Freemont Bridge Painting AE Design Statement of Work.docx
DOCX document 459 KB Posted
- Solicitation number
- S-73000-00007575
- Issued by
- Multnomah County, Oregon
About this file
This document is a Statement of Work (SOW) for an architectural and engineering (A&E) design contract related to the I-405: Fremont Bridge (Willamette River) West Ramps painting project. The project is located in Multnomah County and the City of Portland, Oregon. The SOW details the scope of services to be provided by the consultant, including project management, meetings, risk management, value engineering, environmental services, public involvement, utilities coordination, bridge and structures design, traffic engineering, right-of-way services, and quality assurance/quality control. Key deliverables include progress reports, schedules, design packages, review meetings, and risk management plans. The contract term is not specified.
The SOW does not provide specific pricing terms, set-asides, or funding sources. However, it notes that the project is likely over $25 million in value, which may trigger certain requirements such as a cost risk assessment and value engineering study. The document also references the use of ProjectWise for document management and coordination with the agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35663_Attachment C_SSOW.docx | DOCX document | |
| 35663 Addendum_2.docx | DOCX document | |
| ATT A_Cover Sheet.doc | DOC document | |
| Project Description and Phasing~1.docx | DOCX document | |
| Master List Terms.docx | DOCX document | |
| 35663 Addendum_1.docx | DOCX document | |
| Question 1.docx | DOCX document | |
| ATT B_Project Samples.doc | DOC document | |
| C2023226_GraphicsServices_RFP~2.pdf | ||
| 35663_ITA_Final.docx | DOCX document | |
| K22603 Project Summary.pdf | ||
| Section_B_List.docx | DOCX document | |
| 35663_Final.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A&E Statement of Work - I-405 Fremont Bridge (Willamette River) West Ramps
Contents
| Task 1 – Project Management [11010] | 12 |
| Task 1.1 – Project Management and Coordination [11020] | 12 |
| Task 1.2 – Progress Reports and Invoices [11030] | 13 |
| Task 1.3 – Project Schedule and Schedule Updates [11040] | 13 |
| Task 1.4 – Meetings [11050] | 14 |
| Task 1.4.1 – Kick-off Meeting [11060] | 15 |
| Task 1.4.2 – Project Development Team (“PDT”) Meetings [11070] | 15 |
| Task 1.4.3 – Project Coordination Meetings [11080] | 16 |
| Task 1.4.4 – Project Subteam Meetings [11090] | 16 |
| Task 1.4.5 – Project Site Visit Meetings [11100] | 18 |
| Task 1.4.6A – Mobility Advisory Committee Meetings ("MAC”) [11110] [RESERVED] | 18 |
| Task 1.4.6B – Mobility Advisory Committee Meetings (“MAC”) [11110] | 18 |
| Task 1.4.7 – Design Verification Workshop (“DVW”) [11120] | 19 |
| Task 1.4.8 – Cost Risk Assessment (“CRA”) [11130] | 20 |
| Task 1.4.9 – Design Acceptance Workshop (“DAW”) [11180] | 23 |
| Task 1.4.10 – Preliminary Plans Review Meeting [11190] | 24 |
| Task 1.4.11 – Advance Plans Review Meeting [11200] | 25 |
| Task 1.4.12 – Final Plans Review Meeting [11210] | 25 |
| Task 1.4.13 – Pre-PS&E Package Submittal Meeting [11220] | 26 |
| Task 1.4.14 –PS&E Review Meetings [11230] | 27 |
| Task 1.5 – Construction Support [11250] | 28 |
| Task 1.6 – Risk Management [11260] | 28 |
| Task 1.6.1 – Risk Management Plan [11270] | 29 |
| Task 1.6.2 – Monitoring and Controlling Project Risks [11280] | 29 |
| Task 1.7 – VE Study [11290] | 31 |
| Task 1.7.1 – Pre-VE Workshop [11300] | 32 |
| Task 1.7.2 – VE Workshop [11310] | 33 |
| Task 1.7.3 – VE Report [11320] | 33 |
| Task 1.7.4 – VE Implementation Meeting [11330] | 34 |
| Task 1.7.5 – VE Study Findings Analysis [11340] | 34 |
| Task 1.7.6 – Additional SME(s) for VE workshop [11350] [Contingency Task] | 35 |
| Task 1.8 – Construction Risk Management Transition [11360] | 35 |
| Task 1.9 – Quality Assurance/Quality Control [11370] | 36 |
| Task 1.9.1 – Quality Assurance [RESERVED] | 36 |
| Task 1.9.2 – QA/QC Quality Reviews [11390] | 36 |
| Task 2 – Project Initiation [12010] | 37 |
| Task 2.1 – Consultant SOW Development and Review [RESERVED] | 38 |
| Task 2.2 – Intergovernmental Agreements [RESERVED] | 38 |
| Task 2.3 – Project Charter [RESERVED] | 38 |
| Task 2.4 – Draft Change Management Request (Zero-CMR) [RESERVED] | 38 |
| Task 2.5 – Project Initiation Package [12060] RESERVED] | 38 |
| Task 2.6 – Project Initiation Quality Reviews [12070] RESERVED] | 38 |
| Task 2.7 – Project Initiation Region Phase Gate [RESERVED] | 38 |
| Task 2.8 – Phase Gate Quality Assurance [RESERVED] | 38 |
| Task 3 – Planning Services [13010] [RESERVED] | 38 |
| Task 4 – Scoping [14010] RESERVED] | 38 |
| Task 4.1 – Scoping [14020] RESERVED] | 38 |
| Task 4.1.1 – Scoping Team Coordination [14030] RESERVED] | 38 |
| Task 4.1.2 – Scoping Packet [14040] RESERVED] | 38 |
| Task 4.1.3 – Project Scoping [14050] RESERVED] | 38 |
| Task 4.1.4 – Project Re-scoping [14080] RESERVED] | 38 |
| Task 4.2 – Project Selection [RESERVED] | 38 |
| Task 4.3 – STIP Adoption [RESERVED] | 38 |
| Task 4.4 – Scoping Quality Reviews [14130] RESERVED] | 38 |
| Task 5 – Survey [15010] [Contingency Task] | 38 |
| Task 5.1 – Project Control [15020] [Contingency Task] | 39 |
| Task 5.2 – Control, Recovery, and Retracement (“CRR”) [15030] [Contingency Task] | 40 |
| Task 5.2.1– Survey Filing Map (“SFM”) [15040] [Contingency Task] | 41 |
| Task 5.3 – Topographic Data and Basemap [15050] [Contingency Task] | 42 |
| Task 5.3.1 – Survey Project Initiation [15060] [Contingency Task] | 43 |
| Task 5.4 – [RESERVED] | 43 |
| Task 5.5 – Monumentation Surveys [15080] [Contingency Task] | 43 |
| Task 5.6 – Right of Way (“ROW”) Engineering (Mapping and Descriptions) [15090] [Contingency Task] | 44 |
| Task 5.6.1 – Proposed ROW Design and Layout [15100] [Contingency Task] | 44 |
| Task 5.6.2 – Active ROW Acquisition Map [15110] [Contingency Task] | 44 |
| Task 5.6.3 – ROW Addendum, Descriptions, and Sketch Maps [15120] [Contingency Task] | 45 |
| Task 5.6.4 – ROW Descriptions Revisions due to Project Scope Changes [15125][RESERVED] | 46 |
| Task 5.6.5 – Railroad Exhibit Maps [15130] [Contingency Task] | 46 |
| Task 5.6.6 – Forest Service Plat Maps [15140] [RESERVED] | 47 |
| Task 5.6.7 – Bureau of Land Management (“BLM”) Plat Maps [15150] [RESERVED] | 47 |
| Task 5.7 – Staking [15160] [Contingency Task] | 47 |
| Task 5.8 – Pre-Construction Survey [15170] [Contingency Task] | 47 |
| Task 5.9 – Survey Design Coordination [15180] | 47 |
| Task 5.10 – Survey Quality Reviews [15190] | 48 |
| Task 6 – Environmental Services [15310] | 48 |
| Task 6.1 – Pre-National Environmental Policy Act (“NEPA”) and Planning and Environment Linkages (“PEL”) Activities [15320] ] [RESERVED] | 48 |
| Task 6.2 – NEPA - Categorical Exclusion (“CE”) or Programmatic CE (“PCE”) Documentation [15360] ] [RESERVED] | 48 |
| Task 6.5 – Land Use (includes Coastal Zone, Farmland, and Wild and Scenic Rivers) [15730] [RESERVED] | 48 |
| Task 6.6 – Environmental Justice (“EJ”) [15800] [RESERVED] | 49 |
| Task 6.7 – Socioeconomic Analysis [15850] [RESERVED] | 49 |
| Task 6.8 – Parks and Recreation Resources [15890] [RESERVED] | 49 |
| Task 6.9 – Historic Resources [16100] [RESERVED] | 49 |
| Task 6.10 – Cultural Resources – Archaeology [16210] [RESERVED] | 49 |
| Task 6.11 – Visual/Aesthetics [16440] [RESERVED] | 49 |
| Task 6.12 – Wetlands and Waters Delineation, and Permitting Services [16510] [RESERVED] | 49 |
| Task 6.13 – Biological Services [16680] [RESERVED] | 49 |
| Task 6.14 – Air Quality [16920] | 49 |
| Task 6.14.1 – Air Quality Assessments for Categorical Exclusion Project [16930] | 49 |
| Task 6.14.2 – Air Quality for Environmental Impact Statements (“EIS’s”) or Environmental Assessments (“EA’s”) [17050] [RESERVED] | 62 |
| Task 6.14.3 – Energy Analysis [17210] [RESERVED] | 63 |
| Task 6.14.4 – Air Quality Coordination [17230] | 63 |
| Task 6.14.5 – Air-Quality Quality Reviews [17240] | 64 |
| Task 6.15 – Noise Studies and Variances [17250] [RESERVED] | 65 |
| Task 6.15.1 – Screening Analysis for Traffic Noise Impacts [17260] [RESERVED] | 65 |
| Task 6.15.2 – Field Investigation and Data Gathering for NTR [17270] [RESERVED] | 65 |
| Task 6.15.3 – Noise Model Verification: Compare Measured-to-Predicted (Modeled) Noise Values [17280] [RESERVED] | 65 |
| Task 6.15.4 – Traffic Noise Impact Analysis and Mitigation Consideration [17290] [RESERVED] | 65 |
| Task 6.15.5 – Noise Technical Report (“NTR”) [17300] [RESERVED] | 65 |
| Task 6.15.6 – Final Noise Wall Height and Location Analysis [17350] [RESERVED] | 66 |
| Task 6.15.7 – Noise Variances [17360] | 66 |
| Task 6.15.8 – Noise Studies and Variances Coordination [17420] | 71 |
| Task 6.15.9 – Noise Studies and Variances Quality Reviews [17430] | 71 |
| Task 7 – Public Involvement – Public Information – Public Engagement [18510] [Contingency Task] | 72 |
| Task 7.1 –Public Hearing [18520] [RESERVED] | 72 |
| Task 7.2 – Public Involvement and Communications Plan [18530] | 72 |
| Task 7.2.1 – Public Involvement Kickoff Strategy Meeting [18540] | 74 |
| Task 7.2.2 – Stakeholder Database and Communications Log [18550] | 74 |
| Task 7.3 – Communications Materials | 75 |
| Task 7.3.1 – Graphics [18570] | 75 |
| Task 7.3.1.2 – Display Boards [18650] | 76 |
| Task 7.3.2 – Outreach Materials: Project Fact Sheets, Newsletters, Fliers, and Stakeholder Emails [18580] | 77 |
| Task 7.3.3 – Translation of Outreach Materials and Content [18630] | 79 |
| Task 7.3.4 – Interpretation Services [18640] | 80 |
| Task 7.3.5 – Small Group Briefings, One-on-One Briefings, and Stakeholder Interviews [18730] | 80 |
| 18730.10 – Due to APM at least 15 business days before the first briefing or interview | 82 |
| 18730.20 – Due to APM within 5 business days after receipt of Agency comments | 82 |
| 18730.30 – Due to APM at least 5 business days before the first briefing or interview as defined in Task 7.2 – Public Involvement and Communications Plan | 82 |
| 18730.40 – Due to APM within 5 business days after the last briefing or interview as defined in Task 7.2 – Public Involvement and Communications Plan | 82 |
| 18730.50 – Due to APM within 5 business days after receipt of Agency comments | 82 |
| Task 7.3.6 – Website [18660] | 82 |
| Task 7.3.7 – Social Media Content [18670] | 83 |
| Task 7.3.8 – Advertising and Advertising Plan [18780] | 83 |
| Task 7.3.8.1 – Radio Advertisements [18790] [Contingency Task] | 85 |
| Task 7.3.8.2 – Radio Advertisements [18790] [RESERVED] | 85 |
| Task 7.4 – Media Releases [18680] | 85 |
| Task 7.4.1 – Open House and Public Event [18690] | 86 |
| Task 7.4.2 – Online Open House [18700] | 87 |
| Task 7.4.3 – Project Area Canvassing [18720] | 89 |
| Task 7.5 – Soundwall, Noise Study and Noise Variance Outreach [18740] | 90 |
| Task 7.6 – Access Management Outreach [18750] [RESERVED] | 91 |
| Task 7.7 – Public Involvement Summary Report [18760] | 91 |
| Task 7.8 – Public Comment Response [18770] | 91 |
| Task 7.9 – Community Advisory Committee (“CAC”) [18810] [RESERVED] | 92 |
| Task 7.10 – Community Engagement Liaison Services [18820] [RESERVED] | 92 |
| Task 7.11 – Public Involvement Design Coordination [18830] | 92 |
| Task 7.12 – Public Involvement – Public Information – Public Engagement Quality Reviews [18840] | 92 |
| Task 8 – Utilities Coordination [19010] | 92 |
| Task 8.1 – Utility Location and Coordination [19020] | 93 |
| Task 8.2 – Utility Report [19030] | 94 |
| Task 8.2.1 – National Environmental Policy Act (“NEPA”) Utilities Technical Memorandum or Report for EA and EIS Projects [19040] [RESERVED] | 94 |
| Task 8.3 – Utility Coordination Meetings [19050] | 94 |
| Task 8.4 – Utility Relocations [19060] | 95 |
| Task 8.4.1 – Utility Notices [19070] | 95 |
| Task 8.4.2 – Utility Constraints Notice [19080] | 96 |
| Task 8.4.3 – Review Utility Relocation Plans and Relocation Time Requirement Letters [19090] | 96 |
| Task 8.4.4 – Master Relocation Plan [19095] [RESERVED] | 97 |
| Task 8.5 – Utility Reimbursement [19100] RESERVED] | 97 |
| Task 8.5.2 – Contract with Utility for Reimbursement [RESERVED] | 97 |
| Task 8.5.3 – Reimbursable Utility Agreement [RESERVED] | 97 |
| Task 8.5.4 – Utility Billing Review, Approval, and Payment Recommendation [19150] | 97 |
| Task 8.6 – Add Work Agreements [19130] | 98 |
| Task 8.7 – Utility Special Provisions [19160] | 98 |
| Task 8.8 – Utility Certification [19170] | 99 |
| Task 8.9 – Utilities Design Coordination [19180] | 99 |
| Task 8.10 – Utilities Coordination Quality Reviews [19190] | 100 |
| Task 9 – Geotechnical, Geologic, and Hazardous Materials Services [20010] [RESERVED] | 100 |
| Task 10 – Pavement Design Services [21010] [RESERVED] | 100 |
| Task 11 – Hydraulics and Stormwater [22010] [RESERVED] | 100 |
| Task 12 – Roadway Design [23010][RESERVED] | 100 |
| Task 13 - Railroad Coordination and Support [24010] | 100 |
| Task 13.1 – Railroad Coordination and Correspondence [24020] | 101 |
| Task 13.1.1 - On-site Field Diagnostic Review [24030] [RESERVED] | 101 |
| Task 13.2 – Railroad Notice to Proceed [RESERVED] | 101 |
| Task 13.3 – Railroad Design [24050] | 101 |
| Task 13.3.1 – Railroad Design Quality Review [24060] | 103 |
| Task 13.4 – ODOT Railroad Crossing Order Application [24070] [Contingency Task] | 104 |
| Task 13.5 – Construction and Maintenance Agreement (“C&M”) [24080] [RESERVED] | 104 |
| Task 13.6 – Railroad Design Coordination [24090] | 104 |
| Task 13.7 – Railroad Design Quality Reviews [24100] | 104 |
| Task 14 – Bridges and Structures Design [24210] | 105 |
| Task 14.1 – Bridge Design [24220] [RESERVED] | 105 |
| Task 14.1.1 – Bridge Design Verification Package [24230] | 105 |
| Task 14.1.2 – Bridge Design Acceptance Package (“DAP”) Design Phase [24260] | 107 |
| Task 14.1.3 – Bridge Plans, Specifications, and Estimate (“PS&E”) Design [24330] | 110 |
| Task 14.2 – Retaining Wall Design [24420] [RESERVED] | 116 |
| Task 14.2.1 – Retaining Wall DVP Design [24430] [RESERVED] | 116 |
| Task 14.2.2 – Retaining Wall DAP Design Phase [24460] [RESERVED] | 116 |
| Task 14.2.3 – Retaining Wall PS&E Design [24510] [RESERVED] | 116 |
| Task 14.3 – Sound Wall Design [24590] [RESERVED] | 116 |
| Task 14.3.1 – Sound Wall DVP Design [24600] [RESERVED] | 116 |
| Task 14.3.2 – Sound Wall DAP Design Phase [24630] [RESERVED] | 116 |
| Task 14.3.3 – Sound Wall PS&E Design [24680] [RESERVED] | 116 |
| Task 14.3.3.3 – Sound Wall Final Design [24710] [RESERVED] | 116 |
| Task 14.4 – Traffic Structures Design [24760] [RESERVED] | 117 |
| Task 14.4.1 – Traffic Structures DVP Design [24770] [RESERVED] | 117 |
| Task 14.4.2 – Traffic Structures DAP Design Phase [24800] [RESERVED] | 117 |
| Task 14.4.3 – Traffic Structures PS&E Design [24850] [RESERVED] | 117 |
| Task 14.5 – Culvert Structure Design [24930] [RESERVED] | 117 |
| Task 14.5.1 – Culvert DVP Design [24940] [RESERVED] | 117 |
| Task 14.5.2 – Culvert DAP Design Phase [24970] [RESERVED] | 118 |
| Task 14.5.3 – Culvert PS&E Design [25020] [RESERVED] | 118 |
| Task 14.6 – [RESERVED] | 118 |
| Task 14.7 – [RESERVED] | 118 |
| Task 14.8 – Major Bridge Inspections [25100] | 118 |
| Task 14.8.1 – Inspection Coordination and Closeout [25110] | 118 |
| Task 14.8.2 – Access Plan and Traffic Control [25140] | 119 |
| Task 14.8.3 – Inspections [25150] [Contingency Task] | 121 |
| Task 14.8.4 – Inspection Reports [25200] [Contingency Task] | 125 |
| Task 14.8.5 – Additional Bridge Inspection Services [25280] | 129 |
| Task 14.8.6 – Major Bridge Inspections Quality Reviews [25330] | 130 |
| Task 15 – Intelligent Transportation Systems (“ITS”) [RESERVED] | 132 |
| Task 16 – Traffic Engineering and Management [26010] | 132 |
| Task 16.1 – Transportation Analysis [26020] | 132 |
| Task 16.1.1 – Plans and Policies Review [26030] | 132 |
| Task 16.1.2 – Methodology and Assumptions Technical Memorandum [26040] | 133 |
| Task 16.1.3 – Evaluation of Existing Conditions [26050] | 133 |
| Task 16.1.4 – Future Year Background Traffic Analysis [26090] | 137 |
| Task 16.1.5 – Concept Development and Evaluation [26100] | 138 |
| Task 16.1.6 – Traffic Analysis Report [26140] | 141 |
| Task 16.1.7 – Transportation Analysis Coordination [26150] | 142 |
| Task 16.1.8 – Transportation Analysis Quality Reviews [26160] | 142 |
| Task 16.2 – Code Refinement and Adoption [26170] [RESERVED] | 143 |
| Task 16.2.1 – Code Refinement and Adoption Coordination [26180] [RESERVED] | 143 |
| Task 16.2.2 – Code Refinement and Adoption Quality Reviews [26190][RESERVED] | 143 |
| Task 16.3 – State and Region Traffic Engineer Approval Requests [26200] | 143 |
| Task 16.3.1 – State Traffic-Roadway Engineer (“STRE”) Approvals [26210] | 143 |
| Task 16.3.2 – Region Traffic Engineer (“RTE”) Approvals [26220] | 144 |
| Task 16.3.3 – State and Region Traffic Engineer Approval Requests Coordination [26230] | 145 |
| Task 16.3.4 – State and Region Traffic Engineer Approval Requests Quality Reviews [26240] | 146 |
| Task 16.4 – Access Management [26250] | 146 |
| Task 16.4.1 – Official Project Access List (“OPAL”) [26260] | 146 |
| Task 16.4.2A – Access Management Methodology [26270] | 146 |
| Task 16.4.2B – Access Management Methodology [26270] | 147 |
| Task 16.4.3 – Access Management Methodology Letters [26280] | 147 |
| Task 16.4.4 – Access Approach Decisions [26290] | 148 |
| Task 16.4.5 – [RESERVED] [26300] | 148 |
| Task 16.4.6 – Access Management Meetings with Affected Property Owners [26310] | 148 |
| Task 16.4.7 – Access Management Strategy (“AMStrat”) [26320] | 149 |
| Task 16.4.8 – Final Access Approach Modification, Relocation, and Closure Letters [26330] | 149 |
| Task 16.4.9 – Access Management Strategy Exemption [RESERVED] [26340] | 150 |
| Task 16.4.10 – Access Management Coordination [26350] [RESERVED] | 150 |
| Task 16.4.11 – Access Management Quality Reviews [26360] [RESERVED] | 150 |
| Task 16.5 – Transportation Management Plan (“TMP”) [26370] | 150 |
| Task 16.5.1 – Work Zone Traffic Analysis and Documentation [26380] | 151 |
| Task 16.5.2 – Work Zone Decision Tree [26390] [RESERVED] | 151 |
| Task 16.5.3 – Mobility Considerations Checklist [26400] | 151 |
| Task 16.5.4 – TMP Coordination [26410] | 152 |
| Task 16.5.5 – TMP Quality Reviews [26420] | 152 |
| Task 16.6 –Work Zone Traffic Control Plans (“TCP”) [26430] | 153 |
| Task 16.6.1 –TCP DAP Design [26440] | 153 |
| Task 16.6.2 – TCP PS&E Design [26450] | 154 |
| Task 16.6.2.3 – TCP Final Design [26480] | 154 |
| Task 16.6.2.4 – TCP Final PS&E Design [26490] | 155 |
| Task 16.6.3 – Work Zone TCP Coordination [26500] | 155 |
| Task 16.6.4 – Work Zone TCP Design Quality Review [26510] | 155 |
| Task 16.7 – [RESERVED] | 157 |
| Task 16.8 – Traffic Signal Design [26610] [RESERVED] | 157 |
| Task 16.8.1 – Traffic Signal DAP Design [26620] [RESERVED] | 157 |
| Task 16.8.2 – Traffic Signal PS&E Design [26630] [RESERVED] | 157 |
| Task 16.8.3 – Traffic Signal Design Coordination [26680] [RESERVED] | 157 |
| Task 16.8.4 – Traffic Signal Design Quality Review [26690] [RESERVED] | 157 |
| Task 16.9 – Traffic Signal Interconnect Design [26700] [RESERVED] | 157 |
| Task 16.9.1 – Traffic Signal Interconnect DAP Design [26710] [RESERVED] | 157 |
| Task 16.9.2 – Traffic Signal Interconnect PS&E Design [26720] [RESERVED] | 157 |
| Task 16.9.3 – Traffic Signal Interconnect Design Coordination [26770] [RESERVED] | 157 |
| Task 16.9.4 – Traffic Signal Interconnect Design Quality Review [26780] [RESERVED] | 157 |
| Task 16.10 – Sign Design [26790] [RESERVED] | 157 |
| Task 16.10.1 – Sign DAP Design [26800] [RESERVED] | 157 |
| Task 16.10.2 – Sign PS&E Design [26810] [RESERVED] | 157 |
| Task 16.10.3 – Sign Design Coordination [26860] [RESERVED] | 157 |
| Task 16.10.4 – Sign Design Quality Review [26870] [RESERVED] | 157 |
| Task 16.11 – Pavement Marking Design [26880] [RESERVED] | 157 |
| Task 16.11.1 – Pavement Marking DAP Design [26890] [RESERVED] | 157 |
| Task 16.11.2 – Pavement Marking PS&E Design [26900] [RESERVED] | 158 |
| Task 16.11.3 – Pavement Marking Design Coordination [26950] [RESERVED] | 158 |
| Task 16.11.4 – Pavement Marking Design Quality Review [26960] [RESERVED] | 158 |
| Task 16.12 – Illumination Design [26970] [RESERVED] | 158 |
| Task 16.12.1 – Illumination DAP Design [26980] [RESERVED] | 158 |
| Task 16.12.2 – Illumination PS&E Design [26990] [RESERVED] | 158 |
| Task 16.12.3 – Illumination Design Coordination [27040] [RESERVED] | 158 |
| Task 16.12.4 – Illumination Design Quality Review [27050] [RESERVED] | 158 |
| Task 16.13 – National Environmental Policy Act (“NEPA”) Traffic and Transportation Technical Memorandum or Report for EA or EIS Projects [27060] [RESERVED] | 158 |
| Task 16.13.1 – NEPA Traffic and Transportation Technical Memorandum or Report Coordination [27070] [RESERVED] | 158 |
| Task 16.13.2 – NEP Traffic and Transportation Technical Memorandum or Report for EA or EIS Projects Quality Reviews [27080] [RESERVED] | 158 |
| Task 17 – Erosion and Sediment Control [28010] [RESERVED] | 158 |
| Task 18 – Roadside Development [28510] [RESERVED] | 158 |
| Task 19 – Right of Way (“ROW”) | 158 |
| Task 19.1 – NEPA ROW Technical Memorandum or Report for EA and EIS Projects [29020] [RESERVED] | 158 |
| 19.2 – ROW Services Administration [29030] | 158 |
| Task 19.2.1 – ROW Existing Information [RESERVED] | 159 |
| Task 19.2.2 - ROW Process Coordination [29050] | 159 |
| Task 19.2.3 - ROW Information Tracking System (“RITS”) Management [29060] | 160 |
| Task 19.2.4 - ROW Schedule [29070] | 160 |
| Task 19.2.5 - ROW Meetings [29080] | 161 |
| Task 19.3 – ROW Cost Estimating, Programming Estimate, Access Management, Title Reports, and ROW Setting [29090] | 161 |
| Task 19.4 – Rights of Entry [29100] | 163 |
| Task 19.5 – ROW Authorization [RESERVED] | 163 |
| Task 19.6 – General Information Notice (“GIN”) [29120] | 163 |
| Task 19.7 – Real Estate Appraisals [29130] | 164 |
| Task 19.8 – Document Requests and Subject To Requests [29140] | 165 |
| Task 19.9 – Offer and Negotiation [29150] | 166 |
| Task 19.10 – Relocation [29160] [RESERVED] | 168 |
| Task 19.11 – ROW Condemnation Support [29170] | 168 |
| Task 19.12 – Closings [29180] | 168 |
| Task 19.13 – Certification [29190] | 169 |
| Task 19.14 – Project-Related Property Management [29200] [RESERVED] | 170 |
| Task 19.15 – ROW Coordination During Construction [29210] | 170 |
| Task 19.16 – ROW Design Coordination [29220] | 171 |
| Task 19.17 – ROW Design Quality Reviews [29230] | 171 |
| Task 20 – Design Acceptance Package (“DAP”) [30010] | 171 |
| Task 20.1 – Design Verification Package (“DVP”) [30020] | 172 |
| Task 20.2 – Draft DAP [30030] | 172 |
| Task 20.2.1 – DAP Narrative [30040] | 172 |
| Task 20.2.2 – Design Exception Requests [30070] | 173 |
| Task 20.3 – Final DAP [30080] | 174 |
| Task 20.4 – Certification of Design Acceptance with DAP checklist [RESERVED] | 175 |
| Task 20.5 – DAP Exception Letter [30100] [Contingency Task] | 175 |
| Task 20.6 – DAP Quality Reviews [30110] | 175 |
| Task 20.7 – Phase Gate Quality Assurance [RESERVED] | 176 |
| Task 21 – Plans, Specifications and Estimate (“PS&E”) [31010] | 176 |
| Task 21.1 – Preliminary Plans package [31020] | 177 |
| Task 21.2 – Advance Plans package [31030] | 178 |
| Task 21.2.1 – Letters of Public Interest Finding [31040] [Contingency Task] | 179 |
| Task 21.3 – Final Design package [31050] | 179 |
| Task 21.3.1 – Final PS&E Package Provided by ODOT [RESERVED] | 180 |
| Task 21.4 – Phase Gate Quality Assurance [RESERVED] | 180 |
| Task 21.5 – PS&E Submittal Package [31090] | 180 |
| Task 21.6 –eBIDS Handoff Package [31100] | 180 |
| Task 21.7 –Construction Survey handoff [31110] | 181 |
| Task 21.8 – PS&E Quality Reviews [31120] | 181 |
| Task 22 - Bid and Award assistance [32010] | 182 |
| Task 22.1 – Pre-bid Meeting [RESERVED] | 182 |
| Task 22.2 – Questions During Bidding [32030] | 182 |
| Schedule | 183 |
| Task 22.3 – Addenda to the Bid Documents [32050] [Contingency Task] , | 183 |
| Task 22.4 – Bid and Award Assistance Quality Reviews [32060] | 184 |
| Task 1 – Project Management [11010] | 1 |
| Task 1.1 – Project Management and Coordination [11020] | 1 |
| Task 1.2 – Progress Reports and Invoices [11030] | 2 |
| Task 1.3 – Project Schedule and Schedule Updates [11040] | 2 |
| Task 1.4 – Meetings [11050] | 3 |
| Task 1.4.1 – Kick-off Meeting [11060] | 4 |
| Task 1.4.2 – Project Development Team (“PDT”) Meetings [11070] | 4 |
| Task 1.4.3 – Project Coordination Meetings [11080] | 5 |
| Task 1.4.4 – Project Subteam Meetings [11090] | 5 |
| Task 1.4.5 – Project Site Visit Meetings [11100] | 7 |
| Task 1.4.6A – Mobility Advisory Committee Meetings ("MAC”) [11110] [RESERVED] | 8 |
| Task 1.4.6B – Mobility Advisory Committee Meetings (“MAC”) [11110] | 8 |
| Task 1.4.7 – Design Verification Workshop (“DVW”) [11120] | 9 |
| Task 1.4.8 – Cost Risk Assessment (“CRA”) [11130] | 10 |
| Task 1.4.9 – Design Acceptance Workshop (“DAW”) [11180] | 13 |
| Task 1.4.10 – Preliminary Plans Review Meeting [11190] | 14 |
| Task 1.4.11 – Advance Plans Review Meeting [11200] | 14 |
| Task 1.4.12 – Final Plans Review Meeting [11210] | 15 |
| Task 1.4.13 – Pre-PS&E Package Submittal Meeting [11220] | 16 |
| Task 1.4.14 –PS&E Review Meetings [11230] | 16 |
| Task 1.5 – Construction Support [11250] | 17 |
| Task 1.6 – Risk Management [11260] | 18 |
| Task 1.6.1 – Risk Management Plan [11270] | 18 |
| Task 1.6.2 – Monitoring and Controlling Project Risks [11280] | 19 |
| Task 1.7 – VE Study [11290] | 21 |
| Task 1.7.1 – Pre-VE Workshop [11300] | 22 |
| Task 1.7.2 – VE Workshop [11310] | 22 |
| Task 1.7.3 – VE Report [11320] | 23 |
| Task 1.7.4 – VE Implementation Meeting [11330] | 23 |
| Task 1.7.5 – VE Study Findings Analysis [11340] | 24 |
| Task 1.7.6 – Additional SME(s) for VE workshop [11350] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 24 |
| Task 1.8 – Construction Risk Management Transition [11360] | 25 |
| Task 1.9 – Quality Assurance/Quality Control [11370] | 26 |
| Task 1.9.1 – Quality Assurance [RESERVED] | 26 |
| Task 1.9.2 – QA/QC Quality Reviews [11390] | 26 |
| Task 2 – Project Initiation [12010] | 27 |
| Task 2.1 – Consultant SOW Development and Review [RESERVED] | 27 |
| Task 2.2 – Intergovernmental Agreements [RESERVED] | 27 |
| Task 2.3 – Project Charter [RESERVED] | 27 |
| Task 2.4 – Draft Change Management Request (Zero-CMR) [RESERVED] | 27 |
| Task 2.5 – Project Initiation Package [12060] RESERVED] | 27 |
| Task 2.6 – Project Initiation Quality Reviews [12070] RESERVED] | 27 |
| Task 2.7 – Project Initiation Region Phase Gate [RESERVED][RESERVED] | 28 |
| Task 2.8 – Phase Gate Quality Assurance [RESERVED][RESERVED] | 28 |
| Task 3 – Planning Services [13010] [RESERVED][RESERVED] | 28 |
| Task 4 – Scoping [14010] RESERVED] | 28 |
| Task 4.1 – Scoping [14020] RESERVED] | 28 |
| Task 4.1.1 – Scoping Team Coordination [14030] RESERVED] | 28 |
| Task 4.1.2 – Scoping Packet [14040] RESERVED] | 28 |
| Task 4.1.3 – Project Scoping [14050] RESERVED] | 29 |
| Task 4.1.4 – Project Re-scoping [14080] RESERVED] | 30 |
| Task 4.2 – Project Selection [RESERVED] | 31 |
| Task 4.3 – STIP Adoption [RESERVED] | 31 |
| Task 4.4 – Scoping Quality Reviews [14130] RESERVED] | 31 |
| Task 5 – Survey [15010] [Contingency Task] | 32 |
| Task 5.1 – Project Control [15020] [Contingency Task] | 33 |
| Task 5.2 – Control, Recovery, and Retracement (“CRR”) [15030] [Contingency Task] | 34 |
| Task 5.2.1– Survey Filing Map (“SFM”) [15040] [Contingency Task] | 35 |
| Task 5.3 – Topographic Data and Basemap [15050] [Contingency Task] | 35 |
| Task 5.3.1 – Survey Project Initiation [15060] [Contingency Task] | 37 |
| Task 5.4 – [RESERVED] | 37 |
| Task 5.5 – Monumentation Surveys [15080] [Contingency Task] | 37 |
| Task 5.6 – Right of Way (“ROW”) Engineering (Mapping and Descriptions) [15090] [Contingency Task] | 38 |
| Task 5.6.1 – Proposed ROW Design and Layout [15100] [Contingency Task] | 38 |
| Task 5.6.2 – Active ROW Acquisition Map [15110] [Contingency Task] | 38 |
| Task 5.6.3 – ROW Addendum, Descriptions, and Sketch Maps [15120] [Contingency Task] | 39 |
| Task 5.6.4 – ROW Descriptions Revisions due to Project Scope Changes [15125][RESERVED] | 40 |
| Task 5.6.5 – Railroad Exhibit Maps [15130] [Contingency Task] | 40 |
| Task 5.6.6 – Forest Service Plat Maps [15140] [RESERVED] | 41 |
| Task 5.6.7 – Bureau of Land Management (“BLM”) Plat Maps [15150] [RESERVED] | 42 |
| Task 5.7 – Staking [15160] [Contingency Task] | 42 |
| Task 5.8 – Pre-Construction Survey [15170] [Contingency Task] | 43 |
| Task 5.9 – Survey Design Coordination [15180] | 43 |
| Task 5.10 – Survey Quality Reviews [15190] | 44 |
| Task 6 – Environmental Services [15310] | 44 |
| Task 6.1 – Pre-National Environmental Policy Act (“NEPA”) and Planning and Environment Linkages (“PEL”) Activities [15320] ] [RESERVED] | 44 |
| Task 6.2 – NEPA - Categorical Exclusion (“CE”) or Programmatic CE (“PCE”) Documentation [15360] ] [RESERVED] | 44 |
| Task 6.5 – Land Use (includes Coastal Zone, Farmland, and Wild and Scenic Rivers) [15730] [RESERVED] | 44 |
| Task 6.6 – Environmental Justice (“EJ”) [15800] [RESERVED] | 45 |
| Task 6.7 – Socioeconomic Analysis [15850] [RESERVED] | 45 |
| Task 6.8 – Parks and Recreation Resources [15890] [RESERVED] | 45 |
| Task 6.9 – Historic Resources [16100] [RESERVED] | 45 |
| Task 6.10 – Cultural Resources – Archaeology [16210] [RESERVED] | 45 |
| Task 6.11 – Visual/Aesthetics [16440] [RESERVED] | 45 |
| Task 6.12 – Wetlands and Waters Delineation, and Permitting Services [16510] [RESERVED] | 45 |
| Task 6.13 – Biological Services [16680] [RESERVED] | 45 |
| Task 6.14 – Air Quality [16920] | 45 |
| Task 6.14.1 – Air Quality Assessments for Categorical Exclusion Project [16930] | 45 |
| Task 6.14.2 – Air Quality for Environmental Impact Statements (“EIS’s”) or Environmental Assessments (“EA’s”) [17050] [RESERVED] | 58 |
| Task 6.14.3 – Energy Analysis [17210] [RESERVED] | 82 |
| Task 6.14.4 – Air Quality Coordination [17230] | 83 |
| Task 6.14.5 – Air-Quality Quality Reviews [17240] | 83 |
| Task 6.15 – Noise Studies and Variances [17250] [RESERVED] | 84 |
| Task 6.15.1 – Screening Analysis for Traffic Noise Impacts [17260] [RESERVED] | 84 |
| Task 6.15.2 – Field Investigation and Data Gathering for NTR [17270] [RESERVED] | 85 |
| Task 6.15.3 – Noise Model Verification: Compare Measured-to-Predicted (Modeled) Noise Values [17280] [RESERVED] | 86 |
| Task 6.15.4 – Traffic Noise Impact Analysis and Mitigation Consideration [17290] [RESERVED] | 87 |
| Task 6.15.5 – Noise Technical Report (“NTR”) [17300] [RESERVED] | 88 |
| Task 6.15.6 – Final Noise Wall Height and Location Analysis [17350] [RESERVED] | 93 |
| Task 6.15.7 – Noise Variances [17360] | 96 |
| Task 6.15.8 – Noise Studies and Variances Coordination [17420] | 100 |
| Task 6.15.9 – Noise Studies and Variances Quality Reviews [17430] | 101 |
| Task 7 – Public Involvement – Public Information – Public Engagement [18510] [Contingency Task] | 101 |
| Task 7.1 –Public Hearing [18520] [RESERVED] | 102 |
| Task 7.2 – Public Involvement and Communications Plan [18530] | 103 |
| Task 7.2.1 – Public Involvement Kickoff Strategy Meeting [18540] | 104 |
| Task 7.2.2 – Stakeholder Database and Communications Log [18550] | 105 |
| Task 7.3 – Communications Materials | 106 |
| Task 7.3.1 – Graphics [18570] | 106 |
| Task 7.3.1.2 – Display Boards [18650] | 106 |
| Task 7.3.2 – Outreach Materials: Project Fact Sheets, Newsletters, Fliers, and Stakeholder Emails [18580] | 107 |
| Task 7.3.3 – Translation of Outreach Materials and Content [18630] | 110 |
| Task 7.3.4 – Interpretation Services [18640] | 110 |
| Task 7.3.5 – Small Group Briefings, One-on-One Briefings, and Stakeholder Interviews [18730] | 111 |
| 18730.10 – Due to APM at least 15 business days before the first briefing or interview | 112 |
| 18730.20 – Due to APM within 5 business days after receipt of Agency comments | 112 |
| 18730.30 – Due to APM at least 5 business days before the first briefing or interview as defined in Task 7.2 – Public Involvement and Communications Plan | 112 |
| 18730.40 – Due to APM within 5 business days after the last briefing or interview as defined in Task 7.2 – Public Involvement and Communications Plan | 112 |
| 18730.50 – Due to APM within 5 business days after receipt of Agency comments | 112 |
| Task 7.3.6 – Website [18660] | 112 |
| Task 7.3.7 – Social Media Content [18670] | 113 |
| Task 7.3.8 – Advertising and Advertising Plan [18780] | 113 |
| Task 7.3.8.1 – Radio Advertisements [18790] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 115 |
| Task 7.3.8.2 – Radio Advertisements [18790] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 115 |
| Task 7.4 – Media Releases [18680] | 116 |
| Task 7.4.1 – Open House and Public Event [18690] | 117 |
| Task 7.4.2 – Online Open House [18700] | 118 |
| Task 7.4.3 – Project Area Canvassing [18720] | 119 |
| Task 7.5 – Soundwall, Noise Study and Noise Variance Outreach [18740] | 120 |
| Task 7.6 – Access Management Outreach [18750] [RESERVED] | 121 |
| Task 7.7 – Public Involvement Summary Report [18760] | 122 |
| Task 7.8 – Public Comment Response [18770] | 122 |
| Task 7.9 – Community Advisory Committee (“CAC”) [18810] [RESERVED] | 122 |
| Task 7.10 – Community Engagement Liaison Services [18820] [RESERVED] | 124 |
| Task 7.11 – Public Involvement Design Coordination [18830] | 124 |
| Task 7.12 – Public Involvement – Public Information – Public Engagement Quality Reviews [18840] | 125 |
| Task 8 – Utilities Coordination [19010] | 125 |
| Task 8.1 – Utility Location and Coordination [19020] | 125 |
| Task 8.2 – Utility Report [19030] | 126 |
| Task 8.2.1 – National Environmental Policy Act (“NEPA”) Utilities Technical Memorandum or Report for EA and EIS Projects [19040] [RESERVED] | 127 |
| Task 8.3 – Utility Coordination Meetings [19050] | 128 |
| Task 8.4 – Utility Relocations [19060] | 129 |
| Task 8.4.1 – Utility Notices [19070] | 129 |
| Task 8.4.2 – Utility Constraints Notice [19080] | 129 |
| Task 8.4.3 – Review Utility Relocation Plans and Relocation Time Requirement Letters [19090] | 130 |
| Task 8.4.4 – Master Relocation Plan [19095] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 131 |
| Task 8.5 – Utility Reimbursement [19100] [Contingency Task, see Section F] mark as [RESERVED] and delete the sub-paragraph text if not needed | 131 |
| Task 8.5.1 – Reimbursement Review and Package [19110] | 131 |
| Task 8.5.2 – Contract with Utility for Reimbursement [RESERVED] | 132 |
| Task 8.5.3 – Reimbursable Utility Agreement [RESERVED] | 132 |
| Task 8.5.4 – Utility Billing Review, Approval, and Payment Recommendation [19150] | 132 |
| Task 8.6 – Add Work Agreements [19130] | 133 |
| Task 8.7 – Utility Special Provisions [19160] | 133 |
| Task 8.8 – Utility Certification [19170] | 134 |
| Task 8.9 – Utilities Design Coordination [19180] | 134 |
| Task 8.10 – Utilities Coordination Quality Reviews [19190] | 135 |
| Task 9 – Geotechnical, Geologic, and Hazardous Materials Services [20010] [RESERVED] | 135 |
| Task 10 – Pavement Design Services [21010] [RESERVED] | 135 |
| Task 11 – Hydraulics and Stormwater [22010] [RESERVED] | 135 |
| Task 12 – Roadway Design [23010][RESERVED] | 135 |
| Task 13 - Railroad Coordination and Support [24010] | 135 |
| Task 13.1 – Railroad Coordination and Correspondence [24020] | 136 |
| Task 13.1.1 - On-site Field Diagnostic Review [24030] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 136 |
| Task 13.2 – Railroad Notice to Proceed [RESERVED] | 137 |
| Task 13.3 – Railroad Design [24050] | 137 |
| Task 13.3.1 – Railroad Design Quality Review [24060] | 139 |
| Task 13.4 – ODOT Railroad Crossing Order Application [24070] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 139 |
| Task 13.5 – Construction and Maintenance Agreement (“C&M”) [24080] [RESERVED] | 141 |
| Task 13.6 – Railroad Design Coordination [24090] | 141 |
| Task 13.7 – Railroad Design Quality Reviews [24100] | 141 |
| Task 14 – Bridges and Structures Design [24210] | 141 |
| Task 14.1 – Bridge Design [24220] [RESERVED] | 141 |
| Task 14.1.1 – Bridge Design Verification Package [24230] | 143 |
| Task 14.1.2 – Bridge Design Acceptance Package (“DAP”) Design Phase [24260] | 145 |
| Task 14.1.3 – Bridge Plans, Specifications, and Estimate (“PS&E”) Design [24330] | 150 |
| Task 14.2 – Retaining Wall Design [24420] [RESERVED] | 155 |
| Task 14.2.1 – Retaining Wall DVP Design [24430] [RESERVED] | 155 |
| Task 14.2.2 – Retaining Wall DAP Design Phase [24460] [RESERVED] | 156 |
| Task 14.2.3 – Retaining Wall PS&E Design [24510] [RESERVED] | 159 |
| Task 14.3 – Sound Wall Design [24590] [RESERVED] | 162 |
| Task 14.3.1 – Sound Wall DVP Design [24600] [RESERVED] | 162 |
| Task 14.3.2 – Sound Wall DAP Design Phase [24630] [RESERVED] | 163 |
| Task 14.3.3 – Sound Wall PS&E Design [24680] [RESERVED] | 165 |
| Task 14.3.3.3 – Sound Wall Final Design [24710] [RESERVED] | 166 |
| Task 14.4 – Traffic Structures Design [24760] [RESERVED] | 168 |
| Task 14.4.1 – Traffic Structures DVP Design [24770] [RESERVED] | 169 |
| Task 14.4.2 – Traffic Structures DAP Design Phase [24800] [RESERVED] | 170 |
| Task 14.4.3 – Traffic Structures PS&E Design [24850] [RESERVED] | 172 |
| Task 14.5 – Culvert Structure Design [24930] [RESERVED] | 175 |
| Task 14.5.1 – Culvert DVP Design [24940] [RESERVED] | 175 |
| Task 14.5.2 – Culvert DAP Design Phase [24970] [RESERVED] | 177 |
| Task 14.5.3 – Culvert PS&E Design [25020] [RESERVED] | 179 |
| Task 14.6 – [RESERVED] | 182 |
| Task 14.7 – [RESERVED] | 182 |
| Task 14.8 – Major Bridge Inspections [25100] | 182 |
| Task 14.8.1 – Inspection Coordination and Closeout [25110] | 182 |
| Task 14.8.2 – Access Plan and Traffic Control [25140] | 183 |
| Task 14.8.3 – Inspections [25150] [Contingency Task] | 185 |
| Task 14.8.4 – Inspection Reports [25200] [Contingency Task] | 189 |
| Task 14.8.5 – Additional Bridge Inspection Services [25280] | 194 |
| Task 14.8.6 – Major Bridge Inspections Quality Reviews [25330] | 195 |
| Task 15 – Intelligent Transportation Systems (“ITS”) [RESERVED] | 197 |
| Task 16 – Traffic Engineering and Management [26010] | 197 |
| Task 16.1 – Transportation Analysis [26020] | 197 |
| Task 16.1.1 – Plans and Policies Review [26030] | 197 |
| Task 16.1.2 – Methodology and Assumptions Technical Memorandum [26040] | 198 |
| Task 16.1.3 – Evaluation of Existing Conditions [26050] | 199 |
| Task 16.1.4 – Future Year Background Traffic Analysis [26090] | 202 |
| Task 16.1.5 – Concept Development and Evaluation [26100] | 203 |
| Task 16.1.6 – Traffic Analysis Report [26140] | 206 |
| Task 16.1.7 – Transportation Analysis Coordination [26150] | 207 |
| Task 16.1.8 – Transportation Analysis Quality Reviews [26160] | 207 |
| Task 16.2 – Code Refinement and Adoption [26170] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text (and all subparagraphs) if not needed | 208 |
| Task 16.2.1 – Code Refinement and Adoption Coordination [26180] | 209 |
| Task 16.2.2 – Code Refinement and Adoption Quality Reviews [26190] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text (and all subparagraphs) if not needed | 209 |
| Task 16.3 – State and Region Traffic Engineer Approval Requests [26200] | 210 |
| Task 16.3.1 – State Traffic-Roadway Engineer (“STRE”) Approvals [26210] | 210 |
| Task 16.3.2 – Region Traffic Engineer (“RTE”) Approvals [26220] | 211 |
| Task 16.3.3 – State and Region Traffic Engineer Approval Requests Coordination [26230] | 212 |
| Task 16.3.4 – State and Region Traffic Engineer Approval Requests Quality Reviews [26240] | 212 |
| Task 16.4 – Access Management [26250] | 213 |
| Task 16.4.1 – Official Project Access List (“OPAL”) [26260] | 213 |
| Task 16.4.2A – Access Management Methodology [26270] | 213 |
| Task 16.4.2B – Access Management Methodology [26270] | 213 |
| Task 16.4.3 – Access Management Methodology Letters [26280] | 214 |
| Task 16.4.4 – Access Approach Decisions [26290] | 214 |
| Task 16.4.5 – [RESERVED] [26300] | 215 |
| Task 16.4.6 – Access Management Meetings with Affected Property Owners [26310] | 215 |
| Task 16.4.7 – Access Management Strategy (“AMStrat”) [26320] | 215 |
| Task 16.4.8 – Final Access Approach Modification, Relocation, and Closure Letters [26330] | 216 |
| Task 16.4.9 – Access Management Strategy Exemption [RESERVED] [26340] | 216 |
| Task 16.4.10 – Access Management Coordination [26350] [RESERVED] | 216 |
| Task 16.4.11 – Access Management Quality Reviews [26360] [RESERVED] | 217 |
| Task 16.5 – Transportation Management Plan (“TMP”) [26370] | 217 |
| Task 16.5.1 – Work Zone Traffic Analysis and Documentation [26380] | 218 |
| Task 16.5.2 – Work Zone Decision Tree [26390] [RESERVED] | 219 |
| Task 16.5.3 – Mobility Considerations Checklist [26400] | 219 |
| Task 16.5.4 – TMP Coordination [26410] | 220 |
| Task 16.5.5 – TMP Quality Reviews [26420] | 220 |
| Task 16.6 –Work Zone Traffic Control Plans (“TCP”) [26430] | 221 |
| Task 16.6.1 –TCP DAP Design [26440] | 221 |
| Task 16.6.2 – TCP PS&E Design [26450] | 222 |
| Task 16.6.2.3 – TCP Final Design [26480] | 222 |
| Task 16.6.2.4 – TCP Final PS&E Design [26490] | 223 |
| Task 16.6.3 – Work Zone TCP Coordination [26500] | 223 |
| Task 16.6.4 – Work Zone TCP Design Quality Review [26510] | 223 |
| Task 16.7 – [RESERVED] | 224 |
| Task 16.8 – Traffic Signal Design [26610] [RESERVED] | 224 |
| Task 16.8.1 – Traffic Signal DAP Design [26620] [RESERVED] | 224 |
| Task 16.8.2 – Traffic Signal PS&E Design [26630] [RESERVED] | 225 |
| Task 16.8.3 – Traffic Signal Design Coordination [26680] [RESERVED] | 227 |
| Task 16.8.4 – Traffic Signal Design Quality Review [26690] [RESERVED] | 227 |
| Task 16.9 – Traffic Signal Interconnect Design [26700] [RESERVED] | 228 |
| Task 16.9.1 – Traffic Signal Interconnect DAP Design [26710] [RESERVED] | 228 |
| Task 16.9.2 – Traffic Signal Interconnect PS&E Design [26720] [RESERVED] | 229 |
| Task 16.9.3 – Traffic Signal Interconnect Design Coordination [26770] [RESERVED] | 231 |
| Task 16.9.4 – Traffic Signal Interconnect Design Quality Review [26780] [RESERVED] | 231 |
| Task 16.10 – Sign Design [26790] [RESERVED] | 232 |
| Task 16.10.1 – Sign DAP Design [26800] [RESERVED] | 232 |
| Task 16.10.2 – Sign PS&E Design [26810] [RESERVED] | 233 |
| Task 16.10.3 – Sign Design Coordination [26860] [RESERVED] | 234 |
| Task 16.10.4 – Sign Design Quality Review [26870] [RESERVED] | 234 |
| Task 16.11 – Pavement Marking Design [26880] [RESERVED] | 235 |
| Task 16.11.1 – Pavement Marking DAP Design [26890] [RESERVED] | 235 |
| Task 16.11.2 – Pavement Marking PS&E Design [26900] [RESERVED] | 236 |
| Task 16.11.3 – Pavement Marking Design Coordination [26950] [RESERVED] | 237 |
| Task 16.11.4 – Pavement Marking Design Quality Review [26960] [RESERVED] | 238 |
| Task 16.12 – Illumination Design [26970] [RESERVED] | 238 |
| Task 16.12.1 – Illumination DAP Design [26980] [RESERVED] | 238 |
| Task 16.12.2 – Illumination PS&E Design [26990] [RESERVED] | 239 |
| Task 16.12.3 – Illumination Design Coordination [27040] [RESERVED] | 240 |
| Task 16.12.4 – Illumination Design Quality Review [27050] [RESERVED] | 241 |
| Task 16.13 – National Environmental Policy Act (“NEPA”) Traffic and Transportation Technical Memorandum or Report for EA or EIS Projects [27060] [RESERVED] | 242 |
| Task 16.13.1 – NEPA Traffic and Transportation Technical Memorandum or Report Coordination [27070] [RESERVED] | 243 |
| Task 16.13.2 – NEP Traffic and Transportation Technical Memorandum or Report for EA or EIS Projects Quality Reviews [27080] [RESERVED] | 243 |
| Task 17 – Erosion and Sediment Control [28010] [RESERVED] | 243 |
| Task 18 – Roadside Development [28510] [RESERVED] | 243 |
| Task 19 – Right of Way (“ROW”) | 243 |
| Task 19.1 – NEPA ROW Technical Memorandum or Report for EA and EIS Projects [29020] [RESERVED] | 244 |
| 19.2 – ROW Services Administration [29030] | 245 |
| Task 19.2.1 – ROW Existing Information [RESERVED] | 245 |
| Task 19.2.2 - ROW Process Coordination [29050] | 245 |
| Task 19.2.3 - ROW Information Tracking System (“RITS”) Management [29060] | 246 |
| Task 19.2.4 - ROW Schedule [29070] | 246 |
| Task 19.2.5 - ROW Meetings [29080] | 247 |
| Task 19.3 – ROW Cost Estimating, Programming Estimate, Access Management, Title Reports, and ROW Setting [29090] | 248 |
| Task 19.4 – Rights of Entry [29100] | 249 |
| Task 19.5 – ROW Authorization [RESERVED] | 249 |
| Task 19.6 – General Information Notice (“GIN”) [29120] | 249 |
| Task 19.7 – Real Estate Appraisals [29130] | 250 |
| Task 19.8 – Document Requests and Subject To Requests [29140] | 252 |
| Task 19.9 – Offer and Negotiation [29150] | 252 |
| Task 19.10 – Relocation [29160] [RESERVED] | 255 |
| Task 19.11 – ROW Condemnation Support [29170] | 256 |
| Task 19.12 – Closings [29180] | 256 |
| Task 19.13 – Certification [29190] | 257 |
| Task 19.14 – Project-Related Property Management [29200] [RESERVED] | 259 |
| Task 19.15 – ROW Coordination During Construction [29210] | 259 |
| Task 19.16 – ROW Design Coordination [29220] | 260 |
| Task 19.17 – ROW Design Quality Reviews [29230] | 260 |
| Task 20 – Design Acceptance Package (“DAP”) [30010] | 261 |
| Task 20.1 – Design Verification Package (“DVP”) [30020] | 261 |
| Task 20.2 – Draft DAP [30030] | 262 |
| Task 20.2.1 – DAP Narrative [30040] | 262 |
| Task 20.2.2 – Design Exception Requests [30070] | 262 |
| Task 20.3 – Final DAP [30080] | 263 |
| Task 20.4 – Certification of Design Acceptance with DAP checklist [RESERVED] | 264 |
| Task 20.5 – DAP Exception Letter [30100] [Contingency Task] | 264 |
| Task 20.6 – DAP Quality Reviews [30110] | 265 |
| Task 20.7 – Phase Gate Quality Assurance [RESERVED] | 265 |
| Task 21 – Plans, Specifications and Estimate (“PS&E”) [31010] | 265 |
| Task 21.1 – Preliminary Plans package [31020] | 267 |
| Task 21.2 – Advance Plans package [31030] | 267 |
| Task 21.2.1 – Letters of Public Interest Finding [31040] [Contingency Task] | 268 |
| Task 21.3 – Final Design package [31050] | 269 |
| Task 21.3.1 – Final PS&E Package Provided by ODOT [RESERVED] | 269 |
| Task 21.4 – Phase Gate Quality Assurance [RESERVED] | 269 |
| Task 21.5 – PS&E Submittal Package [31090] | 270 |
| Task 21.6 –eBIDS Handoff Package [31100] | 270 |
| Task 21.7 –Construction Survey handoff [31110] | 271 |
| Task 21.8 – PS&E Quality Reviews [31120] | 271 |
| Task 22 - Bid and Award assistance [32010] | 272 |
| Task 22.1 – Pre-bid Meeting [RESERVED] | 272 |
| Task 22.2 – Questions During Bidding [32030] | 272 |
| Schedule | 273 |
| Task 22.3 – Addenda to the Bid Documents [32050] [Contingency Task, see Section F] mark as [RESERVED] and delete the paragraph text if not needed | 273 |
| Task 22.4 – Bid and Award Assistance Quality Reviews [32060] | 274 |
Task 1 – Project Management [11010] [Project manager to determine what meetings are required, what additional or added coordination efforts are needed to fit the needs of the project.
Project Manager to determine schedule for all milestone deliverables and when associated deliverables are due through coordination with the regional tech center prior to negotiations] This task is to implement a project management strategy through meetings, schedules, coordination, and project management related deliverables to properly manage the project between Agency and Consultant.
Task 1.1 – Project Management and Coordination [11020] Consultant shall provide on-going coordination and communication as needed to appropriately manage the Services under this Contract.
Consultant shall guide and direct the Services and Consultant’s team in conformance with all applicable requirements of the Contract, Statement of Work (“SOW”) and the Project’s goals and objectives. Consultant’s Project Manager (“PM”) shall be Consultant’s primary point of contact and shall communicate with Agency regarding the status of Services being performed and to discuss issues or concerns that may impact the Project, to include weekly check-in phone calls between Agency Project Manager (“APM”) and the PM.
Consultant shall provide leadership, direction and control of these Services and maintain liaison, communication and coordination between Consultant’s staff, APM, and Agency staff to facilitate timely, efficient operations for all involved.
Consultant shall monitor progress of the Project and Services to include, but not limited to budget and expenditures.
Consultant shall maintain Project files including, but not limited to: engineering computations, assumptions, estimated quantities with unit costs, meeting agendas and minutes, business drawings, progress reports, correspondence and memoranda. Compiling the Project files must be an ongoing task, commencing upon receipt of the notice to proceed (“NTP”), and incorporating documents as they are generated throughout the Services for this Project. Unless otherwise indicated, Project files must be saved in an appropriate ODOT assigned ProjectWise folder. All documents must conform to standardized naming conventions from the ProjectWise Naming Tool or the ProjectWise Document Naming Tool Search document in the PW standards folder. Refer to the ODOT Partners PW External User Manual found within the ProjectWise document management system, and ODOT Partners PW Exhibit L for additional information.
Deliverables
11020.10 – Project files as requested by Agency Schedule
11020.10 – Due to APM within XX business days of request Task 1.2 – Progress Reports and Invoices [11030] [Invoice Preparation - may be listed as a task or deliverable (and may include costs in BOC) only if ODOT has on a file a signed Certification of Invoicing and ODC Billing Practices from Consultant that indicates invoice preparation is charged to each project and is not included in the Consultant’s overhead. Consultants approved for invoice prep charges are identified in the Billing Rate Share Drive maintained by OPO. The invoice limitation does not apply to project status reports, which are a required deliverable to be submitted with monthly invoices. Some regions may have required templates for invoicing or progress reports, use of these templates must be negotiated prior to execution of the contract. Format must be negotiated prior to execution of the contract.] Consultant shall prepare monthly progress reports and invoices in a format approved by Agency. Consultant’s progress report must summarize the activities completed and deliverables submitted by task for the reporting period and who the deliverables were provided to. Consultant’s progress report must identify schedule and budget issues, if there are pending issues that need resolution, and describe the planned activities for the next month. Progress report must also identify percentage completed of each task and associated deliverables. Consultant shall include its progress report with Consultant’s monthly invoice.
Consultant’s invoice must identify the reporting period and provide a breakdown of labor and expense costs incurred and must include copies (if required) of expense receipts. The invoice must be in a format acceptable to Agency.
Consultant shall prepare up to XX progress reports for the Services performed under this Contract.
Consultant shall submit monthly billing invoices (electronic copy) in accordance with Section H of the WOC / Exhibit B Compensation Part 1.
Deliverables
11030.10 – Electronic monthly progress reports and invoices Schedule
11030.10 – Due to APM once per month on [identify day – e.g., last business day] Task 1.3 – Project Schedule and Schedule Updates [11040] Consultant shall prepare a detailed work element schedule using MS Project for Consultant’s tasks. Consultant’s work element schedule must have, as a minimum, the following milestones with associated submittal dates:
· NTP
· Meetings (PS&E review, etc.)
· Workshops (Design Acceptance, Design Verification, etc.) Package review milestone completion dates (Preliminary, Advance, Final, PS&E, and Region PS&E)
· Right of Way (“ROW”) phase (if authorized) (i.e. begin prep for obligation, and conclusion of negotiations)
· Project Controls Office (“PCO”) PS&E delivery date
· PCO advertisement date
· PCO bid opening date Consultant shall submit the draft baseline MS Project schedule for Agency review and comment. Agency will consolidate all comments and submit to Consultant. Consultant shall address and incorporate Agency comments and suggested revisions, then deliver the final baseline MS Project schedule to Agency for approval. Consultant shall provide up to XX schedule updates throughout the Project as requested by Agency. If the Project schedule would change any of the due dates or timeframes required for Services or deliverables, an amendment to this contract will be required to make those changes.
Deliverables
11040.10 – Draft baseline MS Project schedule
11040.20 – Final baseline MS Project schedule
11040.30 – Project schedule updates submitted as requested Schedule
11040.10 – Due to APM within 10 business days after NTP
11040.20 – Due to APM 5 business days from receipt of Agency comments
11040.30 – Due to APM within XX business days of Agency request Task 1.4 – Meetings [11050] Consultant shall prepare for, lead, and facilitate meetings as identified in the subtasks below. Meeting locations will be collaboratively scheduled between Consultant and APM. Unless specifically stated otherwise, Consultant shall host meetings with screen and voice sharing software capable of running concurrently for use by Agency, Consultant staff, and sub-Consultant staff, at the discretion of the APM.
For each meeting, Consultant shall prepare a meeting agenda and provide draft meeting summary notes, which must include draft action items and record of any decisions from the meetings. Unless otherwise stated, Consultant shall submit the draft meeting summary for Agency review and comment. Agency will consolidate all comments and submit to Consultant. Consultant shall address and incorporate Agency comments and suggested revisions, then deliver the final meeting summary notes to Agency for approval.
Consultant shall prepare and maintain a Project action item and decision log (as part of meeting summary notes) to track action items and decisions discussed at Project meetings. The action item and decision log must include a description of the item or decision and who is assigned the action. Consultant shall provide the draft meeting summary notes to Agency for review and distribution.
Task 1.4.1 – Kick-off Meeting [11060] Consultant shall facilitate 1 Project kick-off meeting within X business days of contract NTP. Up to XX Consultant staff shall attend the meeting, which is estimated to be 2 hours in length. Consultant shall prepare meeting agenda and draft and final meeting summary notes for the meeting.
Deliverables
11060.10 – Meeting agenda
11060.20 – Draft meeting summary notes (including action item and decision log)
11060.30 – Final meeting summary notes
11060.40 – Meeting attendance - Consultant to verify attendance with Agency. No tangible deliverable may be required for this deliverable.
Schedule
11060.10 – Due to APM at least 5 business days prior to the meeting
11060.20 – Due to APM within 5 business days after the meeting
11060.30 – Due to APM within 5 business days after receipt of Agency comments
11060.40 – Within X business days from Agency issuance of contract NTP Task 1.4.2 – Project Development Team (“PDT”) Meetings [11070] PDT meetings are meant to address issues, design alternatives, technical discussions between Agency and Consultant, and provide an opportunity for the consultant to engage with their peers within the Agency. For ADA Curb Ramp or smaller scaled Projects, other meeting or workshops may be consolidated and addressed during this meeting. Examples: Design Exception and Crossing Closure Workshop, Monitoring and Controlling Project Risks, Construction Risk Management Transition Pre-PS&E Package Submittal Meeting, PS&E Review Meeting.] Consultant shall facilitate XX Agency PDT meetings during performance of the work. Agency PDT meetings will be scheduled at the APM discretion.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .