FY26_B1435 UPS Connections_Bid Schedule.xlsx
XLSX spreadsheet 66 KB Posted
- Attached to
- B1435 UPS Connections
- Solicitation number
- FA283526Q0019
About this file
This is a Bid Schedule for the B1435 UPS Connections project at Hanscom Air Force Base under solicitation FA283526Q0019. The project purpose is to connect all required data center equipment to the primary building Uninterruptible Power Supply (UPS) system, including installation of dedicated power sources for all designated equipment. The scope of work encompasses eight primary line items organized by category: Power Distribution (UPS Output Sub-Panels, Circuit Breakers, Feeder Wire & Conduit), Rack Connections (Branch Wire, Conduit & Fittings, Electrical Whips, Receptacles & Backboxes), Miscellaneous Consumables & Labeling, and Studies & Engineering (Load Studies and Arc Flash Studies). Specific quantities include 2 UPS Output Sub-Panels, 10 Circuit Breakers, 100 feet of Feeder Wire & Conduit, 2,000 feet of Branch Wire, 50 feet of Conduit with Fittings, 30 Underfloor Electrical Whips, and 40 Receptacles & Backboxes.
The schedule appears incomplete as it lacks filled-in unit prices and extended prices for all line items, indicating this is a template for bidder pricing submission. The Period of Performance (PoP) is listed as TBD (To Be Determined), and the contracting office is 66 ABG/SCXP at Hanscom Air Force Base. The customer is identified as 66 ABG/SC with the Location for Project Management Integration at 66 ABG/SCXP. Bidders are required to complete the pricing template with their proposed unit and extended prices for each line item to submit responsive bids for this data center power infrastructure project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| B1435 UPS Connections |
| B1435 UPS Connections |
PoP Start TBD - PoP End TBD
| Customer: Hanscom AFB - 66 ABG/SC | |||||||||||||||||||||||||||||||||||||||||||||||||
| Location for PMI: 66 ABG/SCXP | |||||||||||||||||||||||||||||||||||||||||||||||||
| Line | Category | Description | Qty | Unit Price | Extended Price | ||||||||||||||||||||||||||||||||||||||||||||
| 1 | Power Distribution | UPS Output Sub-Panels | 2 | ||||||||||||||||||||||||||||||||||||||||||||||
| 2 | Power Distribution | Circuit Breakers. | 10 | ||||||||||||||||||||||||||||||||||||||||||||||
| 3 | Power Distribution | 100 Feet of Feeder Wire & Conduit. | 1 | ||||||||||||||||||||||||||||||||||||||||||||||
| 4 | Rack Connections | 2,000 Feet of Branch Wire (Panel to Racks). | 1 | ||||||||||||||||||||||||||||||||||||||||||||||
| 5 | Rack Connections | 50 Feet of Conduit (EMT / Rigid) & Fittings. | 1 | ||||||||||||||||||||||||||||||||||||||||||||||
| 6 | Rack Connections | Underfloor Electrical Whips (One whip per missed rack/device) | 30 | ||||||||||||||||||||||||||||||||||||||||||||||
| 7 | Rack Connections | Receptacles & Backboxes | 40 | ||||||||||||||||||||||||||||||||||||||||||||||
| 8 | Miscellaneous | Consumables & Labeling. | 1 | ||||||||||||||||||||||||||||||||||||||||||||||
| 9 | Studies & Engineering | Load Studies | 1 | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies | Studies & Engineering | Create Arc Flash & Load Studies |
This is the start of the file's text. The full file is on GovTribe.