for each hazardous material line item used within the work center.
6.6.1. Luke AFB Instructions and guidance for HAZMAT and the accountability of HAZMAT use for reporting are established and implemented in Air Force Manual 32- 7002. A Contractor that uses HAZMAT on LAFB shall submit a Contractor’s Hazardous Questionnaire (ATTACHMENT I) to HAZMAT during contract period at least 5 days prior to start of project to identify the type and quantities of chemicals used. A monthly usage report on the actual amount of use will be provided to HAZMAT. Contractor shall notify HAZMAT upon completion of project or service.
6.7. The contractor shall not use products that are or contain Toxic 17 chemicals, Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio accumulative and Toxic (PBT) chemicals. Any Hazardous Materials (HM) containing one of these banned substances will not be allowed on base. Contractors should avoid the use of any confirmed human carcinogens, sensitizers, teratogens, or mutagens.
6.8. The contractor shall ensure all employees complete the local Air Force Hazardous Communication, HAZMAT, and hazardous waste training. The contractor shall appoint a primary and alternate HAZMAT and Hazardous Waste monitor. Monitors are responsible for training all contractor personnel regarding hazardous material containers maintained within Luke AFB and complete SDSs immediately upon receipt of new chemicals, products, or materials. The contractor shall submit SDSs to the HAZMAT Office as required. SDS must be current and match the materials being used.
6.8.1. Identified HAZMAT will be managed and tracked in the installation’s approved HAZMAT tracking system maintained by 56 CES/CEIE, HAZMO Office (Please contact
623) 856-4748/4749 for assistance). Contractor will complete required documents to support installation requirements.
6.9. Contractor shall comply with the requirements set forth in the Luke AFB Environmental Guide for Contractors regarding dust control, air emissions controls, storm water discharges, construction & demolition debris recycling/disposal, protection of native plants, protection of migratory birds, and protection of cultural resources.
6.10. Project sites are subject to inspection by the 56th Civil Engineer Squadron (56 CES) Environmental Office to ensure compliance with environmental regulations.
10.0. Attachments:
A. Non Critical Cooling Towers Workload Data
B. Critical Cooling Tower Workload Data
C. Boiler Workload Data D. Closed Loop Control Ranges
E. Thermal Storage Unit Control Ranges
F. Cooling Tower Control Ranges
G. Central Chilled Water Plant and Distribution Systems and Equipment Estimated Workload Data Information
H. Government Furnished Materials/Services/Equipment Utilities
I. Contractor’s Environmental Reporting Entry Forms
J. Picture of 500K Gallon Thermal Storage Tank Access
ATTACHMENT A
Non Critical Cooling Tower Estimated Workload
Data
BUILDING MAKE
MODEL CAPACITY
Estimate
133 EVAPCO AT14-612 86 TON
161 MARLEY MD5008 171 TON
219 EVAPCO AT1499 70TON
300 EVAPCO AT19-318 175 TON
318 DELTA T-100I 100 TON
334 EVAPCO 1CT-466 70 TON
343 EVAPCO AT14-79 78 TON
415 EVAPCO AT1479 78 TON
416 EVAPCO CT496 60 TON
417 EVAPCO USS 19-3H6 80 TON
450 EVAPCO 30 TON
453 BAC F1742K 30 TON
545 BAC VFI-009-32G 8 TON
799 EVAPCO AT 1496 74 TON
810 EVAPCO AT 19-66 97 TON
820 north EVAPCO AT19-89 200 TON 820 south EVAPCO AT19-89 200 TON
840 EVAPCO USS 1496 75 TON
915 BAC VAT 70C 90 TON
908 EVAPCO AT 1496 50 TON
908 EVAPCO AT 1496 50 TON
934 EVAPCO AT1496 50 TON
934 EVAPCO AT1496 50 TON
936 EVAPCO AT-19-56 60 TON
936 EVAPCO LSTA 463 60 TON
938 BAC F1843L 70 TON
942 EVAPCO AT-1496 60 TON
945 EVAPCO ATW68A2 40 TON
976 EVAPCO USS14-2F6 146 TON
978 EVAPCO USS14-3F6 60 TON
993 EVAPCO OSS 1996 65 TON
999 EVAPCO USS19-2H8 146 Ton
1031 EVAPCO USS14-2F6 40 TON
1143 BAC VTO 155N 150 TON
1525 BAC VTO 57K 50 TON
1540 EVAPCO USS-293H18 200 TON
9002 EVAPCO USS-14-2F6 50 TON
9002 EVAPCO USS-14-2F6 50 TON
9003 EVAPCO USS-14-3G6 50 TON
9003 EVAPCO USS-14-3G6 50 TON
ATTACHEMENT B
Critical Cooling Tower Estimated Workload Data
* Listed in Priority with 1 being the highest*
123 1 EVAPCO ESWB9-33G6 150 TON
123 1 EVAPCO ESWB9-33G6 150 TON
BUILDING PRIORITY MAKE MODEL CAPACITY
998 north 1 EVAPCO 1CT393 25 TON 998 south 1 EVAPCO 1CT393 25 TON
MARLEY
MARLEY
MD5010QAD3LSAF MD-
10078061-A1
MD5010QAD3LSAF MD-
10078061-A3
350 TON
350 TON
620 1 MARLEY MD5010QAD3LSAF MD-
10078061-A3
350 TON
620 1 EVAPCO 350 TON
547 #1 2 MARLEY NC 5222CM-99 325 TON
547 #2 2 MARLEY NC 5222CM-99 325 TON
547 #3 2 MARLEY NC 8305H1CM 350 TON
547 #4 2 MARLEY NC 5221CM-00 325 TON
940 4 EVAPCO SST1986 100 TON
940 4 EVAPCO SST1986 100 TON
545 5 BAC VXT 25 25 TON
1158 CT # 1 6 MARLEY 108727-21303-97 333 TON
1158 CT # 2 6 MARLEY 108727-21303-97 333 TON
959 7 BAC 15201W 200TON
450 8 EVAPCO 30 TON
1119 9 EVAPCO ICT4 86 70 TON
417 PMEL 1 EVAPCO USS 19-3F8 80 TON
ATTACHMENT C
Boiler Estimated Workload Data
BLDG TYPE BOILER TYPE SYSTEM BTU/HR INPUT
26 Fire tube HOT WATER 1,700,000 122 Being replaced 2020 Hot water 525,000 133 Water tube Hot water 1,750,000 161 Water tube Hot water 2,160,000
179 Water tube Hot water 136,000 219 Water tube Hot water 750,000
338 Water tube Hot water 120,000 339 Water tube Hot water 760,000 343 Water tube Hot water 200,000 400 Water tube Hot water 400,000 408 Water tube Hot water 856,000 415 Water tube Hot water 600,000 416 Water tube Hot water 250,000 417 Water tube Hot water 600,000 417 Water tube Hot water 1,200,000 447 Water tube Hot water 140,000 450 Water tube Hot water 250,000 452 Water tube Hot water 489,000 453 Water tube Hot water 175,000 460 Water tube Hot water 461 Water tube Hot water 140,000 485 Water tube Hot water 350,000
528 Water tube Hot water 665,000
542 Water tube Hot water 25,000
546 Water Tube Hot Water 25,000 586 Water Tube Hot Water 760,000
617 Water tube Hot water 500,000
620 Fire Tube Hot water 3,000,000 635 Water tube Hot water 1,500,000 636 Water tube Hot water 680,000 637 Water tube Hot water 722,500 640 Water Tube Hot Water 600,000 663 Water tube Hot water 360,000
668 Water tube Hot water 960,000 687 Water Tube Hot Water 1,500,000 700 Water tube Hot water 1,500,000 799 Water tube Hot water 420,000
840 Water tube Hot water 1,000,000 904 Water tube Hot water 420,000 913 Water tube Hot water 1,300,000 908 Pulse Hot water 1,500,000 908 Pulse Hot water 1,500,000 914 Water tube Hot water 1,300,000 915 Water tube Hot water 600,000
930 Water tube Hot water 1,400,000 931 Water tube Hot water 400,000 931 Water tube Hot water 565,000 936 Water tube Hot water 400,000
942 Water tube Hot water 355,000 945 Water tube Hot water 448,000 959 Water tube Hot water 790,000
962 Sectional Hot water 750,000 984 Water tube Hot water 400,000 988 Water tube Hot water 300,000 993 Water tube Hot water 1,200,000 997 Water tube Hot water 325,000 999 Water tube Hot water 630,000
1018 Water tube Hot water 215,000 1019 Water tube Hot water 650,000 1022 Water tube Hot water 1,450,000 1113 Water tube Hot water 760,000 1119 Water tube Hot water 350,000 1150 Water tube Hot water 2,900,000 1236 Water tube Hot water 136,000 1236 Water tube Hot water 150,000 1236 Water tube Hot water 150,000 1240 Water tube Hot water 179,000 1365 Water tube Hot water 200,000
1525 Water tube Hot water 560,000 1540 Water tube Hot water 1,500,000
70 TOTAL
ATTACHMENT D
Closed Loop Control Ranges Sample source: Hot water
Test Control Range Conductivity <4500 umhos Nitrate 1000-2000 ppm Iron >1.0 ppm Azole 4-10 ppm
PH 8.5-10.5
Sample source: Chilled Water
Conductivity <4500 umhos Nitrate 600-1000 ppm Iron >1.0 ppm
PH 8.5-10.5
ATTACHMENT E
Thermal Storage Unit Control Ranges
Molybdenum 60-120 ppm
PH 8.5-9.5
ATTACHMENT F
Cooling Tower Control Ranges
Conductivity Record Calcium Hardness Record Alkalinity Record Azole 2-4 ppm
PH 8.5-10.5
Cycles of Concentration Maximize and Record
LSI 2.0-2.7
Free Bromine 0.1-0.3 ppm
ATTACHMENT G
Chilled Water Plant and Distribution Systems Estimated Workload Data
Information
CHW Plant (bldg. 547) feeds the following buildings Plate & Frame:
Requires Closed Loop Treatment
BUILDINGS:
S-11
21 TOTAL
Note: thermal storage volume is 500,000 gallons, requires treatment
ATTACHMENT H
GOVERNMENT FURNISHED MATERIALS/SERVICES/EQUIPMENT
1. GENERAL. The government shall provide, without cost, the equipment, materials, and/or services listed below.
1.2. Equipment:
1.2.1. Conductivity controllers, pumps, chemical container barrels and associated equipment
1.2.2. Contamination pallets at each site
1.3. Materials: None provided.
1.4. Services. Electricity, water, and sewage will be provided to the contractor at no cost.
1.5. Refuse collection. Will be provided by the government at no cost to the contractor. Housekeeping is essential. Contractor will ensure areas are cleaned up with no debris remaining after performing maintenance.
1.6. Police and Fire protection. Both services are 911.
ATTACHMENT I
Contractor’s Environmental Reporting Entry Form
CONTRACTOR HAZARDOUS MATERIAL QUESTIONNAIRE
CONTRACTOR COMPANY NAME
NAME OF CONTRACTOR
ADDRESS
CONTRACT NUMBER
DATE, TIME AND LOCATION OF PRE-PERFORMANCE CONFERENCE MEETING
QUALITY ASSURANCE PERSONNEL (QAP)/CONTRACTING OFFICER (CO)
PHONE NUMBER
PROJECTED CONTRACT PERIOD
START DATE COMPLETION DATE
Will contractor be using any hazardous materials (HAZMAT) during this contract?
a) If NO, sign and date below.
CONTRACTOR NAME (PRINT) CONTRACTOR SIGNATURE DATE
b) If YES, sign and date below and complete item c. Complete and submit the attached Hazardous Materials Inventory and copies of all Safety Data Sheets (SDSs) to the 56 CES/CEIE Hazardous Materials Management Office at least 5 days prior to contract start date.
Contractor must also submit a monthly Contractor Environmental Reporting Form no later than 5 days after the end of each month.
CONTRACTOR NAME (PRINT) CONTRACTOR SIGNATURE DATE
c) Will the contractor be generating a potential waste or hazardous waste during the contract period? Yes No
If Yes, contact the base Hazardous Waste Manager at (623) 856-6501 for proper reporting and disposal procedures.
Submit this form to the 56 CES/CEIE Hazardous Waste Management Office: (623) 856-4748/4749
COMMENTS
CONTRACTOR HAZARDOUS MATERIAL QUESTIONANNAIRE HAZARDOUS MATERIAL INVENTORY
CONTRACTOR NAME
CONTRACT NUMBER PROJECT LOCATION
PROJECT TITLE
ESTIMATED START DATE ESTIMATED COMPLETION DATE
HAZARDOUS MATERIALS INVENTORY
MATERIAL OR NATIONAL APPLICATION UNIT OF ISSUES ESTIMATED
STOCK NUMBER HAZARDOUS MATERIAL MANUFACTURER METHOD (e.g. 16 OZ CAN) QUANTITY TO BE
(MSN/NSN) NAME USED DURING
CONTRACT
PERIOD
November 2018
CONTRACTOR ENVIRONMENTAL REPORTING FORM
56 CES/CEIE HAZARDOUS MATERIALS MANAGEMENT OFFICE (623) 856-4748/4749
1. CONTRACT NUMBER 2. CONTRACTOR NAME 3. HAZMAT STORAGE LOCATIONS 4. REPORTING MONTH & YEAR
5. PRODUCT NAME/MSN 6. MANUFACTURER 7. APPLICATION METHOD (e.g.
BRUSH, ROLLER, SPRAY, etc.)
8. UNIT OF ISSUE
(e.g. 16 OZ CAN)
9. QUANTITY BROUGHT ON
BASE
10. QUANTITY
USED
11. QUANTITY
REMAINING
12. QUANTITY BY TYPE OF CONSTRUCTION AND DEMOLITION DEBRIS REMOVED/REUSED.
ON-SITE LOCATION DISPOSAL FACILITY TYPE OF MATERIALS LANDFILL/RECYCLED QUANTITY (lbs)
13. AMOUNT OF POTABLE
WATER
GALLONS
CONTRACTOR SIGNATURE DATE BLDG NUMBER(S)
ATTACHMENT J
Bldg. 547: 500K thermal storage tank access for water treatm
| LUKE AIR FORCE BASE, ARIZONA |
| 1.0 GENERAL |
| 1.2. INITIAL SURVEY OF EQUIPMENT |
| 1.3. WATER TREATMENT AND MAINTENANCE PROGRAM |
| 1.4. REPORTS |
| 1.5. PARTS |
| 3.0 HOURS OF OPERATION |
| 4.0 SECURITY REQUIREMENTS |
| 5.0 SPECIAL QUALIFICATIONS |
| 6.0 ENVIRONMENTAL REQUIREMENTS |
| 10.0. Attachments: |
| ATTACHMENT A |
| Non Critical Cooling Tower Estimated Workload Data |
| ATTACHEMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| ATTACHMENT G |
| ATTACHMENT H |
| ATTACHMENT I |
| Contractor’s Environmental Reporting Entry Form |
File details come from the government source that posted it. Updated .